Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Words on different pages
  1. Page 14 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 14 of 4786 Berlin Settling Basin Remedial Action Plan EVERSOURCE ENERGY 3.0 REMEDIAL ACTION PLAN This section outlines the plans and procedures to be implemented for the remediation of PCB and COC impacted soils at the Site. Details regarding the remedial objectives, scope, and sequence of remediation are provided below. Public notification will be performed prior to performance of the remediation. The public notification will consist of (1) posting a sign of the size specified by CT DEEP and with the required wording on the property a minimum of thirty days prior to starting remediation, (2) publishing notice of remediation in a newspaper of wide circulation in the Town of Berlin, Connecticut, and (3) notifying the Central Connecticut Health District that represents the Town of Berlin. 3.1 Remedial Goals The remedial goals for PCBs and the other COCs at the Site are: • • • • • To remove and dispose of soil with PCBs greater than 10 mg/kg at an off-site facility. Soil with total PCB concentrations ≥50 mg/kg will be transported to a chemical waste landfill for disposal. Soil with >10 mg/kg but <50 mg/kg will be transported to an out-of-state facility permitted to accept these soils. Removal actions will be documented by sampling performed according to the requirements of 40 CFR Part 761 Subpart O. Soil with PCBs greater than 1 mg/kg but less than 10 mg/kg will be consolidated and capped on-site. These PCB removal actions will also be verified by sampling performed according to the requirements of 40 CFR Part 761 Subpart O. The barrier to be constructed over the PCBimpacted soil will consist of an orange geotextile placed over the excavation surface and then covering with four feet of clean soil seeded with grass covering. The goal will be to limit the area of soil impacted with PCBs at these concentrations to the designated Cap Area shown on Figure 7. Excess PCB-impacted soil that cannot be consolidated beneath the cap due to grading constraints will be transported off-site for disposal. Soil impacted by other COCs but not PCBs may also be capped beneath the roadway by placing two feet of clean materials and then paving with a minimum of three inches of bituminous concrete. To remove source materials of groundwater impacts and to perform post-remediation monitoring to assess compliance with applicable remedial criteria. To abandon the existing drainage basin by cutting and capping pipes that convey stormwater and to fill the basin area to match surrounding surface elevations following the completion of remedial excavations. Stormwater will be routed through a replacement drainage system that will include sediment removal and flow equalization. These remedial goals include recording an Industrial/Commercial ELUR on the Site that restricts residential uses. The ELUR will be filed on the property records following the completion of remedial activities. 3.2 Conceptual Remedial Approach The conceptual approach for remediation will be to remediate PCB- and other COC-impacted soil. To achieve this objective, planned remedial activities will include: • • • Preparation of remedial plans and receipt of EPA and CT DEEP Approvals; Preparation of applications for permits and receipt of approval from the responsible agency (see subsection 3.3.1); Provide public notice of remedial actions; westonandsampson.com 3-1
  2. Page 15 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 15 of 4786 EVERSOURCE ENERGY • • • • • • • • • • 3.3 Berlin Settling Basin Remedial Action Plan Preparation of the Site by establishing temporary facilities, fencing, signage, and erosion and sedimentation controls (see section 3.4); Excavation and off-site disposal of PCB-impacted soil with total PCB concentrations greater than 10 mg/kg at any location (see sections 3.6 and 3.8); Excavation and on-site relocation of PCB-impacted soil with total PCB concentrations less than 10 mg/kg but greater than one mg/kg (see section 3.6); Excavation and off-site disposal or on-site relocation of soil impacted with other COCs that exceed the I/C DEC (see sections 3.6 and 3.8); Collection of post-excavation soil samples for PCB analysis and for other COCs as necessary to confirm the limits of soil remediation (see section 3.7); Preparation of sub-grade and on-site relocation of soils in areas to be capped (see section 3.9); Construction of soil and asphalt barriers to render soils inaccessible (see section 3.9); Final restoration of soil excavation areas to the proposed elevations (see section 3.9); Installation of groundwater monitoring wells for post-remediation monitoring; and Installation of permanent fencing and signage around the Site perimeter (as required by the ELUR). Remedial Planning 3.3.1 Permits The following permits and approvals from federal, state and local government agencies are anticipated for Site remediation: • • • • EPA and CT DEEP approval of this RAP EPA approval serves as notification of Eversource’s intent to conduct a self-implementing cleanup plan with some provisions to be approved under §761.61(c). The signed certification, as required by §761.61(a)(3)(E), is included as Section 5 of this report. CT DEEP approval is required by the December 2018 Consent Order; CT DEEP General Permit for Discharge of Groundwater Remediation Wastewater Directly to a Sanitary Sewer; Town of Berlin Inland Wetlands and Watercourse Agency, including Stormwater Pollution Prevention Plan (<5 acres); for remedial work within the buffer zone of the wetlands and watercourse at the Site; and Town of Berlin Planning and Zoning Site Plan Review for installation of the new drainage system. Although not anticipated to trigger the stockpile storage requirements, excavated soil management procedures will be monitored during construction and, if necessary, the project will be registered and follow the requirements of the CT DEEP General Permit for Contaminated Soil and Sediment Management. Permits will be obtained by Weston & Sampson prior to initiating work. 3.3.2 Contractor Submittals The selected Remedial Contractor will be required to prepare and provide submittals prior to initiating remedial work at the Site. These submittals will include but are not limited to a Dust Control Plan, Excavation Support Plan, Excavated Material Management Plan, Dewatering Effluent Treatment Plan, Traffic Control Plan, and an Equipment Decontamination Plan. These plans will be reviewed by Eversource and Weston & Sampson for completeness prior to conducting remedial activities. Weston & Sampson will prepare and implement an Air Monitoring Plan as described below. westonandsampson.com 3-2
  3. Page 16 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 16 of 4786 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Plan 3.4 Site Preparation and Temporary Construction Controls Prior to initiating remedial activities, public notification will be performed, and Site controls installed as required under the permits obtained to perform the work. 3.4.1 Erosion and Sedimentation Controls Prior to initiating soil excavation, erosion and sedimentation controls will be installed around designated work areas and Site perimeter as designated in the Stormwater Pollution Prevention Plan and the permit obtained from the Town of Berlin IWWA. The erosion and sedimentation controls will be designed and installed in accordance with the Connecticut Guidelines for Erosion and Sediment Control. The controls will also be inspected and maintained by the Contractor throughout construction and removed following final stabilization of disturbed surfaces. 3.4.2 Dust Monitoring Dust monitoring for total particulate emissions and fugitive dust within work areas and at the Site perimeter will be implemented during soil excavation and handling activities to reduce potential exposures to on- and off-Site receptors during remediation. Air monitoring will be conducted continuously using real-time measurement equipment. The selected Remedial Contractor will be required to develop a Dust Control Plan that will include provisions to mitigate dust exposures to Site workers and Eversource employees/visitors. The air monitoring plan to be prepared and implemented by Weston & Sampson will include action levels at which the Remedial Contractor will be required to implement or to increase dust control measures. Total Suspended Particulates (TSP) will be monitored in real time using 15-minute timeweighted averages. An action level of 80% the National Ambient Air Quality Standard (NAAQS) of 150 ug/m3 will be established for the project. The results for the dust monitoring will be reviewed regularly by Eversource and the Remedial Contractor to evaluate the effectiveness of the dust control measures employed. At a minimum, dust controls will include the use of windscreens on temporary fencing and use of polyethylene sheeting over temporary stockpiles. If necessary, active dust controls, such as wet spraying will also be deployed. 3.4.3 Clearing and Grubbing As seen on Figure 2, limited clearing and grubbing of brush and small trees at the Site will be required to clear remediation areas and to allow Site access. Within remediation areas, the Remedial Contractor will cut the brushy vegetation approximately six inches from the ground surface and will be responsible for the removal of the clearing wastes from the Site. The roots will be handled and disposed of in the same manner as the soil it is in contact with (e.g., roots in contact with PCB Remediation Waste soil will be sized as required and disposed of with the surrounding soil as PCB Remediation Waste). 3.4.4 Subsurface Structures Subsurface structures to be abandoned include the drainage pipe system associated with the settling basin are noted on Figure 6. The following procedures will be employed to abandon these structures: • • • The drainage piping will be jet washed and the wash water will be collected and sent to the dewatering effluent treatment system for decontamination prior to discharge; Piping from the catch basins will be rerouted to the new drainage system; and Existing pipes will be abandoned in place by cutting, capping, and filling with flowable fill. Temporary stormwater drainage systems will be designed in accordance with the IWWA permit conditions to manage stormwater during remediation. westonandsampson.com 3-3
  4. Page 17 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 17 of 4786 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Plan 3.5 Replacement Drainage System The settling basin will be abandoned following the construction of the new drainage system. The new drainage system will be installed following the completion of remedial excavations but prior to backfilling the excavated areas. The replacement drainage system will accept flows from the same parking areas as the settling basin and the new system will include a vortex for sediment removal and piping to reduce peak discharge/ equalize flow during rain events. Sediment removal from the vortex unit will be performed as needed. Collected sediments will be characterized for appropriate off-site disposal. 3.6 Soil Excavations Soil excavation areas are shown on Figure 6. Prior to performing soil excavations, the Remedial Contractor shall survey and mark the extent of the excavations in the field. Soil excavations will be performed to the depths indicated on Figure 6 at a minimum and will be extended if post-excavation sample results indicate that remedial goals have not been achieved. Excavated soil disposal will be performed as described in Section 3.8. Excavated soil to be relocated on-site will be handled as described in Subsection 3.9.2. 3.6.1 Site-Specific Design Considerations Groundwater will be encountered at varying depths below grade as the surface slopes downward toward the unnamed stream and wetlands on the Site. At the western edge of the Site, where the surface elevation is highest, groundwater is encountered at approximately 15 feet bgs or greater. Excavation is not anticipated to those depths. At the eastern edge of the Site, groundwater is encountered approximately 5 to 6 feet bgs. As such, groundwater is only anticipated to be encountered in the deeper soil excavations to be performed near these surface water features. The Remedial Contractor will be required to obtain the services of a Professional Engineer to design the dewatering and effluent treatment system as well as soil excavation support systems. The Remedial Contractor will submit stamped plans for dewatering and excavation support which Weston & Sampson will review/approve prior to initiation of work. These drawings will be used by Weston & Sampson to obtain the General Permit submittal to discharge water to the sanitary sewer. 3.7 Post-Excavation Sampling The extent of PCB and other COC soil excavation based on Site characterization completed to date is shown on Figure 6. The final extent of soil excavation will be determined based on the post-excavation sample results. Post-excavation samples will be collected and analyzed for total PCBs and other COCs. Post-excavation sampling for PCBs will be performed in accordance with the procedures specified in 40 CFR Part 761 Subpart O. Post-excavation samples will also be tested for polyaromatic hydrocarbons, selected metals, and extractable total petroleum hydrocarbons as required. The additional parameters will be selected based upon the results from the initial characterization sampling performed in 2018. Additional testing using the synthetic precipitation leachate procedure (SPLP) will also be performed for soil above the groundwater table, as needed. The frequency of post-excavation samples for other COCs will be one sample for every 30 linear feet of excavation sidewall and two feet of depth (e.g., three verification samples will be collected from a 30-foot sidewall in an excavation performed to six feet below grade). Post excavation samples will be collected from the base of excavations at a frequency of one per every 500 square feet. westonandsampson.com 3-4
  5. Page 18 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 18 of 4786 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Plan 3.7.1 Contingency Based on the sampling and analysis conducted to date, the extent of PCBs and other COCs in soil is well understood. However, due to the source of the release, removal of additional soil impacted by PCBs may be required to address heterogeneity in subsurface conditions and achieve the remedial objectives. The final limits of soil excavation will be determined according to the post-excavation soil sampling frequency described above. If post-excavation sample results indicate PCB concentrations exceed remedial goals, then additional soil will be removed. Specifically, the horizontal limits of excavation will be extended in five-foot increments for failed sidewall samples, and the vertical limits of excavation will be extended in one-foot increments for failed bottom samples. Following the additional removal, additional samples will be collected. This process will continue until residual PCB and COC concentrations in soil are less than remedial goals. 3.8 Waste Management 3.8.1 Soil and Concrete Excavated soil and concrete from PCB-impacted excavations will be live-loaded into waste containers for transport off-site for disposal. It is estimated that approximately 1,100 tons of soil and concrete will be removed from the Site for disposal as PCB Remediation Waste ≥50 mg/kg at a chemical waste landfill or a Subtitle C Landfill permitted to accept such wastes. It is estimated that an additional 4,350 tons of soil will be removed from the Site for disposal as PCB Remediation Waste < 50 mg/kg at a landfill permitted to accept such wastes. 3.8.2 Dewatering Effluent Dewatering effluent from soil excavations will be treated prior to discharge. The Remedial Contractor will be responsible for the design of the dewatering effluent treatment system and drawings are to be stamped by a Professional Engineer prior to submittal to Eversource/Weston & Sampson for review and approval. It is anticipated that dewatering effluent will be discharged to the publicly owned treatment works/sanitary sewer. Weston & Sampson will prepare the permit application forms for obtaining a General Permit for the Discharge of Groundwater Remediation Wastewater to the sanitary sewer. 3.9 Site Restoration Site restoration will be performed following the completion of removal actions (i.e., soil excavations) at the Site. The purpose of the Site restoration activities will be to stabilize areas of removal actions and to create barriers to render soil beneath the restored areas inaccessible. 3.9.1 Installation of Demarcation Barriers Following achievement of remedial goals, for the purposes of future site management, a demarcation barrier consisting of an orange geotextile will be placed at the base of PCB and COC excavations areas to separate impacted Site soil from clean materials to be used in Site restoration. The base of the excavations will be smoothed and compacted prior to placing the demarcation barrier. After the base has been adequately prepared, the orange geotextile will be placed on the base and sidewalls and secured with landscaping staples suitable for this use. 3.9.2 Backfilling Excavations Excavations will be backfilled with suitable backfill materials. Backfill will be tested at a frequency of one westonandsampson.com 3-5
  6. Page 19 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 19 of 4786 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Plan analytical sample per every 500 tons of material to be transported to the Site. Each sample will be tested for volatile organic chemicals (VOCs), semivolatile organic chemicals (SVOCs), extractable total petroleum hydrocarbons (ETPH), pesticides, PCBs, and RSR-15 metals. Backfill materials will be considered to be non-polluted (i.e., not impacted by a release) if organics (e.g., VOCs, SVOCs, ETPH, pesticides, PCBs) are not detected and metal concentrations are comparable to natural background concentrations as determined for the State of Connecticut. Only non-polluted soil will be used to backfill excavations below the groundwater surface. Polluted fill materials will only be used on the property if (1) a permit has been obtained for their beneficial reuse and (2) any chemicals detected in the soil due to a release are at concentrations less than the RDEC or GA PMC, whichever is lower. Soil excavated at the Site with (1) PCB concentrations <10 mg/kg and (2) that don’t exceed the GA PMC for other COCs will be used as backfill beneath areas to be capped and these impacted soils will be rendered inaccessible by construction of a cap. These soils will not be placed beneath the groundwater table. Backfill materials will be placed and compacted in one-foot lifts to 90% of the modified proctor density. 3.9.3 Establishing Turf Areas to be completed with grass will be backfilled with six inches of topsoil and then hydroseeded. Topsoil will be tested for VOC, SVOCs, ETPH, pesticides, and metals at a frequency of one sample per every 500 tons of material to be transported to the Site. The topsoil shall be a non-polluted material free from impacts due to release. 3.9.4 Construction of Soil Caps to Render Soil Inaccessible Soil caps will be constructed in areas not to be completed with pavement to render the soil beneath inaccessible as shown on Figure 6. The soil cap will consist of the demarcation barrier and soil determined to be non-polluted or polluted soil for which a beneficial reuse permit has been obtained. The limits of PCB-impacted soil to be relocated on-site will be within the Cap Area shown on Figure 7. 3.9.5 Paving Paving materials and paving operations will be performed in accordance with the requirements of the Connecticut Department of Transportation Form 817. Prior to placing subbase for the asphalt, the limits of excavation areas to be paved will be smoothed and compacted. Subbase and base materials will be placed and compacted (minimum 24 inches thick), and then completed with a minimum of three inches of bituminous concrete. Areas to be completed with paving are shown on Figure 6. Pavement will not be used to cap or render PCB-impacted soil inaccessible. Soil excavations beneath the paved areas will be performed until post-excavation sample results are <1 mg/kg total PCBs. 3.9.6 Fencing Permanent chain-link or similar security fencing will be installed around the perimeter of the work area following the final completion of work activities. 3.9.7 Survey The final horizontal and vertical extent of soil excavations will be surveyed following the receipt of postexcavation sample results indicating that remedial goals have been achieved and prior to backfilling. Final surface grades will be surveyed following the completion of Site Restoration. Survey work will be performed by a Connecticut-Licensed Land Surveyor and shall comply with A-2 and T-2 standards. westonandsampson.com 3-6
  7. Page 20 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 20 of 4786 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Plan 3.10 Equipment Decontamination Equipment that contacts PCB Remediation Wastes will either be (1) disposed with the PCB Remediation Wastes or (2) decontaminated prior to removal from the Site or being used for non-PCB work. Nonporous surfaces will either be (1) swabbed with a solvent containing greater than seventy-five percent terpene hydrocarbons or (2) double washed/rinsed in accordance with the procedures outlined in 40 CFR 761, Subpart S. Solid waste generated during decontamination will be stored and handled with PCB Remediation Wastes. Wash water from equipment decontamination will either be decontaminated with dewatering effluent from soil excavation areas for discharge or collected and pumped to an on-Site temporary storage tank. Accumulated wash water will be sampled for disposal characterization analysis and transported and disposed of off-Site based on the characterization data. Heavy equipment and other materials used in the handling and storage of non-PCB-impacted soil will be dry decontaminated to remove soil which will be disposed of with non-PCB wastes. 3.11 Maintenance and Monitoring Procedures During Construction The selected Remedial Contractor will be responsible for maintenance of Site conditions such that they comply with the requirements of this RAP, the EPA and CT DEEP Approvals, and permits obtained for the work. The Remedial Contractor will also be responsible for performing some Site monitoring tasks as required under this RAP, the EPA Approval, and permits (e.g., sampling of treated dewatering effluent, inspection of sediment and erosion controls) during the performance of Site remediation activities. Weston & Sampson will serve as the Owner’s Representative and will observe remedial activities, Site restoration, and the disposal of PCB and COC impacted soil. During remediation, Weston & Sampson will record remediation progress, perform air monitoring, and collect post-excavation samples. Following remedial the completion of remedial activities, Weston & Sampson prepare a Remedial Action Report (RAR) for submittal to EPA and CT DEEP. westonandsampson.com 3-7
  8. Page 21 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 21 of 4786 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Plan 4.0 LIMITATIONS This Remedial Action Plan was prepared for the use of the Eversource, exclusively. The findings provided by Weston & Sampson in this report are based solely on the information reported in this document. Future investigations, and/or information that was not available to Weston & Sampson at the time of the investigation, may result in a modification of the findings stated in this report. Should additional information become available concerning this Site or neighboring properties which could directly impact the Site in the future, that information should be made available to Weston & Sampson for review so that, if necessary, conclusions presented in this report may be modified. The conclusions of this report are based on Site conditions observed by Weston & Sampson personnel at the time of the investigation, information provided by Eversource, and samples collected and analyzed on the date shown or stated in this report. This report has been prepared in accordance with generally accepted engineering and geological practices. No other warranty, express or implied, is made. westonandsampson.com 4-1
  9. Page 22 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 22 of 4786
  10. Page 23 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 23 of 4786 EVERSOURCE ENERGY Berlin Settling Basin Remedial Action Plan 6.0 REFERENCES Weston & Sampson, 2018. Berlin Settling Basin Phase III Investigation Report, October 2018. Weston & Sampson, 2015. Berlin Campus Settling Basin Self-Implementing & Risk Based Cleanup Plan, September 2015. Weston & Sampson, 2012. Remedial Investigation Sampling Plan, Northeast Utilities Berlin Campus Stormwater Settling Basin, February 2012. westonandsampson.com 6-1

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)