Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Words on different pages
  1. Page 10 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 10 of 373 Section 3 Site Description & Environmental Setting Tighe&Bond 3.3 Environmental Setting 3.3.1 Geology Surficial Geology According to the Natural Resources Conservation Service (NRCS) Web Soil Survey (WSS) for the State of Connecticut (NRCS Webpage, 2018), the Site is identified as approximately 80% Udorthents-Urban Land complex under much of the Site, 10% Ridgebury, Leicester, and Whitman soils located on the eastern portion of the Site, 5% Charlton-Chatfield complex located on the northeastern portion of the Site, and 5% Haven and Enfield soils located on the southern portion of the Site. According to the NRCS urban land consists of material that has been extensively filled or reworked and is mostly covered with impervious surfaces. Ridgebury, Leicester, and Whitman soils consist of poorly drained soils originating from lodgment till. CharltonChatfield complex soils consist of rocky materials deposited from trill transported through glacial melt water. Haven and Enfield soils consist of well drained soils deposited from glaciofluvial processes According to the Surficial Materials Map of Connecticut (United States Geological Survey (USGS)/Department of Environmental Protection, Connecticut Geological and Natural History Survey, 1992), and CTDEEP Geographic Information Systems (GIS) surficial materials data, surficial materials beneath the Site are composed of till, alluvium sand overlying sand and gravel, and swamp. The soils observed during this SSI consisted of primarily of silty sand in monitoring wells MW-104R and MW-105R and fine to medium sand in monitoring well MW-101R. Bedrock Geology According to the Bedrock Geologic Map of Connecticut (U.S. Geological Survey, 1985), the northern portion of the Site is located within the Hope Valley Alaskite Gneiss. The USGS Mineral resources spatial data for Connecticut on-line describes this unit as light pink to gray, medium- to coarse-grained granitic gneiss. The middle portion of the Site is located within the Plainfield Formation. The USGS Mineral resources spatial data for Connecticut on-line describes this unit as an interlayered thinly bedded quartzite, mica schist, and dark grey gneiss. The southern portion of the Site is located within the Potter Hill Granite Gneiss. The USGS Mineral resources spatial data for Connecticut on-line describes this unit as light pink to gray, fine- to medium-grained granitic gneiss. Bedrock was not encountered during the monitoring well reinstallation activities to a depth of 15 ftbgs. 3.3.2 Groundwater According to the CTDEEP Bureau of Water Protection and Land Reuse, groundwater at the Site is classified as GA. CTDEEP Water Quality Standards (effective April 12, 1996, revised 11-21-2015) indicate that GA classification is designated for uses including existing private and potential public or private supplies and base flow for hydraulically connected surface water bodies. GA classified groundwater is presumed suitable for human consumption without treatment. The Site is not mapped within an Aquifer Protection Area (APA) identified by the CTDEEP. APAs are intended to protect high-yield public water supply well fields by identifying the area contributing groundwater to the wells, and then regulating land use in those areas. Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 3-3
  2. Page 11 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 11 of 373 Section 3 Site Description & Environmental Setting Tighe&Bond 3.3.3 Surface Water Two unnamed ponds are located on the east and west of the Site. According to CTDEEP, these ponds are classified as class A waterbodies. CTDEEP indicates that class A surface water is designated for use as a potential drinking water supply; fish and wildlife habitat; recreational use; agricultural and industrial supply and other legitimate uses including navigation 3.3.4 Flood Plains and Wetlands A review of the FEMA Flood Insurance Maps indicates that the southern portion of the Site is located within Zone A and a base flood elevation has not been developed. The northern portion of the Site along Moxley Road is not located within a flood zone. According to the National Wetlands Inventory and CTDEEP Wetlands GIS databases, wetlands surround the Site to the east, west and south. 3.3.5 Ecological Receptors and Endangered Species CTDEEP mapping for Natural Diversity Data Base Areas in the vicinity of the Site was reviewed. The Site is not located within a listed species or natural community area. 3.3.6 Topography The Site topography is relatively flat along the ash fill in the center of the Site. The topography slopes down from the fill pile in the east, south, and west sides towards the wetlands and unnamed ponds. Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 3-4
  3. Page 12 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 12 of 373 Tighe&Bond Section 4 CTDEEP and Local File Review Tighe & Bond reviewed the available information on-file at the CTDEEP Public File Room for the Site. A summary of the pertinent information regarding the Site and drinking water sampling results from adjacent properties has been provided above in Section 3.2. Tighe & Bond also requested information regarding the Site from the Montville Town Hall and the Uncas Health Department. No additional information was obtained from the Town Hall or Heath Department. 4-1
  4. Page 13 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 13 of 373 Tighe&Bond Section 5 Supplemental Site Investigation Activities 5.1 Site Condition The Site has remained unchanged since the 2007 investigation completed by VHB. The Site is covered with dense vegetation and mature trees. The banks of the Site at the edges of the surface water appear to be stable and signs of erosion were not observed at the Site during the completion of the Supplement SI. 5.2 Monitoring Well Installation and Development On December 18, 2019, Cisco Geotechnical, LLC (Cisco) of Glastonbury, Connecticut installed three monitoring wells (MW-101R, MW-104R, and MW-105R) under the supervision of Tighe & Bond. The three groundwater monitoring wells were installed using a Geoprobe® 7822DT track-mounted rig and flush joint casing. The wells were constructed of 2-inch diameter 10-slot PVC well screen and were installed to a depth ranging from 13 to 15 ftbgs using #00 filter sand pack and bentonite to seal. Each of the wells were completed with a 4” diameter metal standpipe. Depth to groundwater at the Site was observed during drilling activities to range from two to five ftbgs. Soils from each of the monitoring well locations were evaluated in the field using a twostep approach: • Physical characteristics of soils at each location were observed and documented using the modified Burmeister soil classification method. Descriptions are included on the boring logs in Appendix A. • Soils from the five-foot macro-core sampler were -screened in the field using a Photoionization Detector (PID) to measure VOCs and were observed for visual and olfactory indications of contamination. The groundwater monitoring wells were developed by Tighe & Bond following installation on December 18, 2019. Each well was developed to remove fines using a surge block and a whale pump. At least five well volumes were removed from each well during development. Due to excessive fines remaining in the monitoring wells following development on December 18, 2019, Tighe & Bond returned to the Site on December 20, 2019 to further develop the monitoring wells using a surge block and a whale pump. The soils generated during monitoring well installation and purge water generated during the monitoring well development were stored in labeled 55-gallon closed top steel drums. The drums were staged at the entrance to the Site behind the existing chain-link fence along Moxley Road on a covered drum pad. 5.3 Groundwater Monitoring Well Survey On January 8, 2020, Tighe & Bond oversaw Kratzert, Jones, and Associates of Milldale, CT (KJA) who conducted an elevation survey of the previously installed VHB monitoring wells (MW-100 through MW-106), the newly installed monitoring wells (MW-101R, MW104R, and MW-105R), and three existing surface water gauges. Elevations were based on the North American Vertical Datum of 1988 (NAVD88). 5-1
  5. Page 14 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 14 of 373 Section 5 Supplemental Site Investigation Activities Tighe&Bond 5.4 Groundwater Sampling & Gauging Tighe & Bond conducted four consecutive quarterly groundwater sampling events of the three newly installed monitoring wells on January 8, 2020 (Q1), May 5, 2020 (Q2), July 28, 2020 (Q3), and November 5, 2020 (Q4). Groundwater sampling was conducted following low flow sampling procedures in general accordance with the CTDEEP's Site Characterization Guidance Document dated September 2007 (revised December 2010) and Region I EPA’s Low Stress (low flow) Purging and Sampling Procedure (revised January 19, 2010). Purging and sampling were performed using a peristaltic pump and dedicated polyethylene tubing. Dissolved samples were collected using dedicated 0.45-micron filters. Purged water volumes were based on the rate of stabilization of field-measured water quality parameters, including dissolved oxygen, specific conductance, temperature, pH, turbidity, and oxidation/reduction potential. Field parameters, purging rates and water levels were measured and recorded at five-minute intervals. Upon stabilization of the groundwater parameters, the groundwater samples were collected in the appropriate laboratory supplied containers and were immediately stored in a cooler with ice. The samples were then transported by Tighe & Bond staff to Con-Test Analytical Laboratories (now Pace Analytical) of East Longmeadow, MA (Contest) for analysis. Copies of the low-flow ground water sampling logs are included in Appendix B. Groundwater samples were collected from the monitoring wells and submitted to Contest for laboratory analysis of the following: • Total and dissolved RCP Metals using EPA Method 6020B (mercury via 7470A, thallium via 6020B) • Total and dissolved iron using EPA method 6010D • Total and dissolved manganese using EPA method 6020B • pH using Standard Methods 4500-H+B Concurrently with the groundwater sampling event, each of the sampled groundwater monitoring wells were gauged for depth to water prior to purging activities. In addition, each of the existing VHB monitoring wells were also gaged for depth to water. Groundwater elevations measured during the four quarters ranged from a maximum of 105.63 feet during the Quarter 2 sampling event to a minimum of 95.14 during the Quarter 4 sampling event. Groundwater elevations are summarized in Table 1. Due to the mix of 1-inch and 2-inch PVC monitoring wells, groundwater contours were generated from the 2-inch PVC monitoring wells only (MW-101R, MW-104R, and MW105R). Based on the measured groundwater elevations, groundwater flow appears to be to the southeast and southwest, toward the open water on either side of the filled area. Groundwater contours for each gauging event were similar. Therefore, groundwater contours for the third quarter (summer) gauging event are depicted on Figure 3. 5.5 Surface Water Sampling Concurrently with the groundwater sampling events, Tighe & Bond collected surface water samples from three locations (SW-8, SW-9, and SW-16) as shown on Figure 2. The surface water samples were collected in dedicated 500 milliliter plastic bottles provided by the laboratory and decanted into the appropriate laboratory supplied containers and were immediately stored in a cooler with ice. The dissolved surface water samples were pumped through polyethylene tubing to a 0.45-micron filter using a peristaltic pump. Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 5-2
  6. Page 15 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 15 of 373 Section 5 Supplemental Site Investigation Activities Tighe&Bond The surface water samples were submitted to Contest for laboratory analysis of the following: • Total and dissolved RCP Metals using EPA Method 6020B (mercury via 7470A, thallium via 6020B) • Total and dissolved iron using EPA method 6010D • Total and dissolved manganese using EPA method 6020B • pH Standard Methods 4500-H+B 5.6 SEH Soil Delineation During a review of the 2007 Site Investigation Report, Tighe & Bond identified arsenic concentrations above the SEH Condition Notification Threshold within two feet of the surface at locations MW-102 (SEH Area 1), B4 (SEH Area 2), and B6 (SEH Area 3). As part of this SSI, Tighe & Bond collected additional soil samples around each of the three locations to delineate the extent of the SEH concentrations. In general, the samples were collected from depths of 0-1 and 1-2 ftbgs. The initial delineation samples were collected at a horizontal distance of five feet to the north, south, east, and west at each of the locations. As described below, additional samples were needed to further delineate the SEH concentrations at locations B4 and B6. These samples were collected using the same methodology as the initial delineation samples. Some locations were adjusted due to the presence of trees, roots and/or large rocks. The SEH delineation samples are shown on the insets on Figure 2. The SEH delineation samples were collected in dedicated glass jars provided by the laboratory and were immediately stored in a cooler with ice. The samples were submitted to Phoenix Environmental Laboratories in Manchester, CT (Phoenix) for laboratory analysis of the following: • Total arsenic using EPA Method 6020B Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 5-3
  7. Page 16 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 16 of 373 Tighe&Bond Section 6 Supplemental Site Investigation Findings 6.1 Groundwater Analytical Results Each of the three newly installed monitoring wells (MW-101R, MW-104R, and MW-105R) were sampled on a quarterly basis to evaluate seasonal fluctuations in the groundwater concentrations. The winter sampling event was conducted on January 8, 2020, the spring sampling event was conducted on May 5, 2020, the summer sampling event was conducted on July 28, 2020, and the fall sampling event was conducted on November 5, 2020. Groundwater analytical results were compared to the following CTDEEP regulatory criteria: • Groundwater Protection Criteria (GWPC) • Surface Water Protection Criteria (SWPC) • Additional Polluting Substances Criteria • CTDEEP Significant Environmental Hazard (SEH) Notification Concentrations (10-times the Acute Aquatic Toxicity concentrations) Threshold During the winter sampling event, one duplicate groundwater sample (MW-DUP) was collected from MW-105R and an equipment blank (EQ Blank) was collected for groundwater sampling materials for quality assurance/quality control (QA/QC) purposes. QA/QC sample results are discussed below in Section 8.3. Several metals in both the total and dissolved forms were detected at concentrations above the GWPC and/or SWPC in each of the three monitoring wells during one or more of the sampling events. Metals that were detected at concentrations above the RSR criteria include arsenic, beryllium, cadmium, chromium, copper, iron, lead, manganese, nickel, thallium, vanadium, and zinc. In addition to the concentrations exceeding the RSR criteria, concentrations above the SEH Notification Threshold Concentrations were detected during the fall sampling event. SEH exceedances include dissolved cadmium in MW-101R and MW-105R, dissolved copper in MW-101R, MW-104R, and MW-105R, and dissolved zinc in MW-101R and MW105R. pH values were measured in the field at the time of sampling as well as at the laboratory. pH was generally observed to be in the upper 3s for MW-101R and MW-104R and in the mid 4s for MW-105R with the exception of the summer sampling event where the pH values were observed in the mid 5s to low 6s at each of the monitoring wells. In general, the lowest concentrations of metals in the groundwater samples appear to be during the summer sampling event in MW-101R and during the spring sampling event in wells MW-104R and MW-105R. Groundwater sampling results from the 2020 quarterly sampling, as well as the groundwater sampling conducted by VHB on May 4, 2007, are included in Table 2. Copies of the laboratory analytical reports are included in Appendix C. 6-1
  8. Page 17 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 17 of 373 Section 6 Supplemental Site Investigation Findings Tighe&Bond 6.2 Surface Water Analytical Results Concurrent with the groundwater sampling events, three surface water locations (SW-8, SW-9, and SW-16) were sampled. A sample was not collected from SW-8 during the summer sampling event due to lack of water at the sampling location. Groundwater analytical results were compared to the following CTDEEP Water Quality Standards: • Freshwater Aquatic Life Criteria-Chronic • Freshwater Aquatic Life Criteria-Acute • Human Health Criteria for the consumption of Water and Fish During the winter sampling event, one duplicate groundwater sample (SW-DUP) was collected from SW-9 for QA/ QC purposes. QA/QC sample results are discussed below in Section 8.3. Concentrations of total arsenic at SW-16, dissolved beryllium at SW-9 and SW-16, and dissolved thallium at SW-8, SW-9, and SW-16 were detected above the Human Health Criteria for the consumption of water and fish. Concentrations of dissolved cadmium at SW-9 and SW-16, dissolved copper at SW-16, dissolved lead at SW-16, dissolved nickel at SW-9, and dissolved zinc at SW-9 and SW-16 were detected above the chronic Freshwater Aquatic Life Criteria. Concentrations of dissolved cadmium at SW-9, dissolved copper at SW-16 and dissolved zinc at SW-9 and SW-16 were detected above the acute Freshwater Aquatic Life Criteria. Exceedances generally occurred at SW-8 and SW-9 during the fall sampling event and during each sampling event except for the summer sampling event at SW-16. Surface water sampling results from the 2020 quarterly sampling are summarized in Table 3. Copies of the laboratory analytical reports are included in Appendix C. 6.3 Soil Analytical Results Soil analytical results are summarized in Table 4 and compared to the following CTDEEP regulatory criteria: • Residential Direct Exposure Criteria (Res DEC) • Residential Significant Hazard Notification Threshold Concentrations (Res SEH) As described above, arsenic was identified in three areas above the Res SEH concentration during the 2007 VHB investigation. A discussion of the soil results by SEH area is provided below. 6.3.1 SEH Area 1 Five initial delineation locations (HA-1 through HA-4 and HA-15) were sampled on September 23, 2020 at a distance of five feet north, south, east, and west of soil boring B6. HA-15 was advanced adjacent to B6 to confirm the previous sampling results. Total arsenic was detected above the Res DEC in each of the samples at depths of zero to one foot and one to two ftbgs. Total arsenic was detected above the Res SEH concentration in one sample, HA-3, located five feet west of B6 at a depth of one to two ftbgs. On November 5, 2020, three additional locations (HA-16, HA-17, and HA-18) were sampled. HA-16 was located five feet to the west of HA-3 while HA-17 and HA-18 were located six feet to the southwest and northwest, respectively. Total arsenic was detected Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 6-2
  9. Page 18 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 18 of 373 Section 6 Supplemental Site Investigation Findings Tighe&Bond above the Res DEC in each of the samples at a depth of one to two ftbgs. Total arsenic was detected above the Res SEH concentration in HA-16 at a depth of one to two ftbgs. On April 22, 2021, three additional locations (HA-24, HA-25, and HA-26) were sampled. HA-25 was located 5 feet to the west of HA-16 while HA-24 and HA-25 were located five feet to the northwest and southwest, respectively. Total arsenic was detected above the Res DEC in each of the samples at depths of zero to one foot and one to two ftbgs. Total arsenic was not detected above the Res SEH at any of the three locations. Therefore, SEH Area 1 was delineated five feet to the north, south, and east of B6 and 15 feet to the west. 6.3.2 SEH Area 2 Five initial delineation locations (HA-5 through HA-8 and HA-14) were sampled on September 23, 2020 at a distance of five feet north, south, east, and west of monitoring well MW-102. HA-14 was advanced adjacent to MW-102 to confirm the previous sampling results. Total arsenic was detected above the Res DEC in each of the samples at depths of zero to one foot and one to two ftbgs. Total arsenic was not detected above the Res SEH concentration any of the four locations. Therefore, SEH Area 2 was delineated five feet to the north, south, east, and west of MW-102. 6.3.3 SEH Area 3 Five initial delineation locations (HA-9 through HA-13) were sampled on September 23, 2020 at a distance of five feet north, south, east, and west of soil boring B4. HA-13 was advanced adjacent to B4 for to confirm the previous sampling results. Total arsenic was detected above the Res DEC in each of the samples at depths of zero to one foot and one to two ftbgs. Total arsenic was detected above the Res SEH concentration in two samples, HA-9, located five feet east of B4, and HA-12, located five feet south of B4, both at a depth of one to two ftbgs. On November 5, 2020, four additional locations (HA-19 through HA-23) were sampled. HA-19 was located five feet to the northeast of HA-9, HA-20 was located five feet to the east of HA-9, HA-21 was located 10 feet to the south of HA-9, HA-22 was located five feet south of HA-12, and HA-23 was located five feet southwest of HA-12. Total arsenic was detected above the Res DEC in each of the samples at a depth of one to two ftbgs. Total arsenic was detected above the Res SEH concentration in HA-20 and HA-21 at a depth of one to two ftbgs. On April 22, 2021, five additional locations (HA-27 through HA-31) were sampled. HA-27 was located 5 feet northeast of HA-20, HA-28 was located five feet east of HA-20, HA-29 was located five feet south of HA-20, HA-30 was located five feet east of HA 21, and HA31 was located five feet south of HA-21. Total arsenic was detected above the Res DEC in each of the samples at depths of zero to one foot and one to two ftbgs. Total arsenic was not detected above the Res SEH at any of the five locations. Therefore, SEH Area 3 was delineated five feet to the north and west of B4 and 15 feet to the south and west. Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 6-3
  10. Page 19 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 19 of 373 Tighe&Bond Section 7 Water Supply Well Receptor Survey Tighe & Bond completed a Water Supply Well Receptor Survey throughout 2020 in general accordance with CTDEEP’s Water Supply Well Receptor Survey Guidance Document dated September 2009 (revised January 2015). For the purposes of this report, a receptor is defined as a residential or commercial potable well that is in use. The receptor survey is intended to assess the extent of public water service within 500-feet of the Site and identify those properties where potable groundwater supply wells may still be in-use. The Site is located in a residential and wooded area with residential uses to the north, east, and west. As indicated previously, the Site is located within a GA groundwater classification area, which indicates that groundwater is presumed suitable for human consumption without treatment. 7.1 Water Supply Well Survey Methods The following section describes the process used by Tighe & Bond used to assess the presence of water supply wells in the vicinity of the Site. Information sources that were used by Tighe & Bond as part of the water supply survey. GIS information from the Town of Montville was used to establish a 500-foot buffer zone around the Site boundary. The street address and other information for the 10 parcels falling within the 500-foot buffer zone were obtained from the Town of Montville tax assessor. The list of properties was submitted to the Uncas Health Department on December 17, 2019 to request information regarding potable well installation records or potable water sampling results. A visual “windshield survey” was conducted from the public street ROWs as well as the Eversource electrical line easement within the 500-foot interval to identify potential residential well-heads, if present, and public water source indicators, e.g. water lines, and fire hydrants. Tighe & Bond reviewed the following information sources to assess for potential water supply wells in the vicinity of the Site: • • • • • • • Water Quality Classification Map, Montville, CT dated October 2018. Public Water Supply Map published by the Connecticut Department of Health (http://www.ct.gov/dph/cwp/view.asp?a=3139&q=513480) Town of Montville GIS Application (https://www.axisgis.com/montvillect/) CTDEEP’s Atlas of the Public Water Supply Sources & Drainage Basin of Connecticut, June 1982 Water Well Completion Reports for the Town of Montville from 1970 through 2021 and the Village of Uncasville from 1977 through 2020 available from Department of Consumer Protection, 365 Capital Avenue, Hartford, CT. CT DPH Drinking Water Section- public drinking water supplies including community and noncommunity systems (http://www.portal.ct.gov/DPH/DrinkingWater/DWS/Public-Water-System-Lists) List of Significant Environmental Hazards Reported to DEEP (Period covering 10/01/1998 through 3/31/2021 updated April 29, 2021) (https://portal.ct.gov//media/DEEP/site_clean_up/hazard_notification/hazardnotificationsummarypdf.p df ) 7-1

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)