Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Words on different pages
  1. Page 19 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 19 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 3.5.3 Cable Conduit Installation and Excavation Excavation for the ADSS cable conduit was performed between late April and the end of May 2022. As noted in Section 3.3.2, the conduit passed through an area that exceeded the SEH Condition Notification Threshold for BaP (around SB-78). The trench was expanded in that area to remove the impacted soils to the limits of the delineation. For excavation around SB-78, a total of 380 cubic feet of soil was removed and disposed of at Clean Earth (Section 3.3.2). For the entire trench excavation, including the SEH soils around SB-78, a total of 108.64 tons of soil were transported for disposal at Clean Earth in Plainville, CT. Copies of the waste manifests for the conduit installation are included in the Soil Management Summary in Appendix C of this Annual Report. 3.5.4 Utility Pole Installation Two utility poles were installed along Maple Street and West Main Street at the Site in August 2022. Soil displaced by the installation was containerized in four 55-gallon drums for waste characterization and disposal. A waste characterization sample was collected on August 10, 2022, for laboratory analysis. The drums were temporarily stored within the Outer Substation Area until September 8, 2022, when they were transported to Red Technologies in Portland, CT for disposal. A copy of the waste manifest and the analytical results for the waste characterization sample are included in the Soil Management Summary in Appendix C of this Annual Report. 3.6 Well Repairs and Replacement Two monitoring wells, MW-12D and MW-12S, were damaged during construction activities to install Structure 6713 (Section 3.5). Based upon post-construction reconnaissance, MW-12D had been partially buried and damaged at the ground surface, and MW-12S had been irreparably damaged. Tighe & Bond oversaw well replacement and repair on November 23, 2022. MW-12S was abandoned by grouting the well to the ground surface. Replacement monitoring well MW-12SR was subsequently installed immediately southeast of the previous well location. Soil cuttings were logged and screened with a PID during installation. The well was constructed of 2-inch ID PVC with ten feet of 0.010-inch slotted monitoring well screen from 6-16 ft bgs. A well completion log and a figure showing the location of the new monitoring well are included in the Soil Management Summary Report created by Tighe & Bond (Appendix C of this Annual Report). MW-12D was repaired by digging out around the existing riser pipe and creating a clean cut below the damaged section. A new section of PVC pipe was attached the existing riser to extend it to the road box completion. After the repair, both MW12-D and MW12SR were developed to remove sediments. GEI Consultants, Inc. 15
  2. Page 20 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 20 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 Development water was containerized in a 55-gallon drum and temporarily stored within the fenced area of the Site. The monitoring well repair and replacement activities were documented by Tighe & Bond in their Soil Management Summary Report, and it is included in Appendix C of this Annual Report. GEI Consultants, Inc. 16
  3. Page 21 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 21 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 4. Conceptual Site Model Tighe & Bond created a preliminary CSM summary table that was included in the 2021 Annual Report. That table has been modified to reflect additional data/findings from activities performed in 2022 and available to date. The revised table is included as Table 1 of this Annual Report. Modifications made from the version included in the 2021 Annual Report are indicated in red text on Table 1. A revised/updated CSM will be developed to identify releases, migration pathways, potential receptors, and risks of the environmental system at the Site. An updated CSM will be provided as part of the Comprehensive Phase III Report, and reflect the additional data and findings collected through the implementation of the Supplemental Phase II/III ESA Work Plan. In doing so, GEI intends to consolidate AOCs to provide a streamlined CSM to clearly document the three dimensional and temporal distribution of contaminants in the context of the geologic, hydrogeologic, and hydrologic framework of the Site. GEI Consultants, Inc. 17
  4. Page 22 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 22 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 5. Schedule An approximate timeframe for the anticipated Site activities for 2023 is provided below. Timeframes are estimated based on recently completed activities and may be altered if additional data gaps are identified or delays are encountered. The schedule will be updated annually as new data is available. Task Details Approximate Timeframe Supplemental Phase II/III Investigation Activities Including soil borings advancement, monitoring well installations, sediment/surface water sampling, SEH soil sampling, staff gauge installations, and surveying Completed in December 2022 1Q23 Well Gauging and Sampling Comprehensive gauging of monitoring wells and NAPL assessment at all wells, and groundwater sampling at select well locations January 2023 Data Gap Assessment To be performed following receipt of data from November/December 2022 fieldwork and data from January 2023 groundwater monitoring event. If needed, recommendations will be made to address remaining data gaps. March 2023 2Q23 Well Gauging and Sampling DNAPL gauging at select wells based on the results of the 1Q23 gauging, and groundwater sampling at locations identified after comprehensive groundwater data evaluation April 2023 Revised SLERA Will reflect the results of the surface water and sediment sampling performed in December 2022 and will be submitted to CT DEEP when available Third Quarter of 2023 2023 SEH Status Update Form To include any SEH-related activities performed since the 2022 SEH Status Update Form submittal By June 1, 2023 3Q23 Well Gauging and Sampling DNAPL gauging and groundwater sampling at previously selected locations July 2023 4Q23 Well Gauging and Sampling DNAPL gauging and groundwater sampling at previously selected locations October 2023 2023 Annual Report Submittal to CT DEEP to include a summary of all investigation tasks and results completed in the calendar year End of December 2023 GEI Consultants, Inc. 18
  5. Page 23 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 23 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 Comprehensive Phase III Report GEI Consultants, Inc. To be prepared approximately three months after the Q4 groundwater monitoring event, assuming no additional data gaps are identified based on results Estimate submittal to CT DEEP in early 2024 19
  6. Page 24 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 24 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 Tables GEI Consultants, Inc. 20
  7. Page 25 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 25 of 259 Table 1. Conceptual Site Model Summary 2022 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Potentially Mechanisms and Migration Affected Media Pathways Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Phase I ESA (2017) Phase II Investigation (1992) Phase III ESA (2016-2020) Phase II/III ESA (2022) Remedial evaluation pending the completion of the Phase III investigation. Phase I ESA (2017) Phase II Investigation (1992) Phase III ESA (2016-2020) Remedial evaluation pending the completion of the Phase III investigation. Rockville Former MGP Site (On-Site) 1 Former Retorts/ Generating Room Coal and oil used to generate manufactured gas. ByVOCs products generated could (BTEX), include tar residues, coal ash, Surface soils SVOCs, coke, complexed cyanide Subsurface soils Metals, Total compounds during the Groundwater Cyanide, production of gas. Materials ETPH could have been used as fill in the building foundation. TB-34 TB-47 SB-07 SB-43 SB-44 SB-46 SB-47 SB-48 MW-35S SB-76 SB-77 MW-9S/ MW-9D MW-9S/ MW-9D MW-35S ETPH above RES and I/C DEC and GB PMC in SB-07, SB-47, and MW35S ETPH above RES DEC in SB-43 and SB-46 Shallow: PAHs above RES and I/C DEC and GB PMC in SB-07, SB-43, SB-46, SBMW-9S: ETPH, VOCs (1,2,447, MWtrimethylbenzene and naphthalene), PAHs, 35S, SB-77 and SB-78. Benzo(a) pyrene above SEH Condition Threshold Subsurface Soil samples from cyanide above SWPC. ETPH detected above Res Concentration in SB-76. MW-09 contained VOC VC and I/C VC. (ethylbenzene), SVOCs MW-9S: VOCs (xylenes), Surface water Fill observed (ash, brick, coal) in SB-07 above GB PMC, metals PAHs, metals, cyanide MW-35S: ETPH , MA VPH, MA EPH (Hockanum Staining with petroleum odors (10-11.5 ft.) detected. above SWPC and PAHs above SWPC. ETPH and MA VPH River) Tar impacts in SB-07: 16 to 25ft, 33-33.5ft., 39-40 ft. Pesticides detected (GB PMC above Res VC. VOC (naphthalene) detected upgradient of Tar impacts in SB-43 and SB-47 at 11-15ft. exempt) MW-9D: PAHs and metals above the SWPC. the AOC Tar impacts in SB-44 at 12-15ft and 24.5-26ft. above SWPC Fill observed (ash, brick) and Tar impacts in SB-46 10-37ft. tar sheen and odors on auger Deep: Tar impacts MW-35S 8-20 ft. cuttings. MW-9D: VOC,ETPH and cyanide not detected. Petroleum odors in SB-77 4-6 ft. Naphthalene and metals detected below the Fill observed in SB-76 0-4 ft. SWPC. Fill observed in SB-77 0-2 ft. A soil vapor sample (SV-CH-1) taken from beneath the control house was below RES VC and I/C VC for VOCs and ETPH (Phase II/III ESA) 2 3 Former Purifying House Manufactured gas was passed VOCs through lime used to scrub (BTEX), impurities (sulphur/cyanide) Surface soils SVOCs, from the gas (Purifier waste). Subsurface soils Metals, Total Materials could have been Groundwater Cyanide, used as fill in the building ETPH foundation. TBX1 TB-3 TB-4 TB-5 TB-20 TB-21 TB-22 Residual tar droplets collected inside the bottom of TB-18 (Refusal 13.6') VOCs Former Gas Holder the holder which is likely Surface soils TB-19 (Refusal 14') (BTEX), #1 [GasometerSVOCs, Total subgrade based upon its age Subsurface soils TB-6 (Refusal 15.5') 3 22,000 ft Capacity (pre-1900 and boring refusal). Groundwater TB-7 (Refusal 16.5') Cyanide, ] Possible leaks or spills from TB-45 CSS-4 ETPH the holder to the soils. TP-01 TP-02 TP-03 SB-31 SB-52 SB-04 SB-05 SB-06 SB-29 SB-30 SB-31 SB-85 TP-04 TP-05 MW-9S/ MW-9D MW-9S/MW-9D MW-10S MW-10M MW-10D MW-9S MW-9D MW-10S MW-10M MW-10D MW-10BR MW-10SR MW-24S MW-32S Shallow: Soil samples from MW-09 ETPH and PAHs above RES and I/C DEC and GB PMC in SB-31 and SB-52 MW-9S: ETPH, VOCs (1,2,4contained VOC DEC does not apply due to samples greater than 15'. PAHs above RES and MW-9S: VOCs (xylenes), trimethylbenzene and naphthalene), PAHs, Surface water (ethylbenzene), SVOCs I/C DEC and GB PMC, ETPH above RES DEC in TP-03. PAHs detected PAHs, metals, cyanide cyanide above SWPC. ETPH detected above Res (Hockanum above GB PMC, metals above RES and I/C DEC and GB PMC. Cyanide detected in all but SB-31. above SWPC VC and I/C VC. River) detected. Pesticides detected (GB PMC exempt) upgradient of Fill observed (bricks, metal pieces, metal conduit, cast iron pipe, ash) Deep: MW-9D: PAHs and metals Fill observed (brick) and the AOC MW-9D: VOC,ETPH and cyanide not detected. above SWPC sheen and strong odors on Naphthalene and metals detected below the Tar impacts in SB-31 and SB-52 15-31ft auger cuttings. SWPC. Shallow: MW-10SR: Not sampled due to visual MW-9S: VOCs (xylenes), observations of tar globules/ staining during PAHs, metals, cyanide development. Tar present in subsequent gauging. above SWPC ETPH above RES DEC in SB-29 and SB-30. ETPH and VOCs above RES & Tar present in MW-24S and MW-32S during Surface soil: PAHs detected. I/C DEC and/or GB PMC in SB-05, SB-06, SB-31, and TP-05. DEC does not MW-9D: PAHs and metals development. MW-24S contained in subsequent Phase I ESA apply to SB-05 due to sample depth greater than 15'. PAHs above RES and gauging. above SWPC (2017) I/C DEC and/or GB PMC in SB-29, SB-30, and SB-31 Soil samples from MW-10 Phase II Surface water contained VOCs, SVOCs, Intermediate: MW-10S: VOCs and Investigation (Hockanum Fill observed (ash, slag, and/or metal) in SB-06, SB-29, SB-30, SB-31, TPpesticides above GB PMC Remedial evaluation cyanide detected, PAHs MW-10M: ETPH, VOCs (naphthalene) detected (1992) River) 04, TP-05 but below the water table. pending the completion of and PAHs above SWPC and metals above Human Health upgradient of the Phase III investigation. SWPC. Risk Assessment Strong sheen and odor the AOC Heavily tar impacted soils within the Gas Holder #1 (5.75 to 14 feet). TCLP Deep: (1994) observed on auger cuttings. benzene in impacted above characteristic hazardous waste level in SB-85. MW-10D: Not sampled due to visual MW-10M: VOCs Phase III ESA Fill observed TB-18 and TBobservations of tar globules/ staining during (xylenes) detected, PAHs (2016-2020) 19. Outside holder tar impacts observed in SB-04, SB-05 19.5- 39 feet, 44.5 ft. development and metals above SWPC to 50 feet, 71 to 74 ft. and SB-31 from 11 to 31 ft and 47 to 49 ft MW-10D: SVOCs and metal (zinc) above SWPC Page 1 of 9 Bedrock: MW-10BR: ETPH, PAHs , VOCs, and metals detected.
  8. Page 26 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 26 of 259 Table 1. Conceptual Site Model Summary 2022 Annual Report Rockville Former MGP Site AOC # 4 5 6 AOC Description COCs Possible Release Potentially Mechanisms and Migration Affected Media Pathways Previous Investigation Soil Locations Residual tar droplets TBX-4 collected inside the bottom of VOCs Former Gas Holder TB-16 (Refusal 18') the holder which is likely Surface soils (BTEX), #2 [GasometerTB-17 SVOCs, Total subgrade based upon its age Subsurface soils 3 TB-8 22,000 ft (pre-1900) and boring refusal. Groundwater Cyanide, TB-9 Capacity] Possible leaks or spills from ETPH TB-42 the holder to the soils. Residual tar droplets collected inside the bottom of VOCs Former Gas Holder SS-3A the holder which is likely a (BTEX), Surface soils #3 [GasometerCSS-3 SVOCs, Total shallow subgrade based upon Subsurface soils 3 TB-13 (Refusal 8') 110,000 ft its age (post 1900). Possible Groundwater Cyanide, TB-14 (Refusal 6.5') Capacity) ETPH leaks or spills from the holder to the soils. Former Coal Shed PAHs, Metals Coal stockpiled for MGP Surface soils Soils not investigated could be present in the soils. Subsurface soils Phase II/III Soil Locations SB-02 SB-03 SB-04 SB-05 SB-28 SB-29 SB-73 SB-74 SB-75 SB-83 SB-84 TP-05 TP-06 TP-07 SS-102 SS-103 SEH Invest. HA-01 HA-02 HA-03 HA-04 HA-05 HA-06 HA-07 HA-08 HA-09 Previous Investigation Groundwater Locations MW-10S MW-10M MW-10D Groundwater not investigated. Water encountered inside the holder foundation. Phase III Investigation Groundwater Locations MW-10S MW-10S2 MW-10M MW-10D MW-10BR MW-24S MW-7S/MW-7D Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status PAHs, ETPH and VOCs above RES & I/C DEC and GB PMC in SB-03 and SB-05. PAHs and ETPH above GB PMC in SB-02. PAHs above RES and I/C DEC and/or GB PMC in SB-28, SB-29, and SBShallow: 73. SB-73 is in compliance with GB PMC through SPLP testing. Elevated MW-10SR: Not sampled due to visual PAHs detected in SB- 75 likely intersects the apparent seasonal high water Surface soil: PAHs detected. MW-10S: VOCs and observations of tar globules/ staining during table. Phase I ESA cyanide detected, PAHs development Arsenic above RES and I/C DEC and benzene above GB PMC in SB-28. (2017) Soil samples from MW-10 and metals above ETPH above RES DEC in SB-29 Phase II SWPC. Surface water contained VOCs, SVOCs, Deep: Total and SPLP benzene above GB PMC and 10X GWPC in SB-83 1 to 3 ft. Investigation pesticides above GB PMC MW-10M: ETPH, VOCs (naphthalene) detected (Hockanum Remedial evaluation (1992) but below the water table MW-10M: VOCs and PAHs above SWPC River) pending the completion of Fill observed (ash, brick, coal) in SB-05, SB-28, and SB-29, TCLP benzene Human Health upgradient of (xylenes) detected, PAHs MW-10D: Not sampled due to visual the Phase III investigation. in impacted above characteristic hazardous waste level in SB-84. Risk Assessment Strong sheen and odor and metals above SWPC observations of tar globules/ staining during the AOC (1994) observed on auger cuttings development. Fill (wood, glass, metal) observed in TP-05. Phase III ESA MW-10D: SVOCs and (TB-16 and TB- 17). Fill (2016-2020) metal (zinc) above SWPC Bedrock: (bricks) observed in TB- 16. Tar impacts: SB-02: 18 to 39 ft. MW-10BR: ETPH, PAHs ,VOCs, and SB-03: 10.5 to 15 ft. metals detected. SB-04: 2.5-37 ft. 44.5-50 ft. SB-05: 19.5 to 39 ft., 71-74 ft. SB-28: 24-36.5 ft. TP-05: 5.75 -6.0 ft. Surface soils: PAHs and metals detected Surface soils: PAHs, cyanide and metals detected No visual impacts in soils. Fill observed Groundwater investigations not completed in AOC. Shallow : MW-7S: ETPH and PAHs detected above the SWPC. VOCs and metals detected. Deep: MW-7D: PAHs, VOCs and metals detected Investigation complete. Phase I ESA Soil remediation is not (2017) required. Phase II Surface water Investigation Groundwater impacts are (Hockanum likely associated with AOC(1992) River) Human Health 3 and AOC - 4 (Holder #1 upgradient of and Risk Assessment the AOC Holder #2). (1994) Phase III ESA Groundwater impacts are (2016-2018) addressed under site- wide groundwater AOC- 15. PAHs, ETPH, and lead above the RES and I/C DEC and GB PMC in SS-102. PCBs detected. Benzo (a) pyrene detected above the SEH Condition Notification Threshold Concentration. Groundwater not Groundwater not investigated investigated (within active (within active transformer yard) transformer yard) No investigations completed in the AOC. PAHs, ETPH, and arsenic above the RES and I/C DEC and/or GB PMC in SS-103. Cyanide detected. PAHs above the RES and I/C DEC in HA-01 through HA-09. SEH Threshold Notification Concentration for benzo(a)pyrene delineated HA-01, HA-2 and HA-03 above the threshold. Groundwater investigations not completed in AOC. Groundwater investigations not completed in AOC. Groundwater investigations not completed in AOC. Surface water (Hockanum River) upgradient of the AOC Phase I ESA (2017) Phase III ESA (2017-2018) Groundwater investigations not completed in AOC. Surface water (Hockanum River) upgradient of the AOC Phase I ESA (2017) Phase III ESA (2018) Delineation SEH soils for benzo (a) pyrene was completed in 2018. Remedial evaluation pending the completion of the Phase III investigation. Fill observed (coal, ash) in shallow soils below the trap-rock gravel cover to 2 feet below grade. PAHs above RES and I/C DEC and GB PMC in SS-100. Arsenic above RES and I/C DEC in SS-100 and SS-101. ETPH and cyanide detected. 7 Former PCBs, ETPH Transformer House Transformer use. Possible leaks or spills could have impacted soils. Surface soils Subsurface Soils Soils not investigated (within active transformer yard) SS-100 SS-101 SB-44 Groundwater not Groundwater not investigated investigated (within active (within active transformer yard) transformer yard) No investigations completed in the AOC. Fill, coal and brick, encountered to 5 feet below grade in SB-44. ETPH and cyanide detected. Visual Impacts (Appear to be associated with AOC -1) 12- 15 ft.: Petroleum odor and sheen 24.5-26: Faint tar odor Page 2 of 9 Remedial evaluation pending the completion of the Phase III investigation.
  9. Page 27 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 27 of 259 Table 1. Conceptual Site Model Summary 2022 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Potentially Mechanisms and Migration Affected Media Pathways Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Phase I ESA (2017) Phase II Investigation (1992) Phase III ESA (2016-2020) Phase III ESA and predesign sampling is needed for this AOC. Remedial evaluation pending the completion of the Phase III investigation. Arsenic and ETPH above RES and I/C DEC in SS-100, SS-101, SS-104 and SS-106. PAHs, ETPH, and lead above the RES and I/C DEC and GB PMC in SS-102. PCBs detected. PAHs, ETPH, and arsenic above the RES and I/C DEC and/or GB PMC in SS-103. Cyanide detected. ETPH also above RES DEC, I/C DEC and GB PMC in SS-104 and Res DEC in SS- 106. PAHs above RES and I/C DEC and GB PMC in SS-100, SS-104, SS-105 and SS- 106. Surface soils Subsurface Soils 8 9 Current Substation Historic Site Fill PCBs, ETPH, Metals, VOCs, SVOCs, Metals, PCBs, ETPH Possible leaks or spills from transformers Historic placement of fill during the development of Site. If significant release: groundwater TB-34 TB-38 TB-39S TB-32 MW-8S SS-100 to SS106 HA-01 to HA-11 SB-43 SB-44 MW-8S TB-02, TB-03,TB04, TB-06, TB-13, TB-14, TB-16, TBOn-site soils 17, TB-18, TB-19, borings, SS-100 TB-20, TB-21, TB- to SS-107, SB22, TB-27, TB-31, 76 to SB-83, TPTB-32, TB-33, TB01 to TP-07, 34, TB-38, TB-39, HA-01 to HA TB-40, TB-42, TB- 18, SB-78A to Surface soils 45, TB-47, MWD, SB-76A to Not Applicable Subsurface soils 02D, MW-04D, MW- D, SB-76A1 05S, MW- 05D, MW10S, MW-10M, MW- Historic fill was identified in 10D multiple borings which overlap Historic fill was with other identified in multiple AOCs borings which overlap with other AOCs MW-2SR, MW2D, MW-2BR, MW5S, MW-5D, MW8SR, MW-16S, MW-17S, MW25S, MW-32S, MW-33S, MW34S, MW-35S, MW-36S Shallow: MW-2SR: Not sampled due to visual observations of tar globules (2017). PAHs detected above SWPC. VOC (naphthalene detected). MW-5S: PAHs detected above SWPC. ETPH detected above the SWPC, RES VC and I/C VC. VOCs, and metals detected. MW-8SR: PAHs detected above the SWPC. Elevated metals detected. Possibly associated HA-01 through HA-07, HA-08 and HA-09: SEH investigation (See AOC 6) . with turbidity in sample. PAHs above the RES and I/C DEC in HA-01 through HA-09. SEH MW-16S: Metals and VOC (Chloroform) Condition Notification Threshold Concentration for benzo(a)pyrene detected . delineated see AOC-9. Fill observed in top 2 feet of soils. MW-17S: VOCs (tetrachloroethene)and ETPH Surface water detected below SWPC. Metals detected. HA-09A: ETPH exceeds RES DEC, arsenic exceeds the RES and I/C DEC. MW-33S: acenaphthylene detected above SWPC (Hockanum PAHs exceed RES DEC, I/C DEC and GB PMC. Cyanide detected. PCBs MW-8S: Metals detected PAHs and metals detected. and ETPH above SWPC, RES VC and I/C VC. River) located above the SWPC. Cyanide not detected. adjacent but Fill (sand) observed MW-34S; ETPH above SWPC, RES detected. up gradient of VC and I/C VC and PAHs (acenaphthylene, HA-10: ETPH and PAHs exceed RES DEC, I/C DEC and GB PMC. location. Benz(a)anthracene, chrysene) detected above the Cyanide detected below RES DEC and GB PMC. Arsenic exceeds the RES SWPC and I/C DEC MW-35S: ETPH , MA VPH, MA EPH and PAHs above SWPC. ETPH and MA VPH HA-11: Arsenic exceeds the RES and I/C DEC. ETPH detected. above Res VC. VOC (naphthalene) detected above the SWPC. (associated with AOC-3). ETPH above RES DEC in MW-35S & MW-36S and above RES & I/C DEC in MW- 32S Deep: Arsenic above RES & I/C DEC in MW-35S and MW-36S MW-2D: Not sampled due to visual observations PAHs above RES & I/C DEC and GB PMC in MW-32S, MW-33S, MWof tar globules. 34S, MWMW-5D: Metals and ETPH detected 35S, and MW-36S. Benzo(a) pyrene detected above the SEH Condition Notification Threshold Concentration in SB-76 (0-2 ft.) and SB-78 (0-1 ft.) Bedrock: MW-2BR: PAHs detected below the SWPC. Visual Impacts (Appear to be associated with AOC -1) 12- 15 ft.: Petroleum Metals detected. odor and sheen 24.5-26: Faint tar odor Fill (i.e., ash, bricks, slag, metals, glass, building debris, coal, and site fill) and former MGP plant foundations observed in several Phase III investigation locations. Fill as deep as 15 ft. Not Applicable Fill (i.e., ash and bricks observed) Concentrations of COCs including PAHs, ETPH, and metals above RSR criteria covered under separate AOCs. Concentrations of benzo (a) pyrene Wells screened below fill (See AOC-15) above SEH Threshold Notification Concentration delineated in SS-102, HA01A, HA-02 HA-03, HA-18, SB-76, SB-78 and SB-76A. The extent of SEH exceedances around SB-78 and SB-76 was delineated during sampling performed in March 2022 (SB-78A to D and SB-76A to D) and Decemeber 2022 (SB-76A1) Page 3 of 9 Wells screened below fill (See AOC-15) Surface water (Hockanum River) located adjacent but up gradient of location. Phase I ESA (2017) Phase II Investigation (1992) Phase III ESA (2018-2020) Phase II/III ESA (2022) Phase III ESA and predesign sampling is needed for this AOC. Remedial evaluation pending the completion of the Phase III investigation. Soils in the vicinity of SB78 were excavated and disposed of in May 2022.
  10. Page 28 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 28 of 259 Table 1. Conceptual Site Model Summary 2022 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Potentially Mechanisms and Migration Affected Media Pathways Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations River Sediment Samples SED-01 SED-02 SED-03 SED-04 SED-05 SED-06 10 Hockanum River Sediment PAHs and Metals Possible historic discharges to the river from the Site, historic discharges from up gradient industries, current storm water run-off and anthropogenic sources. Sediment R-Sed-A/B/C/D Sediments (A,B,C, D) Outfall Sediment Samples SED-07 SED-08 SED-09 SW-01 SW-02 SW-03 SW-04 Not Applicable Background Sediment Samples SED101 SED-102 SED-103 SED-104 SED-105 11 Coal Tar impacts VOCs and Fill Observed (BTEX), at TB-33 SVOCs, Total (Southwestern Cyanide, portion of Site) ETPH Historic placement of fill. Surface soils Subsurface Soils Groundwater TB-33 TB-34 MW-5S MW-5D SB-11 SB-36 SB-37 SB-38 SB-39 SB-40 SB-41 SB-42 SB-53 MW-16S MW-17S SB-69 SB-70 SB-71 MW-31S (boring) Phase III Investigation Groundwater Locations MW-5S MW-5D Background Surface Water Samples SW-100 SW-101 MW-5S MW-5D MW-16S MW17S MW-30S MW-38S MW-39S MW-31S Previous COCs in Soil PAHs and metals detected above sediment screening criteria. VOC (methylene chloride) detected. Phase II/III COCs in Soil River Sediment Samples ETPH, PAHs, and metals detected. Highest PAH concentrations were detected upstream at SED-01. ETPH detected in all sediment samples. Metals detected in all sediment samples. Elevated copper, lead and zinc detected in SED-06. SED-06A, B, C were collected in the vicinity of SED06. Outfall Sediment Samples VOC (toluene), ETPH, PAHs and metals were detected. Background Sediment Samples PAHs, ETPH and metals detected in SED-101 through 105. Previous COCs in Groundwater Not applicable Phase III COCs in Groundwater COCs not detected in groundwater. Barium detected below SWPC in adjacent monitoring wells. COCs in Surface Water Barium detected in all surface water samples. Chromium detected in SW-01 and SW-02, Zinc detected in SW- 01, SW02, SW03, and SW-04 Remediation Status Phase I ESA (2017) Phase II Investigation (1992) Phase III Investigation (2017- 2020) Investigation is completed. SLERA is currently being prepared and will be submitted to CTDEEP for review Phase I ESA (2017) Phase II Investigation (1992) Phase III Investigation (2016- 2018) Remedial evaluation pending the completion of the Phase III investigation. Background surface water samples: Barium detected. Shallow: ETPH and PAHs detected above RES and I/C DEC and GB PMC in SB-11. MW-5S: ETPH and VOCs detected below Naphthalene (VOC) detected above GB PMC and arsenic and lead detected SWPC. PAHs detected above SWPC. Metals above RES and I/C DEC in SB-11. detected. Fill (Ash and Slag) observed in SB-11, SB-36, SB-39 ,SB-40, SB-40A, SBMW-5S: PAH MW-16S: Metals and Chloroform (VOC) (Acenaphthylene) detected 69, SB- 70, SB-71 to approximately 5 feet. detected above the SWPC. SB-11: Sheen and tar odor observed from 5 to 8 feet. SB-36: Tar odor 12 to MW-17S: VOC (tetrachloroethene), ETPH Surface water VOC (xylene) and metal 20 feet. Sheen 15 to 20 feet. detected below SWPC. Metals detected. (Hockanum (chromium) detected. SB-38: sheen and tar odor 10 to 11 feet. SB-40: sheen and tar odor 8 to 15 VOCs, PAHs and metals MW-30S: ETPH and acenaphthylene above River) located feet. detected. SWPC. ETPH above RES VC MW-31S: Metals adjacent but Fill (sand) with tar observed. SB-69: ETPH above RES & I/C DEC & GB PMC, arsenic above RES & I/C MW-5D: VOC (Benzyl detected up gradient of Alcohol) and metals DEC 1 to 3 feet. PAHs above RES & I/C DEC & GB PMC 1 to 3 feet and 4 MW-38S & MW-39S: Acenaphthylene above location. detected above SWPC. to 5 feet. SWPC SB-70: Arsenic above RES & I/C DEC. PAHs above RES & I/C DEC & GB SVOC (2-methylphenol) MW-39S: ETPH detected above the SPWC, RES detected. PMC 3 to 4 feet. VC and I/C VC SB-71: ETPH above RES DEC & GB PMC 1 to 3 feet and 8 to 10 feet. PAHs above RES & I/C DEC & GB PMC 1 to 3 feet, 5 to 7 feet and 8 to 10 Deep: feet. MW-5D: Metals and ETPH detected Page 4 of 9 Investigation Status

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)