Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Words on different pages
  1. Page 21 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 21 of 2201 EVERSOURCE ENERGY • • • • • • • • • • • Berlin Settling Basin Remedial Action Report verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work, identified as C2A and C2B. For C2, C2A, and C2B, 24 of 30 verification sample results were non-detect for PCBs, with the remainder detected <1 mg/kg. C3 – This cell was added as part of remedial construction activities and was excavated to the planned final depth of 14 ft bg. All verification sample results were non-detect for PCBs. C4 – This cell was added as part of remedial construction activities with a planned excavated depth of 14 . The final excavation depth was between 14 and 15 ft bg. Two of 24 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work, identified as C4A and C4B. For C4, C4A, and C4B, 32 of 39 verification sample results were non-detect for PCBs with the remainder detected <1 mg/kg. C5 – This cell was added as part of remedial construction activities and was excavated to the planned final depth of 14 ft bg. All verification sample results were non-detect for PCBs. C6 – This cell was added as part of remedial construction activities with a planned excavated depth of 10 ft bg. The final excavation depth was between 10 and 11 ft bg. Seven of 28 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work identified as C6B through C6K. For C6 and C6B through C6K, 61 of 89 verification sample results were non-detect for PCBs, with the remainder detected <1 mg/kg. C7 – This cell was added as part of remedial construction activities and was excavated to the as-planned final depth of 5 to of 15 ft bg. Three of 24 initial verification sample results were >1 mg/kg. These areas were removed during subsequent excavation work identified as C7A through C7D. For C7 and C7A through C7D, 34 of 49 verification sample results were non-detect for PCBs, with the remainder detected <1 mg/kg. E5 – This cell was excavated to the as-planned final depth of 2 ft bg. Three of 26 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤10 mg/kg. Soils with PCB-sample results ≤10 mg/kg were consolidated and capped on-Site. E7 – This cell was excavated to the as-planned final depth of 2 ft bg. One of 21 initial verification sample results was >10 mg/kg. This area was removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with PCB-sample results ≤10 mg/kg were consolidated and capped on-Site. E8 – This cell was excavated to the as-planned final depth of 2 ft bg. Five of 30 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with PCB-sample results ≤10 mg/kg were consolidated and capped on-Site. E10 – Originally planned to be performed to a total depth of 2 ft bg, the final excavation depth of this cell was 2 to 4 ft bg. Five of 98 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with PCB-sample results ≤10 mg/kg were consolidated and capped on-Site. E13 – This cell was excavated to the as-planned final depth of 2 ft bg. One of 61 initial verification sample results were >10 mg/kg. This area was removed during subsequent excavation work. Final verification soil sample results were not detected or reported ≤ 10 mg/kg. Soils with PCB-sample results ≤10 mg/kg were consolidated and capped on-Site. E16 – Originally planned to be performed to a total depth of 2 ft bg, the final excavation depth for this cell was from 2 to 4 ft bg. All verification sample results were <10 mg/kg and these soils were consolidated and capped on-Site. westonandsampson.com 2-5
  2. Page 22 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 22 of 2201 EVERSOURCE ENERGY • • • • • • • • • • • Berlin Settling Basin Remedial Action Report E17 – This cell was excavated to a final depth of 4 to 6 fbg. Deeper excavations at portions of E17, including the proposed 9-foot excavation depth located adjacent to the concrete box culvert and stream (shown in Figure 3) was originally planned under the RAP. Portions of E17 were initially outside of the proposed EUR boundary, where soil was required to be cleanup up to ≤1 mg/kg. The EUR boundary was later modified to encompass E17 which changed the cleanup goal to ≤10 mg/kg beneath a 4-foot thick, clean cap. This resulted in a shallower excavation to meet the higher cleanup standard. Four of 132 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤10 mg/kg, except for eastern sidewall samples (those samples contained PCBs <1 mg/kg). Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E18 – This cell was excavated to the as-planned final depth of 2 ft bg. All verification sample results were <10 mg/kg except for the eastern sidewall samples (those samples contained PCBs <1 mg/kg). These soils were consolidated and capped on-Site. E19 – This cell was excavated to the as-planned final depth of 2 ft bg. All verification sample results were <10 mg/kg except for the eastern and southern sidewalls (those samples contained PCBs <1 mg/kg). These soils were consolidated and capped on-Site. E21 – Originally planned to be excavated to a total depth of 6 ft bg, the final excavation depth of this cell was 6 to 7 ft bg. Six of 45 initial verification sample results were >10 mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤10 mg/kg, except for the northern and eastern sidewalls. Samples collected from the northern and eastern sidewalls contained PCBs <1 mg/kg. E22 – Originally planned to be excavated to a total depth of 2 ft bg, the final excavation depth of this cell was 5 ft bg. All verification sample results were <10 mg/kg and limited removal actions were completed during subsequent excavation work to allow for the establishment of a 4-foot thick, clean cap. E23 – This cell was excavated to the as-planned final depth of 4 ft bg. All verification sample results were <10 mg/kg and limited removal actions were completed during subsequent excavation work to allow for the establishment of a 4-foot thick, clean cap. E24 – Originally planned to be excavated to a total depth of 2 ft bg, the final excavation depth of this cell was 4 ft bg. Seventeen of 79 initial verification sample results were 10 >mg/kg. These areas were removed during subsequent excavation work. Final verification sample results were not detected or reported ≤ 10 mg/kg. Soils with sample results ≤10 mg/kg were consolidated and capped on-Site. E25 – Originally planned to be excavated to a total depth of 2 ft bg, the final excavation depth of this cell was 4 to 5 ft bg. All verification sample results except for the northern sidewall were <10 mg/kg. All results for samples collected from the northern sidewall of the excavation were reported at concentrations <1 mg/kg. E26 – Originally planned to be excavated to a total depth of 2 ft bg, the final excavation depth of this cell was from 2 to 2.5 ft bg. All verification sample results were <1 mg/kg. E27 – This cell was excavated to the as-planned final depth of 5 ft bg. All verification sample results except for the northern sidewall were <10 mg/kg. All results for samples collected from the northern sidewall of the excavation were reported at concentrations <1 mg/kg. SPLP PCB Analysis – To screen soil quality to the CT DEEP default total PCB Pollutant Mobility Criteria (0.5 micrograms per liter (ug/L)) for a GA Groundwater Classified Area (GA PMC), 67 soil samples were collected from soil remaining in place containing PCBs <10 westonandsampson.com 2-6
  3. Page 23 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 23 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report mg/kg. These samples were analyzed for leachable PCBs using SPLP testing. SPLP PCBs were detected slightly above the 0.5 ug/L criterion in 17 of the 67 soil samples. The remaining SPLP PCB results were non-detect (<0.5 ug/L). Compliance with the GA PMC will be demonstrated through groundwater monitoring in accordance with the RSRs (Section 22a133k-2(c)(5)(C)) as follows: o Soil polluted with PCBs within the remediation area is not required to be remediated to the applicable PMC, provided that at such release area: ▪ (i) Eighty (80) percent or more of the mass of the substances remaining at the release area has been subject to infiltration; ▪ (ii) Infiltration was not obstructed by anthropogenic features, for at least five (5) years; ▪ (iii) Groundwater monitoring complies with the requirements of section 22a133k-3(h)(1) of the RSRs; and ▪ (iv) The laboratory analytical results for all groundwater sample events collected as specified in section 22a-133k-3(h)(3) of the RSRs for a GA groundwater classified area are equal to or less than the groundwater protection criteria (GWPC) and the surface water protection criteria (SWPC). The site meets requirements (i) and (ii) above. In August 2021, seven groundwater-monitoring wells identified as MW-1S, MW-2S, MW-3S, MW-4S, MW-5S, MW-D and MW-BR (a bedrock well) were installed within the PCB-remediation area. On August 25 and 26, 2021, and November 16, 2021, the first and second quarters of compliance groundwater monitoring was completed in accordance with the CT DEEP approved (approved on July 27, 2021) Post Remediation Groundwater Plan, dated July 9, 2021, prepared by Weston & Sampson. The groundwater-analytical results for both sampling events indicated that PCBs were not detected in groundwater at concentrations above the reporting limit, ranging from 0.27 to 0.5 ug/L or the GWPC and SWPC of 0.5 ug/L. Two additional quarterly-monitoring events will be conducted in February 2022 and May 2022 to meet requirement (iii) above. It is anticipated that the groundwater results from the two remaining quarterly events will be consistent with the August and November 2021 evens, confirming that PCBs are not present in groundwater within the remediation area and therefore requirement (iv) above would be met. This would result in compliance with the GA PMC, such that further remediation of SPLP PCBs above 0.5 ug/L would not be required. Following completion of compliance-groundwater monitoring a report will be prepared and submitted to the CT DEEP under separate cover. Verification samples for the C-cells were collected until all total PCB results were ≤1 mg/kg. For the E-cell excavations, additional excavation was performed until the PCB remedial goal was achieved. Verification sample locations are shown in Figure 4 and final verification sample results are presented in Table 1. Laboratory analytical data reports are attached in Appendix C. No material was stockpiled on-Site during excavation activities. Soil was managed within the excavation and graded to allow placement of a 4-foot thick, clean soil cap above remaining materials containing PCBs ≤10 mg/kg. 2.2.4 PCB-Containing Concrete Wastes Two concrete stormwater drainage pipes and structures (one at the southwestern portion of the basin and one at the northwestern portion of the basin) were addressed during remediation activities. westonandsampson.com 2-7
  4. Page 24 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 24 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report The southwestern concrete drainage pipes and associated structures (i.e., catch basins) that formerly discharged into the basin were encountered within the E-cell PCB-excavation areas and were removed (see Figure 4). This concrete was segregated from PCB-impacted soils and was sized (broken into smaller pieces) as needed prior to removal and transportation to the waste receiving facility. The concrete was disposed at the facility with its corresponding excavated soils. A total of 108.7 tons of waste concrete was disposed in this manner. The northwestern concrete drainage piping that formerly discharged into the basin from the parking lot, west of the basin was filled with flowable fill and abandoned in place. (see Figure 4). Prior to remediation, sampling of the catch basins connected to the drainage pipes and the concrete piping that was proposed to be abandoned in place during remediation was conducted as described in the April 30, 2019, email “Response to EPA verbal comments of April 18, 2019” in January 2020. PCBs were not detected in these concrete samples. Further details of the concrete sampling are presented in Appendix A (February 12, 2020, submittal to EPA – Required Submittal under PCB Cleanup and Risk-Based Disposal Approval under 40 CFR 761.61(a) and (c)). The concrete box culvert that runs under the access road depicted on Figure 4 was not encountered during excavation activities. The PCB-verification sidewall-soil sample results from the eastern-most extent of excavations E17, E28 and E21, located closest to the box culvert were either not detected or reported at concentrations <1 mg/kg. 2.2.5 Other Contaminants of Concern Excavation of soils containing other COC (i.e., ETPH, PAHs, and metals) greater than CT DEEP RSR Industrial/Commercial Direct Exposure Criteria (I/C DEC) and GA PMC were planned in the RAP. The final surveyed extent of these excavations is shown in Figure 4 and described below: • • • • • • • D1 – This cell was added as part of remedial construction activities for PAHs and was excavated to the as-planned final depth of 4 ft bg. All verification sample results were nondetect for PAHs. E8 – This cell was excavated to the as-planned final depth of 2 ft bg, for remediation of selected metals. All verification samples contained barium and cadmium at concentrations below the CT DEEP RSR criteria. The remaining metals results were non-detect. E11 – Originally planned to be excavated to a total depth of 5 ft bg for remediation of arsenic, the final excavation depth of this cell was 6 ft bg. All verification samples contained arsenic at concentrations below the CT DEEP RSR criteria. E13 – This cell was excavated to the as-planned final depth pf 2 ft bg for remediation of silver. Two of 6 verification samples contained silver at concentrations below the CT DEEP RSR criteria. The remaining silver results were non-detect. E14 – Originally planned to be excavated to a total depth of 2 ft bg for remediation of silver and PAHs, the final excavation depth of this cell was from 2 to 3.5 ft bg. Final verification samples contained PAHs at concentrations below the RSR I/C DEC and GB PMC. One of four of the final verification samples analyzed for silver, contained silver at a concentration below the CT DEEP RSR criteria. The remaining silver results were non-detect. E17 – This cell was excavated to a final depth of 4-6 ft bg for remediation of PAHs. Four of 7 verification samples contained PAHs at concentrations below the CT DEEP RSR criteria. The remaining PAH results were non-detect. E23 – This cell was excavated to the as-planned final depth of 4 ft bg for remediation of PAHs. Four of 5 verification samples contained PAHs at concentrations below the CT DEEP RSR criteria. The remaining PAH results were non-detect. westonandsampson.com 2-8
  5. Page 25 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 25 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report Excavations were conducted until all verification sample results were below the I/C DEC and GA PMC. Verification sample locations are shown in Figure 4 and final verification sample results are presented in Table 2. Laboratory analytical data reports are provided in Appendix C. Soils excavated for remediation of other COC were removed and disposed offsite with the PCB-impacted soil. The volume of COC-impacted soils removed was not accounted for separately from the PCB-impact soil. 2.3 Verification Sample Analysis As described in the Approved RAP, Verification samples were collected in accordance with 40 CFR Part 761Subpart O and analyzed for PCBs as Aroclors with Soxhlet extraction by EPA Methods 8082 and 3540 at Phoenix Environmental Laboratories in Manchester, Connecticut (a Connecticut Department of Public Health certified laboratory). Samples were collected at discrete sample locations from the upper three inches of soil when possible. However, for deeper excavations below the groundwater table, samples were collected using an excavator bucket as these excavations could not be entered safely. Quality Control and Quality Assurance (QA/QC) samples were analyzed by the laboratory and assessed for compliance by Weston & Sampson. Analytical data was generated following CT DEEP Reasonable Confidence Protocols (RCPs). All samples were submitted to the laboratory using standard chain of custody procedures. The laboratory case narratives and RCP check lists for each analytical report package were reviewed and no issues were found that would be expected to invalidate any of the confirmation data. 2.4 Grading of Remaining Impacted Soils and Backfilling Soils impacted with non-PCB compounds in excess of applicable RSR criteria were delineated during the Site investigation and removed during remediation. Soils impacted with PCB compounds >1 mg/kg and ≤10 mg/kg were graded and covered with clean fill to render them “inaccessible” (i.e., buried 4 ft bg), as stipulated in the RSRs. Clean backfill materials were used to establish final post-remediation grades. Backfill materials were determined to be “clean fill” (i.e., free of impacts) based upon review of analytical data for samples obtained from the backfill material (see Appendix G). Crushed stone was also used to backfill excavations and a letter from the suppling rock quarry indicates that the stone was generated by quarrying virgin rock and then sizing it according to the design specification (see Appendix G). Clean backfill materials were placed then compacted in place. Compaction testing data is attached in Appendix G. 2.5 Significant Environmental Hazard Abatement The original Significant Environmental Hazard (SEH) filing (September 2012) and CT DEEP acknowledgment are attached in Appendix H. In 2012, a chain-link fence was erected along the top of the bank around the entire settling basin and warning signage was posted in prominent locations along the fencing that identified the SEH Condition. In July 2014, when additional Site investigations changed the extent of the identified SEH Condition, the extent of the fencing was temporarily adjusted to enclose this area using snow fencing with warning signs. In September 2014 the temporary snow fencing was replaced with permanent chain link fence. In May 2015, additional sampling identified another SEH Condition in a densely wooded/vegetated area outside of the permanently fenced area. Eversource erected steel stake snow fencing with warning signs to prevent unauthorized access to this area. In November 2019, a temporary perimeter fence was installed during mobilization by the remedial contractor to maintain SEH mitigation measures during remediation. westonandsampson.com 2-9
  6. Page 26 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 26 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report The SEH Condition was remediated by the excavation and disposal of soils containing PCBs>10 mg/kg within the top 4 feet of final grade, as shown in Figures 4 and 5. Accordingly, the SEH Condition was fully mitigated by the PCB removal activities during remediation. 2.6 Replacement Drainage System The settling basin was abandoned in May 2020 following construction of the new drainage system. Between February and May 2020, the replacement drainage system was constructed outside of the remediation area except for the remedial excavations completed at the southeastern extent, located within and immediately adjacent to the bituminous parking lot. Soil containing PCBs at these locations, depicted on Figures 3 and Figure 4 (Inset A and B) were remediated to <1 ppm total PCBs prior to installation of the replacement drainage system. The system includes a hydrodynamic separator for sediment removal and appropriate piping and underground detention chambers to meter peak discharge and equalize flow during rain events. The location of the new drainage system is shown on the as-built drawing provided in Appendix I. 2.7 Dust Control Activities Dust monitoring for total particulate emissions and fugitive dust within work areas and at the Site perimeter was implemented during soil excavation and handling activities to monitor potential exposures to on- and off-site receptors during remediation. Monitoring was conducted continuously using real-time measurement equipment, and the results were reviewed by Weston & Sampson and SES to evaluate dust control measures. Dust controls included wet spraying during dry or windy conditions. Wet spraying was deployed to reduce fugitive dust emissions and meet applicable National Ambient Air Quality Standards (NAAQS) for particulate matter with an aerodynamic diameter less than or equal to 10 microns (PM10). A Dust Action Level of 150 micrograms per cubic meter (μg/m3) was established for the project to maintain 24-hour averaged PM10 concentrations below 150 μg/m3in accordance with the National (40 CFR 50.6) and Connecticut Ambient Air Quality Standard (RCSA Section 22a-174-24(e)). Dust monitoring occurred on all non-rainy active workdays. The dust monitoring station was placed generally downwind of Site activities near the Site perimeter. The dust monitoring continuously logged instantaneous concentrations, 15-minute time-weighted averages (TWAs), and a TWA for the entire workday. No exceedances of the 15-minute TWA and TWA for the entire workday were recorded. Dust monitoring data can be found in Appendix E. 2.8 Construction Dewatering Construction dewatering was required due to rain events and because some deep soil removal activities were performed below the water table. SES prepared dewatering plans prior to mobilization, and the dewatering system was operational by January 2021. The dewatering system consisted of a 21,000-gallon frac tank, a bag filtration system consisting of two bag filters in parallel, two liquid-phase activated carbon vessels in series, and a 21,000-gallon weir frac tank. Treated water from the weir frac tank was discharged into a sanitary sewer at rates permitted by the Mattabassett District Water Pollution Control Facility (MDWPCF). A total of 140,000 gallons of treated water were discharged over the course of the project. Re-useable dewatering system equipment was emptied of sediments (first tank prior to filter system only) and the sediments were disposed as ≥50 mg/kg PCB-remediation waste. All equipment was then double wash/rinsed according to the procedures specified in 40 CFR Part 761 Subpart S. Following decontamination, wipe samples were collected from within the dewatering system for laboratory analysis. The analytical data are provided in Appendix F. westonandsampson.com 2-10
  7. Page 27 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 27 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report 2.9 Site Restoration The site was restored as required by the permits obtained from the Town of Berlin and as described in the RAP and EPA Approval. In areas where soils containing PCBs >1 mg/kg remained in the subsurface, a geotextile marker layer was installed over the impacted soil and backfilled to render the soils inaccessible. In areas restored with grass surface cover, the minimum thickness of clean backfill materials was four feet. In areas restored with a pavement surface, the minimum thickness of clean backfill material was four feet. 2.10 Use Restriction Filing Attached in Appendix I are: • • A copy of a map, filed in accordance with State law, showing the notation on the deed to the property that will in perpetuity notify any potential purchaser of the property: o That the land has been used for PCB remediation waste disposal and is restricted in use. o Of the existence of the fence and cap and the requirement to maintain the fence and cap. o The applicable cleanup levels left at the site (i.e., ≤10 mg/kg), inside the fence constructed around the perimeter and under the cap. A certification with the wording as defined in §761.3, signed by the owner, that they have recorded the notation. westonandsampson.com 2-11
  8. Page 28 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 28 of 2201 Berlin Settling Basin Remedial Action Report EVERSOURCE ENERGY 3.0 SUMMARY AND CONCLUSIONS The information, findings and conclusions presented by Weston & Sampson in this RAR are summarized below: • • • • • The majority of remediation activities to address PCBs and other COC were conducted at the Site between May 2020 and May 2021. The remediation was completed on September 7, 2021, when fencing was installed to delineate the area where PCBs ≤10 mg/kg but >1 mg/kg in soil were consolidated beneath a cap. Sediment and erosion controls were installed, inspected, and maintained throughout the remediation activities, as required in the IWWA permit obtained from the Town of Berlin. Excavation areas were surveyed and marked in the field as indicated on the RAP drawings. Excavation limits were extended if verification sample results indicated further excavation was warranted. Excavation was terminated following the receipt of verification sample results indicating that remedial goals had been achieved. The settling basin was abandoned in May 2020 following construction of the new drainage system. Between February and May 2020, the replacement drainage system was constructed outside of the remedial excavation areas. The system includes a hydrodynamic separator for sediment removal and appropriate piping and underground detention chambers to meter peak discharge and equalize flow during rain events. Replacement wetlands were constructed, as required under the IWWA permit obtained from the Town of Berlin. All soils containing total PCBs >10 mg/kg were removed from the Site and disposed at a permitted off-Site facility. Debris consisting of brick, black viscous (non-flowing) tar material, gray ash, metal, concrete masonry units, fragments of timber and plywood, ceramic tile, felt material and charred materials that was encountered in the excavations completed beneath the access road were also removed and disposed. A summary of offsite soil disposal is provided below: Material Total Tonnage Receiving Facility PCB remediation waste ≥50 mg/kg 3,578.07 Chemical Waste Management Landfill, Emelle, AL PCB remediation waste >10 mg/kg but <50 mg/kg 7,050.74 Sunny Farms Landfill, Fostoria, OH • • • The removal of PCB-impacted soil also included the excavation and offsite disposal of Site soils impacted with non-PCB COC including ETPH, PAHs and select metals at concentrations above applicable CT DEEP RSR criteria. Remaining Site soils impacted with PCBs at concentrations ≤10 mg/kg were consolidated within excavations and capped on-Site. Concrete in contact with soils that were excavated for disposal were disposed with that soil, including the headwall, catch basins and drainage pipe that conveyed stormwater from the former settling basin to the unnamed stream. Remaining concrete piping left in place were tested (as described in Weston & Sampson EPA submittal, dated February 12, 2020, presented in Appendix A), determined not to be PCB remediation waste, and abandoned in place. westonandsampson.com 3-1
  9. Page 29 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 29 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report • After PCB-impacted soils were consolidated onsite, remaining excavation areas were backfilled with clean material and compacted. For areas restored with turf, the minimum thickness of clean backfill was 4 feet and included 6-inches of clean topsoil to support the establishment of grass. For areas restored with pavement, the minimum thickness of clean backfill materials placed beneath a minimum of 3 inches of pavement was 4 feet. • Dust control measures were employed at the Site. Continuous dust monitoring indicated that respirable dust concentrations were maintained at concentrations below 150 μg/m3, except on six occasions when instantaneous but not sustained readings exceeded 150 ug/m3, as described in the RAP and required by the EPA Approval. • Site dewatering was performed with approximately 140,000 gallons of dewatering effluent being treated and discharged to the MDWPCF sanitary sewer under a CT DEEP General Permit. No violations were identified during sampling. • The areas where PCB concentrations in surficial soil (0 to 2 ft bg) triggered a reportable SEH Condition were fully remediated. Accordingly, no SEH conditions remain at the Site. Eversource will submit this RAR to the CT DEEP with a request to revise the state SEH database to indicate that the Condition has been permanently addressed. • The cost for performing the remediation as described in the RAP, EPA Approval, and approved modifications was approximately $4.3 million. These costs include invoiced amounts from 1) the remedial contractor who performed the work, 2) Weston & Sampson for observation of remedial actions and for preparation of modification requests and other submittals during remediation, and 3) the analytical laboratory for analysis of verification samples. Costs are not included for investigation activities performed prior to the remediation or for post-remediation tasks (e.g., groundwater monitoring). In conclusion, the Site remediation was performed in conformance with the RAP, the EPA Approval, modification requests that were submitted to EPA and CT DEEP, and the Consent Order issued by CT DEEP. Remedial goals for PCBs and COC in Site soil were achieved. Post-remediation groundwater monitoring, as required by the Consent Order and the RSRs, is ongoing. A post-remediation groundwater-monitoring plan was submitted to the CT DEEP on July 9, 2021 and approved by the CTDEEP on July 27, 2021. Monitoring wells have been installed, developed, and the first quarter of groundwater sampling was completed in August 2021. A postremediation groundwater-monitoring report will be submitted to the CT DEEP after completion of four quarters of groundwater monitoring. In 2015, a SLERA was performed for sediments and surface water in the unnamed stream and no excess risk was identified. The CT DEEP agreed with this conclusion and indicated that no further action was required. However, discharge of stormwater from the settling basin to the unnamed stream could not be terminated in 2015 without the installation of a replacement drainage system. Therefore, releases to the stream may have occurred after the SLERA was completed. The field sampling plan for the 2015 SLERA will be updated, and the sampling repeated so that current risk may be assessed. The results from that sampling and an evaluation of potential ecological risk will then be submitted to the CT DEEP. westonandsampson.com 3-2
  10. Page 30 of 2,201

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 98 Page 30 of 2201 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Report 4.0 LIMITATIONS This Remedial Action Report was prepared for the exclusive use of Eversource for submittal to the EPA and the CT DEEP. The findings provided by Weston & Sampson in this report are based solely on the information reported in this document. Future investigations, and/or information that was not available to Weston & Sampson at the time of the remediation, may result in a modification of the findings stated in this report. Should additional information become available concerning this Site or neighboring properties that could directly impact the Site in the future, that information should be made available to Weston & Sampson for review so that, if necessary, conclusions presented in this report may be modified. The conclusions of this report are based on Site conditions observed by Weston & Sampson personnel at the time of the investigation and remediation, information provided by Eversource, information provided by the remedial contractor, and samples collected and analyzed on the date shown or stated in this report. This report has been prepared in accordance with generally accepted engineering and geological practices. No other warranty, express or implied, is made. westonandsampson.com 4-1

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)