Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Words on different pages
  1. Page 1 of 121

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 54 Page 1 of 121 Electronic Transmittal Form for DEEP Remediation, LUST, and PCB Secure File Transfer (SFT) DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION REMEDIATION DIVISION, PCB PROGRAM, AND LEAKING UNDERGROUND STORAGE TANK COORDINATION PROGRAM www.ct.gov/deep This Electronic Transmittal Form must be completed and included as the cover sheet of your electronic document when uploading a document to the Connecticut SFT website. Requirements for Transmittals through the SFT website: • • • Documents submitted through the SFT website must include all applicable figures, tables and laboratory data. Files must be formatted as PDF/A and use the appropriate naming convention: o For Remediation Filings: REM_REMID #_SiteAddress_Town_DocumentType_DateofDocument o For LUST Filings: LUST_SiteAddress_Town_AbbreviationForDocumentType_DateofDocument o For PCB Filings: PCB_SiteAddress_Town_AbbreviationForDocumentType_DateofDocument Example: LUST_1MainStreet_Hartford_ESA_01-01-2001 Note: For “AbbreviationForDocumentType” use appropriate abbreviation at Transmittal of Documents If no Rem ID assigned (new filing) or REM ID is unknown leave field blank Part I: Primary Recipient*: Remediation Program (* required) For Remediation documents: For PCB/LUST documents: Primary Program*: Property Transfer UST Facility ID: Rem ID*: 3688 Spill Case Number: (if applicable) (if known) Part II: Site Information Site Name*: Former Enfield Cl&P Area Work Center Site Address*: 1654 King Street City/Town*: Enfield State: CT Zip Code: 06082 Secondary Programs (complete as many as applicable for this document): Program: Select Secondary Program Program: Select Secondary Program Program: Select Secondary Program Program: Select Secondary Program Project ID: Project ID: Project ID: Project ID: Provide Project ID for each secondary program if it is known. Each program has a unique ID (i.e. Rem ID, Spill Case #, UST Facility ID, etc.) Part III: Document Information (document type required for appropriate program[s] only) Remediation*: Annual Report LUST/PCB*: LUST/PCB Document Type Date of Document*: 1/31/2026 Version: Final Part IV: Submitter Information Name*: Kevin Paradise E-mail*: [email removed] Name of business this document is being submitted on behalf of and contact person email: * The Connecticut Light and Power Company dba Eversource Energy DEEP-ETF 1 of 1 Rev.09-11-2023
  2. Page 2 of 121

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 54 Page 2 of 121 LIGHTSHIP ENGINEERING ASSESSMENT AND REMEDIATION • CIVIL ENGINEERING • ENERGY MANAGEMENT • WATER AND WASTEWATER MANAGEMENT • PERMITTING January 31, 2026 Ms. Claire Quinn Connecticut Department of Energy and Environmental Protection Bureau of Water Protection and Land Reuse Remediation Division North Central District 79 Elm Street Hartford, CT 06106-5127 RE: Biannual Status Report – 2024 and 2025 Former CL&P Area Work Center 1654 King Street Enfield, Connecticut CTDEEP Remediation ID: 3688 Lightship Engineering Project No. 500.101.1 To Whom it May Concern: As requested by the Connecticut Department of Energy and Environmental Protection (“CTDEEP”), Lightship Engineering, LLC (“Lightship Engineering”) on behalf of The Connecticut Light and Power Company dba Eversource Energy (“Eversource”) has prepared this biannual status report for the years 2024 and 2025 in connection with the former CL&P Area Work Center property located at 1654 King Street in Enfield, Connecticut (the “Site”). A Site Locus Map and Site Map are provided as Figures 1 and 2, Attachment A, respectively. Site Background and Current Regulatory Status The information set forth in this section is based on information provided by Eversource and set forth in previous reports prepared by Apex Companies, LLC (“Apex”) to the CTDEEP. • Connecticut Light and Power (“CL&P”) sold the Site to Joseph F. Petronella on December 31, 1997. • Joseph F. Petronella sold the property to JFP Realty, Inc. (“JFP”) on September 11, 2000. JFP Realty is the present property owner. • CL&P remains the certifying party for the December 31, 1997 property transfer pursuant to the Connecticut Transfer Act (CGS §22a-134). • The Site was used by CL&P as an Area Work Center from 1944 to 1995. The AWC included offices for accounting and support services, line crews, transformer repairs and storage, vehicle fueling and maintenance facilities for company vehicles. • The following historical structures and Site areas were associated with the former CL&P Area Work Center at the locations indicated on Figure 2, Attachment A: o Service Building; o Garage Building; 6 Resnik Road • Suite 207 • Plymouth, Massachusetts 02360 • [phone removed] • [phone removed] www.LightshipEngineering.com
  3. Page 3 of 121

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 54 Page 3 of 121 LIGHTSHIP ENGINEERING ASSESSMENT AND REMEDIATION • CIVIL ENGINEERING • ENERGY MANAGEMENT • WATER AND WASTEWATER MANAGEMENT • PERMITTING Connecticut Department of Energy and Environmental Protection January 31, 2026 Page 2 of 8 o Covered Parking Structure; o Transformer Storage Area; o Former Remediation Shed; o Former Gasoline Dispenser; o Paved Areas; and o Gravel Storage Area • A Form III was submitted to the CTDEEP in 1989, as a result of a property transfer. • Since 1989, various subsurface investigations and assessments have been conducted. • Between 1990 and 2003, a groundwater remediation system was operated in connection with a release of gasoline from former underground storage tanks (“UST”) at the Site. • A second Form III was submitted to the CTDEEP in January 1998, along with an Environmental Condition Assessment Form (“ECAF”) as a result of the December 1997, property transfer from CL&P to Joseph F. Petronella. • The 1998 ECAF indicated that the applicable groundwater classification for the Site is GA, but the Site is not located within the zone of contribution of a public water supply well and municipal water is available to the Site and surrounding area. In addition, the nearest downgradient surface water body was identified as the Connecticut River, located approximately 2,600 feet west of the Site, with a surface water classification of C/B. • CTDEEP approved the reclassification of groundwater at the Site from GA to GB on October 9, 2003. A copy of the CTDEEP Water Quality Classifications map indicating the Site is in an area of GB Groundwater is provided at Attachment A. Lightship Engineering has not reviewed any information to date indicating that groundwater is currently in use at the Site (e.g.: potable water, irrigation, industrial uses, etc.). • Therefore, the State of Connecticut Remediation Standard Regulations (“RSR”) criteria that apply at the Site are the following: o Residential Direct Exposure Criteria (“R-DEC”); o GB Pollutant Mobility Criteria (“GB PMC”); o Residential Ground Water Volatilization Criteria (“R-GWVC”); and o Surface Water Protection Criteria (“SWPC”). • Additional details are set forth in the following reports prepared by Apex and submitted to the CTDEEP: o Supplemental Phase II/Limited Phase III Report dated January 23, 2008; o Phase III Site Investigation Report dated January 15, 2009; 6 Resnik Road • Suite 207 • Plymouth, Massachusetts 02360 • [phone removed] • [phone removed] www.LightshipEngineering.com
  4. Page 4 of 121

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 54 Page 4 of 121 LIGHTSHIP ENGINEERING ASSESSMENT AND REMEDIATION • CIVIL ENGINEERING • ENERGY MANAGEMENT • WATER AND WASTEWATER MANAGEMENT • PERMITTING Connecticut Department of Energy and Environmental Protection January 31, 2026 Page 3 of 8 o Remedial Action Plan dated February 19, 2009; o Annual Groundwater Monitoring and Soil Remedial Action Report dated January 2010; o Annual Groundwater Monitoring Report dated January 2011; o Annual Status Report dated January 2012; o Annual Status Report and Remedial Action Plan Addendum dated January 2013; o 2013 Annual Status & Remediation Summary Report dated January 2014; o 2014 Annual Status Report dated January 2015; o 2015 Annual Status Report dated January 2016; o 2016 Annual Status Report dated January 2017; o 2017 Annual Status Report dated January 2018; o 2018 Annual Status Report dated January 2019; o 2019 Annual Status Report dated January 2020; and o 2021 Annual Status Report dated January 2022. On behalf of Eversource, Lightship Engineering submitted a Biannual Status Report – 2022 and 2023 dated January 12, 2024 (the “2022/2023 Status Report”). A brief summary of the site activities detailed in the 2022/2023 Status Report is set forth below, additional details are provided in the 2022/2023 Status Report. • In an attempt to assess data gaps associated with the historic assessment activities, specifically associated with Area of Concern (“AOC”) 7 (Loading docks at the Site), a ground penetrating radar (“GPR”) and electromagnetic (“EM”) survey was conducted on September 20, 2022, at accessible locations in the area where waste material were identified during the 2013, assessment and remediation activities. The purpose of the survey was to attempt to assess the estimated limits of the previously observed waste material (reportedly: utility poles [some coated with creosote], scrap metal, ceramic insulators, pipes and wiring) and to assess if additional remediation (excavation and/or waste removal) is required. • The results of the GPR and EM survey are provided in the Geophysical Report – 1654 King St, Enfield, CT dated October 3, 2022, prepared by TPI Environmental, Inc. (the “TPI GPR EM Survey report”) included as Attachment B. As set forth in the TPI GPR EM Survey report, two areas (10’ x 8’ and 11’ x 17’) within the EM61 data display slightly elevated conductivity values, suggesting the possibility of some scattered metallic debris. These areas are highlighted in Figure 1 and were marked on-site to assist in 6 Resnik Road • Suite 207 • Plymouth, Massachusetts 02360 • [phone removed] • [phone removed] www.LightshipEngineering.com
  5. Page 5 of 121

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 54 Page 5 of 121 LIGHTSHIP ENGINEERING ASSESSMENT AND REMEDIATION • CIVIL ENGINEERING • ENERGY MANAGEMENT • WATER AND WASTEWATER MANAGEMENT • PERMITTING Connecticut Department of Energy and Environmental Protection January 31, 2026 Page 4 of 8 future test pitting efforts. Locations of elevated conductivity values are indicated on Figure 3, Attachment A. • On November 22, 2022, Lightship Engineering advanced soil borings LE-SB1 through LE-SB13 at the locations indicated on Figure 3, Attachment A using the direct push drilling methodology in an attempt to assess the extent of compounds resulting from the waste and/or historic Site operations based on the historic response actions conducted to date and recent GPR/EM survey results. Each soil boring was advanced to approximately 16 to 20 feet below grade. Soil samples were collected continuously in two-foot intervals and field screened for total organic vapors (“TOV”) with a photoionization detector (“PID”), equipped with a 10.6 eV lamp and calibrated to respond as parts per million by volume isobutene, using the MassDEP jar headspace method 1, and classified utilizing the Unified Soil Classification System (“USCS”) the results are set forth in the soil boring logs provided at Attachment C. As set forth in the soil boring logs provided at Attachment C, fill material, including coal and ceramic was observed in soil borings LESB2 from approximately eight to 10 feet below grade and LE-SB7 from approximately 12 to 14 feet below grade at the locations indicated on Figure 3, Attachment A. • Based on visual, olfactory, and TOV field screening data, select soil samples were collected and submitted to a Connecticut certified analytical laboratory for extractable petroleum hydrocarbons (“EPH”) carbon ranges only, and polycyclic aromatic hydrocarbons (“PAHs”) analyses. In addition, if concentrations of PAHs exceeded the GB PMC set forth in the 2021 State of Connecticut RSRs, these samples were extracted by EPA Method 1312 synthetic precipitation leaching procedure (“SPLP”) and the SPLP extract was analyzed for PAH. In addition, select historic soil sampling locations were re-collected for SPLP PAH analysis as well, to provide vertical delineation of previous GB PMC exceedances. The results of the soil sampling are provided in Table 1, Attachment D and a copy of the laboratory analytical data package was included in the 2022/2023 Status Report. • Upon completion of the soil boring advancement, the soil generated during soil boring advancement was returned to the soil borings and the asphalt pavement was patched with cold patch asphalt. • On October 5, 2023, Lightship Engineering assessed the depth to groundwater from monitoring wells MW-9, MW-12, MW-13, RW-3, RW-4 and RW-5 and assessed for the presence of non-aqueous phase liquid (“NAPL”) with an oil and/or water interface probe, but no NAPL was observed. As set forth in the 2022/2023 Status Report, the depth to groundwater ranged from 4.55 to 13.37 feet below the top of PVC inner casing. The estimated groundwater flow direction is in a northwesterly direction, towards the 1. “Interim Remediation Waste Management Policy for Petroleum Contaminated Soils #WSC-94-400; ATTACHMENT II - JAR HEADSPACE ANALYTICAL SCREENING PROCEDURE”; MassDEP (1994) 6 Resnik Road • Suite 207 • Plymouth, Massachusetts 02360 • [phone removed] • [phone removed] www.LightshipEngineering.com
  6. Page 6 of 121

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 54 Page 6 of 121 LIGHTSHIP ENGINEERING ASSESSMENT AND REMEDIATION • CIVIL ENGINEERING • ENERGY MANAGEMENT • WATER AND WASTEWATER MANAGEMENT • PERMITTING Connecticut Department of Energy and Environmental Protection January 31, 2026 Page 5 of 8 Connecticut River, which is consistent with the historic groundwater flow direction at the Site. • Prior to sampling, Lightship Engineering purged groundwater from each groundwater monitoring well using the low flow purging methodology consistent with the Environmental Protection Agency’s (“EPA’s”) standard operating procedures 2. • Purging was performed at a rate of 300 milliliters per minute (“mL/min.”) or less to minimize stress on the overburden groundwater system. To assess if the aquifer had been stabilized prior to sample collection, Lightship Engineering monitored turbidity, dissolved oxygen (“DO”), oxidation-reduction potential (“ORP”), pH, temperature and specific conductance every five to ten minutes in accordance with the EPA’s Low-Flow sampling methodology. Each groundwater monitoring well was purged until the aquifer was considered stabilized consistent with the EPA’s Low-Flow sampling methodology (in general, three consecutive readings within the following limits: turbidity: +10%; DO: +10%; specific conductance: +3%; temperature: +3%; pH: +0.1 unit; and ORP: +10 millivolts). All groundwater wells sampled on October 5, 2023, had three consecutive readings within the limits set forth above and/or consistent with the stabilization parameters set forth in the EPA’s Low-Flow sampling methodology. Well Purging-Field Water Quality Measurement Forms for each of the wells sampled were provided in the 2022/2023 Status Report. • Consistent with the historic annual sampling conducted at the Site, groundwater samples were collected from groundwater monitoring wells MW-9, MW-12, MW-13, RW-3, RW4 and RW-5 using the low flow sampling methodology and submitted to a State of Connecticut certified analytical laboratory for volatile organic compounds (“VOCs” by Method 8260C), polynuclear aromatic hydrocarbons (“PAHs” by Method 8270D) and Connecticut “RSR15” total metals analyses. The groundwater samples submitted for VOC analysis were collected with dedicated, disposable polyethylene bailers. The results are set forth in historical analytical summary tables attached at Attachment E and a copy of the groundwater laboratory analytical data package was provided in the 2022/2023 Status Report. The analytical results were compared to applicable CTDEEP RSRs, specifically, the: o R-GWVC, which apply Site wide; and o SWPC, for which compliance may be demonstrated in groundwater at the downgradient property boundary. • As set forth in Attachment E, with the exception of total arsenic and zinc in groundwater monitoring well MW-13, concentrations of VOCs, PAHs and total Connecticut “RSR15” 2. “LOW STRESS (low flow) PURGING AND SAMPLING PROCEDURE FOR THE COLLECTION OF GROUNDWATER SAMPLES FROM MONITORING WELLS”; USEPA Region I; EQASOP-GW4 Region 1 Low-Stress (Low-Flow) SOP Revision Number: 4 Date: July 30, 1996 Revised: September 19, 2017 6 Resnik Road • Suite 207 • Plymouth, Massachusetts 02360 • [phone removed] • [phone removed] www.LightshipEngineering.com
  7. Page 7 of 121

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 54 Page 7 of 121 LIGHTSHIP ENGINEERING ASSESSMENT AND REMEDIATION • CIVIL ENGINEERING • ENERGY MANAGEMENT • WATER AND WASTEWATER MANAGEMENT • PERMITTING Connecticut Department of Energy and Environmental Protection January 31, 2026 Page 6 of 8 metals were reported below the laboratory analytical reporting limits and/or applicable RGWVC and SWPC. It should be noted that the initial turbidity value (52.1 Nephelometric Turbidity Units [“NTU”]) at groundwater monitoring well MW-13 was the highest initial turbidity value compared to the other wells sampled during this groundwater monitoring event and the stabilized turbidity value (9.6 NTU) was the highest stabilized turbidity value compared to the other wells sampled during this groundwater monitoring event as set forth in the 2022/2023 Status Report. The total arsenic (0.0323 milligrams per liter [“mg/L”]) and total zinc (0.166 mg/L) detected at groundwater monitoring well MW-13 in October 2023, above the SWPC for arsenic (0.004 mg/L) and for zinc (0.123 mg/L), may be due to the particulates/turbidity in the sample. • As set forth in the 2022/2023 Status Report, the soil and groundwater data included in the 2022/2023 Status Report is considered usable for assessing current soil and groundwater conditions at the Site. Site Activities On September 16, 2025, Lightship Engineering assessed the depth to groundwater from monitoring wells MW-9, MW-12, MW-13, RW-3, RW-4 and RW-5 and assessed for the presence of NAPL with an oil and/or water interface probe, capable of measuring to 0.01 feet, no NAPL was observed. The groundwater elevations results are summarized in Attachment F. As set forth in Attachment F, the depth to groundwater ranged from 7.61 to 14.01 feet below the top of PVC inner casing. As indicated on Figure 4, Attachment A, the estimated groundwater flow direction is in a northwesterly direction, towards the Connecticut River, which is consistent with the historic groundwater flow direction at the Site. Prior to sampling, Lightship Engineering purged groundwater from each groundwater monitoring well using the low flow purging methodology consistent with the EPA Region I lowflow SOP. Purging was performed at a rate of 300 mL/min or less to minimize stress on the overburden groundwater system. To assess if the aquifer had been stabilized prior to sample collection, Lightship Engineering monitored turbidity, DO, ORP, pH, temperature and specific conductance every five to ten minutes in accordance with the EPA’s Low-Flow Sampling methodology. Each groundwater monitoring well was purged until the aquifer was considered stabilized consistent with the EPA’s Low-Flow sampling methodology (in general, three consecutive readings within the following limits: turbidity: +10%; DO: +10%; specific conductance: +3%; temperature: +3%; pH: +0.1 unit; and ORP: +10 millivolts, or as noted in Attachment F). All groundwater wells sampled on September 16, 2025, had three consecutive readings within the limits set forth above and/or consistent with the stabilization parameters set forth in the EPA’s Low-Flow sampling methodology. Lightship Engineering completed a Well 6 Resnik Road • Suite 207 • Plymouth, Massachusetts 02360 • [phone removed] • [phone removed] www.LightshipEngineering.com
  8. Page 8 of 121

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 54 Page 8 of 121 LIGHTSHIP ENGINEERING ASSESSMENT AND REMEDIATION • CIVIL ENGINEERING • ENERGY MANAGEMENT • WATER AND WASTEWATER MANAGEMENT • PERMITTING Connecticut Department of Energy and Environmental Protection January 31, 2026 Page 7 of 8 Purging-Field Water Quality Measurement Form for each of the wells sampled, provided in Attachment F. Consistent with the historic annual sampling conducted at the Site, groundwater samples were collected from groundwater monitoring wells MW-9, MW-12, MW-13, RW-3, RW-4 and RW-5 using the low flow purging methodology and submitted to a State of Connecticut certified analytical laboratory for VOCs (Method 8260C), PAHs (Method 8270D) and Connecticut “RSR15” total metals analyses. The groundwater samples submitted for VOC analysis were collected with dedicated, disposable polyethylene bailers. The results are set forth in historical analytical summary tables attached at Attachment E and a copy of the groundwater laboratory analytical data package is provided at Attachment G. The analytical results were compared to applicable CTDEEP RSRs, specifically, the: • R-GWVC, which apply Site wide; and • SWPC, for which compliance may be demonstrated in groundwater at the downgradient property boundary. As set forth in Attachment E, with the exception of total arsenic and zinc in groundwater monitoring well MW-13, concentrations of VOCs, PAHs and total Connecticut “RSR15” metals were reported below the laboratory analytical reporting limits and/or applicable R-GWVC and SWPC. The total arsenic (0.0149 mg/L) detected at groundwater monitoring well MW-13 in September 2025 is above the SWPC for arsenic (0.004 mg/L), but lower than the total arsenic (0.0323 mg/L) detected at groundwater monitoring well MW-13 in October 2023. The total zinc (0.175 mg/L) detected at groundwater monitoring well MW-13 in September 2025 is above the SWPC for zinc (0.123 mg/L) and generally consistent with the total zinc (0.166 mg/L) detected at groundwater monitoring well MW-13 in October 2023. These results are generally consistent with historical trends for this groundwater monitoring well, and indicate that concentrations continue to remain stable and/or decrease. Data Quality Assessment/Data Usability Analysis and Reasonable Confidence Protocols The groundwater laboratory analyses performed during the 2025 groundwater monitoring event were conducted in general conformance with the CTDEEP’s “Laboratory Quality Assurance and Quality Control Guidance – Reasonable Confidence Protocols (RCP) Guidance Document” (Version 3.0, March 2024) and the analytical results were evaluated in general conformance with the CTDEEP’s May 2009 Laboratory Quality Assurance and Quality Control – Data Quality Assessment and Data Usability Evaluation Guidance Document, Version 3.0, April 2024). As set forth in Attachment G, select compounds did not meet the method specifications set forth in the applicable laboratory analytical method, but the differences were within the overall method allowances, questions 1, 1A and 1B were answered “Yes” on the Laboratory Analysis QA/QC Certification Form and Reasonable Confidence was met for each laboratory analytical data package provided at Attachment G. Therefore, the data set forth in Attachment G is considered usable for assessing current soil and groundwater conditions at the 6 Resnik Road • Suite 207 • Plymouth, Massachusetts 02360 • [phone removed] • [phone removed] www.LightshipEngineering.com
  9. Page 9 of 121

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 54 Page 9 of 121 LIGHTSHIP ENGINEERING ASSESSMENT AND REMEDIATION • CIVIL ENGINEERING • ENERGY MANAGEMENT • WATER AND WASTEWATER MANAGEMENT • PERMITTING Connecticut Department of Energy and Environmental Protection January 31, 2026 Page 8 of 8 Site. It should be noted that the PAH phenanthrene was reported in the method blank laboratory QA/QC sample and in select groundwater monitoring wells sampled during the 2025 groundwater monitoring event. The concentration of phenanthrene reported in the groundwater monitoring wells is well below the CTDEEP SWPC. Summary of Site Activities Conducted for the 2024-2025 Reporting Period As set forth in Attachment E, with the exception of total arsenic and zinc in groundwater monitoring well MW-13, concentrations of VOCs, PAHs and total Connecticut “RSR15” metals were reported below the laboratory analytical reporting limits and/or applicable R-GWVC and SWPC. The total arsenic (0.0149 mg/L) and total zinc (0.175 mg/L) detected at groundwater monitoring well MW-13 in September, above the SWPC for arsenic (0.004 mg/L) and for zinc (0.123 mg/L) are generally consistent with historical trends for this groundwater monitoring well. Lightship Engineering and Eversource are presently assessing the historic and recent soil and groundwater sampling results in an attempt to develop an approach to achieving Final Verification. It should be noted that as set forth above, the Site is owned by JFP, therefore JFP must review and approve any closure approach. Groundwater sampling will continue to be conducted every two years with the next sampling event scheduled for 2027. The results will be summarized in a Biannual Status Report submitted to the CTDEEP on every other year basis until a Final Verification is achieved (next status report due January 2028). If you have any questions, please contact either Kevin Paradise or Michael Pierdinock at [phone removed], extensions 150 and 110, respectively. Very truly yours, Lightship Engineering, LLC Kevin Paradise, LSP Senior Project Manager Michael J. Pierdinock, LSP, CHMM Principal Matthew E. Hackman, LEP No. 145 6 Resnik Road • Suite 207 • Plymouth, Massachusetts 02360 • [phone removed] • [phone removed] www.LightshipEngineering.com
  10. Page 10 of 121

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 54 Page 10 of 121 ATTACHMENT A FIGURES Figure 1 Site Locus Map Figure 2 Site Map CTDEEP Water Quality Classifications Map Figure 3 Sampling Locations Map Figure 4 Groundwater Monitoring Well Locations

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)