Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Words on different pages
  1. Page 6 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 6 of 373 Tighe&Bond Section 1 Introduction Tighe & Bond, Inc. (Tighe & Bond) has prepared this Supplemental Site Investigation (SSI) report for The Connecticut Light and Power Company (CL&P) dba Eversource Energy (Eversource) for the property located at 128 Moxley Road in the village of Uncasville, Montville, Connecticut (the Site). The Site encompasses 14.43-acres and is located on the southern side of Moxley Road. Figure 1 depicts the location of the Site. The Site is currently an undeveloped, overgrown, and wooded area and is primarily defined by a lobe-shaped deposit of ash material. Wetlands surround the Site to the east, west and south. Two ponds are located on the east and west of the Site. From 1962 to circa 1968, coal ash and associated materials from the former CL&P Montville Generating Station were reportedly deposited in the swampy area of the property. The Site is currently owned by CL&P. The SSI was conducted to evaluate previously identified Significant Environmental Hazard (SEH) conditions at the Site. This SSI was conducted in accordance with the Connecticut Department of Energy and Environmental Protection (CTDEEP) Site Characterization Guidance Document (SCGD), dated September 2007, revised December 2010. 1-1
  2. Page 7 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 7 of 373 Tighe&Bond Section 2 Objectives In May 2007, Northeast Utilities Service Company (NUSCO) on behalf of CL&P submitted an SEH Notification Report to CTDEEP for two SEH conditions, Drinking Water Well Is Threatened by A Groundwater Pollution Plume (Connecticut General Statute [CGS] Section 22a-6u(g) and Surface Water Threatened (CGS Section 22a-6u(f)). Concentrations of several metals including arsenic, beryllium, cadmium, and thallium were detected in onsite monitoring wells within 500 feet upgradient of a public or private drinking water supply well at concentrations that exceed the Groundwater Protection Criteria (GWPC). The objective of the SSI was to further evaluate the SEH conditions in groundwater identified at the Site in 2007. The SSI also included the collection of seasonal groundwater and surface water samples at the Site to evaluate seasonal trends in metals concentrations and groundwater flow. During a review of previous soil data, Tighe & Bond identified an SEH condition for arsenic at three locations across the Site. The extent of these SEH concentrations were delineated as part of the Supplement SI. A potable well receptor survey was also conducted for the area in the vicinity of the Site. 2-1
  3. Page 8 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 8 of 373 Tighe&Bond Section 3 Site Description and Environmental Setting 3.1 Location The Site consists of a single parcel of land located along the southern side of Moxley Road in the village of Uncasville, Montville, Connecticut as shown on Figure 1. The Site is owned by CL&P and is identified by the Town of Montville Tax Assessor’s Office as Map 10, Lot 8 with a total acreage of 14.43 acres. The Site is currently an undeveloped, overgrown, and wooded area. The Site is primarily defined by a lobe-shaped deposit of ash material. Wetlands surround the Site to the east, west and south. Two ponds are located on the east and west of the Site. Ash deposits reportedly extend into the adjacent wetlands based on a 2007 Site Investigation Report prepared by Vanasse Hangen Brustlin, Inc. (VHB). Most of the Site and the property are mapped within the 100-year Federal Emergency Management Agency (FEMA) flood zone (Zone A) except for the northern portion of the Site near Moxley Road. According to CTDEEP mapping, the Site is located in a GA groundwater area. GA groundwater areas are designated for potential drinking water supply; fish and wildlife habitat; recreational use; agricultural and industrial supply and other legitimate uses including navigation. The Site and surrounding area are zoned residential (R-40) by the Town of Montville, which is designated as medium to high density residential development. Access to the Site is provided by a locked, chain-link fence at the northern Site boundary. Large boulders are also located at the entrance to the Site along Moxley Road to the north. A residential property, 126 Moxley Road, abuts the Site/property to the east and a residence and horse stable, Bit by Bit Stable, are located adjacent to the Site/ property to the west at 132 Moxley Road. A wooded residential lot, 131 Moxley Road, is located to the north of Moxley Road. Interstate-395 (I-395) and associated right-of-way (ROW) abuts the Site to the south. 3.2 Site History and Previous Environmental Investigations From 1962 to circa 1968, ash materials from the former CL&P Montville Generating Station were reportedly deposited in the swampy area of the Site. This area encompasses approximately 5-acres in the central portion of the 14.43-acre property. The limits of the ash material are shown on Figure 2. Environmental investigations conducted by CTDEEP in 2006 and summarized in the Subsurface Investigation Report prepared by CTDEEP dated April 24, 2006 and VHB on behalf of NU/CL&P in 2007 and summarized in the Site Investigation Report prepared by VHB dated August 2007 confirmed the presence of ash materials in soils at the Site. Previous sample locations are provided on Figure 2. Ash materials were encountered in soils to depths ranging from 7 feet to 17 feet below grade surface (ftbgs) at the Site. Concentrations of metals in the ash material were above the established CTDEEP Remediation Standard Regulation (RSR) soil and groundwater criteria. Arsenic was detected above the Residential Direct Exposure Criteria (Res DEC) in soil samples collected from 1 foot to 12 ftbgs collected during the 2006 CTDEEP Subsurface Investigation and the 2007 Site Investigation. Sporadic detections of thallium and 3-1
  4. Page 9 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 9 of 373 Section 3 Site Description & Environmental Setting Tighe&Bond beryllium were also detected above the Res DEC. Concentrations of leachable metals were generally not detected with the exception of sporadic detections of arsenic, barium, nickel and selenium at B-4, MW-101 and MW-102 sample locations. Metals including arsenic, beryllium, cadmium, copper, lead, mercury, nickel, thallium and/or zinc were detected above the Groundwater Protection Criteria (GWPC) and/or the Surface Water Protection Criteria (SWPC) in groundwater samples collected from each of the monitoring wells during previous investigations. Groundwater was assessed using 1inch diameter monitoring wells during the previous investigations. Metals including arsenic, beryllium, copper, nickel and zinc were detected in surface water samples collected from the adjacent wetlands at concentrations that exceeded the freshwater acute life criteria and/or human health criteria, collectively referred to as CTDEEP Water Quality Standards (WQSs). Elevated concentrations of metals were also detected in sediments collected from the adjacent wetlands. In 2006, CTDEEP sampled the bedrock water supply wells located at 126 Moxley Road and 132 Moxley Road. Following the sampling, the CTDEEP concluded that the bedrock water supplies were potable at both residences. However, CTDEEP identified an elevated level of radon in the bedrock well at 132 Moxley Road. On May 29, 2007, NU/CL&P submitted an SEH Notification Report to CTDEEP. CTDEEP subsequently issued an Acknowledgement Letter for the Notification of the SEH at the Ash Disposal Site at 128 Moxley Road, Montville, CT to NU/CL&P on June 12, 2007 (SEH Acknowledgement Letter). In the SEH Acknowledgement Letter, CTDEEP requested the following actions be undertaken: • Determine if the dug well at 132 Moxley Road was in use at the property. If in use, it was requested that NU sample the well immediately, and on a quarterly basis for pH and for all metals (total and dissolved) that currently exceed for Connecticut Department of Health (CTDPH) Drinking Water Action Levels and the GWPC. • Permanently fence and install signs for the contaminated area, evaluate whether the farm ponds and dug well located to the west of the Site (132 Moxley Road) have been impacted by the ash disposal area and develop a plan to abate surface water and groundwater impacts. On June 22, 2007, NU/CL&P reported that the dug well was used as the drinking water source for the 132 Moxley Road residence. NU/CLP collected a water sample from the kitchen tap of the residence and the farm pond directly to the south of the residence. Metals were not detected above the GWPC or CTDPH drinking water action levels in the dug well or the farm pond. NU/CL&P provided the sample results to CTDEEP on July 9, 2007 and the results were provided to the property owners. No additional sampling result information was identified in CTDEEP or Eversource records for the water supply wells at 126 Moxley Road or 132 Moxley Road properties. In 2015, NU/CL&P installed a chain-link fence along Moxley Road. The Site is currently identified as the “Ash Disposal Site“ at 128 Moxley Road, Montville, Connecticut in the CTDEEP’s List of Significant Environmental Hazards Reported to CTDEEP dated February 28, 2019. The list includes the following information relative to the Site: Nearby drinking water wells were sampled, and pollutants associated with the Site were not detected. An on-going evaluation of the surface water body was being conducted. Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 3-2
  5. Page 10 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 10 of 373 Section 3 Site Description & Environmental Setting Tighe&Bond 3.3 Environmental Setting 3.3.1 Geology Surficial Geology According to the Natural Resources Conservation Service (NRCS) Web Soil Survey (WSS) for the State of Connecticut (NRCS Webpage, 2018), the Site is identified as approximately 80% Udorthents-Urban Land complex under much of the Site, 10% Ridgebury, Leicester, and Whitman soils located on the eastern portion of the Site, 5% Charlton-Chatfield complex located on the northeastern portion of the Site, and 5% Haven and Enfield soils located on the southern portion of the Site. According to the NRCS urban land consists of material that has been extensively filled or reworked and is mostly covered with impervious surfaces. Ridgebury, Leicester, and Whitman soils consist of poorly drained soils originating from lodgment till. CharltonChatfield complex soils consist of rocky materials deposited from trill transported through glacial melt water. Haven and Enfield soils consist of well drained soils deposited from glaciofluvial processes According to the Surficial Materials Map of Connecticut (United States Geological Survey (USGS)/Department of Environmental Protection, Connecticut Geological and Natural History Survey, 1992), and CTDEEP Geographic Information Systems (GIS) surficial materials data, surficial materials beneath the Site are composed of till, alluvium sand overlying sand and gravel, and swamp. The soils observed during this SSI consisted of primarily of silty sand in monitoring wells MW-104R and MW-105R and fine to medium sand in monitoring well MW-101R. Bedrock Geology According to the Bedrock Geologic Map of Connecticut (U.S. Geological Survey, 1985), the northern portion of the Site is located within the Hope Valley Alaskite Gneiss. The USGS Mineral resources spatial data for Connecticut on-line describes this unit as light pink to gray, medium- to coarse-grained granitic gneiss. The middle portion of the Site is located within the Plainfield Formation. The USGS Mineral resources spatial data for Connecticut on-line describes this unit as an interlayered thinly bedded quartzite, mica schist, and dark grey gneiss. The southern portion of the Site is located within the Potter Hill Granite Gneiss. The USGS Mineral resources spatial data for Connecticut on-line describes this unit as light pink to gray, fine- to medium-grained granitic gneiss. Bedrock was not encountered during the monitoring well reinstallation activities to a depth of 15 ftbgs. 3.3.2 Groundwater According to the CTDEEP Bureau of Water Protection and Land Reuse, groundwater at the Site is classified as GA. CTDEEP Water Quality Standards (effective April 12, 1996, revised 11-21-2015) indicate that GA classification is designated for uses including existing private and potential public or private supplies and base flow for hydraulically connected surface water bodies. GA classified groundwater is presumed suitable for human consumption without treatment. The Site is not mapped within an Aquifer Protection Area (APA) identified by the CTDEEP. APAs are intended to protect high-yield public water supply well fields by identifying the area contributing groundwater to the wells, and then regulating land use in those areas. Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 3-3
  6. Page 11 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 11 of 373 Section 3 Site Description & Environmental Setting Tighe&Bond 3.3.3 Surface Water Two unnamed ponds are located on the east and west of the Site. According to CTDEEP, these ponds are classified as class A waterbodies. CTDEEP indicates that class A surface water is designated for use as a potential drinking water supply; fish and wildlife habitat; recreational use; agricultural and industrial supply and other legitimate uses including navigation 3.3.4 Flood Plains and Wetlands A review of the FEMA Flood Insurance Maps indicates that the southern portion of the Site is located within Zone A and a base flood elevation has not been developed. The northern portion of the Site along Moxley Road is not located within a flood zone. According to the National Wetlands Inventory and CTDEEP Wetlands GIS databases, wetlands surround the Site to the east, west and south. 3.3.5 Ecological Receptors and Endangered Species CTDEEP mapping for Natural Diversity Data Base Areas in the vicinity of the Site was reviewed. The Site is not located within a listed species or natural community area. 3.3.6 Topography The Site topography is relatively flat along the ash fill in the center of the Site. The topography slopes down from the fill pile in the east, south, and west sides towards the wetlands and unnamed ponds. Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 3-4
  7. Page 12 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 12 of 373 Tighe&Bond Section 4 CTDEEP and Local File Review Tighe & Bond reviewed the available information on-file at the CTDEEP Public File Room for the Site. A summary of the pertinent information regarding the Site and drinking water sampling results from adjacent properties has been provided above in Section 3.2. Tighe & Bond also requested information regarding the Site from the Montville Town Hall and the Uncas Health Department. No additional information was obtained from the Town Hall or Heath Department. 4-1
  8. Page 13 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 13 of 373 Tighe&Bond Section 5 Supplemental Site Investigation Activities 5.1 Site Condition The Site has remained unchanged since the 2007 investigation completed by VHB. The Site is covered with dense vegetation and mature trees. The banks of the Site at the edges of the surface water appear to be stable and signs of erosion were not observed at the Site during the completion of the Supplement SI. 5.2 Monitoring Well Installation and Development On December 18, 2019, Cisco Geotechnical, LLC (Cisco) of Glastonbury, Connecticut installed three monitoring wells (MW-101R, MW-104R, and MW-105R) under the supervision of Tighe & Bond. The three groundwater monitoring wells were installed using a Geoprobe® 7822DT track-mounted rig and flush joint casing. The wells were constructed of 2-inch diameter 10-slot PVC well screen and were installed to a depth ranging from 13 to 15 ftbgs using #00 filter sand pack and bentonite to seal. Each of the wells were completed with a 4” diameter metal standpipe. Depth to groundwater at the Site was observed during drilling activities to range from two to five ftbgs. Soils from each of the monitoring well locations were evaluated in the field using a twostep approach: • Physical characteristics of soils at each location were observed and documented using the modified Burmeister soil classification method. Descriptions are included on the boring logs in Appendix A. • Soils from the five-foot macro-core sampler were -screened in the field using a Photoionization Detector (PID) to measure VOCs and were observed for visual and olfactory indications of contamination. The groundwater monitoring wells were developed by Tighe & Bond following installation on December 18, 2019. Each well was developed to remove fines using a surge block and a whale pump. At least five well volumes were removed from each well during development. Due to excessive fines remaining in the monitoring wells following development on December 18, 2019, Tighe & Bond returned to the Site on December 20, 2019 to further develop the monitoring wells using a surge block and a whale pump. The soils generated during monitoring well installation and purge water generated during the monitoring well development were stored in labeled 55-gallon closed top steel drums. The drums were staged at the entrance to the Site behind the existing chain-link fence along Moxley Road on a covered drum pad. 5.3 Groundwater Monitoring Well Survey On January 8, 2020, Tighe & Bond oversaw Kratzert, Jones, and Associates of Milldale, CT (KJA) who conducted an elevation survey of the previously installed VHB monitoring wells (MW-100 through MW-106), the newly installed monitoring wells (MW-101R, MW104R, and MW-105R), and three existing surface water gauges. Elevations were based on the North American Vertical Datum of 1988 (NAVD88). 5-1
  9. Page 14 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 14 of 373 Section 5 Supplemental Site Investigation Activities Tighe&Bond 5.4 Groundwater Sampling & Gauging Tighe & Bond conducted four consecutive quarterly groundwater sampling events of the three newly installed monitoring wells on January 8, 2020 (Q1), May 5, 2020 (Q2), July 28, 2020 (Q3), and November 5, 2020 (Q4). Groundwater sampling was conducted following low flow sampling procedures in general accordance with the CTDEEP's Site Characterization Guidance Document dated September 2007 (revised December 2010) and Region I EPA’s Low Stress (low flow) Purging and Sampling Procedure (revised January 19, 2010). Purging and sampling were performed using a peristaltic pump and dedicated polyethylene tubing. Dissolved samples were collected using dedicated 0.45-micron filters. Purged water volumes were based on the rate of stabilization of field-measured water quality parameters, including dissolved oxygen, specific conductance, temperature, pH, turbidity, and oxidation/reduction potential. Field parameters, purging rates and water levels were measured and recorded at five-minute intervals. Upon stabilization of the groundwater parameters, the groundwater samples were collected in the appropriate laboratory supplied containers and were immediately stored in a cooler with ice. The samples were then transported by Tighe & Bond staff to Con-Test Analytical Laboratories (now Pace Analytical) of East Longmeadow, MA (Contest) for analysis. Copies of the low-flow ground water sampling logs are included in Appendix B. Groundwater samples were collected from the monitoring wells and submitted to Contest for laboratory analysis of the following: • Total and dissolved RCP Metals using EPA Method 6020B (mercury via 7470A, thallium via 6020B) • Total and dissolved iron using EPA method 6010D • Total and dissolved manganese using EPA method 6020B • pH using Standard Methods 4500-H+B Concurrently with the groundwater sampling event, each of the sampled groundwater monitoring wells were gauged for depth to water prior to purging activities. In addition, each of the existing VHB monitoring wells were also gaged for depth to water. Groundwater elevations measured during the four quarters ranged from a maximum of 105.63 feet during the Quarter 2 sampling event to a minimum of 95.14 during the Quarter 4 sampling event. Groundwater elevations are summarized in Table 1. Due to the mix of 1-inch and 2-inch PVC monitoring wells, groundwater contours were generated from the 2-inch PVC monitoring wells only (MW-101R, MW-104R, and MW105R). Based on the measured groundwater elevations, groundwater flow appears to be to the southeast and southwest, toward the open water on either side of the filled area. Groundwater contours for each gauging event were similar. Therefore, groundwater contours for the third quarter (summer) gauging event are depicted on Figure 3. 5.5 Surface Water Sampling Concurrently with the groundwater sampling events, Tighe & Bond collected surface water samples from three locations (SW-8, SW-9, and SW-16) as shown on Figure 2. The surface water samples were collected in dedicated 500 milliliter plastic bottles provided by the laboratory and decanted into the appropriate laboratory supplied containers and were immediately stored in a cooler with ice. The dissolved surface water samples were pumped through polyethylene tubing to a 0.45-micron filter using a peristaltic pump. Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 5-2
  10. Page 15 of 373

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 45 Page 15 of 373 Section 5 Supplemental Site Investigation Activities Tighe&Bond The surface water samples were submitted to Contest for laboratory analysis of the following: • Total and dissolved RCP Metals using EPA Method 6020B (mercury via 7470A, thallium via 6020B) • Total and dissolved iron using EPA method 6010D • Total and dissolved manganese using EPA method 6020B • pH Standard Methods 4500-H+B 5.6 SEH Soil Delineation During a review of the 2007 Site Investigation Report, Tighe & Bond identified arsenic concentrations above the SEH Condition Notification Threshold within two feet of the surface at locations MW-102 (SEH Area 1), B4 (SEH Area 2), and B6 (SEH Area 3). As part of this SSI, Tighe & Bond collected additional soil samples around each of the three locations to delineate the extent of the SEH concentrations. In general, the samples were collected from depths of 0-1 and 1-2 ftbgs. The initial delineation samples were collected at a horizontal distance of five feet to the north, south, east, and west at each of the locations. As described below, additional samples were needed to further delineate the SEH concentrations at locations B4 and B6. These samples were collected using the same methodology as the initial delineation samples. Some locations were adjusted due to the presence of trees, roots and/or large rocks. The SEH delineation samples are shown on the insets on Figure 2. The SEH delineation samples were collected in dedicated glass jars provided by the laboratory and were immediately stored in a cooler with ice. The samples were submitted to Phoenix Environmental Laboratories in Manchester, CT (Phoenix) for laboratory analysis of the following: • Total arsenic using EPA Method 6020B Supplemental Site Investigation, 128 Moxley Road, Uncasville, Montville, CT 5-3

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)