Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Words on different pages
  1. Page 12 of 1,282

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 22 Page 12 of 1282 Section 1 Background Tighe&Bond Tighe & Bond proposed that a Phase III ESA be completed to assess the nature and extent of coal tar/creosote impacts and to assess if releases occurred at other identified AOCs at the site. In addition, Tighe & Bond proposed the collection of additional water service records for properties within 500-feet of the site as part of an updated Water Well Receptor Survey which was completed as part of the 2017 Phase III ESA activities at the site. 1.4 Significant Environmental Hazards Notification and Investigation Tighe & Bond identified that benzo(a)pyrene was detected in SS-102 (0-6”) at a concentration of 45 milligrams/kilogram (mg/Kg) which is above CTDEEP’s Significant Environmental Hazard (SEH) Condition Notification Threshold Concentration of 30 mg/Kg during the 2017 Phase III ESA. SEH soil delineation activities are provided in Significant Environmental Hazard Soil Delineation, Former Rockville Manufactured Gas Plant, Rockville Substation 14W, 13 Maple Street, Rockville, CT, dated February 25, 2018, prepared by Tighe & Bond. SS-102 was collected from the top six inches of soil below the crushed gravel cover within the active Inner Substation Area. The SS-102 sample location is situated within the footprint of the former Coal Shed associated with the MGP. Historic fill material, and a large piece of coal were observed within soils during the collection of SS-102. A SEH Notification Form was submitted to CTDEEP on February 26, 2018 because the SEH Condition in surface soils was not mitigated within 90-days of identification. CTDEEP issued an SEH acknowledgement letter RE: Notification of Significant Environmental Hazard, Former Rockville Manufactured Gas Plant, 13 Maple Street, Vernon, CT dated March 16, 2018 (SEH Acknowledgement Letter). The SEH Acknowledgement Letter indicated that the reported condition did not require an immediate response to limit short-term risk because a permanent fence surrounds the property limiting access. However, annual inspection reports, site investigation and remediation would need to be continued in accordance with the plan provided in the SEH notification form. The SEH shallow soil investigation included the advancement of hand auger soil borings, HA-1 through HA-09 to 2 feet below grade around SS-102 within and adjacent to the footprint of the former coal house within the Inner Substation. The soil boring locations are provided on Figure 4. Fill materials observed in soil included brick, coal fragments, slag, wood, asphalt, glass fragments and ash. Hand auger refusal was encountered at HA-03 on a suspected foundation within the footprint of the former Coal Shed. Concentrations of benzo(a)pyrene were detected above the SEH Condition Notification Threshold Concentration of 30 mg/Kg in the three SEH investigation sample locations and depth intervals: • • • HA-01A (1.0-1.5 feet): 53 mg/Kg HA-02 (1.5-2.0 feet): 33 mg/Kg HA-03 (0.5 -1.0 feet): 32 mg/Kg PAHs were detected above the Res DEC, I/C DEC, and GB PMC at each of the hand auger locations (HA-01 through HA-09). The findings of the SEH Soil delineation were provided to CTDEEP in a letter report dated September 25, 2018. 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 1-6
  2. Page 13 of 1,282

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 22 Page 13 of 1282 Section 1 Background Tighe&Bond 1.5 2017 Annual Report The 2017 Annual Report for the Rockville Former MGP site provided a summary of the first round of Phase III ESA investigations at the site. The 2017 Annual Report provided a summary of soil, groundwater, sediment and surface water sampling that was completed at the site under the VRP. A summary of Phase III ESA and previous investigations are provided in Figure 5. The Annual Report identified data gaps that were identified in process of assessing the on-site and off-site impacts. CTDEEP requires that data gaps be fully investigated as part of the Conceptual Site Model (CSM) process prior to the remediation of a site. The following data gaps were presented in the 2017 Annual Report: • Off-site Delineation of Coal Tar Impacts to North and West of Site: Coal tar impacts were encountered to the north of the site within the St. Joseph Church Parking lot within SB-15 and MW-20S between approximately 31.5 and 38 feet below grade below the water table. Coal tar impacts were encountered in SB-13 between 20 and 40 feet below grade at the northwestern site boundary. Concentrations of PAHs were detected above the SWPC in deep monitoring MW18D and in bedrock well MW-03BR at the northwest corner of the site and in MW7S on the northeast corner of the site. ETPH was detected above the SWPC in MW-18D and MW-7S. Additional delineation of soil and groundwater impacts was identified for the northwest portion of the site and off-site to the north and west. • Assessment of Soils in Vicinity of Gas Holder #1 and Gas Holder #2: Coal tar impacted soils were encountered inside the former Gas Holders above the water table. Impacted soils were encountered outside the former Gas Holders in SB-04 and SB-05 near the apparent water table. Additional investigations were proposed to assess coal tar impacts above the seasonal high-water table for compliance with the GB PMC. • Delineation of Coal Tar/Petroleum Impacts Along the Sewer Line: Visuallyimpacted soils with petroleum odors and coal-tar odors were observed near the brick sewer line that transverses the site from Maple Street to West Street from 5 feet to 20 feet below grade. Concentrations of ETPH, PAHs and/or metals (arsenic and lead) exceeded RSR criteria in soils and PAHs exceeded the SPWC in MW-5S at the southwestern corner of the Inner Substation. Additional off-site delineation of soil and groundwater impacts to the west were proposed to assess the extent of impacts along the sewer line. • Assessment of Extent of Impacted Soils within the Inner Substation Area: Soil containing fill materials were observed within surficial soil and soil borings completed within the Inner Substation. Concentrations of PAHs, ETPH, and metals (arsenic and lead) were detected above RSR criteria. Further delineation of vertical and lateral extent of impacts in subsurface soils within the Inner Substation was recommended. • Extent of Impacted Soils within the Southern Outer Substation Area: Fill materials were encountered within the southern portion of the Outer Substation in the vicinity of the substation driveway beneath the grassed area to the east of 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 1-7
  3. Page 14 of 1,282

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 22 Page 14 of 1282 Section 1 Background Tighe&Bond the existing Control House, along the northern bank of the Hockanum River and within the overgrown portion of the site to the south of the Hockanum River abutting West Main Street. Soils in this area of the site contained concentrations of PAHs and/or ETPH above RSR criteria. Additional delineation was recommended to assess the nature and extent of the fill materials. • Seasonal Groundwater Variation: Assessment of the seasonal groundwater variation at the site. Previous groundwater sampling was completed by Northeast Utilities Service Company in April 1990 and February 1993. A comprehensive sampling during the seasonal high-water table condition was proposed to assess current groundwater conditions during the seasonal high groundwater condition at the site. • Water Supply Well Use at 13 Windsor Avenue: A water supply well record was identified for 13 Windsor Avenue in 1971. The property is currently serviced by the Connecticut Water Company. Additional efforts were recommended to assess if the supply well was currently in use. 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 1-8
  4. Page 15 of 1,282

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 22 Page 15 of 1282 Tighe&Bond Section 2 Phase III ESA Summary Tighe & Bond developed a Phase III ESA investigation program to assess the nature and extent of on-site and off-site impacts associated with the Rockville former MGP and siterelated AOCs. The Phase III ESA built upon previous investigations completed by Northeast Utilities Service Company Environmental Service Department between 1990 and 1995. The Phase III ESA was initially completed between August and November 2017. Data gaps were identified following the completion Phase III ESA in 2017. Additional Phase III ESA investigations were completed in 2018 to address data gaps and advance the CSM for the site. The Phase III ESA included the collection of hand auger soil borings to assess shallow subsurface soils, advancement subsurface soil borings to characterize soils and the installation of monitoring wells to characterize groundwater conditions on-site and offsite areas of investigation. Sediments within the Hockanum River were collected to assess sediment concentrations identified during previous site investigations and to assess contributions from outfalls that discharge to the Hockanum River. Figure 5 depicts the on-site and off-site investigation areas, previous investigation areas, and Phase III ESA sample locations. 2.1 Methods As part of the Phase III ESA, Eversource conducted outreach to secure property access agreements for abutting properties at 17 Maple Street, 51 West Street and St. Joseph Church property. Continued coordination with the United States Postal Service (USPS) was completed with to maintain access to the USPS access road for off-site groundwater gauging and sampling to the east of the site. Access to off-site properties was secured between June and September 2018. Access was requested by the property owner for 59/ 61 West Street to the west of the site; however, access was not provided for Phase III ESA investigations. Tighe & Bond and the environmental drilling subcontractor, Cisco Geotechnical, LLC (CISCO), marked out investigation locations and notified Call-Before-You-Dig (CBYD)/811 to identify publicly-owned utilities for the on-site and off-site Phase III ESA locations prior to the commencing intrusive work. In addition, private subsurface utility mark-out contractor, Underground Survey, LLC, was retained to identify subsurface utilities or obstructions at Phase III ESA locations. As a precaution, soils borings and/or monitoring wells within the Maple Street right-of-way (ROW) and within the Inner Substation Area were vacuum cleared to 5-feet below grade to avoid potentially damaging buried subsurface utilities or substation infrastructure. Environmental drilling was completed using a Geoprobe® 3230 drill rig or Geoprobe® 7822 drill rig. The compact Geoprobe 54LT was utilized for drilling on the western site boundary with 59/61 West Street where a smaller drilling footprint was required at the property boundary. Drilling was completed using direct-push drilling using Geoprobe’s dual tube DT35 sampling system which cased-off the borehole during the advancement of the deep soil borings. Samples were primarily collected using a 3.25-inch sampler which used dedicated acetate liners. Shallow samples within the top 5-feet were collected with a standard Marco-Core and dedicated acetate liner. Each boring was drilled continuously to the target completion depth of the soil boring or rig refusal. Soil 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 2-1
  5. Page 16 of 1,282

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 22 Page 16 of 1282 Section 2 Phase III ESA Summary Tighe&Bond borings were advanced from 12 feet to 75 feet below grade. Soils were logged for lithology and evidence of visual and/or olfactory impacts. Soils were screened within a photo-ionization detector (PID) and up to two headspace screening samples were collected from soil sample interval. Analytical soil samples were collected from soils containing fill, coal tar/creosote-impacted intervals or just above the seasonal high groundwater table to assess compliance with the GB PMC, or below the water table at similar depth/ elevations adjacent impacts to delineate the lateral extent of coal tar impacts or fill materials. Following completion, deep soil borings advanced below the water table were abandoned via grouting. Shallow soil borings above the water table abandoned with a combination bentonite chips and/or clean sand. Following the collection of samples, soil boring sampling equipment was decontaminated by steam cleaning over a decontamination pad located within the Outer Substation Area of the site prior to commencing sampling at the next Phase III ESA sample location. Hand auger soil borings were collected with a hand auger or a post-hole digger because of the coarse nature of the fill. Hand auger borings were advanced to collect shallow soil samples from the ground surface to 4 feet below grade in areas with limited access for a drill rig along the bank of the Hockanum River. Groundwater monitoring wells were installed using 4 ¼” hollow-stem augers using the Geoprobe® 3230. Each overburden monitoring well consisted of a 0.010”-slotted polyvinyl chloride (PVC) screen that were 10-feet in length affixed to a PVC riser that extended to the ground surface using standard well construction methods which included a sand filter pack constructed 2 feet above the top of the screen and a bentonite seal. The annulus of the deep overburden monitoring well, MW-26D, was grouted with a bentonite-grout slurry above the bentonite to seal the borehole above the well screen in order to assess water quality of the deep overburden aquifer. For water table monitoring wells, the boring annulus above the water table was backfilled with clean sand or native soil cuttings above the bentonite seal. Phase III ESA locations within the Maple Street ROW were repaired by CISCO with hot asphalt pavement in accordance with the Town of Vernon street permit. MW-26BR was installed by drilling the bedrock with a roller bit to allow for the installation of steel isolation casing. The isolation casing was grout into the bedrock and allowed to cure after which MW-26BR was drilled with an air hammer. Water table groundwater monitoring wells, designated with “S”, were installed to straddle the groundwater table which ranged between approximately 7.5 feet below grade within the Rockville 14W Inner Substation Area to 34 feet below grade in MW-23S within the USPS Access Road off-site to the east. The difference in elevation is attributable in part to a significant increase in elevation, approximately 22 feet, to the north across the site and off-site in the area MW-23S. Deep monitoring wells, designated “D” were screened in glacial materials between 64 to 83 feet below grade at or near the bedrock interface. The bedrock surface elevation contours are provided on Figure 6. Newly installed monitoring wells were surveyed by Kratzert, Jones and Associates, Inc. a Connecticut-licensed surveyor and incorporated into the site-wide survey. Newly installed groundwater monitoring wells were developed with a Waterra Hydro lift pump or whale submersible pump and surged with a surge block and check value to remove silt. In addition, MW-14S and MW-14D were developed prior to the spring event and fall event. MW-13S and MW-13D were redeveloped prior to the fall sampling event. MW-13S was previously filled with sediments and MW-13D was historically paved over 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 2-2
  6. Page 17 of 1,282

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 22 Page 17 of 1282 Section 2 Phase III ESA Summary Tighe&Bond and was located as part of 2018 activities. Groundwater wells were gauged and sampled at least one week following development. Groundwater monitoring wells were sampled using EPA Region 1 Low Stress (low flow) Purging and Sampling of Groundwater Samples from Monitoring Wells, dated July 30, 1996, Revised September 19, 2017. Groundwater samples were collected with a peristaltic pump or a bladder pump for wells where depth to groundwater was below 25 feet below grade. Groundwater was pumped through dedicated tubing through a flow through cell that was monitored with a multi-parameter YSI meter that measured groundwater parameters including pH, conductivity, oxygen reduction potential (ORP), dissolved oxygen and temperature. Turbidity was monitored with a separate turbidimeter during groundwater purging. Monitoring well screen interval information, depth to groundwater and groundwater elevation is provided on Table 1 (Appendix B). Low-flow groundwater monitoring sheets are provided in Appendix C. All field work was completed under a site-specific health and safety plan (HASP). Work activities completed within the active Inner Substation Area of the Rockville Substation 14W required completion of Eversource Substation Awareness Training and oversight by a Eversource Qualified Escort during work within the Inner Substation Area. Phase III ESA analytical samples were collected into laboratory provided and preserved sample containers, chilled on ice and maintained under chain-of-custody prior to delivery to the analytical testing laboratory, Phoenix Environmental Laboratories, Inc. (Phoenix) in Manchester, CT. Phoenix is a Connecticut Department of Health (CTDPH)-approved commercial environmental laboratory (PH-0618). Analytical samples were analyzed by reasonable confidence protocol (RCP) analytical methods. Samples were analyzed for site constituent of concern (COCs) by the following methods: volatile organic compounds (VOCs) via EPA Method 8260, SVOCs via EPA Method 8270, total CTDEEP RSR metals, leachable CTDEEP RSR metals and cyanide via synthetic precipitation leaching procedure (SPLP), extractable total petroleum hydrocarbons (ETPH) via CTDEEP ETPH Method and total cyanide via EPA 9012. PCBs were analyzed using EPA Method 8082 for soils collected within the Inner Substation and in select soils collected on the West Main Street parcel. Select soil samples were collected for pesticides in the grassed area of the Outer Substation to assess historic detections of pesticides. A summary of detected analytical results are provided by media, soil, groundwater, and sediment on Table 2, Table 3, and Table 4, respectively in Appendix B. Analytical laboratory data reports are provided in Appendix D. A summary of Phase III ESA work completed on-site at 13 Maple Street and off-site are discussed in following Sections 2.2 and 2.3, respectively. 2.2 On-Site Investigations and Findings On-site Phase III ESA investigations were completed between July and October 2018 and SEH investigations were completed between April and May 2018. Site Investigations included: 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 2-3
  7. Page 18 of 1,282

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 22 Page 18 of 1282 Section 2 Phase III ESA Summary • Advancement of 35 soil borings o soil borings (SB-28 through SB-39, SB-40, SB-40A, SB-41 through SB-59, and SB-65) o • Tighe&Bond Three soil borings for monitoring well installations (MW-24S, MW-25S, MW-30S/SB-40) Advancement of 21 hand auger soil borings (HA-01 through HA-18) o Ten SEH hand auger soil borings: HA-1, HA-1A, and HA-2 through HA-9 o Eleven Phase III ESA hand auger soil borings: HA-7A, HA-9A, and HA-10 through HA-18 o Installation of four shallow, monitoring wells screened across the water table designated “S” including one replacement well designated “R”): MW24S, MW-25S, MW-30S and MW-4SR Phase III ESA analytical samples collected on-site included: • Eighty-eight soil samples, including three blind duplicate samples. Of these samples, thirty-one, including one duplicate, were associated with the SEH assessment within the Inner Substation. • Twenty-eight groundwater samples, including two duplicates, were collected during the spring groundwater sampling event and nine groundwater samples, including one duplicate, were collected during the fall groundwater sampling event. Groundwater samples were not collected from the following monitoring wells because coal tar blebs, staining and/or sheens were observed during the development or subsequent gauging of the wells: MW-10SR, MW-24S, MW-02D, MW-03D, MW-10D on-site and MW-20S (off-site) • Seven sediment samples (SED-06A, SED-06B, SED-06C and SED-07 through SED-09) including one blind duplicate sample from sediments within the Hockanum River. A summary of on-site Phase III ESA findings is provided below. A preliminary CSM table is provided as Table 5. 2.2.1 Subsurface Soils Assessment of Extent of Impacted Soils within the Inner Substation Area • Shallow subsurface soils within the Inner Substation at the former Coal House (AOC-6) and Current Substation (AOC-8) were assessed as part of the SEH investigation described above. Concentrations of PAHs were detected above the RES DEC, I/C DEC and GB PMC at each hand auger location. Benzo(a) pyrene exceeded the SEH Condition Notification Threshold Concentration in HA-01A, HA02, and HA-03 within the footprint of the former Coal Shed within the Inner Substation. Fill materials including ash and coal fragments, were observed in soils collected from hand auger borings completed to a depth of 2 feet below grade. • Soils containing fill materials including brick, coal fragments, ash, were observed in soils collected from the central, southern and eastern potions of the Inner Substation. Shallow soils with cobbles were observed in the northern and western portion of the Inner Substation. Concentrations of PAHs, ETPH and total arsenic 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 2-4
  8. Page 19 of 1,282

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 22 Page 19 of 1282 Section 2 Phase III ESA Summary Tighe&Bond exceeded RSR criteria within the soils containing fill material to 7 feet below grade. Fill material was encountered in the footprint of the former Generator House in SB-47 to a depth of 11 feet below grade. o Concentrations of PAHs were detected above the RES DEC, I/C DEC and GB PMC in soil samples collected to between 2 and 7-feet below grade within soils that contained fill including soil borings: SB-33 (5 to 7 feet), B-34 (2 to 4 feet), B-35 (5 to 7 feet), B-36 (2 to 4 feet), SB-38 (5 to 7 feet), SB-43 (0.5 to 2 feet and 5 to 7 feet), and SB-46 (5 to 7 feet) and hand auger soil borings HA-07A (0 to 1 foot), HA-09A (2 to 2.5 feet) and HA-10 (2 to 2.5 feet). o Concentrations of ETPH were detected above the RES DEC, I/C DEC and or the GB PMC in SB-33 (5 to 7 feet), B-34 (2 to 4 feet), B-35 (5 to 7 feet), SB-43 (5 to 7 feet) and ) and hand auger soil borings HA-07A (0 to 1 foot), HA-09A (2 to 2.5 feet) and HA-10 (2 to 2.5 feet). o Concentrations of total arsenic were detected above the RES DEC and I/C DEC in soil borings SB-33 (5 to 7 feet), B-34 (2 to 4 feet), B-35 (5 to 7 feet), B-36 (2 to 4 feet), SB-43 (0.5 to 2 feet), and SB-46 (5 to 7 feet) and hand auger soil borings HA-09A(2 to 2.5 feet), HA-10 (2 to 2.5 feet) and HA-11 (1 to 2 feet). Elevated concentrations of lead ranging from 49.1 to 106 mg/Kg below the RES DEC. SPLP arsenic and lead were either not detected or detected below the GB PMC. o VOCs were detected in soil borings advanced in the shallow fill within SB33 (5 to 7 feet), B-34 (2 to 4 feet), B-35 (5 to 7 feet), B-36 (2 to 4 feet). Concentrations of benzene exceeded the GB PMC in SB-33 (5 to 7 feet) and SB-34 (2 to 4 feet). Petroleum-related VOCs were also detected in SB-33 through SB-36 at concentrations below the GB PMC and RES DEC. Concentrations of tetrachloroethylene (PCE) were detected in shallow soil samples collected from B-34 (2 to 4 feet), B-35 (5 to 7 feet), SB-42 (2 to 4 Feet), SB-43 (0.5 to 2 feet), SB-44 (1 to 3 feet) at concentrations below the GB PMC and RES DEC. Delineation of Coal Tar/Petroleum Impacts Along the Sewer Line Additional Phase III soil borings, SB-33 through SB-40A were advanced to assess subsurface soil impacts (sheens with petroleum and/or coal tar-like odor) that were observed in from approximately 5 feet to 21 feet below grade in the southwestern portion of the Inner Substation (AOC-11) near the sewer main that transverses the site. A sheen and coal tar-like odor were observed between 19 and 24.5 feet below grade in SB-10 to the south of the sewer main. Concentrations of ETPH, PAHs and/or metals (arsenic and lead) exceeded the Res DEC and/or GB PMC in SB-11 and MW-2BR. The invert for the sewer main is located between approximately 10.2 feet below grade within Maple Street to approximately 6.6 feet below grade within the Inner Substation. Sewer discharge flow is westward from Maple Street to West Street. The sewer line continues westward beneath the off-site property located at 59/61 West Street and West Street. 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 2-5
  9. Page 20 of 1,282

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 22 Page 20 of 1282 Section 2 Phase III ESA Summary Tighe&Bond Soils with sheens and/or coal tar odors were encountered in SB-33 to westward to SB36 from 11.5 feet to 20 feet below grade below the apparent watertable within the Inner Substation Area. Soils exhibiting a sheen with coal tar odors were observed in SB-38 from 10 to 11 feet below grade at the southwest property boundary and in SB-40 from 8 to 15 feet below grade along the western site boundary. Fill material, ash, coal and brick. was observed in soil borings in the vicinity of the sewer line in soil borings SB-39, SB-40 and SB-40A to 4 feet below grade. Soil samples were collected at the apparent water table at SB-38 and SB-40A. Concentrations of individual PAH compounds, chrysene in SB-38 (5 to 7 feet) and benzo (a) pyrene in SB-40A were detected above the RES DEC, I/C DEC, and/or GB PMC. Concentrations of multiple PAHs were detected in SB-39 (3 to 5 feet) within fill material above the RES DEC, I/C DEC, and/or GB PMC. ETPH was detected in SB-40A at 230 mg/Kg below RSR criteria but was detected above the RES DEC in SB-39 within the fill material. Cyanide was detected in SB-38 at 3.55 mg/Kg and in a duplicate soil sample for SB-39 at 2.33 mg/Kg below RSR criteria. Extent of Impacted Soils within the Southern Outer Substation Area Fill materials were encountered within southern portion of the Outer Substation in the vicinity of the substation driveway beneath the grassed area to the east of the existing Control House, along the bank of the Hockanum River. Soils in this area of the site contained concentrations of PAHs and/or ETPH above RSR criteria. Phase III ESA investigations in this area included the advancement of the following: • • • Five soil borings, SB-32, SB-48, SB-49, SB-50 and SB-51 within the grassed area of the Outer Substation. Seven hand auger borings, HA-12 through HA-18, along the bank of the Hockanum River. Four soil borings, SB-54 through SB-58, located on the overgrown West Main Street Parcel. Fill material including coal, slag and ash were observed in SB-32 and SB-48 through SB51 from 2 feet to as deep as 10 feet below grade. Concentrations of PAHs and ETPH were detected above the RES DEC, I/C DEC and/or the GB PMC in SB-32 (2 to 4 feet) and SB-51 (2 to 4 feet). Concentrations of arsenic were detected in each of the soil borings above the RES DEC and I/C DEC. In SB-50, coal tar material was observed in soils mixed with brick and wood piping. Sheens and coal tar blebs were observed from 15 to 17 feet below grade and sheens and coal tar odors were observed from 17 feet to 25 feet below grade. Further to the east in SB-51, petroleum odors and grey staining were observed in SB-51 from 14 to 17 feet below grade. Sheen, coal tar blebs and/or coal tar odors were observed from 17 to 20 feet below grade. Soils with fill materials were observed along the Hockanum River bank. Hand auger samples were collected from 0.5 to 4 feet below grade. Concentrations of PAHs were detected above the Res DEC, I/C DEC, and GB PMC in each hand auger location with the exception of HA-15. HA-18 (1 to 2 feet) had elevated concentrations of PAHs. Benzo (a) pyrene was detected at 86 mg/Kg which exceeds the SEH Condition Notification Threshold Concentration of 30 mg/Kg. This information was transmitted to CTDEEP in an e-mail from Tighe & Bond on December 28, 2018. CTDEEP responded via e-mail on December 28, 2018 indicating that the discovery of additional subsurface soils above the 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 2-6
  10. Page 21 of 1,282

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 22 Page 21 of 1282 Section 2 Phase III ESA Summary Tighe&Bond SEH Condition Threshold Concentration at HA-18 are covered under the February 26, 2018 SEH Notification and that a separate SEH Notification was not required. ETPH was detected above the RES DEC, I/C DEC and/or the GB PMC in HA-16 and HA18. Arsenic was detected above the RES DEC and I/C DEC in HA-15, HA-16 and HA-18. Leachable lead was detected above the GB PMC. To the south of the Hockanum River, fill materials including coal, ash and brick were observed in soil borings SB-54 to SB-57 to as deep as 8 feet below grade. Concentrations of PAHs were detected above the RES DEC, I/C DEC and GB PMC in SB54, SB-55, SB-56 and SB-58 in samples collected between 0.5 and 4 feet below grade. Assessment of Soils in Vicinity of Gas Holder #1 and Gas Holder #2 Six soil borings, SB-28 through SB-31, SB-65 and MW-24S, were advanced adjacent to the Relief Holder No.1 and No.2 to assess shallow fill and coal tar impacts above the groundwater table. Soil with fill materials, coal, ash, brick, slag, were encountered from 1 foot below grade to 7 feet below grade in SB-28 through SB-31 and MW-24S. Glass fragments were observed in the top 3 feet of SB-65. Concentrations of PAHs were detected above the RES DEC, I/C DEC and GB PMC. ETPH was detected above the RES DEC, I/C DEC and/or the GB PMC in shallow soil samples from SB-29 through SB-31 and SB-65. Benzene was detected above the GB PMC in SB-29 (1 to 3 feet). Arsenic was detected above the RES DEC and I/C DEC in SB-28 and SB-32. Leachable arsenic was not detected. Concentrations of cyanide were detected in shallow soil samples at concentrations below the RES DEC. Coal tar impacts, sheen and coal tar odors, were observed in SB-31 between 11 feet and 15 feet below grade within a silty-sand and silt layers that are situated above the groundwater level of approximately 15 feet below grade in MW-9S. Coal tar impacts were observed at the apparent water table in SB-28, SB-31, and SB-65. Coal tar impacts, blebs and odors, were observed from 25 feet to 36.5 feet below grade in SB-28 and staining and sheen was observed from 15 to 24 feet below grade. Coal tar impacts were observed in SB-65 from 17 to 25 feet below grade where the boring was terminated. SB-65 is located topographically downgradient from Relief Holder #1 and Relief Holder #2. Soil samples were collected just above the apparent watertable in SB28 through SB-31. Concentrations of PAHs were detected above the GB PMC in SB-28, SB-29 and SB-31. ETPH was detected above the GB PMC in SB-31 (15 to 17 feet). VOCs were detected at concentrations below RSR criteria in SB-31 (15 to 17 feet). 2.2.2 Groundwater On-site groundwater impacts were assessed under AOC-15. A summary of RSR exceedances in groundwater are summarized by shallow (water table) and deep monitoring wells that are screened within the overburden aquifer and bedrock wells for the Phase III ESA sampling completed during 2018. Figures 7, 8, and 9 provide a groundwater contour maps and inferred flow direction for the shallow (water table), deep overburden aquifer and bedrock aquifer beneath the site and off-site areas of investigation based upon October 2018 gauging data. Groundwater flow is northward to north-northwest in the shallow (water table), deep overburden and bedrock aquifer. Groundwater flow in the deep overburden and bedrock aquifers has a north-northwest component along Maple Street. 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 2-7

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)