Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Words on different pages
  1. Page 79 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 79 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 4.0 SITE CLEANUP PLAN 4.1 Cleanup Plan Objectives, Approach and Proposed Schedule The following sections present the proposed remedial actions for the Site. These actions include removal and subsequent disposal of soils with equal to or greater than 25 mg/kg of PCBs, on-site consolidation and capping of soils greater than 10 mg/kg but less than 25 mg/kg of PCBs, restricted access to soils with PCB concentrations <10 mg/kg but greater than 1 mg/kg, construction of an engineered barrier preventing access to soils containing greater than 10 mg/kg beneath the cap, and implementation of an Environmental Land Use Restriction (ELUR)/Deed Restriction for the area containing >1 mg/kg. Eversource proposes the following schedule for the Site cleanup: Task Proposed/Estimated Time Frame Submittal to EPA/CTDEEP of Remedial Plan September 2015 EPA Approval December 2015 Contractor Bidding and Selection January -May 2016 Impacted Soil Excavation, and Cleanup Verification Sampling June-September 2016 Post Cleanup Reporting October-December 2016 A Health & Safety Plan (HASP) will be prepared by a Certified Industrial Hygienist (CIH) in accordance with 29 CFR 1910.120 by the selected remediation contractor prior to commencement of remedial activities. The HASP will specify personnel protective equipment, ambient monitoring requirements and emergency response procedures. 4.2 Air Monitoring and Environmental Protection During excavation activities, the contractor shall monitor real-time dust concentrations and implement dust control methods to reduce or eliminate airborne dust emissions. An action limit of 120 micrograms-per-cubic meter (µg/m3) dust will be utilized which represents 80% of the 24hour US EPA National Ambient Air Quality Standards (NAAQS) for PM 10 (NAAQS is 150 µg/m3. If dust concentrations exceed this level, work will be stopped until engineering controls or additional dust control measures (e.g. water missing, wind barriers etc.) are implemented. Work conducted in the field will be performed under a HASP prepared and/or approved by a CIH. The HASP will specify personnel protective equipment, ambient monitoring requirements and emergency response procedures. 4.2.1 Erosion and Sedimentation Control Measures Proper erosion and sedimentation control measures will be employed during the remediation activities. Sedimentation controls will be installed along the upgradient and downgradient perimeter areas of the site that will receive stormwater from soil excavation activities. These structures will be observed and maintained on a regular basis for the duration of the project and will be installed prior to commencing field activities. Perimeter sedimentation control will include silt fencing, filtration logs or hay bales installed along the perimeter of the work zone, in stockpile/staging areas, or as needed. www.westonandsampson.com 4-1
  2. Page 80 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 80 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan 4.2.2 September 2015 Dewatering The maximum depth of anticipated excavation is approximately 7 feet bsg and the depth to groundwater is approximately 6 feet bsg. The maximum anticipated area to be excavated at a depth of 7 feet bsg is approximately 1,500 square feet. Therefore, given the relative small area that will be intersecting the groundwater table, dewatering activities are not anticipated or proposed as part of the remedial plan. 4.3 Off-Site Management of Soils The selected remediation contractor will be responsible for off-site soil disposal based upon the pre-characterization soil sampling results. The contractor will also be responsible for the preparation of manifests and other documentation required for off-site disposal of impacted soil. Excavated soil will be placed directly into a lined/sealed, roll-off container that will also be used for storage of impacted soil. • • • • • PCB-impacted soil will be temporarily stockpiled on-Site. In addition, soil from areas with known PCB concentrations greater than or equal to 50 mg/kg will be segregated and stockpiled separately from materials with PCB concentrations less than 50 mg/kg. Soil staging will be performed in keeping with the general principles of the CTDEEP soil staging permit but a formal CTDEEP registration is not required because the material will be on-site less than 30 days per TSCA requirements. Remediation Waste with PCBs ≥ 50 mg/kg will be transported and disposed off-site as at a TSCA-certified disposal facility; Remediation Waste PCBs ≥ 25 mg/kg and <50 mg/kg will be transported and disposed off-site at an out-of-state RCRA Subtitle D landfill ; Remediation Waste PCBs ≥ 10 mg/kg and <25 mg/kg will be consolidated within the settling basin and capped; and Remediation Waste PCBs <10 mg/kg will be left in place. As shown on Tables 1 through 3, there are a total of eleven boring locations with PCB concentrations at varying depths exceeding 50 mg/kg. These soils will be excavated, containerized and shipped off-site to a TSCA-certified Subtitle C landfill for disposal. The estimated volume of PCB-impacted soils greater than 50 mg/kg is approximately 340 cubic yards. It is requested that soils containing PCB concentrations greater than 25 mg/kg but less than 50 mg/kg be disposed at a Non-TSCA Subtitle D landfill such as Waste Management’s Turnkey landfill facility in Rochester, New Hampshire. Preliminary estimates show that approximately 1,160 cubic yards of Non-TSCA PCB-impacted soil will be generated and shipped off-site. 4.4 On-Site Consolidation of Soils Once the off-site disposal of >25 mg/kg PCB-impacted soils has been completed, soil with PCB concentrations >10 and <25 mg/kg will be consolidated within the settling basin and capped with an engineered barrier/control. Soil exhibiting PCB impacts less than 10 mg/kg will remain in place in accordance with EPA and CTDEEP regulations; access to these areas will be restricted by fencing with signage and an ELUR will be placed over the area with PCB impacts greater than 1 mg/kg. This approach assumes that the remaining PCB impacts do not exceed CT RSR Pollutant Mobility Criteria. 4.5 Engineered Barrier The proposed cap area is located within the settling basin. A standard cap is proposed and will consist of an orange geotextile demarcation barrier or black geotextile fabric with an orange www.westonandsampson.com 4-2
  3. Page 81 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 81 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 snow fence demarcation barrier and then ten inches of compacted soil meeting the following TSCA criteria per 761.61(a)(7): • • • • Permeability: <1x10-7 cm/s % passing 200 sieve: > 30 Liquid limit: > 30 Plasticity index: > 15 A new settling basin design also includes the installation of a high density polyethylene (HDPE) or polyvinyl chloride (PVC) liner and a sand protection/drainage layer over residual PCBimpacted soils to further ensure the remaining PCB-impacted (<10 mg/kg) soils remain environmentally isolated. A schematic of the proposed cap is shown below: Proposed Cap HDPE or PVC Liner 3-inch sand drainage layer 10-inches compacted <10 ppm PCB soil per 761.61(a)(7) Demarcation Barrier Soil Containing >10 but < 25 mg/kg PCBs Based upon the area, berms surrounding the settling basin/cap area will be stabilized at a 3:1 slope. The proposed cap is located within a landscaped area, therefore the completion of the cap entails covering it with six inches of loam and then seeded. Trap rock/rip rap will be applied to appropriate areas as needed to mimic existing conditions and prevent soil erosion. The cap will be constructed to encompass the footprint of the settling basin, and will be designed in accordance with the requirements of 40 CFR 761.61(a)(7). The footprint of the proposed cap area is depicted on Figure 8. 4.6 Restoration Upon completion of excavation activities including cleanup verification soil sampling as presented in Section 4.9, the existing basin will be capped as described above in Section 4.5. A new settling basin/stormwater system will be designed and constructed at a new on-site location (to be determined) outside of the capped area as part of the restoration activities planned for the site. Stormwater flows previously handled by the basin will be re-routed to a new 20,000 cubic foot sub-surface detention basin. This design includes re-routing and new overflow/discharge piping from the sub-surface detention basin around the former settling basin toward the stream. Final design will be determined upon completion of the remedial activities. Further, the practice of storing oil filled electrical equipment, storage tanks, etc. in the parking lot upgradient of the settling basin will be evaluated in an effort to eliminate potential future releases. www.westonandsampson.com 4-3
  4. Page 82 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 82 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan 4.7 September 2015 Deed Restriction As discussed with EPA on September 24, 2014, the proposed cleanup plan includes placing a deed restriction on the property in accordance with 761.61(a)(8to minimize potential exposures during future activities at the Site with the potential to disturb the cap or underlying postremediation soils left in place. The deed restriction will be prepared in a manner consistent with RCSA 22a-133q-1 and contain a description of the residual PCB impacts remaining at the Site, a Soil Management Plan (SMP), identify futures activities at the Site that are consistent and inconsistent with the level of PCB impacts remaining, and outline a list of obligations and conditions necessary to ensure the cap is maintained. The deed restricted area will also be surrounded by a locked fence preventing access to the restricted areas. The deed restricted area and proposed fence line surrounding the area is shown on Figure 8. 4.8 Storm Water Control In preparation for storm event(s) during remediation/construction activities and as part of best management practices, erosion and sedimentation controls shall be implemented prior to commencement of work. These controls include the use of hay bales and silt fencing around the work area and in front of the outlet of the settling basin. The existing storm water system will be diverted around the work area and the basin outlet and catch basins located in the parking lot west/northwest of the settling of basin will be capped. Additionally, an anti-tracking pad consisting of stone will be located at the entrance of the construction site to prevent tracking of soils from heavy equipment off-Site. 4.9 Cleanup Verification Soil Sampling In areas where the extent of impacts to less than 1 mg/kg have not been identified during precharacterization, cleanup verification soil sampling will be performed in accordance with 40 CFR 761 Subpart O. Individual samples will be collected in a grid pattern with 5-foot (1.5-meter) intervals along each sidewall and excavation bottom for laboratory analysis. The total number of samples that will be collected for cleanup verification analysis will be determined by the size of the finished excavation. All soil samples will be collected 0 to 3 inches beneath the excavation surface (walls and bottom), and the minimum volume of sample to be collected at each point will be specified by the laboratory. One blind duplicate sample per 20 samples collected will be submitted for PCB analysis by Soxhlet Extraction for QA/QC purposes. Since the extent of excavation over a majority of the proposed remediation area has been precharacterized, it is requested that cleanup verification sampling data be utilized to augment these data. Excavation areas will be securely covered with polyethylene sheeting and secured until cleanup verification results are received and reviewed. If PCB concentrations in the cleanup verification samples are less than 10 mg/kg the excavation will be backfilled with clean soil (certified by the contractor). The analytical testing results of the backfill demonstrating that it is free of contaminants will be provided prior to importing onto the Site and will be submitted as part of the final cleanup report for the site. Otherwise, additional soil will be excavated in the locations where elevated PCBs were identified, and cleanup verification sampling will then be performed again in a similar grid manner. 4.10 Decontamination Wastes Following the completion of the cleanup, the selected remediation contractor will be responsible for the decontamination of equipment that has come in contact with PCB impacted media (excavator bucket, hoe ram etc.) in accordance with 40 CFR 761.79. The contractor will verify the completeness of equipment decontamination by performing standard wipe tests in www.westonandsampson.com 4-4
  5. Page 83 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 83 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 accordance with 40 CFR 761 subpart P. Non-liquid cleaning materials and personal protective equipment waste and other non-liquid materials resulting from decontamination shall be disposed of in accordance with 40 CFR 761.61(a)(5)(v). The decontamination wastes generated will be placed in Department of Transportation (DOT) approved 55-gallon drums. The decontamination waste drums will be labeled in accordance with 40 CFR 761 subpart C, and temporarily stored on-site in a secure area prior to off-site disposal. The drums must be transported off-site in containers meeting the requirements of the DOT Hazardous Materials Regulations (DOT HMR) at 40 CFR parts 171-180, as stated in 40 CFR 761.61(a)(5)(B) and within the applicable storage timelines. At a minimum, the drum labels will indicate that the contents include PCBs, date of generation, and emergency contact information. Composite samples will be collected from the decontamination waste drums for waste profile analysis. The results of the laboratory analysis will be evaluated to determine the method of offsite disposal by a licensed waste facility. The disposal method chosen will be based upon the decontamination methods used and the results of the waste characterization performed. www.westonandsampson.com 4-5
  6. Page 84 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 84 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 5.0 REMOVAL ACTION CLOSURE REPORT A Removal Action Closure Report will be prepared summarizing the remedial activities performed and cleanup verification results. The report will include figures showing limits of excavation, pre-characterization and cleanup verification sampling locations, laboratory data and disposal/decontamination documentation. The report will be submitted to CTDEEP and the EPA for approval. www.westonandsampson.com 5-1
  7. Page 85 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 85 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 6.0 DOCUMENTATION CERTIFICATION Enclosed in Appendix C is a written certification signed by Eversource certifying that all relevant documentation is on file at the offices of Eversource and are available for EPA inspection. In addition, a copy of the proposed certifications for the future remediation contractor and analytical laboratory are included in Appendix C. In addition, Eversource will submit a copy of the future contractor’s work plan to EPA and CTDEEP as typically required by EPA in their approval of the SIP/Risk-based remedial plan. www.westonandsampson.com 6-1
  8. Page 86 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 86 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 7.0 LIMITATIONS This Self-Implementing and Risk-Based Hybrid Cleanup Plan was prepared for the use of Eversource exclusively. The findings provided by Weston & Sampson in this report are based solely on the information reported in this document. Future investigations, and/or information that was not available to Weston & Sampson at the time of the investigation, may result in a modification of the findings stated in this report. Should additional information become available concerning this Site or neighboring properties which could directly impact the Site in the future, that information should be made available to Weston & Sampson for review so that, if necessary, conclusions presented in this report may be modified. The conclusions of this report are based upon current Site conditions observed by Weston & Sampson personnel at the time of the investigation, information provided by Eversource and samples collected and analyzed on the dates shown or stated in this report. This report has been prepared in accordance with generally accepted engineering and geological practices. No other warranty, express or implied, is made. Z:\CT-RockyHill-Projects\NUSCO+EVERSOURCE\Berlin Settling Pond\2015\SIP and RBC\Final PDF\Final 9-2015\Berlin SIP and RBC Plan September 2015 Report.docx www.westonandsampson.com 7-1
  9. Page 87 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 87 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan September 2015 8.0 REFERENCES Connecticut Department of Environmental Protection, 2002, Water Quality Standards; CTDEP, 2002. http://magic.lib.uconn.edu/connecticut data.html with sources from Connecticut Department of Environmental Protection, University of Connecticut Library Map and Geographic Information Center (MAGIC), United States Census Bureau, Trinity College, and other sources. Multispectral Color Orthophotography at 1 foot GSD, 2012, 5k Tile# 005795 State Plane Zone 0600 (CT) projection, GeoTIFF file format for the entire state of Connecticut 1.0 Reston, VA United States Environmental Protection Agency, 2005, 40 CFR (7-1-05 Edition) 761.61 PCB Remediation Waste. United State Environmental Protection Agency, The Clean Air Act, Amended 1990, National Ambient Air Quality Standards, 40 CFR part 50. United States Geological Survey, 2009, USGS The National Map (TNM), Hartford South Quadrangle, 7.5-Minute Series Topographic Map. www.westonandsampson.com 8-1
  10. Page 88 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 55 Page 88 of 4786 Berlin Campus Settling Basin Self-Implementing & Risk-Based Cleanup Plan Figures www.westonandsampson.com September 2015

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)