Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Words on different pages
  1. Page 70 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 70 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 2.0 SITE DESCRIPTION The approximate 8,000 square-foot stormwater settling basin and upland/wooded area (the “Site”) is located southeast of the parking garage on Eversource’s Berlin Campus located at 107 Selden Street, Berlin, Connecticut. The location of the Site is shown on Figure 1 (Site Locus Map), sensitive receptors around the Site are shown in Figure 2 (Area Receptors Map), an aerial plan of the Site is shown in Figure 3 (Aerial Site Plan) and the significant Site features are shown in Figure 4 (Existing Conditions Plan). The settling basin receives storm water from two inlets connected to three catch basins located in a paved parking lot located upgradient of the Site and along the southeast side of the parking garage. The Site is surrounded by a parking garage and paved area to the northwest and west, an access road off Deming Road followed by undeveloped wooded land to the north and east, and heavily vegetated/wooded undeveloped land to the south. Topographically, the Site slopes from northwest to southeast and is located within a drainage low situated between topographic highs to the north, east, south, and west of the settling basin. With the exception of the parking garage, a majority of the surrounding land is undeveloped and densely vegetated. Soil at the Site consists of light brown fine to coarse sand in the upper 2.5 feet (ft.) in the vicinity of the two inlets to the settling basin. Subsurface soil in the remainder of the settling basin consists of approximately one (1) foot of dark brown fine sandy silt transitioning to a reddish brown fine sand and clay underlain by up to seven (7) ft. of red-brown sand and fine gravel. Groundwater at the Site is classified by the Connecticut Department of Energy and Environmental Protection (CTDEEP) as GA. The GA classification means that the groundwater is presumed to be suitable for drinking without treatment. Groundwater elevation beneath the Site may be variable throughout the year due to seasonal fluctuation within the basin but was encountered approximately 6 feet below surface grade (bsg). The closest water body is an unnamed stream, located approximately 70 ft. southwest of the outlet from the settling basin. Stormwater overflows from the settling basin into the top of an outlet structure, travels underground in a 36-inch reinforced concrete pipe, then discharges to the unnamed stream referenced above. 2.1 Conceptual Site Model Weston & Sampson was retained by Eversource to evaluate the nature and extent of PCBimpacted soil at the Site for the purposes of remediation of PCB impacted areas. In July 2010, Eversource) conducted pre-characterization of the soil located along the base of the settling basin in support of a project to remove the material that accumulated along the bottom of the settling basin. The soil samples collected as part of the pre-construction characterization indicated the presence of low level PCBs in shallow soils located in the southern and central regions of the settling basin. Based upon these results, additional investigation and sampling was warranted prior to the commencement of remediation/restoration activities, due to the presence of PCBs above regulatory criteria. Additional investigations were conducted by Weston & Sampson from December 2011 through July 2015 and consisted of the advancement of soil borings; the installation of monitoring wells; and the collection and analysis of soil, groundwater, and sediment samples. Based upon the soil and sediment analytical data collected during the additional investigations, PCB-impacted soil (>1 mg/kg) was identified in both the interior and exterior portions of the settling basin. The vertical extent of PCB impacts have been defined to five feet below grade or less in most areas of the Site, with the exception of two areas where PCB impacts extend to 6 to 7 ft. below grade. Low level PCB concentrations were detected in select sediment sample www.westonandsampson.com 2-1
  2. Page 71 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 71 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 locations collected from the unnamed stream adjacent to the settling pond. PCB impacts to sediments were assessed and addressed via a Screening Level Ecological Risk Assessment (SLERA) completed by Anchor QEA and Weston & Sampson, the results of which determined that no risk is present relative to the PCB concentrations detected in sediment. A copy of the SLERA is included in Appendix A. Six groundwater monitoring wells were installed in July 2015 at locations both inside and outside the settling basin, as well as at upgradient and downgradient locations. The groundwater analytical results indicate that groundwater has not been impacted by PCBs at the Site. The groundwater table in the settling basin area appears to somewhat variable, as groundwater was not present in monitoring well MW-4 (northeast corner of the basin area). The conceptual site model presents two possible release mechanisms for PCBs at the Site. 1. Based upon a historic aerial photograph dated August 21, 1969 and interviews with knowledgeable Eversource staff, this location on the Berlin campus was historically utilized as a line training area. The training area may have utilized PCB oil-containing equipment which could have potentially released PCBs to the environment. It is plausible that the PCB impacts discovered upon Eversource’s characterization event and subsequent Weston & Sampson sampling events were remnants from previously impacted soils from releases associated with the training area. It is also possible that the distribution of PCB impacts, particularly outside the basin, are a result of previously impacted soils being manipulated and/or redistributed during the construction of the basin and/or PCB-impacted soil from other areas used to construct and/or grade the hillside and other impacted portions of the Site. 2. Another potential release mechanism for PCBs to the environment involves the migration of PCB-impacted fine-grained sediment or PCB containing oils originating from the upgradient equipment storage area to the above-referenced catch basins. PCBimpacted soil outside the perimeter of the settling basin may likely be a result of periodic flooding or overflow of the settling basin. However, this scenario is unlikely given the random distribution and severity of PCB impacts located at the Site and the fact that PCBs were not identified in catch basin sediments. Due to the random distribution and severity of PCB impacts located at the Site and the fact that PCBs were not identified in catch basin sediments, the second scenario is considerably unlikely. Therefore, PCB impacts at the Site are most likely attributed to the historic use of this area as a line training area that resulted in PCB impacts from the manipulation and/or redistribution of the impacted soils during the construction of the basin and other construction or earth-moving activities in this area of the property. Based upon our understanding of the Site, exposure routes for PCBs at the site consist of trespassers, construction workers and Eversource employees coming in direct contact with soil or soil-derived dust. Groundwater has not been and is not expected to become, impacted by PCBs. Sediment, although exhibiting randomly distributed very low concentrations of PCBs, has been determined through a screening level ecological risk assessment to not be a source for PCB exposure. Based upon comments received from CTDEEP on the SLERA, ecological risk to receptors is negligible and no further study is needed. www.westonandsampson.com 2-2
  3. Page 72 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 72 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 3.0 NOTIFICATION AND CERTIFICATION 3.1 The Nature of Impacts Eversource and its subsidiary company (Northeast Utilities) have operated the Site and overall campus for a period of approximately 62 years. The storm water settling basin was constructed in 1992 concurrent with the construction of the aforementioned parking garage. The settling basin receives storm water from two inlets connected to three catch basins located in a paved parking lot along the southeast side of the Eversource parking garage. This paved parking lot was previously and is currently utilized for the storage of various oil containing electrical equipment. The exact source of PCBs is unknown however the conceptual site model presented in section 2.0 describes the likely source. 3.2 Summary of Assessment Procedures and Results Numerous site investigations have been conducted at the Site since 2010. A discussion of each subsurface investigation is presented in the following sections. 3.2.1 Historic Sampling Events Pre-Construction Characterization (July 2010-January 2012) Following notification to the Town of Berlin Wetlands Agent regarding the proposed assessment activities, Eversource completed pre- characterization of the soil located in the settling basin on July 19, 2010 in support of a project to remove material accumulated in the settling basin. Soil samples were collected from five of seven hand auger boring locations (TP-01, TP-03, TP-04, TP-05, and TP-07) and submitted to a laboratory for typical pre-characterization parameters. A blind duplicate sample was also collected from one sample location for Quality Assurance/Quality Control (QA/QC) purposes. See Table 1 for a summary of July 2010 soil sample analytical results. During this investigation, the presence of low level PCB-impacted soil was documented in shallow soils in two samples located in the southern and central regions of the settling basin at concentrations exceeding the CTDEEP Residential Direct Exposure Criteria (RDEC) of 1 mg/kg. Based upon the initial sampling results, Eversource completed additional investigation activities due to the presence of PCBs above applicable regulatory criteria. On December 19, 2011, Weston & Sampson, on behalf of Eversource, mobilized New England Geotech, LLC (NEG) of Jamestown, Rhode Island to advance fifteen (15) soil borings (WSE-1 through WSE-15) utilizing Geoprobe® direct-push technologies. The Geoprobe® sampling device consisted of a 5-foot long, 2-inch diameter, stainless steel, macro core sampler and a disposable acetate liner. Direct-push test borings were advanced to depths of up to 8 ft. below grade. Discrete soil samples were collected from 0.5 ft. depth intervals from ground surface to 4.0 ft. within the settling basin. A deeper discrete soil sample was collected at one location at a depth of 6.5 ft. to 7.0 ft. below surface grade (bsg). Sampling equipment including the macro core sampler and Geoprobe® rod were decontaminated on-site during and at the conclusion of sampling in accordance with 40 CFR 761.79 (c)(2)(ii). This double-wash/rinse method for decontaminating non-porous surfaces utilizing a hexane solvent was utilized following removal and disposal of the acetate liners. Solid and liquid investigation derived wastes (IDW), such as acetate liners, gloves, decontamination liquids, etc., generated from sampling activities were www.westonandsampson.com 3-1
  4. Page 73 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 73 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 containerized in separate 55-gallon drum(s) (one drum for solids and one drum for liquids) for off-Site disposal at a TSCA-certified facility under waste manifest documentation. Thirty-one (31) soil samples were submitted under a chain of custody to ConTest Analytical Laboratory (ConTest), a Connecticut certified analytical laboratory, located in East Longmeadow, Massachusetts (CT certified laboratory PH 0567). The samples were submitted for analysis of PCBs via EPA Method 8082 Soxhlet Extraction Method 3540C. With the exception of four soil sampling locations (WSE-5, WSE-7, WSE-8, and WSE12), PCBs were detected in soil at 0.5 ft. to 2.0 ft. and 2.0 ft. to 4.0 ft. PCBs were also detected at 550 mg/kg at a depth of 6.5 ft. to 7.0 ft. below grade from the deep discrete soil sample. PCBs were not detected above the laboratory reporting limits in WSE-5, WSE-7, WSE-8, and WSE-12. See Table 2 for a summary of the December 2011 and January 2012 soil sample analytical results. On January 11, 2012, Weston & Sampson personnel collected three discrete sediment samples (WSE-16, WSE-17, and WSE-18) downstream of the settling basin outfall. Samples were collected 0.5 ft. into the sediment within the stream bed. In addition, a sediment sample (CB-1) was collected from one of three catch basins located in the paved parking area located southeast of the parking garage. Collection of sediment from the other two catch basins was not feasible since there was either no sediment or less than three inches of sediment at these locations. The sediment samples were preserved and kept chilled in accordance with applicable testing methods. A total of four (4) sediment samples, three downstream (WSE-16, WSE-17, and WSE18) and one catch basin (CB-1), were submitted under a chain of custody to Con Test. The samples were submitted for analysis of PCBs via EPA Method 8082 by Soxhlet Extraction Method 3540C. . PCBs were detected in one of the downstream sediment samples at a concentration of 0.23 mg/kg. PCBs were not detected above the laboratory reporting limit 0.12 mg/kg in samples in the remaining two downstream samples nor the catch basin sample. A summary of soil sample analytical results for the downstream sediment samples and catch basin samples can also be found in Table 2. Based on this supplemental analytical data, the detected concentrations of PCBs in soil appear to be distributed within the central and southern portions of the settling basin. Data gaps existed based on the lateral/vertical distribution of PCBs detected during this round of sampling. To meet the characterization requirements of Sub Part N Cleanup Site Characterization Sampling for PCB Remediation Waste {(40 CFR 761.61 (a)(2)} additional soil sampling was required. Remedial Investigation (June 2012-September 2014) Based on the results of the December 19, 2011 supplemental investigation, a Remedial Investigation Sampling Plan was developed by Weston & Sampson in February 2012 to further define the lateral/vertical extents of the PCB-impacted soils previously identified within and potentially outside of the settling basin. The initial remedial investigation activities were executed over a span of five days on June 26, 2012 through June 29, 2012 and July 2, 2012. Similar to the December 2011 sampling event, NEG advanced eighty-nine (89) borings (B-1 through B-97 series borings) utilizing Geoprobe® direct-push technologies under the observation of Weston & www.westonandsampson.com 3-2
  5. Page 74 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 74 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 Sampson personnel (Figure 5 – Sampling Location Plan). The soil borings were spaced approximately 10 feet apart in a grid-like pattern across the interior and exterior of the basin and approximately 5 feet apart immediately downgradient of the discharge locations of both inlets. The secondary column of proposed soil borings within the wooded area along the southern/southwestern boundary of the settling basin were eliminated from the investigation due to accessibility issues for the drill rig. Discrete soil samples were collected at a 6-inch sampling interval at 2 foot vertical increments to a depth of 10 feet. Discrete soil samples were submitted for laboratory analysis for the majority of the borings located at the northwest interior corner of the basin. This area was chosen for discrete sampling due to the elevated PCB results of soil samples collected in this area during previous sampling events, including the PCB exceedence at depth. Composite sampling was conducted along the exterior of the settling basin as well as at the remainder of the areas inside the settling basin where a discrete sample was not initially submitted. Composite samples consisted of combining soil from two, three, or four adjoining nodes into a single sample for analysis. In general, composite samples were collected from the same vertical soil horizon including either a shallow depth (0.02.0 ft.), intermediate depth (2.0-4.0 ft.), or deep depth (8.0-10.0 ft.). Based upon the number of nodes combined to create the composite, results of the composite samples were compared to an adjusted mg/kg criterion as follows: 2 nodes at 0.5 mg/kg, 3-nodes at 0.33 mg/kg and 4 nodes at 0.25 mg/kg. Based on composite sampling results, select discrete soil samples from which the composite included were activated for analysis. The composite and discrete soil sample analytical results are presented in Tables 3, 3A and 4. Table 3 is a presentation of the composite sample analytical data; Table 3A is a composite sample key that identified which boring samples were combined to form each composite sample. Table 4 is a summary of the resultant analyses of the discrete soil samples collected from each boring that was composited. All discrete and composite samples were submitted to ConTest for analysis of PCBs via 8082 by Soxhlet Extraction Method 3540C. Field QA/QC procedures included the collection of blind duplicate samples at a frequency of one duplicate per twenty samples. A total of seventy (74) composite soil samples, including four duplicate composite samples and two hundred ninety (290) discrete soil samples, including thirteen duplicate samples, were submitted for laboratory analysis. An equipment blank was also collected at the completion of the sampling event by pouring de-ionized water through a decontaminated macro corer used to collect the soil samples. The equipment blank was also submitted to ConTest for PCB analysis via the 8082 Method without the Soxhlet Extraction Method 3540C because the extraction cannot be performed on aqueous samples. A summary of equipment blank analytical data can be found in Table 7. The macro coring equipment used to collect the soil samples and any equipment used to composite samples was decontaminated using the following procedure: • • • • • A 55-gallon drum was set up on a 6-mil. polyethylene bermed area; Soil was physically removed with a brush and Alconox rinse; Equipment was rinsed with distilled water; Equipment was then rinsed with hexane rinse; and Equipment was rinsed with distilled water as a final rinse. www.westonandsampson.com 3-3
  6. Page 75 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 75 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 Rinsate was placed into a 55-gallon drum. Also, due to the potential presence of PCBs, any solid or liquid IDW (acetate liners, gloves, decontamination liquids, etc.) generated from sampling activities were containerized in 55-gallon drums for liquids and a roll-off dumpster for solids. IDW (solid and liquids) were disposed of off-Site at a TSCA-certified facility under waste manifest documentation. IDW generated were placed in Department of Transportation (DOT) approved 55-gallon drums and/or roll-off and labeled in accordance with 40 CFR 761 subpart C. The drums/roll-off were transported off Site in containers meeting the requirements of the DOT Hazardous Materials Regulations (DOT HMR) at 40 CFR parts 171-180, as stated in 40 CFR 761.61(a)(5)(B). On April 18, 2014 and April 25, 2014, supplemental remedial investigation activities were conducted by Weston & Sampson personnel to further characterize the nature and extent of PCB impacts at the Site and consisted of the advancement of twenty-four (24) borings (B-99 through B-122) – See Figure 5 for sampling locations. The April 2014 soil borings were conducted in the same manner as the initial remedial investigation activities that were completed on June 26, 2012 through June 29, 2012 and July 2, 2012. NEG, under the observation of Weston & Sampson, advanced the twenty-four (24) borings utilizing Geoprobe® direct-push technologies. The soil borings were spaced approximately 10 feet apart in a grid-like pattern from the northwest to the southwest side of the settling basin. Discrete soil samples were collected at 0.5 ft. sampling intervals at 2 feet increments to a depth of 10 ft. and were submitted to ConTest for analysis of PCBs via 8082 by Soxhlet Extraction Method 3540C. Field QA/QC procedures included the collection of blind duplicate samples at a frequency of one duplicate per twenty samples. A total of one hundred twenty seven (127) discrete soil samples, including seven duplicate samples, were submitted for laboratory analysis. Equipment blanks were also collected at the completion of each field day using the same process as previously described for the 2012 initial remedial investigation (by pouring de-ionized water through a decontaminated macro corer used to collect the soil samples). The equipment blanks were submitted to ConTest for PCB via the 8082 Method, and a summary of equipment rinse blanks can be found in Table 7. The equipment and decontamination procedures used were the same as those outlined above for the 2012 initial remedial investigation. The April 2014 soil analytical results are presented in Table 5. Sediment Investigation (2014) In response to CTDEEP input on the January 2012 sediment data, Weston & Sampson conducted additional sediment sampling in April and September 2014 for PCBs from the unnamed stream adjacent to the settling pond. The samples were to be analyzed by ConTest using the lowest technically practicable reporting limit for the April and September sampling. On April 25 & 28 2014, sediment samples (S-1 through S-11) were collected by Weston & Sampson from 11 locations within the stream along an approximately 1,000-foot reach. On September 3, 2014, Weston & Sampson and ecological risk assessor, Anchor QEA personnel, collected six sediment samples (AQ-1 through AQ-6) for risk assessment purposes. The September 2014 sediment sampling included: re-sampling certain locations from the April 2014 sampling event; collecting sediment from new locations within the stream reach in the immediate vicinity of the www.westonandsampson.com 3-4
  7. Page 76 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 76 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 outlet from the settling basin and an upstream reference location; and obtaining total organic carbon (TOC) and grain size data to support evaluation of benthic substrate and exposure pathway assessment in the risk assessment. Based upon their review of the data, calculations and opinions presented in the screening report, CTDEEP opined that “…the ecological risk to receptors is negligible and no further study is needed.” A copy of CTDEEP’s email response is included with the screening report in Appendix A of this report. Additional details of the sediment sampling are provided in the Screening Level Ecological Risk Assessment Report, prepared by Anchor QEA, LLC and submitted to CTDEEP in January 2015, included in Appendix A. 3.2.2 2015 Sampling Events (May 2015-July 2015) Between May 11, 2015 and July 9, 2015, Weston & Sampson performed additional investigation activities including the advancement of soil borings, installation of groundwater monitoring wells, and collection of soil and groundwater samples. This investigation was conducted in the same manner as the initial remedial investigation activities that have been completed at the Site. During the week of May 11, 2015, Weston & Sampson personnel observed NEG complete the advancement of 63 soil borings (B-123 through B-186 and boring B-144 were inadvertently omitted from the numbering scheme) surrounding the detention basin. The borings were advanced to a maximum depth of 5 feet below grade. This termination depth was selected based on historical data obtained from outside the basin structure that indicated PCBs were less than 1.0 mg/kg at depths greater than 5 feet. Soil samples were collected from each boring at 1 foot intervals over the span of the five-foot sample. Each sample was submitted to ConTest for PCB analysis via soxhlet extraction. Initially, the top two or three samples were immediately extracted and analyzed. Subsequent to receipt of the analytical data, additional samples from each boring were extracted and analyzed until PCB concentrations were reported as less than 1 mg/kg or all 5 samples from borings in questions were analyzed. It should be noted that of the 315 samples collected, 12 were not extracted within the required hold times. Those 12 samples were analyzed to obtain at least reference data. It should be noted that the few samples that were analyzed beyond their hold times revealed PCB concentrations less than 1 mg/kg and for the most part, in areas where the delays were inconsequential to the overall assessment plan for this site, meaning that those samples were either on the outer limits of the investigation or in areas where additional postremediation sampling would still be required. Equipment blanks were again collected at the completion of each field day using the same process as previously described for the 2012 and 2014 remedial investigations. The equipment blanks were submitted to ConTest for PCB via the 8082 Method, and a summary of equipment rinse blanks can be found in Table 7. The equipment and decontamination procedures used were also the same as those outlined above for the 2012 and 2014 remedial investigations. The results of the May 2015 investigation accomplished defining the horizontal and vertical extents for approximately 95% of the impacted area. The vertical extent of PCB impacts identified during the completion of this portion of the investigation has been defined to 7 feet below grade or less. The horizontal extent of PCB impacts less than 10 mg/kg has been 100% defined. With the exception of the northeast corner, along campus drive and a small portion of the southern tip of the basin/impacted area, the horizontal limits of PCB impacts have been defined to less than 1 mg/kg. A summary of www.westonandsampson.com 3-5
  8. Page 77 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 77 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 soil sample analytical results for the May and June 2015 soil samples can also be found in Table 5. On June 30, 2015, Weston & Sampson and NEG returned to the site to install 6 groundwater monitoring wells (MW-1 through MW-6) and to advance one additional soil boring (B-187) at the site. The purpose of boring B-187 was to attempt to delineate the northeastern extent of PCB impacts. Although the surficial sample (0 – 1’) reported a PCB concentration of 2.1 mg/kg, the 1 – 2’ and 2 – 3’ samples both reported PCB concentrations of less than 1 mg/kg. Upon installation of the groundwater monitoring wells on June 30, 2015, the wells were developed and allowed to stabilize prior to sampling. Two of the wells were installed in the areas that exhibited the highest concentrations of PCBs in soil, others in downgradient locations and the remaining in upgradient locations or randomly placed to assess all potential contributors to potential impact groundwater. Groundwater samples were collected on July 9, 2015. Monitoring well MW-4 was dry and thus not sampled. The groundwater samples were submitted to ConTest for PCB analysis. All five groundwater samples reported non-detectable concentrations of PCBs [less than 0.2 micrograms-per-liter (µg/L)]. See Table 6 for a summary of July 2015 groundwater sample analytical results. Based on the data, PCBs have not impacted groundwater beneath the site. Copies of all the laboratory analytical reports are included in Appendix B. 3.3 Location and Extent of the Identified Impacted Areas Figure 6 has been developed utilizing results of sampling conducted on-site and represents current conditions. The locations of the samples containing PCB concentration ranges are depicted in Figure 6. Concentration ranges for total PCBs are color coded and include the following: • • • • • Less than (<) 1 mg/kg presented in blue; < 10 mg/kg presented in green; < 25 mg/kg presented in brown; < 50 mg/kg presented in orange; and > 50 mg/kg presented in purple. The estimated extent of PCB impacted soils proposed for remediation is illustrated on Figure 7. Soils will be excavated at the following locations to the indicated targeted depths: 7 ft. in the areas between WSE-3 and B-56 6 ft. in the areas between B-113, B-18, B-27, B-51, B-29 and B-119 5 ft. in the area of B-40, B-124 and B-125, as well as B-16 and the areas between B105, B-10, B-17 and B-109 4 ft. in the areas between B-99, B-102 and B-103 2 ft. in the areas between B-141, B-115, B-120 and B-156, as well as B-176. Overall, the highest PCB impacts appear to exist to a depth of 7.0 feet inside the basin and 6.0 feet outside the settling basin. Particularly, the areas of the basin containing PCB concentrations >25 mg/kg, are located within the southwest quadrant of the basin, and areas containing greater than 50 mg/kg PCB along the northwest and north-central regions of the basin. Beyond 6.0 feet, PCB concentrations within the settling basin decrease significantly. Some of the highest PCB concentrations are located along the outside southern perimeter of the basin. PCB impacts observed along this southern boundary consistently decrease with depth up to 6.0 feet and continue to decrease markedly to BDL by 10 feet below surface grade. Based upon the data compiled to date it appears that PCB-impacts have been defined vertically www.westonandsampson.com 3-6
  9. Page 78 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 78 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 within and outside of the basin, as well as laterally outside of the basin consistent with the TSCA’s low occupancy standard of 25 mg/kg and CTDEEP’s industrial/commercial standard of 10 mg/kg. On September 19, 2012, CL&P filed a Significant Environmental Hazard (SEH) Notification with the CTDEEP. The specific contaminant of concern triggering this reporting requirement was PCBs, which was found in excess of the SEH concentration of 30 mg/kg in soil within the upper two feet of the ground surface at three boring locations (B-16, B-28, and B-51). The SEH documented that surface soil contamination was due to a release of PCBs. The locations of these detections are restricted by means of a locked, gated fence with appropriate signage. Two additional SEH notifications were completed and submitted to CTDEEP by Eversource on July 2, 2014 and June 8, 2015, and they include the elevated PCB concentrations above the SEH threshold detected in surficial soil collected from borings B-113, B-116, B-117, B-119, B142 and B-156. The fence line was expanded to include these areas and restrict access to impacted surficial soils. www.westonandsampson.com 3-7
  10. Page 79 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 79 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 4.0 SITE CLEANUP PLAN 4.1 Cleanup Plan Objectives, Approach and Proposed Schedule The following sections present the proposed remedial actions for the Site. These actions include removal and subsequent disposal of soils with equal to or greater than 25 mg/kg of PCBs, on-site consolidation and capping of soils greater than 10 mg/kg but less than 25 mg/kg of PCBs, restricted access to soils with PCB concentrations <10 mg/kg but greater than 1 mg/kg, construction of an engineered barrier preventing access to soils containing greater than 10 mg/kg beneath the cap, and implementation of an Environmental Land Use Restriction (ELUR)/Deed Restriction for the area containing >1 mg/kg. Eversource proposes the following schedule for the Site cleanup: Task Proposed/Estimated Time Frame Submittal to EPA/CTDEEP of Remedial Plan September 2015 EPA Approval December 2015 Contractor Bidding and Selection January -May 2016 Impacted Soil Excavation, and Cleanup Verification Sampling June-September 2016 Post Cleanup Reporting October-December 2016 A Health & Safety Plan (HASP) will be prepared by a Certified Industrial Hygienist (CIH) in accordance with 29 CFR 1910.120 by the selected remediation contractor prior to commencement of remedial activities. The HASP will specify personnel protective equipment, ambient monitoring requirements and emergency response procedures. 4.2 Air Monitoring and Environmental Protection During excavation activities, the contractor shall monitor real-time dust concentrations and implement dust control methods to reduce or eliminate airborne dust emissions. An action limit of 120 micrograms-per-cubic meter (µg/m3) dust will be utilized which represents 80% of the 24hour US EPA National Ambient Air Quality Standards (NAAQS) for PM 10 (NAAQS is 150 µg/m3. If dust concentrations exceed this level, work will be stopped until engineering controls or additional dust control measures (e.g. water missing, wind barriers etc.) are implemented. Work conducted in the field will be performed under a HASP prepared and/or approved by a CIH. The HASP will specify personnel protective equipment, ambient monitoring requirements and emergency response procedures. 4.2.1 Erosion and Sedimentation Control Measures Proper erosion and sedimentation control measures will be employed during the remediation activities. Sedimentation controls will be installed along the upgradient and downgradient perimeter areas of the site that will receive stormwater from soil excavation activities. These structures will be observed and maintained on a regular basis for the duration of the project and will be installed prior to commencing field activities. Perimeter sedimentation control will include silt fencing, filtration logs or hay bales installed along the perimeter of the work zone, in stockpile/staging areas, or as needed. www.westonandsampson.com 4-1

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)