Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Words on different pages
  1. Page 50 of 1,005

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 21 Page 50 of 1005 Table 3 Groundwater Analytical Data Summary Rockville Former MGP Site 13 Maple Street Rockville, CT So on Laboratory ID Sample Date Duplicate MW-2BR BZ39893 11/10/2017 - CT DEEP RSRs MW-3BR BZ39264 11/9/2017 - MW-7D BZ39261 11/9/2017 - MW-8SR MW-10BR BZ39894 BZ39263 11/10/2017 11/9/2017 - MW-14S BZ39267 11/9/2017 - MW-14D BZ39268 11/9/2017 - MW-16S MW-17S BZ39896 BZ39895 11/10/2017 11/10/2017 - MW-18D BZ39262 11/9/2017 - MW-19S BZ39266 11/9/2017 MW-Dup MW-DUP BZ39270 11/9/2017 MW-19S MW-21S BZ39269 11/9/2017 - MW-23S BZ39265 11/9/2017 - EQ BLANK BZ39271 11/9/2017 - TRIP BLANK BZ39272 BZ39897 11/9/2017 11/10/2017 - SWPC RES VC^ I/C VC^ CT ETPH (ug/L) 250* 250* 250* ND <67 84 ND <68 ND <68 78 ND <66 ND <66 ND <67 ND <67 530 ND <69 ND <67 ND <68 ND <66 ND <66 - - Total Cyanide (ug/L) 52 NE NE ND<10 ND<10 ND<10 ND<10 ND<10 ND<10 ND<10 ND<10 ND<10 ND<10 ND<10 ND<10 ND<10 ND<10 ND<10 - - VOCs (ug/L) 1,1,1-Trichloroethane 1,2,4-Trimethylbenzene 1,3,5-Trimethylbenzene Benzene Bromodichloromethane Carbon disulfide Chloroform Dibromochloromethane Ethylbenzene Isopropyl benzene (cumene) m,p-Xylene1 Methyl tert butyl ether Methylene chloride Naphthalene o-Xylene1 Tetrachloroethene Toluene Total Xylenes 62,000 150* 260* 710 510* 150* 14,100 1,020 580,000 210* 270* 10,000* 48,000 210* 270* 88 4,000,000 270* 20,400 940* 730* 215 1.1* 2100* 287 NE 50,000 900* 21,300 50,000 50,000 NE 21,300 1,500 23,500 21,300 50,000 12800* 10000* 530 35* 5200* 710 NE 50,000 2200* 50,000 50,000 50,000 NE 50,000 3,820 50,000 50,000 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 1.2 ND <5.0 7.8 ND <0.50 1.3 ND <1.0 1.1 ND <1.0 ND <1.0 19 ND <1.0 ND <1.0 ND <1.0 1.1 ND <1.0 ND <1.0 ND <1.0 ND <0.70 1.1 ND <5.0 8.1 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 0.88 ND <5.0 15 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 2.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 1.1 ND <1.0 ND <1.0 2.5 ND <0.50 ND <5.0 ND <1.0 ND <0.50 1.1 ND <1.0 ND <1.0 1.1 ND <1.0 5.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 6.4 ND <1.0 ND <1.0 ND <1.0 8.4 3.1 1.8 3.0 33 18 0.58 22 2.0 16 ND <1.0 ND <1.0 44 11 ND <1.0 3.7 27 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 3.5 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 2.8 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <0.70 ND <0.50 ND <5.0 ND <1.0 ND <0.50 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 ND <1.0 SVOCs (ug/L) 2-Methylnaphthalene Acenaphthene Acenaphthylene Anthracene Benz(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(g,h,i)perylene Benzo(k)fluoranthene bis(2-Ethylhexyl)phthalate Chrysene Dibenz(a,h)anthracene Dibenzofuran Fluoranthene Fluorene Indeno(1,2,3-cd)pyrene Naphthalene Phenanthrene Pyrene 62* 150* 0.3 1,100,000 0.3 0.3 0.3 150* 0.3 59 0.54* 0.3* 40* 3,700 140,000 0.54* 210* 14* 110,000 1,000* 30,500 NE NE NE NE NE NE NE NE NE NE 460* NE NE NE NE NE NE 13,100* 50,000 NE NE NE NE NE NE NE NE NE NE 5,800* NE NE NE NE NE NE ND <0.95 ND <0.05 ND <0.05 ND <0.05 ND <0.05 0.06 ND <0.05 ND <0.19 ND <0.05 ND <0.48 ND <0.05 ND <0.01 ND <0.05 ND <0.05 ND <0.10 ND <0.05 ND <0.10 ND <0.05 0.08 3.1 1.3 1.6 0.35 ND <0.05 ND <0.05 ND <0.05 ND <0.20 ND <0.05 ND <0.49 ND <0.05 ND <0.01 0.11 0.29 0.98 ND <0.05 8.7 2 0.37 ND <0.99 0.92 0.08 0.06 0.07 ND <0.05 ND <0.05 ND <0.20 ND <0.05 ND <0.49 0.06 ND <0.01 ND <0.05 0.34 0.24 ND <0.05 ND <0.10 0.09 0.49 ND <0.98 ND <0.05 0.22 0.1 0.41 0.86 0.57 0.74 0.56 ND <0.49 0.49 0.1 ND <0.05 0.38 ND <0.10 0.64 ND <0.10 0.09 0.76 ND <0.94 0.09 0.26 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.19 ND <0.05 ND <0.47 ND <0.05 ND <0.01 ND <0.05 0.09 0.14 ND <0.05 1.1 0.32 0.11 ND <0.94 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.19 ND <0.05 ND <0.47 ND <0.05 ND <0.01 ND <0.05 ND <0.05 ND <0.09 ND <0.05 ND <0.09 ND <0.05 ND <0.05 ND <0.94 0.39 ND <0.05 ND <0.05 ND <0.05 ND <0.05 0.06 ND <0.19 ND <0.05 0.47 0.06 0.01 ND <0.05 0.13 ND <0.09 ND <0.05 ND <0.09 0.11 0.15 ND <0.96 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.19 ND <0.05 ND <0.48 ND <0.05 ND <0.01 ND <0.05 ND <0.05 ND <0.10 ND <0.05 ND <0.10 ND <0.05 ND <0.05 ND <0.97 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.19 ND <0.05 ND <0.49 ND <0.05 ND <0.01 ND <0.05 ND <0.05 ND <0.10 ND <0.05 ND <0.10 ND <0.05 ND <0.05 28 8.4 21 1.7 0.06 ND <0.05 ND <0.05 ND <0.19 ND <0.05 ND <0.48 0.05 ND <0.01 0.83 0.82 7.0 ND <0.05 130 5.4 0.96 ND <0.98 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.20 ND <0.05 ND <0.49 ND <0.05 ND <0.01 ND <0.05 ND <0.05 ND <0.10 ND <0.05 ND <0.10 ND <0.05 ND <0.05 ND <0.98 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.20 ND <0.05 ND <0.49 ND <0.05 ND <0.01 ND <0.05 ND <0.05 ND <0.10 ND <0.05 ND <0.10 ND <0.05 ND <0.05 ND <0.94 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.19 ND <0.05 ND <0.47 ND <0.05 ND <0.01 ND <0.05 ND <0.05 ND <0.09 ND <0.05 ND <0.09 ND <0.05 ND <0.05 ND <0.95 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.19 ND <0.05 ND <0.48 ND <0.05 ND <0.01 ND <0.05 ND <0.05 ND <0.10 ND <0.05 ND <0.10 ND <0.05 ND <0.05 ND <0.94 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.05 ND <0.19 ND <0.05 ND <0.47 ND <0.05 ND <0.01 ND <0.05 ND <0.05 ND <0.09 ND <0.05 ND <0.09 ND <0.05 ND <0.05 - - 86,000 2200* NE 48 13 880 270* 123 NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE ND <5 347 10 ND <5 ND <2 ND <1 ND <2 4.0 ND <5 135 96 ND <5 ND <2 ND <1 4.0 ND <2 ND <5 176 10 ND <5 ND <2 2.0 7.0 7.0 ND <5 71 4.0 12 3.0 2.0 4.0 8.0 ND <5 144 144 ND <5 ND <2 1.0 10 42 ND <5 243 144 6.0 ND <2 729 ND <2 13 ND <5 168 364 13 4.0 84 4.0 16 ND <5 23 2.0 ND <5 ND <2 ND <1 ND <2 ND <2 ND <5 31 ND <1 ND <5 2.0 ND <1 ND <2 ND <2 ND <5 82 26 7.0 ND <2 3.0 7.0 10 ND <5 74 3.0 ND <5 ND <2 ND <1 ND <2 ND <2 ND <5 74 ND <1 ND <5 ND <2 ND <1 ND <2 ND <2 ND <5 216 2.0 ND <5 ND <2 ND <1 ND <2 3.0 14 91 13 ND <5 ND <2 2.0 6.0 10 ND <5 ND <2 ND <1 ND <5 ND <2 ND <1 ND <2 ND <2 - - Metals (ug/L) Antimony Barium Chromium Copper Lead Nickel Vanadium Zinc Notes: CT DEEP RSRs - Connecticut Department of Energy & Environmental Protection Remediation Standard Regulations SWPC - Surface Water Protection Criteria RES VC - Residential Volatilization Criteria I/C VC - Industrial/Commercial Volatilization Criteria ug/L - micrograms per Liter CT ETPH - Connecticut Extractable Total Petroleum Hydrocarbons VOCs - Volatile Organic Compounds SVOCs - Semi Volatile Organic Compounds ND - Not detected above listed laboratory reporting limit NE - RSR criteria not established * - Additional Polluting Substance and Alternative Criteria approved by CTDEEP for use with permission on a site-by-site basis. 1 - Xylene criteria apply to Total Xylenes only ^ - Volatilization Criteria Does Not Apply to Wells Screen Greater Than 15' Below the Water table Only compounds detected are summarized in the table (compounds that are not listed were not detected) Bolded and boxed - Concentration exceeds RSR value - Sample not analyzed
  2. Page 51 of 1,005

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 21 Page 51 of 1005 Table 4 Sediment Analytical Data Summary Rockville Former MGP Site 13 Maple Street Rockville, CT SED-01 BZ40749 11/13/2017 SED-02 BZ40750 11/13/2017 SED-DUP BZ40755 11/13/2017 SED-02 SED-03 BZ40751 11/13/2017 SED-04 BZ40752 11/13/2017 SED-05 BZ40753 11/13/2017 SED-06 BZ40754 11/13/2017 170 310 250 ND <290 ND <290 330 1,100 19,000 17,000 25,000 5,100 6,200 10,000 24,000 VOCs (mg/Kg) BDL BDL BDL BDL BDL BDL BDL SVOCs (mg/Kg) 2-Methylnaphthalene Acenaphthene Acenaphthylene Anthracene Benz(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(g,h,i)perylene Benzo(k)fluoranthene Carbazole Chrysene Dibenz(a,h)anthracene Dibenzofuran Fluoranthene Fluorene Indeno(1,2,3-cd)pyrene Naphthalene Phenanthrene Pyrene 0.42 1.3 0.38 3.3 7.2 6.1 5.3 3.3 5.4 1.5 7.6 0.8 1.1 19 1 3.9 0.77 19 16 ND<0.31 ND<0.31 0.42 0.9 3.0 2.7 2.8 1.6 2.6 0.66 3.5 ND<0.31 ND<0.31 7.1 0.35 1.7 ND<0.31 4.3 5.6 ND<0.30 ND<0.30 0.49 0.79 2.7 2.4 2.2 1.4 2.1 ND<0.43 3.0 ND<0.30 ND<0.30 6.1 0.35 1.5 ND<0.30 3.8 5.0 ND<0.27 ND<0.27 0.58 0.88 4.0 3.6 3.1 1.8 3.4 ND<0.38 4.1 0.43 ND<0.27 6.6 0.31 2.0 ND<0.27 2.5 6.3 ND<0.26 ND<0.26 0.29 ND<0.26 1.0 1.1 0.89 0.78 1.0 ND<0.37 1.2 ND<0.26 ND<0.26 1.5 ND<0.26 0.77 ND<0.26 0.81 1.6 ND<0.31 ND<0.31 0.41 0.59 1.9 1.8 1.7 1.1 1.7 ND<0.44 2.1 ND<0.31 ND<0.31 3.4 0.32 1.1 ND<0.31 2.2 3.1 ND<3.0 ND<3.0 ND<3.0 ND<3.0 3.9 3.6 ND<3.0 ND<3.0 3.4 ND<4.3 4.7 ND<3.0 ND<3.0 7.0 ND<3.0 ND<3.0 ND<3.0 5.5 8.3 PCBs (mg/Kg) ND<0.44 ND<0.45 ND<0.42 ND<0.39 ND<0.38 ND<0.43 ND<0.43 Total Cyanide (mg/Kg) ND<0.61 ND<0.68 ND<0.59 ND<0.59 ND<0.57 ND<0.61 ND<0.59 Metals (mg/Kg) Arsenic Barium Cadmium Chromium Copper Lead Mercury Nickel Vanadium Zinc ND <0.79 29 ND <0.40 9.22 16.1 37.7 ND <0.03 6.81 21.7 53.2 2.26 49.5 ND <0.44 17.5 26.1 64.1 ND <0.03 8.7 37.3 77.4 1.35 36.3 ND <0.41 10.1 28.4 46.1 ND <0.03 7.25 29.5 86.8 1.5 27.5 0.4 10.2 27.6 26.1 ND <0.03 7.53 31.9 77.6 2.1 40.6 0.89 14.6 46.4 78.2 ND <0.03 9.02 41.5 88.5 1.26 29.6 ND <0.46 11.3 20 28.8 ND <0.03 7.97 31.7 70.9 3.95 24.5 0.94 17.4 2,190 153 0.1 12.2 26.5 292 Sample ID Laboratory ID Sample Date Duplicate CT ETPH (mg/Kg) Total Organic Carbon (mg/Kg) Notes: mg/Kg - milligrams per kilogram NE - Not Established ND- Not detected to the reporting limit shown CT ETPH - Connecticut Extractable Total Petroleum Hydrocarbons VOCs - Volatile Organic Compounds PAHs - Polycyclic Aromatic Hydrocarbons BDL - Below Detection Limits Only compounds detected are summarized in the table (compounds that are not listed were not detected)
  3. Page 52 of 1,005

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 21 Page 52 of 1005 Table 5 Summary of Surface Water Analytical Data Rockville Former MGP Site 13 Maple Street Rockville, CT Sample ID Laboratory ID Sample Date Duplicate CT Water Quality Standards Aquatic Life Criteria SW-01 BZ40757 11/13/2017 SW-Dup SW-Dup BZ40761 11/13/2017 SW-01 SW-02 BZ40758 11/13/2017 - SW-03 BZ40759 11/13/2017 - SW-04 BZ40760 11/13/2017 - Acute Chronic CT ETPH (ug/L) NE NE ND<66 ND<66 ND<68 ND<68 ND<70 Total Cyanide (ug/L) 22 5.2 ND<10 ND<10 ND<10 ND<10 ND<10 VOCs (ug/L) Varies Varies BDL BDL BDL BDL BDL SVOCs (ug/L) Varies Varies BDL BDL BDL BDL BDL Total Metals (ug/L) Barium Zinc NE 65 NE 65 50 2.0 51 3.0 53 ND <2 47 ND <2 49 ND <2 Dissolved Metals (ug/L) Barium Chromium1 Zinc NE 323 65 NE 42 65 46 1.0 4.0 46 ND<1 3.0 56 1.0 4.0 47 ND<1 3.0 48 ND<1 6.0 Notes: ug/L - micrograms per Liter CT ETPH - Connecticut Extractable Total Petroleum Hydrocarbons VOCs - Volatile Organic Compounds SVOCs - Semi Volatile Organic Compounds NE - Criteria not established 1 - Trivalent chromium standard used based on historic site use ND - Not detected above listed laboratory reporting limit Only compounds detected are summarized in the table (compounds that are not listed were not detected) - Sample not analyzed
  4. Page 53 of 1,005

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 21 Page 53 of 1005 AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Phases of Investigation Completed Previous COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Subsurface Soil samples from MWPAHs and ETPH above RES and I/C MW-9S: ETPH, VOCs (1,2,409 contained VOC (ethylbenzene), DEC and GB PMC trimethylbenzene and naphthalene), PAHs, MW-9S: VOCs (xylenes), SVOCs above GB PMC, metals Surface water PAHs, metals, cyanide above cyanide above SWPC. ETPH detected above detected. Pesticides detected (GB Fill observed (ash, brick, coal) Res VC APS. (Hockanum River) SWPC PMC exempt) upgradient of the Staining with petroleum odors (10-11.5 ft.) AOC MW-9D: PAHs and metals MW-9D: VOC,ETPH and TCN not detected. Fill observed (ash, brick) and Naphthalene and metals detected below the Coal tar impacts above SWPC creosote sheen and odors on auger SWPC. ( 16 to 25, 33-33.5ft., 39-40 ft.) cuttings. Phase II Investigation (1992) Phase III Investigation (2016/2017) Remedial evaluation pending the completion of the Phase III investigation. Phase II Investigation (1992) Phase III Investigation (2016/2017) Remedial evaluation pending the completion of the Phase III investigation. Surface water (Hockanum River) upgradient of the AOC Phase II Investigation (1992) Human Health Risk Assessment (1994) Phase III Investigation (2016/2017) Remedial evaluation pending the completion of the Phase III investigation. Supplemental Phase III ESA proposed in 2018. Surface water (Hockanum River) upgradient of the AOC Phase II Investigation (1992) Human Health Risk Assessment (1994) Phase III Investigation (2016/2017) Remedial evaluation pending the completion of the Phase III investigation. Supplemental Phase III ESA proposed in 2018. Previous COCs in Soil Phase III COCs in Soil Phase III COCs in Groundwater Rockville Former MGP Site (On-Site) 1 2 Former Retorts/ Generating Room Coal and oil used to generate manufactured gas. Byproducts generated could include coal tar residues, coal VOCs (BTEX), ash, coke, complexed cyanide SVOCs, Metals, compounds during the Total Cyanide, ETPH production of gas. Materials could have been used as fill in the building foundation. Manufactured gas was passed through lime used to scrub impurities (sulphur/cyanide) VOCs (BTEX), from the gas (Purifier waste). Former Purifying House SVOCs, Metals, Total Cyanide, ETPH Materials could have been used as fill in the building foundation. Surface soils Subsurface soils Groundwater Surface soils Subsurface soils Groundwater TB-47 TBX1 TB-3 TB-4 TB-5 TB-20 TB-21 TB-22 SB-07 TP-01 TP-02 TP-03 MW-9S/ MW-9D MW-9S/ MW-9D MW-9S/MW-9D MW-9S/MW-9D Phase III Phase III PAHs above RES and I/C DEC and Soil samples from MW-09 GB PMC, ETPH above RES DEC in contained VOC (ethylbenzene), TP-03. PAHs detected above RES and SVOCs above GB PMC, metals I/C DEC and GB PMC. Cyanide detected. Pesticides detected (GB detected. PMC exempt) Fill observed (brick) and sheen and strong odors on auger cuttings. Surface soil: PAHs detected. 3 Former Gas Holder #1 [Gasometer-22,000 ft3 Capacity ] VOCs (BTEX), SVOCs, Total Cyanide, ETPH Residual coal tar droplets collected inside the bottom of the holder which is likely subgrade based upon its age (pre-1900 and boring refusal). Possible leaks or spills from the holder to the soils. Surface soils Subsurface soils Groundwater TB-18 (Refusal 13.6') TB-19 (Refusal 14') TB-6 (Refusal 15.5') TB-7 (Refusal 16.5') TB-45 SB-04 SB-05 SB-06 TP-04 TP-05 MW-10S MW-10M MW-10D MW-10S MW-10M MW-10D MW-10BR Phase III Soil samples from MW-10 contained VOCs, SVOCs, pesticides above GB PMC but below the water table. Strong sheen and odor observed on auger cuttings. Fill observed TB18 and TB-19. Surface soil: PAHs detected. 4 Former Gas Holder #2 [Gasometer-22,000 ft3 Capacity] VOCs (BTEX), SVOCs, Total Cyanide, ETPH Residual coal tar droplets collected inside the bottom of the holder which is likely subgrade based upon its age (pre-1900) and boring refusal. Possible leaks or spills from the holder to the soils. Surface soils Subsurface soils Groundwater TBX-4 TB-16 (Refusal 18') TB-17 TB-8 TB-9 SB-02 SB-03 SB-04 SB-05 TP-05 TP-06 MW-10S MW-10M MW-10D MW-10S MW-10M MW-10D MW-10BR Phase III Soil samples from MW-10 contained VOCs, SVOCs, pesticides above GB PMC but below the water table Strong sheen and odor observed on auger cuttings (TB-16 and TB-17). Fill (bricks) observed in TB-16. Fill observed (bricks, metal pieces, metal conduit, cast iron pipe, ash) ETPH and VOCs above RES & I/C DEC and/or GB PMC in SB-05, SB06, and TP-05. DEC does not apply to SB-05 due to sample depth greater than 15' Fill observed (ash, slag, metal) in SB06, TP-04, TP-05 Heavily coal tar impacted soils within the Gas Holder #1 (5.75 to 14 feet). Outside holder coal tar impacts observed in SB-04, SB-05 19.5- 39 feet, 44.5 ft. to 50 feet, 71 to 74 ft. PAHs, ETPH and VOCs above RES & I/C DEC and GB PMC in SB-03 and SB-05. PAHs and ETPH above GB PMC in SB-02. Fill observed (ash, brick, coal) in SB05, Fill (wood, glass, metal) observed in TP-05. Coal tar impacts: SB-02: 18 to 39 ft. SB-03: 10.5 to 15 ft. SB-04: 2.5-37 ft. 44.5-50 ft. SB-05: 19.5 to 39 ft. , 71-74 ft. TP-05.: 5.75 -6.0 ft. MW-9S: VOCs (xylenes), PAHs, metals, cyanide above SWPC MW-9D: PAHs and metals above SWPC MW-10S: VOCs and cyanide detected, PAHs and metals above SWPC. MW-10M: VOCs (xylenes) detected, PAHs and metals above SWPC MW-10D: SVOCs and metal (zinc) above SWPC MW-10S: VOCs and cyanide detected, PAHs and metals above SWPC. MW-10M: VOCs (xylenes) detected, PAHs and metals above SWPC MW-10D: SVOCs and metal (zinc) above SWPC MW-9S: ETPH, VOCs (1,2,4trimethylbenzene and naphthalene), PAHs, Surface water cyanide above SWPC. ETPH detected above Res VC APS. (Hockanum River) upgradient of the AOC MW-9D: VOC,ETPH and cyanide not detected. Naphthalene and metals detected below the SWPC. MW-10SR: Not sampled due to visual observations of tar globules/ staining during development MW-10M: ETPH, VOCs (naphthalene) detected and PAHs above SWPC. Metals detected. MW-10D: Not sampled due to visual observations of tar globules/ staining during development MW-10BR: ETPH, PAHs , VOCs, and metals detected. MW-10SR: Not sampled due to visual observations of tar globules/ staining during developmenet MW-10M: ETPH, VOCs (naphthalene) detected and PAHs above SWPC MW-10D: Not sampled due to visual observations of tar globules/ staining during development MW-10BR: ETPH, PAHs , VOCs, and metals detected.
  5. Page 54 of 1,005

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 21 Page 54 of 1005 AOC # 5 AOC Description Former Gas Holder #3 [Gasometer-110,000 ft3 Capacity) COCs Possible Release Mechanisms and Migration Pathways VOCs (BTEX), SVOCs, Total Cyanide, ETPH Residual coal tar droplets collected inside the bottom of the holder which is likely a shallow subgrade based upon its age (post 1900). Possible leaks or spills from the holder to the soils. Potentially Affected Media Surface soils Subsurface soils Groundwater Previous Investigation Soil Locations SS-3A CSS-3 TB-13 (Refusal 8') TB-14 (Refusal 6.5') Phase III Soil Locations TP-07 Previous Investigation Groundwater Locations Groundwater not investigated. Water encountered inside the holder foundation. Phase III Investigation Groundwater Locations MW-7S/MW-7D Phases of Investigation Completed Phase III Previous COCs in Soil Phase III COCs in Soil Surface soils: PAHs and metals detected Surface soils: PAHs, cyanide and metals detected Fill observed Fill observed Previous COCs in Groundwater Groundwater investigations not completed in AOC. COCs in Surface Water Investigation Status Surface water (Hockanum River) upgradient of the MW-7D: PAHs, VOCs and metals detected AOC Phase II Investigation (1992) Human Health Risk Assessment (1994) Phase III Investigation (2016/2017) Phase III COCs in Groundwater MW-7S: ETPH and PAHs detected above the SWPC. VOCs and metals detected. PAHs, ETPH, and lead above the RES and I/C DEC and GB PMC in SS-102. PCBs detected. 6 Former Coal Shed PAHs, Metals Coal stockpiled for MGP could be present in the soils. Surface soils Subsurface soils Soils not investigated SS-102 SS-103 Groundwater not investigated (within active transformer yard) Groundwater not investigated (within active transformer yard) Phase II No investigations completed in the PAHs, ETPH, and arsenic above the Groundwater investigations not Groundwater investigations not completed in No surface water AOC. at the location. AOC. completed in AOC. RES and I/C DEC and/or GB PMC in SS-103. Cyanide detected. Phase III Investigation (2017) Former Transformer House PCBs, ETPH Transformer use. Possible leaks or spills could have impacted soils. Surface soils Subsurface Soils Soils not investigated (within active transformer yard) SS-100 SS-101 Groundwater not investigated (within active transformer yard) Groundwater not investigated (within active transformer yard) Phase II No investigations completed in the AOC. PAHs above RES and I/C DEC and GB PMC in SS-100. Arsenic above Groundwater investigations not Groundwater investigations not completed in No surface water RES and I/C DEC in SS-100 and SScompleted in AOC. at the location. AOC. 101. ETPH and cyanide detected. 8 Current Substation PCBs, ETPH, Metals, ETPH Possible leaks or spills from transformers Surface soils Subsurface Soils If significant release: groundwater TB-38 TB-39S TB-32 MW-8S MW-8S Phase III PAHs and metals detected. Fill (sand) observed 9 Historic Site Fill VOCs, SVOCs, Metals, PCBs, ETPH Historic placement of fill during the development of Site. PAHs, ETPH, and arsenic above the MW-8S: Metals detected above RES and I/C DEC and/or GB PMC in the SWPC. cyanide detected. SS-103. Cyanide detected. ETPH also above RES DEC, I/C DEC and GB PMC in SS-104 and Res DEC in SS-106. Surface soils Subsurface soils Historic fill was identified in Not Applicable Not Applicable Phase III Fill (i.e., ash, bricks, slag, metals, glass, building debris, coal, and site fill) and former MGP plant foundations Fill (i.e., ash and bricks observed) observed in several Phase III investigation locations. Fill as deep as 15 ft. Phase III Investigation (2017) MW-2BR: PAHs detected below the SWPC. Metals detected. MW-5S: PAHs detected above SWPC. ETPH, VOCs, and metals detected. MW-5D: Metals detected. Surface water (Hockanum River) located adjacent but up gradient of location. Phase II Investigation (1992) Phase III Investigation (2016/2017) Surface water (Hockanum River) located adjacent but up gradient of location. Phase II Investigation (1992) Phase III Investigation (2017) MW-8SR: PAHs detected above the SWPC. Elevated metals detected. Possibly associated with turbidity in sample. PAHs above RES and I/C DEC and GB PMC in SS-100, SS-104, SS-105 and SS-106. SB-01, SB-02, SB03, SB-04, SB-05, SB-06, SB-07, SB08, SB-09, SB09A, SB-10, SBTB-02, TB-03,TB-04, TB- 11, SB-12, SB-13, 06, TB-13, TB-14, TB-16, SB-20, SB-20, SBTB-17, TB-18, TB-19, TB- 21, SB-22, SB-23, 20, TB-21, TB-22, TB-27, SB-24, SB-25, SB26, SB-27, SSTB-31, TB-32, TB-33, TB34, TB-38, TB-39, TB-40, 100, SS-101, SSTB-42, TB-45, TB-47, MW- 102, SS-103, SS02D, MW-04D, MW-05S, 104, SS-105, SSMW-05D, MW-10S, MW- 106, SS-107, TP01, TP-02, TP-03, 10M, MW-10D TP-04, TP-05, TPHistoric fill was identified in 06, TP-07, MW2BR, MW-8SR, multiple borings which MW-16S, MWoverlap with other AOCs 17S, MW-18D Delineation and excavation of elevated PAH concentrations and benzo (a) pyrene in the top 2 feet in vicinity of SS-102. Phase III ESA investigations are proposed to assess the nature and extent of fill within the Inner Substation Area (AOC-8 below) MW-2D: Not sampled due to visual observations of tar globules PAHs, ETPH, and lead above the RES and I/C DEC and GB PMC in SS-102. PCBs detected. MW-2SR, MW-2D, MW-2BR, MW-5S, MW-5D, MW-8SR, MW-16S, MW-17S Groundwater impacts are likely associated with AOC-3 and AOC 4 (Holder #1 and Holder #2). Groundwater impacts are addressed under site-wide groundwater AOC-15. MW-2SR: Not sampled due to visual observations of tar globules Arsenic and ETPH above RES and I/C DEC in SS-100, SS-101, SS-104 and SS-106. SS-100 SS-101 SS-102 SS-103 SS-104 SS-105 SS-106 MW-8SR Investigation complete. Soil remediation is not required. Additional Phase II ESA of this AOC and Inner Substation Area proposed. Large pieces of coal observed in SS102 location. 7 Remediation Status Phase III ESA investigations are proposed to assess the nature and extent of fill within the Inner Substation Area . Groundwater impacts in MW-5S are likely attributable to AOC-11 MW-16S: Metals detected . MW-17S: VOCs (tetrachloroethene) detected below SWPC. Metals detected. Wells screened below fill (See AOC-15) Wells screened below fill (See AOC-15) Additional Phase III Investigations proposed at the site to assess nature and extent of fill. Remedial evaluation pending the completion of the Phase III investigation.
  6. Page 55 of 1,005

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 21 Page 55 of 1005 AOC # 10 11 12 AOC Description Hockanum River Sediment Coal Tar impacts and Fill Observed at TB-33 (Southwestern portion of Site) Creosote/ Coal Tar impacts and Fill Observed (Southeastern portion of Site) COCs Possible Release Mechanisms and Migration Pathways PAHs and Metals Possible historic discharges to the river from the Site, historic discharges from up gradient industries, current storm water run-off and anthropogenic sources. VOCs (BTEX), SVOCs, Total Cyanide, ETPH VOCs (BTEX), SVOCs, Total Cyanide, ETPH Historic placement of fill. Historic placement of fill. Possible migration for spills or leaks from adjacent Retorts (AOC-1) or Purifying House (AOC-2). Potentially Affected Media Sediment Surface soils Subsurface Soils Groundwater Surface soils Subsurface Soils Groundwater Previous Investigation Soil Locations Phase III Soil Locations R-Sed-A/B/C/D Sediments (A,B,C, D) SED-01 SED-02 SED-03 SED-04 SED-05 SED-06 TB-33 MW-5S MW-5D CSS-5 TB-2 TB-24 TB-28 MW-6S SB-11 MW-16S MW-17S SB-08 SB-09 SB-09A SB-10 SB-24 SS-107 SS-108 Previous Investigation Groundwater Locations Not Applicable MW-5S MW-5D Phase III Investigation Groundwater Locations Not Applicable MW-5S MW-5D MW-16S MW17S Phases of Investigation Completed Phase III Phase III Previous COCs in Soil Phase III COCs in Soil PAHs and metals detected above sediment screening criteria. VOC (methylene chloride) detected. ETPH, PAHs, and metals detected. Highest PAH concentrations were detected upstream at SED -01. ETPH detected in all sediment samples. Metals detected in all sediment samples. Elevated copper, lead and zinc detected in SED-06. Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Not applicable. Investigation Status Remediation Status Metals (Barium chromium, zinc) below criteria. Concentrations detected at upstream sample location. Phase II Investigation (1992) Phase III Investigation (2017) Additional sediment sampling proposed as part of Phase III ESA to assess sediment in the vicinity of SED-06 which is located adjacent to a cast iron outfall pipe. Additional sediment sampling is proposed at outfalls at Maple Avenue to assess sediment input to tributary to the Hockanum River. Surface water (Hockanum River) located adjacent but up gradient of location. Phase II Investigation (1992) Phase III Investigation (2016/ 2017) Additional Phase III ESA investigations are proposed to assess soils in the vicinity of the sewer line that transverses the southern portion of the Inner Substation. MW-2SR/MW-2D: Not sampled due to MW-2S: Dry. visual observations of tar globules MW-2D: Metals and PAHs detected above the SWPC and MW-2BR: PAHs detected below the SWPC. Hockanum River VOCs (xylene and Subsurface soils: VOC(methylene Fill (brick, glass, slag, and/or ash) Metals detected. located adjacent ethylbenzene detected). chloride), SVOCs, cyanide, and observed in SB-08, SB-09A and SBbut up gradient of metals detected. 24. MW-6S: Metals detected. location. MW-6S: Metals detected above the SWPC. SVOC (bis2SB-08: Staining and fuel oil odor 11-12 Fill (ash and sand fill), coal tar MW-6D: PAHs detected below SWPC. ft. Staining and coal tar odor from 24 - ethylhexylphthalate) detected. impacts sheen observed. Metals detected. 29 ft. Phase II Investigation (1992) Human Health Risk Assessment (1994) Phase III Investigation (2017) Additional Phase III ESA investigations are proposed to further assess the nature and extent of fill in this area of the site. Phase II Investigation (1992) Human Health Risk Assessment (1994) Phase III Investigation (2017) Additional Phase III ESA investigations are proposed to further assess the nature and extent of fill in this area of the site. ETPH and PAHs detected above RES and I/C DEC and GB PMC in SB-11. Naphthalene (VOC) detected above GB PMC and arsenic and lead detected VOCs, PAHs and metals detected. above RES and I/C DEC in SB-11. Fill (sand) with coal tar observed. Fill (Ash and Slag) observed in SB-11. Sheen and coal tar odor observed from 5 to 8 feet. Not applicable. MW-5S: PAH (Acenaphthylene) detected above the SWPC. VOC (xylene) and metal (chromium) detected. MW-5D: VOC (Benzyl Alcohol) and metals detected above SWPC. SVOC (2-methylphenol) detected. MW-5S: ETPH and VOCs detected below SWPC. PAHs detected above SWPC. Metals detected. MW-5D: Metals detected MW-16S: Metals detected MW-17S: VOC (tetrachloroethene) detected below SWPC. Metals detected. PAHs detected above RES and I/C DEC and GB PMC in SB-08, SB-09A. PAHs detected in SB-24 above the RES DEC and GB PMC in SB-24. Surface Soil: PAHs exceeded the ETPH detected above RES DEC in SBRes DEC and GB PMC. 09A. MW-2S MW-2D MW-6S MW-6D MW-2SR MW-2D MW-2BR MW-6S MW-6D Phase III SB-10: Sheen and coal tar odor 9 to 24.5 ft. 13 Possible Historic Fill to the south of the Hockanum River PAHs Possible historic placement of fill. Surface Soil Subsurface Soil SS-5A, SS5B, SS-5C, SS-5D TBX2 TB-63 and TB-64 SB-25 SB-26 SB-27 MW-11S MW-11D MW-12S MW-12D MW-11S MW-11D MW-12S MW-12D Phase III Surface Soil: PAHs detected above Surface soil and shallow subsurface RES and I/C DEC and GB PMC in SBsoils: PAHs exceeded the RDEC, 25. Initial PAH SPLP results indicate IDEC and GB PMC. PAHs are not leachable and in compliance with GB PMC MW-11S/ MW-11D MW-12S / 12D No analytical data Fill (slag and/or ash) observed in SB-26 and SB-27. MW-11S: Metals detected MW-11D: Cyanide detected below SWPC MW-12S/MW-12D: Metals detected Hockanum River located adjacent and downgradient.
  7. Page 56 of 1,005

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 21 Page 56 of 1005 AOC # 14 15 AOC Description Coal Tar impacts and Fill Observed (Northern portion of Site) Site wide groundwater impacts COCs VOCs (BTEX), SVOCs, Total Cyanide, ETPH Possible Release Mechanisms and Migration Pathways Impacted area to the north of former Gas Holders #1 and #2, Possible migration for spills or leaks from adjacent holders that migrated northward. Groundwater impacts from VOCs, SVOCs, spills or leaks occurring at the Metals, PCBs, ETPH, site. Groundwater flows to the Chromium, Barium, north away from the ETPH Hockanum River. Potentially Affected Media Surface soils Subsurface Soils Groundwater Groundwater Previous Investigation Soil Locations TB-12, TB-36, TB-37,TB40, TB-42 TB-46, TB-49A,TB-50, TB51, TB-52, TB-53, TB-54, TB55 TB-55A, TB-56, TB-58 , TB59, TB-60, TB-61, TB-62, MW1, MW-3S, MW-3D, MW4S, MW-7S TBX5, TBX6 SS-3B. SS3-C, SS3-E, SS3D, SS1-C, CSS-1, CSS-2 NA Phase III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Phases of Investigation Completed Previous COCs in Soil Phase III COCs in Soil Shallow Subsurface Soils: PAHs detected in SB-21 above the RES DEC, I/C DEC and GB PMC. SPLP PAHs were not detected indicating PAHs are not leachable. PAHs detected in SB-22. SB-01 SB-12 SB-13 SB-20 SB-21 SB-22 MW-18D MW-1S, MW-1D, MW-1S, MW-1D, MW- MW-3S, MW-3D, 3S, MW-3D, MW-4S, MW-3BR, MW-4S, MW-4D MW-4D, MW-7S, MW-7D, MW-18D NA MW-1S, MW-1D, MW-2SR, MW-2BR, MW-2D, MW-3S, MW-1S, MW-1D, MWMW-3BR, MW-4S, 2S, MW-2D, MW-3S, MW-4D, MW-5S, MW-3D, MW-4S, MWMW-5D, MW-6S, 4D, MW-5S, MW-5D, MW-6D, MWMW-6S, MW-6D, MW7S,MW-7D, MW8S, MW-9S, MW-9D, 8SR, MW-9S, MWMW-10S, MW-10M, 9D, MW-10SR, MWMW-10D, MW-11S, 10M, MWMW-11D, MW-12S, 10BR,,MW-11S, MWMW-12D 11D, MW-12S, MW12D, MW-16S, MW17S, MW-18D Phase III Previous COCs in Groundwater MW-1S:Metals detected above the SWPC. MW-1D: Metals detected above the SWPC. SVOCs detected. Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Phase II (1990/1991) Human Health Risk Assessment (1994) Phase III ESA (2017) Additional Phase III ESA investigations are proposed to further assess the nature and extent of coal tar impacts in the northwest portion of the site and off-site to the northwest. Phase II Investigation (1992) Phase III Investigation (2016/2017) Additional Phase III ESA investigation is proposed to assess the seasonality of groundwater conditions MW-1S: ETPH and PAH (acenaphthylene) detected above SWPC MW-1D/MW-3S: Metals detected. Surface Soil: PAHs detected above PAHs, ETPH, VOCs, cyanide were MW-3D: Not sampled due to visual the Res DEC and GB PMC. Metals not detected in SB-01, SB -12 and SBobservations of tar globules/ staining during MW-3S: Metals and PAHs and cyanide detected. 13 in samples collected just above development detected above the SWPC. apparent apparent water table. VOCs detected. Subsurface soils: SVOCs detected MW-3BR: PAH (acenaphthylene) detected Hockanum River above the Res and I/C DEC and Elevated concentrations of ETPH, above SWPC. ETPH and VOCs detected. is located up MW-3D: Metals detected GB PMC and VOCs and pesticide VOCs, and SVOCs detected in SB-13 gradient on -site above the SWPC. SVOCs and (lindane) detected above the GB (25.5-27.5') below water table (~15ft.) MW-4S/MW-4D: PAHs detected below VOC (1,1,1-TCA) detected PMC. Metals detected. SWPC Fill observed: Brick observed at 0.5MW-4S: Metals detected Fill observed and coal tar odors 2.0 ft. in SB-21. MW-7S: ETPH, and PAHs detected above above the SWPC. cyanide, and creosote sheen. Coal tar impacts were encountered SBthe SWPC. VOCs (1,1,1-TCA) and SVOC 12: from 25-30 ft. (Staining, sheen and (bis2-ethylhexylphthalate) coated soils) and 37.5-39ft. (Strong MW-7D: VOCs, PAHs and metals detected. detected. coal tar odor) SB-13: 20-39 ft. (Staining and heavily MW-18D: ETPH and PAH (acenaphthylene) MW4D: Lead detected above coal tar coated soils and odors) detected above SWPC. VOCs detected. the SWPC. SB-01: 29 to 31 ft. Sheen and coal tar odor. Shallow: ETPH, VOCs, PAHs, and /or Cyanide above the SWPC. in MW-1S, MW5S, MW7S, MW-9S, and MW-10M. Tar globules and staining observed in MWShallow: ETPH, VOCs, PAHs, 2S, MW-10SR during development. See metals, and Cyanide above the above AOCs for individual well summary of SWPC. See above AOCs for COCs. individual wells Phase III Soils not assessed Soils not assessed Deep: ETPH, VOCs, PAHs, metals, and Cyanide above the SWPC.. See above AOCs for individual wells Deep: ETPH, PAH (acenaphthylene) above the SWPC in MW-18D. Hockanum River is located up gradient on -site/ Losing Stream Tar globules and staining observed in MW2D, MW-3D and MW-10D Bedrock: PAH (acenaphthylene) above SWPC [MW-3BR] . See AOCs above for individual wells. Off-site AOCs MW-13S: Copper detected above the SWPC. Metals, SVOC (bis2ethylhexylphthalate) detected. TB-113, TB-115, TB-116, TB-117, TB-118, TB-119, TB-120, TB-121, TB-125, TB-126, TB-127, TB-130 16 Off-site Creosote Impacts St. Josephs School/Church Parking Lot VOCs (BTEX), SVOCs, Total Cyanide, ETPH Impacted area to the north of the property line. Possible migration of impacts to the north from the MGP. Shallow fill possible in the development of the property. Subsurface Soils Groundwater Surface soils R426-A, R426-B, R426-C, R426-D R437-A, R437-B, R437-C, R437-D R438-A, R438-B, R438-C, R438-D R446-A, R446-B, R446-C, R446-D R452-A, R452-B, R452-C, R452-D SB-14, SB-15, SB16, SB-17, MW19S, MW-20S MW-13S, MW-13D, MW-14S, MW-14D MW-14S, MW-14D, MW-19S, MW-20S, MW-21S Phase III Subsurface soils: PAHs detected MW-14S: Metals detected. above the GB PMC VOCs PAHs, ETPH, VOCs, cyanide were MW-13D: Metals detected. MW-14D: PAHs, VOCs and metals detected. (ethylbenzene, toluene, and xylene not detected in SB-14, SB-15, SB-16, detected). SB-17 in samples collected just above MW-19S/ MW-21S: Metals detected MW-14S: Metals detected. apparent water table. Hockanum River MW-14D Metals detected. Fill observed and coal tar odors an is located MW-20S: Not sampled due to visual creosote sheen. VOC (tetrachloroethylene) and EPTH, VOCs, and PAHs detected in upgradient on-site observations of tar globules and staining. SVOC (bis2the deep soil samples collected from and ethylhexylphthalate) detected. SB-14and MW-20S within coal tar approximately 400 SB-14: 20.5-23 ft. coated with coal tar Surface Soil: PAHs detected above impacted intervals below the water feet to the west. material with coal tar odors. the Res DEC and GB PMC. table. SB-15: 31.5-34 ft. veins coated with coal tar. MW-20S: 35-38 ft. black stained and sheen with coal tar odor. Phase II (off-site) 1993 Phase III Investigation (2017) Additional Phase III ESA investigation is proposed to assess groundwater conditions at St. Joseph's Church property and to assess the seasonality of groundwater conditions Additional Phase III ESA investigations to the north and east of Maple Street.
  8. Page 57 of 1,005

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 21 Page 57 of 1005 AOC # 17 AOC Description Off-site Creosote Impacts Maple Street ROW COCs VOCs (BTEX), SVOCs, Total Cyanide, ETPH Possible Release Mechanisms and Migration Pathways Impacted area within the Maple Street ROW from 15 to 32 feet. Possible migration of impacts from the Retorts (AOC-1) Former Gas Holders #1, #2, (AOCs 3,+). Potentially Affected Media Subsurface Soils Groundwater Possible off-site fuel oil impacted in TB-101 and TB103 from up gradient source of fuel oil. 18 19 20 21 Petroleum Impacts #12 and #14 Maple Street Suspected Fill #12 and #14 Maple Street Off-site Creosote Impacts (Residence #14 Maple Street) Off-site Surface Soils Maple Street School [PAHs Detected above RSR Criteria] VOCs (BTEX), SVOCs, ETPH PAHs VOCs (BTEX), SVOCs, Total Cyanide, ETPH PAHs Petroleum-impacted soils from 15 to 27 feet below grade from an up gradient source that migrated via groundwater flow onto the properties. PAHs detected in the shallow subsurface soils (TB-217) possibly from historic fill used in the development of the property. Creosote-impacted soils (sheen and odor) between 30 and 37 feet. Creosote migrated beneath Maple Avenue onto the western portion of the property. PAHs detected in surface soils and shallow subsurface soils at the Maple Street School property. Subsurface soils Groundwater Previous Investigation Soil Locations TB-97, TB-99, TB-101, TB103, TB-104, TB-105, TB106, TB-111A, TB-11B, and TB-111C TB-203, TB-204, TB-206, TB-219, TB-221, TB-224 (#8 Maple Street) Phase III Soil Locations SB-18, SB-19 Not investigated during Phase III Previous Investigation Groundwater Locations Groundwater not investigated Groundwater not investigated Phase III Investigation Groundwater Locations Groundwater not investigated Phases of Investigation Completed Phase III TB-217 Not investigated during Phase III Groundwater not investigated Phase III COCs in Soil ETPH, VOCs, and PAHs detected in SB-18 above the GB PMC. The DEC does not apply to SB-18 due to the Subsurface Soils had sample depth greater than 15'. SPLP concentrations of VOCs, SVOCs, VOCs and PAHs detected. pesticides (Aldrin, alpha-BHC, and Petroleum staining/ sheen and odors 192-Hexanone) at concentrations 23ft. above the GB-PMC but were Coal tar staining/ odors from 24-29 ft. located below the water table. Cyanide and metals were detected. ETPH and PAHs were detected above the RES and I/C DEC and GB PMC in Creosote impacts (sheen and SB-19. odors) encountered from 15 to 32 Petroleum staining/ sheen and odors 11feet. 19 ft. Coal tar staining/ odors from 19-26.5 ft. Previous COCs in Groundwater Groundwater not tested. Phase II Groundwater not tested. Surface soils TB-207, TB-210, TB-211, TB-215, MW-15D R453, R454, R455, R456 R501-A, R-501-B, R-501-C, R-501-D R502-A, R-502-B, R-502-C, R-502-D R503-A, R-503-B, R-503-C, R-503-D R504-A, R-504-B, R-504-C, R-504-D R505-A, R-505-B, R-505-C, R-505-D R506-A, R-506-B, R-506-C, R-506-D Not investigated during Phase III Not investigated during Phase III MW-15S MW-15D Groundwater not investigated MW-23S Groundwater not investigated Phase II Phase II Hockanum River located up gradient of location. Investigation Status Phase II (off-site) 1993 Phase III Investigation (2017) Remediation Status Off-site petroleum impacts are noted within the Maple Street ROW. Petroleum impacts also ere noted at #12 and #14 Maple Street. Impacts could be associated with former 1,000gallon leaking underground storage tank at former 8 Maple Street residence or other off-site source. Groundwater not tested. Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (off-site) 1994 Phase III Investigation (2017) Phase I ESA identified a 1,000 leaking underground storage tank used for heating oil at the former 8 Maple Street Residence. Not investigated during Phase III Groundwater not tested. Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (off-site) 1994 Phase III Investigation (2017) Possible historic fill associated with the development of property or potential off-site source. Subsurface soils contained detections of VOCs and PAHs at concentrations above the GB PMC. However, these impacts are likely below the water table and the GB PMC is not applicable. Not investigated during Phase III MW-15S: Metals and cyanide exceeded SWPC. VOC (MTBE detected). Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (off-site) 1994 Phase III Investigation (2017) Surface soils and shallow subsurface soils Not investigated during Phase III Groundwater not tested. Hockanum River located up gradient of location. Phase II- Surface Soil collection in 1995 Subsurface soils contained detections of PAHs, with a detection of (Benzo (a)pyrene) above the Res DEC, I/C DEC and GB PMC. Boring log was not available during the CSM development to assess for presence of fill. Subsurface soils Groundwater COCs in Surface Water Not investigated during Phase III Phase III Boring log was not available during the CSM development. MW-23S Phase III COCs in Groundwater Remedial evaluation pending the completion of the Phase III investigation. Subsurface soils contained detections of PAHs. MW-23S TB-200 and TB-217 (#12 Maple Street) Surface soils Subsurface soils Previous COCs in Soil MW-15D: Metals detected above the SWPC. Groundwater not tested. Access to property was not provided. Coal tar impacts were assessed with a soil boring within Maple Street ROW (AOC-17) Remedial evaluation pending the completion of the Phase III investigation. Possible historic fill associated with the development of the school property or potential offsite source.
  9. Page 58 of 1,005

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 21 Page 58 of 1005 AOC # 22 23 AOC Description Off-site Surface Soils 175 Union Street [PAHs Detected above RSR Criteria] Off-site Groundwater Impacts COCs Possible Release Mechanisms and Migration Pathways PAHs PAHs are detected in surface soils at nearby off-site properties (175 Union Street and Tolland AWC) VOCs Groundwater impacts from spills or leaks occurring at the site and migrating offsite. Potentially Affected Media Surface soils Groundwater NOTES: MGP=- manufactured gas plant VOC = Volatile Organic Compound BTEX- Benzene, toluene, ethyl benzene and xylenes ETPH- Extractable Total Petroleum Hydrocarbons PAH = Polycyclic Aromatic Hydrocarbon TPH = Total Petroleum Hydrocarbons PCBs= Polychlorinated Biphenyls SWPC- Surface Water Protection Criteria Res DEC- Residential Direct Esposure Criteria I/C DEC - Industrial Commercial Direct Exposure Criteria CSM = Conceptual site model, described by the Connecticut Department of Environmental Protection as "a representation of an environmental system that is used as a tool for understanding and for explaining to others the basis and rationale for site investigation and the conclusions drawn about the environmental conditions at a site. A CSM describes, explains, and provides and understanding of the nature and distribution of contaminants necessary to evaluate potential risks to human health and the environment. The CSM is an iterative approach to site characterization. The number of iterations and quantity and quality of information is a function of the complexity of site conditions and data quality objectives". This interim CSM is subject to change. AOC = Area of concern, defined by the Connecticut Department of Environmental Protection as "locations or areas at a site where hazardous waste and or hazardous substances (including petroleum products) have been used, stored, treated, handled, disposed, spilled, and/or released to the environment". Previous Investigation Soil Locations Phase III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Phases of Investigation Completed Previous COCs in Soil Phase III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status R426-A,R426-B,R426-C, R426-D R437-A,R437-B,R437-C, R437-D R438-A,R438-B,R438-C, R438-D R446-A,R446-B,R446-C, R446-D R452-A,R452-B,R452-C, R452-D RBG2-B and RBG2-C Not investigated during Phase III Groundwater not investigated Groundwater not investigated Phase II Surface soils and shallow subsurface soils Not investigated during Phase III Groundwater not tested. Groundwater not tested. Hockanum River located up gradient of location. Phase II- Surface Soil collection in 1995 Possible historic fill associated with the development of the property or potential off-site source. NA MW-13S, MW-13D, MW-14S, MW-14D, MW-15S, MW-15D, MW-19S, MW-20S, MW-21S, MW-23S MW-14S, MW-14D, MW-19S, MW-20S, MW-21S, MW-23S Shallow: Metals and cyanide Hockanum River detected above SWPC. VOCs Shallow: Tar globules / staining in MW-20S. is located and PAHs detected Metals detected. upgradient on-site and Deep: Metals detected above Deep: VOCs, PAHs and metals detected in approximately 400 SWPC. VOCs and PAHs MW-14D. Metals detected. feet to the west. detected Phase II (off-site) 1994 Phase III Investigation (2017) Additional Phase III ESA investigation is proposed to assess groundwater conditions at St. Joseph's Church property and to the west of the site and to assess the seasonality of groundwater conditions NA Phase III Soils not assessed Soils not assessed
  10. Page 59 of 1,005

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 21 Page 59 of 1005 APPENDIX C

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)