Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Words on different pages
  1. Page 66 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 3566 of 4786 BERLIN SETTLING BASIN PHASE III INVESTIGATION EVERSOURCE ENERGY Table 1 (continued) Soil Sampling Summary Table Settling Basin 107 Selden Street, Berlin, Connecticut Boring ID Total Depth (ft) VOCs ETPH SVOCs PCBs PAHS RSR-15 Metals B-223 5 0 1 1 2 0 0 B-224 10 0 0 0 3 0 0 B-225 10 0 1 0 3 0 1 2 0 1 1 B-226 5 0 0 0 B-227 5 0 0 0 2 0 B-228 10 0 0 0 2 0 0 B-229 10 0 0 0 3 0 0 3 0 0 0 B-230 5 0 0 0 B-231 0.5 0 0 0 1 0 B-232 5 0 0 0 3 0 0 Totals - 15 34 34 111 1 49 3.2 Groundwater Investigation Five of the six existing groundwater monitoring wells on the property were sampled for PCBs and other analytical parameters that were not tested for during previous investigations. One monitoring well (MW2) could not be located during the sampling event. Weston & Sampson conducted one groundwater sampling event at the Site on February 1, 2018. Prior to groundwater sampling, all wells were gauged for depth-to-groundwater. Groundwater samples were collected using low-flow sampling techniques in accordance with EPA’s Region I “Low Stress (low flow) Purging and Sampling Procedure for the Collection of Ground Water Samples from Monitoring Wells”, EPASOP-GW 001 (Revision 3, January 19, 2010). Groundwater sampling forms are provided in Appendix B. The groundwater samples were collected after low-flow parameters stabilized using peristaltic pumps and new tubing dedicated to each well. Samples were collected and analyzed for the following parameters: Total PCBs by EPA Method 8082; Volatile Organic Chemicals by EPA Method 8260; Extractable Total Petroleum Hydrocarbons (ETPH) by the CT DEEP method; Semivolatile Organic Chemicals (SVOCs) by EPA Method 8270; and Metals by EPA Methods 6010 and 7471. 3-3 westonandsampson.com
  2. Page 67 of 500

    EVERSOURCE ENERGY The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 3567 of 4786 BERLIN SETTLING BASIN PHASE III INVESTIGATION Analyte lists were those listed in the EPA methods except for metals. For metals, the analyte list was the RSR-fifteen metals. The samples were placed directly into new laboratory-prepared sample containers and stored on ice and shipped under proper chain-of custody protocols to Con-Test, a CT DPH certified laboratory, in East Longmeadow, Massachusetts for chemical analysis. Laboratory analysis was performed and reported in accordance with the CT DEEP RCP. QA/QC samples were collected and analyzed for each of the chemical analyses and included blind field duplicates, equipment blanks, and trip blanks for VOC analyses. 3-4 westonandsampson.com
  3. Page 68 of 500

    EVERSOURCE ENERGY The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 3568 of 4786 BERLIN SETTLING BASIN PHASE III INVESTIGATION REGULATORY FRAMEWORK The following describes the remedial standards and criteria that were used to evaluate the analytical data. 4.1 Remediation Standard Regulations Connecticut's RSRs, Sections 22a-133k-1 through 3, inclusive, of the RCSA provide detailed guidance and remedial criteria that may be used at any site to evaluate whether remediation is necessary to protect human health and the environment. The RSRs contain numeric and narrative standards for the investigation and/or remediation of soil and groundwater. Factors that may affect the degree of investigation and/or remediation at an impacted site include groundwater quality classification of the site, land use of the property, and proximity to sensitive receptors. The RSRs contain numeric cleanup standards and, when a substance is not listed in the RSRs, a process exists for using Additional Polluting Substance (APS) criteria. APS criteria must be requested and approved by the Commissioner to complete cleanup at any site under the RSRs. 4.1.1 Soil Criteria The RSRs define two criteria that apply to soil, the Direct Exposure Criteria (DEC) and the Pollutant Mobility Criteria (PMC). The DEC defines the level of regulated compounds allowed in soil to a depth of 15 ft. bgs without posing a threat due to direct human exposure. The CT DEEP has established two sets of DEC using exposure assumptions appropriate for residential land use (RES DEC) and for industrial or commercial land use (I/C DEC). The CT DEEP and the RSRs define “residential activity” to include any activity related to a residence or dwelling, or to a school, hospital, day care center, playground, or outdoor recreation area. The I/C DEC, which are generally less stringent than the RES DEC because of the exposure assumptions used in their development, may only be applied if an Environmental Land Use Restriction (ELUR) prohibiting residential activity is recorded for the property. The I/C DEC are used to compare to soil data in the data tables because it is assumed that an industrial/commercial ELUR will be placed on the site following remediation. The PMC were established by CT DEEP to prevent groundwater impacts resulting from migration of chemicals in soil to groundwater. The CT DEEP has established PMC for sites with a GA groundwater classification (GA PMC) and for sites with a GB groundwater classification (GB PMC). The Site is located in a GA classification area and the GA PMC has been used to evaluate soil data. 4.1.2 Groundwater Criteria The RSRs define three criteria that may apply to groundwater, the Groundwater Protection Criteria (GWPC), Surface Water Protection Criteria (SWPC), and Volatilization Criteria (VC). Each are discussed below. The GWPC defines the levels of regulated compounds allowed in groundwater for protection of the groundwater as a potable water source. The GWPC applies to sites located in a GA groundwater quality area. These criteria are applicable to this site since it is located in a GA groundwater quality area and the criteria are used to evaluate groundwater data. 4-1 westonandsampson.com
  4. Page 69 of 500

    EVERSOURCE ENERGY The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 3569 of 4786 BERLIN SETTLING BASIN PHASE III INVESTIGATION The SWPC applies to groundwater that is discharging to a surface water body and one standard has been established for all surface water bodies regardless of the quality classification of the receiving water body. The SWPC specifies the levels of compounds allowable in groundwater just prior to discharging into surface water. These criteria are applicated to this site because groundwater discharges to the unnamed stream located to the west of the Site. The VC establishes the allowable levels of VOCs in groundwater that are within 15 feet of the ground surface or a building. The VC is designed to protect humans from exposure to VOCs present in shallow groundwater. Residential and industrial/commercial VC (RES VC and I/C VC, respectively) have been established, with the RES VC being more stringent. The I/C VC only apply when an ELUR has been recorded for the property and this standard is used for comparison to groundwater data because it is assumed that an ELUR will be placed on the Site following remediation. 4.2 Federal PCB Regulations The federal PCB regulations are found in the Code of Federal Regulations, Chapter 40, Part 761 (40 CFR Part 761) and area also referred to as the Toxic Substance Control Act (TSCA) regulations. Remedial standards are established in §761.61(a)(4) for high-occupancy and low-occupancy site uses. Soil data developed as part of the investigation of this Site are compared to the high-occupancy standards. For an area that is not capped in a high-occupancy area, the standard for total PCBs is 1 mg/kg. For areas capped in accordance with the requirements of §761.61(a)(7) or an alternative approved by the Environmental Protection Agency (EPA) regional PCB coordinator, the standard is 10 mg/kg as long as a site restriction is placed on the area in accordance with §761.61(a)(8). 4-2 westonandsampson.com
  5. Page 70 of 500

    EVERSOURCE ENERGY The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 3570 of 4786 BERLIN SETTLING BASIN PHASE III INVESTIGATION INVESTIGATION RESULTS The following describes the results of the soil and groundwater sampling performed as part of the most recent Site investigation. 5.1 Soil Results The following sections describe the laboratory results for soil from this additional investigation. Soil analytical results are presented in Table 2. The soil results for PCBs from this investigation and previous investigation activities are presented in Figure 3. Analytical data for other COCs during the most recent Site investigation are presented in Figure 4. Complete laboratory packages are provided in Appendix C. Soil borings were advanced around the perimeter of areas previously investigated and sampled for both PCBs and other COCs to delineate the extent impacts to the Site. Additional soil borings were performed within areas previously investigated and analyzed for COCs other than PCBs to characterize the fill materials placed in the area. The following summarizes the findings of the Site investigation PCBs: Soil was collected from all soil borings at multiple depths to characterize and to delineate PCB impacts. PCBs were found to exceed applicable remedial criteria from the RSRs but the extent of PCB impacts exceeding 1 mg/kg has been delineated following completion of the most recent Site investigation as shown on Figure 3. Metals: Twelve of the perimeter borings were analyzed for metals and all results had detections above the reporting limit. However, as shown on Figure 4, none results exceeded applicable RSR criteria. Results for metals within the area previously investigated found limited metals impacts exceeding applicable RSR criteria. Barium and Beryllium were found to exceed the GA PMC at one sample location and Arsenic was found to exceed the I/C DEC in two samples from one soil boring. SVOCs: Twelve of the perimeter samples were analyzed for SVOCs. Four locations had results for PAHs that exceeded applicable RSR criteria, but characterization sampling was continued until these impacts had been delineated. PAHs were also found to exceed applicable RSR criteria within the area previously characterized for PCBs. The highest PAH concentrations were found at soil boring location B-206. Wood chips were found from 3 to 4 ft bgs and it appeared that this wood had been preserved. It is considered likely that these wood chips are present from the use of the area for pole training. ETPH: ETPH was detected in nearly all of the samples collected but only exceeded the I/C DEC at one location. This location, B-206, is the same where there were high detections of PAHs. VOCs: VOCs were not detected in any of the samples collected. 5.2 Groundwater Results On February 1, 2018 five of the six monitoring wells on the Site were sampled. MW-2 could not be 5-1 westonandsampson.com
  6. Page 71 of 500

    EVERSOURCE ENERGY The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 3571 of 4786 BERLIN SETTLING BASIN PHASE III INVESTIGATION located and was not sampled. MW-4 had low recharge and did not provide enough groundwater for all sample analyses. The following summarizes the findings from this investigation: PCBs: No PCBs were detected above the reporting limit in any of the five wells sampled. SVOCs: No SVOCs were detected above the reporting limit in any of the five wells sampled. ETPH: ETPH was detected above the reporting limit in monitoring wells MW-1, MW-3 and MW6. All detections were well below applicable RSR criteria, however, a SWPC for ETPH has not been promulgated by CT DEEP. Metals: Metals were detected above the reporting limit in all of the five wells sampled. Copper and silver were detected above the SWPC in MW-3 located just outside of the former settling basin perimeter. Cadmium and Silver were detected in concentrations that exceed the SWPC and GWPC in MW-1 located inside of the former settling basin perimeter. Barium and silver were detected above the SWPC in MW-6 located just west of the former settling basin. 5-2 westonandsampson.com
  7. Page 72 of 500

    EVERSOURCE ENERGY The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 3572 of 4786 BERLIN SETTLING BASIN PHASE III INVESTIGATION CONCEPTUAL SITE MODEL An updated conceptual site model (CSM) has been developed for the Site based upon the data collected to date. The CSM is a representation of the processes that led to impacts to soil and groundwater at the Site and that control the transport, migration, and impacts of contamination to potential receptors. 6.1 Updated Conceptual Site Model The initial site conditions prior to construction of the Eversource Berlin Campus are not known. However, based on a historic aerial photograph dated August 21, 1969 and interviews with knowledgeable Eversource staff, the Site area was filled and then used as a pole-training facility. After the use as a training area was terminated, the area was regraded, and the settling basin was constructed to receive stormwater runoff from the paved area and parking garage constructed to the west. 6.2 Potential Sources and Chemicals of Concern The following potential sources of COCs at the Site have been identified: Fill: Fill materials placed at the Site is a potential source of PCB and other COC impacts to soil. The characterization of soil at the Site indicate no distinct patterns of impacts, especially PCBs, in the soil. Placing of fill materials with varying levels of impacts and then reworking and regrading the fill could account for this pattern of impacts. Metals and PCBs in the fill material is considered to be the primary source of impacts to the Site and, because the extent of PCBs has been delineated to a concentration < 1 mg/kg, the extent of impacted fill placed at the Site has been delineated. Pole Training Area: There is a potential that PCB-Oil filled equipment was used during training operations in this area and surficial soil impacts due to releases during training are possible. However, because the area was regraded to construct the settling basin, some of these release areas may have been buried. Preserved wood poles would have been used in the training area and surficial and deeper soil impacts may be present due to releases from the poles and also if wood chipped off the poles onto or into soil. Settling Basin: The settling basin received stormwater discharge from the asphalt-covered area to the west of the Site that was used for equipment storage laydown. PCB-containing materials were historically stored on the asphalt. Releases from this equipment could have washed off the asphalt and discharged to the Settling Basin and could be a source of PCB, PAH, and metals to surficial soil. 6.3 Migration and Exposure Pathways Potential transport mechanisms include migration through soil via stormwater runoff previously discharged to the settling basin and from stormwater falling directly onto the Site. No portions of the Site are paved, resulting in exposed soil throughout. Exposed soil is more susceptible to migration from runoff and rainfall within the vadose zone. Groundwater impacts, primarily for metals, were found in monitoring wells installed within locations were fill materials were historically placed. Thus, leaching of 6-1 westonandsampson.com
  8. Page 73 of 500

    EVERSOURCE ENERGY The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 3573 of 4786 BERLIN SETTLING BASIN PHASE III INVESTIGATION soil impacts into groundwater is considered to be a complete pathway. Direct exposure to soil at the Site is a potential exposure pathway. However, the area is not currently in use and much of the area has been fenced to prevent exposure to areas where significant hazards were identified. Dust generation and transport in wind is a potential migration and exposure pathway. However, the entire area is covered in grass and dust generation has not been noted. Thus, the migration and exposure pathway is not considered to be complete. 6.4 Site Receptors The Site is no longer in use and an area has been fenced because of a Significant Environmental Hazard involving PCBs in shallow soil. Thus, site users and trespassers are not considered to be potential receptors. However, the presence of metals in groundwater indicates a potential for migration from the Site to the unnamed stream. 6-2 westonandsampson.com
  9. Page 74 of 500

    EVERSOURCE ENERGY The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 3574 of 4786 BERLIN SETTLING BASIN PHASE III INVESTIGATION DATA QUALITY ASSESSMENT/DATA USABILITY EVALUTATION A Data Quality Assessment (DQA) was performed on the soil and groundwater analytical data received for the investigation performed in 2018. Each of the analytical data reports were assessed to determine the quality of the data as received. The following summarizes the DQA: All data was reported following the CT DEEP Reasonable Confidence Protocols. For each analytical method, narration was provided for each analysis for which results fell outside of acceptance criteria. Equipment Blanks, Trip Blanks, and other QA/QC samples used to measure potential contamination were free of analytes. Laboratory Control Samples and Duplicates (LCS/LCSDs) were analyzed with each analytical data batch. In general, the recoveries of spiked compounds and the relative percent difference (RPD) between duplicate samples were within acceptance criteria. No trends in the data for LCS/LCSD samples was observed that would indicate a bias in the data set. Matrix Spike Samples and Duplicates (MS/MSDs) were analyzed with each analytical data batch. In general, the recoveries of spiked compounds and the relative percent difference (RPD) between duplicate samples were within acceptance criteria. No trends in the data for MS/MD samples was observed that would indicate a bias in the data set. Samples were received under chain of custody and any discrepancies in the documentation were promptly resolved. Samples were received at the appropriate temperature and properly preserved. Samples were extracted and analyzed within specified holding times. Required reporting limits were specified on the chain of custody forms and these reporting limits were generally achieved. Some samples contained target analytes at concentrations high enough to require dilution and the reporting limits for other analytes did not always meet requested reporting limits. The interpretation of these data has been modified as needed and no bias in the overall data set is seen. The purpose of these data is to characterize and to delineate potential impacts to soil and groundwater at the Site. The summary of the DQA above indicates that the data are acceptable for this purpose. Thus, the Data Usability Evaluation is that the data are appropriate their intended use. 7-1 westonandsampson.com
  10. Page 75 of 500

    EVERSOURCE ENERGY The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 3575 of 4786 BERLIN SETTLING BASIN PHASE III INVESTIGATION SUMMARY AND CONCLUSIONS Pertinent findings of the Additional 2018 Investigation include the following: The extent of PCB impacts to soil has been delineated to <1 mg/kg and a remedial design can be completed to remediate these impacts. PCBs are the primary COC in the area and releases are potentially from the fill placed and historical Site operations. Given that PCBs are delineated, the extent of the fill material placed in the area is considered to be delineated. Metal soil results indicated limited impacts, but groundwater is impacted with metals at concentrations that exceed applicable remedial criteria. Metals in groundwater indicates a potential migration pathway to a sensitive receptor (i.e., the unnamed stream) and these impacts should be remediated. The primary source for these metals is considered to be fill materials placed at the Site. PAHs were detected at concentrations above RSR criteria in soil at seven locations throughout the Site but other SVOCs were not detected. No SVOCs were not detected in groundwater. The likely sources of these PAHs are considered to be either from stormwater runoff into the settling basin or from the use of treated wood poles as part of training operations. ETPH soil results was detected at concentrations exceeding the RSR criteria in only one location, B-193 located south of the former settling basin perimeter. The sample was resubmitted for SPLP and results came back below RSR criteria. ETPH was detected in groundwater at the site. Potential sources of ETPH are fill placed in the area, releases during training operations, and from stormwater discharge to the settling basin. VOCs are not a COC at this Site. No data gaps have been identified in the data and they are sufficient for designing remedial actions 8-1 westonandsampson.com

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)