Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Words on different pages
  1. Page 28 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 28 of 259 Table 1. Conceptual Site Model Summary 2022 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Potentially Mechanisms and Migration Affected Media Pathways Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations River Sediment Samples SED-01 SED-02 SED-03 SED-04 SED-05 SED-06 10 Hockanum River Sediment PAHs and Metals Possible historic discharges to the river from the Site, historic discharges from up gradient industries, current storm water run-off and anthropogenic sources. Sediment R-Sed-A/B/C/D Sediments (A,B,C, D) Outfall Sediment Samples SED-07 SED-08 SED-09 SW-01 SW-02 SW-03 SW-04 Not Applicable Background Sediment Samples SED101 SED-102 SED-103 SED-104 SED-105 11 Coal Tar impacts VOCs and Fill Observed (BTEX), at TB-33 SVOCs, Total (Southwestern Cyanide, portion of Site) ETPH Historic placement of fill. Surface soils Subsurface Soils Groundwater TB-33 TB-34 MW-5S MW-5D SB-11 SB-36 SB-37 SB-38 SB-39 SB-40 SB-41 SB-42 SB-53 MW-16S MW-17S SB-69 SB-70 SB-71 MW-31S (boring) Phase III Investigation Groundwater Locations MW-5S MW-5D Background Surface Water Samples SW-100 SW-101 MW-5S MW-5D MW-16S MW17S MW-30S MW-38S MW-39S MW-31S Previous COCs in Soil PAHs and metals detected above sediment screening criteria. VOC (methylene chloride) detected. Phase II/III COCs in Soil River Sediment Samples ETPH, PAHs, and metals detected. Highest PAH concentrations were detected upstream at SED-01. ETPH detected in all sediment samples. Metals detected in all sediment samples. Elevated copper, lead and zinc detected in SED-06. SED-06A, B, C were collected in the vicinity of SED06. Outfall Sediment Samples VOC (toluene), ETPH, PAHs and metals were detected. Background Sediment Samples PAHs, ETPH and metals detected in SED-101 through 105. Previous COCs in Groundwater Not applicable Phase III COCs in Groundwater COCs not detected in groundwater. Barium detected below SWPC in adjacent monitoring wells. COCs in Surface Water Barium detected in all surface water samples. Chromium detected in SW-01 and SW-02, Zinc detected in SW- 01, SW02, SW03, and SW-04 Remediation Status Phase I ESA (2017) Phase II Investigation (1992) Phase III Investigation (2017- 2020) Investigation is completed. SLERA is currently being prepared and will be submitted to CTDEEP for review Phase I ESA (2017) Phase II Investigation (1992) Phase III Investigation (2016- 2018) Remedial evaluation pending the completion of the Phase III investigation. Background surface water samples: Barium detected. Shallow: ETPH and PAHs detected above RES and I/C DEC and GB PMC in SB-11. MW-5S: ETPH and VOCs detected below Naphthalene (VOC) detected above GB PMC and arsenic and lead detected SWPC. PAHs detected above SWPC. Metals above RES and I/C DEC in SB-11. detected. Fill (Ash and Slag) observed in SB-11, SB-36, SB-39 ,SB-40, SB-40A, SBMW-5S: PAH MW-16S: Metals and Chloroform (VOC) (Acenaphthylene) detected 69, SB- 70, SB-71 to approximately 5 feet. detected above the SWPC. SB-11: Sheen and tar odor observed from 5 to 8 feet. SB-36: Tar odor 12 to MW-17S: VOC (tetrachloroethene), ETPH Surface water VOC (xylene) and metal 20 feet. Sheen 15 to 20 feet. detected below SWPC. Metals detected. (Hockanum (chromium) detected. SB-38: sheen and tar odor 10 to 11 feet. SB-40: sheen and tar odor 8 to 15 VOCs, PAHs and metals MW-30S: ETPH and acenaphthylene above River) located feet. detected. SWPC. ETPH above RES VC MW-31S: Metals adjacent but Fill (sand) with tar observed. SB-69: ETPH above RES & I/C DEC & GB PMC, arsenic above RES & I/C MW-5D: VOC (Benzyl detected up gradient of Alcohol) and metals DEC 1 to 3 feet. PAHs above RES & I/C DEC & GB PMC 1 to 3 feet and 4 MW-38S & MW-39S: Acenaphthylene above location. detected above SWPC. to 5 feet. SWPC SB-70: Arsenic above RES & I/C DEC. PAHs above RES & I/C DEC & GB SVOC (2-methylphenol) MW-39S: ETPH detected above the SPWC, RES detected. PMC 3 to 4 feet. VC and I/C VC SB-71: ETPH above RES DEC & GB PMC 1 to 3 feet and 8 to 10 feet. PAHs above RES & I/C DEC & GB PMC 1 to 3 feet, 5 to 7 feet and 8 to 10 Deep: feet. MW-5D: Metals and ETPH detected Page 4 of 9 Investigation Status
  2. Page 29 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 29 of 259 Table 1. Conceptual Site Model Summary 2022 Annual Report Rockville Former MGP Site AOC # 12 AOC Description Tar impacts and Fill Observed (Southeastern portion of Site) COCs Possible Release Potentially Mechanisms and Migration Affected Media Pathways Historic placement of fill VOCs (AOC-13). Possible (BTEX), Surface soils migration for spills or leaks Subsurface Soils SVOCs, Total from adjacent Retorts (AOCCyanide, Groundwater 1) or Purifying House (AOCETPH 2). Previous Investigation Soil Locations CSS-5 TB-2 TB-3 TB-24 TB-28 MW-6S MW-6D Phase II/III Soil Locations SB-08 SB-09 SB-09A SB-10 SB-24 SB-32 SB-33 SB-48 SB-49 SB-50 SB-51 SB-82 SS-107 SS-108 HA-17 HA-18 SB-76 to SB-82 Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status PAHs detected above RES and I/C DEC and GB PMC in SB-08, SB-09A. PAHs detected above the RES DEC and GB PMC in SB-24. ETPH detected above RES DEC in SB-09A. Concentrations of PAHs and ETPH were detected above the RES DEC, I/C DEC and/or the GB PMC in SB-32 and SB51. Concentrations of arsenic were detected in above the RES DEC and I/C DEC. MW-2S MW-2D MW-6S MW-6D MW-2SR MW-2D MW-2BR MW-6S MW-6D Shallow: HA-17: ETPH and cyanides detected. PAHs detected above the RES DEC., MW-2SR: Not sampled due to visual I/C DEC and GB PMC. Lead above the GB PMC. Surface Soil: PAHs Phase I ESA MW-2S: Dry. observations of tar globules (2017). MW-6S: Naphthalene and metals detected below exceeded the Res DEC and HA-18: ETPH, PAHs above the RES DEC/ I/C DEC and GB PMC. Benzo (2017) MW-2D: Metals and (a) pyrene above the SEH Threshold Notification Concentration. the SWPC. GB PMC. Phase II PAHs detected above the SB-76: to SB-82: PAHs above the RES DEC/ I/C DEC and GB PMC Hockanum Investigation SWPC and VOCs (xylene SB-79: Benzene above GB PMC 1-2 ft, PCE above GB PMC and RES DEC Deep: Subsurface soils: Remedial evaluation River located (1992) and ethylbenzene 1-2 ft, GB PMC 3-4 ft and 5-6 ft MW-6D: PAHs detected below SWPC. Metals VOC(methylene chloride), adjacent but Human Health pending the completion of detected). SB-81: Dieldrin above GB PMC 0-1 ft detected. SVOCs, cyanide, and metals up gradient of Risk Assessment the Phase III investigation. SB-82: ETPH above RES DEC, I/C DEC, and GB PMC 2-3 ft detected. (1994) location. MW-6S: Metals detected MW-2D: Not sampled due to visual observations Phase III SB-08: Staining and fuel oil odor 11 to 2 ft. Staining and tar odor from 24 to above the SWPC. SVOC of tar globules Fill (ash and sand fill), Tar Investigation (bis2-ethylhexylphthalate) 29 ft. impacts sheen observed. (2016- 2020) Bedrock: SB-10: Sheen and tar odor 9 to 24.5 ft. detected. MW-2BR: PAHs detected below the SWPC. SB-33: tar odor 7 to 11 ft. Sheen, blebs and tar odor 11.5- 20 ft. Metals detected. SB-50: Tar from 11-12 ft. Sheens and tar blebs were observed from 15 to 17 feet. sheens and tar odors were observed from 17 feet to 25 feet SB-51: petroleum orders and grey staining from 14 to 17 feet. Sheen, tar blebs and/or tar odors were observed from 17 to 20 feet. Fill (brick, glass, slag, and/or ash) observed in SB-08, SB-09A and SB-24, SB-32, SB-33, SB-48 to SB-51, and SB-76 to SB-82. 13 Possible Historic Fill to the south of the Hockanum River PAHs Possible historic placement of Surface Soil fill. Subsurface Soil SS-5A, SS5B, SS5C, SS-5D TBX2 TB-63 and TB-64 SB-25 SB-26 SB-27 SB-54 SB-55 SB-56 SB-57 Surface Soil: PAHs detected above RES and I/C DEC and GB PMC in SB25, SB-54 and SB-55. MW-11S MW-11D MW-12S MW-12D MW-11S MW-11D MW-12S MW-12D Surface soil and shallow subsurface soils: PAHs exceeded the RDEC, IDEC and GB PMC. Cyanide was detected in SB-54 and SB-55, Metals were detected in SB-54, SB-55, SB-56, and SB-57. SPLP metals were detected in SB-54 and SB-57. MW-11S/ MW-11D MW12S / 12D No analytical data Fill (slag and/or ash) observed in SB-26, SB-27, SB-54, SB-55, SB-56, and SB-57. Shallow: MW-11S/ MW-12S: Metals detected Deep: MW-11D/ MW-12D: Metals and/or pyrene (PAH) detected Phase II Investigation (1992) Hockanum Human Health Remedial evaluation River located Risk Assessment pending the completion of adjacent and (1994) the Phase III investigation. downgradient. Phase III Investigation (2017- 2018) Shallow Subsurface Soils: PAHs detected in SB-21 above the RES DEC, I/C DEC and GB PMC. SPLP PAHs were not detected indicating PAHs are not leachable. PAHs detected in SB-22. 14 Tar impacts and Fill Observed (Northern portion of Site) Shallow: MW-4S: Cyanide, metals, VOCs, and PAHs detected Shallow: MW-4SR: Acenaphthylene (PAH) detected MW-1S:Metals detected above the SWPC. Cyanide detected. above the SWPC. PAHs, ETPH, VOCs, cyanide were not detected in SB-01, SB -12 and SBMW-25S: Cyanide, metals, and PAHs detected MW-3S: Metals and SB-01 TB-12, TB-36, TB13 in samples collected just above apparent water table. MW-3S/MW-7S: Metals and VOCs detected. PAHs detected above the 37,TB-40, TB-42 TBSB-12 Surface Soil: PAHs detected PAHs and ETPH detected above the SWPC SWPC. VOCs detected. SB-13 46, TB- 49A,TB-50, above the Res DEC and GB Elevated concentrations of ETPH, VOCs, and SVOCs detected in SB-13 MW-1S: Metals, ETPH and PAHs detected MW-4S: Metals detected TB-51, SB-20 MW-1S, MW-1D, PMC. Metals and cyanide (25.5- 27.5') below water table (~15ft.) above the SWPC. cyanide, above the SWPC. SB-21 TB-52, TB-53, TBMW-3S, MW-3D, detected. MW-24S: Measurable tar observed in well. VOCs (1,1,1-TCA) and SB-22 54, TB-55 MW-3DR MWImpacted area to the north of SB-45: Metals detected SVOC (bis2VOCs TB-55A, TB-56, SB-45 3BR, MW-4S, Subsurface soils: SVOCs former Gas Holders #1 and SB-59: PAHs, Cyanide, and VOCs detected MW-1S, MW-1D, ethylhexylphthalate) Deep: (BTEX), Surface soils TB-58 , TB-59, SB-59 MW-4SR, detected above the Res and #2, Possible migration for MW-1D: ETPH and VOCs detected. PAHs and detected. Subsurface Soils MW-3S, MW-3D, SVOCs, Total TB-60, TB-61, TB- SB-60 (off-site) MW-4D, MW-7S, I/C DEC and GB PMC and spills or leaks from adjacent Fill observed: Brick observed at 0.5-3.0 ft. in SB-21 and SB-59. metals (copper and nickel) detected above the Groundwater MW-4S, MW-4D Cyanide, 62, MW-1, MW- SB-64 (off-site) MW-7D, MW- VOCs and pesticide (lindane) Tar impacts were encountered SB-12: from 25-30 ft. (Staining, sheen and holders that migrated SWPC. Deep: ETPH SB-68 3S, MW-3D, MW18D, MW-24S, northward. detected above the GB coated soils) and 37.5-39ft. (Strong tar odor) MW-1D: Metals detected MW-3DR: ETPH and acenaphthylene detected SB-73 4S, MW-7S TBX5, MW-25S, MWPMC. Metals detected. SB-13: 20-39 ft. (Staining and heavily tar coated soils and odors) SB-01: 29 above SWPC. above the SWPC. SVOCs TBX6 SB-74 37D, MW- 37BR to 31 ft. Sheen and tar odor. detected. MW-4D/MW-7D: Metals detected. MW-18D: SB-75 SS-3B. SS3-C, SS3Fill observed and tar odors SB-45: Tar odors 30-41 ft. Tar blebs observed from 30-38 ft. ETPH, VOCs, and PAHs MW-3D: Metals detected MW-37S/D E, SS3-D, SS1-C, and tar sheen. SB-59: Coal and slag 2-3 ft. Tar odors 30 to 45 ft. PAHs,VOCs, and cyanide detected above the SWPC. Metals detected. above the SWPC. SVOCs CSS-1, CSS-2 MW-03DR detected (2 to 3) MW-37D: Metals detected. and VOC (1,1,1-TCA) SB-60: Tar odor 40 to 45 ft. Naphthalene and Xylene (VOCs) detected. detected. SB-64: No visual impacts or odors. Bedrock: MW4D: Lead detected MW-37S/D: Sheen and odors observed below water table. MW-3BR: PAH (acenaphthylene) above SWPC. above the SWPC. SB-68: Tar product observed (23-34 ft), sheen observed (23-59 ft). VOCs, ETPH and VOCs detected. Metals detected. PAHs, and ETPH detected MW-37BR: Metals and VOCs detected. MW-03DR: Tar product observed in auger cuttings (23') Page 5 of 9 Additional Phase III ESA Phase I ESA investigation is proposed (2017) Phase II Hockanum to assess the seasonal (1990/1991) River is groundwater conditions Human Health located up and assessment of the Risk Assessment gradient on recoverability of tar. (1994) site Remedial evaluation Phase III ESA pending the completion of (1996-2020) the Phase III investigation.
  3. Page 30 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 30 of 259 Table 1. Conceptual Site Model Summary 2022 Annual Report Rockville Former MGP Site AOC # 15 AOC Description Site wide groundwater impacts COCs Possible Release Potentially Mechanisms and Migration Affected Media Pathways VOCs, Groundwater impacts from SVOCs, spills or leaks occurring at the Metals, PCBs, site. Groundwater flows to ETPH, the north away from the Chromium, Hockanum River. Barium, ETPH Groundwater Previous Investigation Soil Locations NA Phase II/III Soil Locations NA Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil MW-1S, MW-1D, MW-2SR, MW2BR, MW-2D, MW-3S, MW-3BR, MW4S, MW-4SR, MW4D, MW-5S, MW-5D, MW-6S, MW-6D, MW-7S,MW-7D, MW-1S, MW-1D, MW-8SR, MWMW-2S, MW-2D, 9S, MW-9D, MWMW-3S, MW-3D, 10SR, MW-10M, MW-4S, MWMW- 10BR,MW4D, 11S, MWMW-5S, MW-5D, 11D, MW-12S, See AOCs above for site MW-6S, MW-6D, MWinvestigation information for MW-8S, MW-9S, 12D, MW-16S, soils MW-9D, MWMW10S, MW-10M, 17S, MW-18D, MW- 10D, MWMW11S, MW19S, MW-24S, 11D, MW-12S, MWMW25S, MW-26S, 12D MW26D, MW-26BR, MW-27S, MW28S, MW-29S, MW-29D, MW30S, MW-33S, MW-34S, MW35S, MW-36S, MW-37D, MW37BR, MW- 38S, MW-39S Phase II/III COCs in Soil See AOCs above for site investigation information for soils Previous COCs in Groundwater Phase III COCs in Groundwater Shallow: ETPH, VOCs, PAHs, and /or Cyanide above the SWPC. in MW-1S, MW-5S, MW7S, MW-8SR, MW-9S, and MW- 10M, MW-29S, MW-30S, MW-33S, MW-34S, MW-35S, MW-38S, and MW-39S. See above AOCs for individual well summary of COCs. Shallow: ETPH, VOCs, Tar globules and staining observed in MW-2S, PAHs, metals, and MW-10SR, and MW-24S Cyanide above the SWPC. during development. Measurable tar observed in See above AOCs for MW-10SR and MW-24S individual wells Deep: Deep: ETPH, VOCs, VOCs, ETPH, PAH (acenaphthylene) above the PAHs, metals, and SWPC in MW-18D. MW- 3DR: ETPH and acenaphthylene detected above SWPC. Cyanide above the SWPC.. See above AOCs Tar globules and staining observed in MW-2D, MW-3D and MW-10D for individual wells Bedrock: PAH (acenaphthylene) above SWPC [MW-3BR] . ETPH and VOCs detected. Metals detected. See AOCs above for individual well information. Page 6 of 9 COCs in Surface Water Investigation Status Remediation Status Hockanum River is located up gradient on site/ Losing Stream Phase I ESA (2017) Phase II Investigation (1992) Phase III Investigation (2016- 2020) Additional Phase III ESA investigation is proposed to assess the seasonal groundwater conditions
  4. Page 31 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 31 of 259 Table 1. Conceptual Site Model Summary 2022 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Potentially Mechanisms and Migration Affected Media Pathways Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Phase II (offsite) 1993 Phase III Investigation (20172020) Additional Phase III ESA investigation is proposed to further assess seasonal groundwater conditions at St. Joseph's Church property and the extent of off-site groundwater impacts in intermediate groundwater zone. Off-site AOCs Shallow: MW-13S: Metals and bis2- ethylhexylphthalate) MW-14S: PAHs, metals and cyanide detected. MW-19S: Metals detected MW-21S: Metals and PAHs detected MW-20S: Tar globules / staining in MW-20S. MW-29S: ETPH and benzene above SWPC and RES & I/C VC. Benzene and ETPH in compliance with the RES VC via soil vapor testing. Naphthalene above SWPC. 16 Soil Borings TB-113, SB-14, SB-15, TB-115, TB-116, TBSB117, TB-118, TB- 16, SB-17, MW119, TB-120, TB- 19S, MW-20S, 121, TB-125, TBSB126, TB-127, TB-130 61, SB-62, SBTar impacted area to the north Surface Soil R426-A, 66, of the property line. Possible VOCs Off-site Tar SB-67, MWMW-13S, MWmigration of impacts to the Subsurface Soils R426-B, R426-C, (BTEX), Impacts St. Josephs R426-D R437-A, 29D, MW-14M 13D, MW-14S, north from the MGP. Groundwater SVOCs, Total School/Church R437-B, R437-C, (Boring) MWMW-14D Surface soils Cyanide, Parking Lot R437-D R438-A, 40S Shallow fill possible in the ETPH R438-B, R438-C, (Boring) MWdevelopment of the property. R438-D R446-A, 41S R446-B, R446-C, (Boring) R446-D R452-A, MW-42S R452-B, R452-C, (Boring) MWR452-D 43S/M (Boring) MW-41S: ETPH was detected above SWPC and RES & I/C VC. ETPH is in compliance with the Subsurface soils: PAHs RES VC via soil vapor testing. Acenaphthylene Shallow: detected above the GB PMC above SWPC. PAHs, metals, and VOCs detected MW-13S: Copper MW-13S, MWEPTH, VOCs, and PAHs detected in the deep soil samples collected from SBVOCs (ethylbenzene, MW-42S: VOCs and ETPH not detected. detected above the SWPC. 13D, MW-14S, 14 and MW-20S within tar-impacted intervals below the water table. toluene, and xylene Phenanthrene, barium, and chromium detected. Metals, SVOC (bis2MW-14M, MWdetected). MW-43S: VOCs and ETPH not detected. ethylhexylphthalate) 14D, MW-19S, Hockanum SB-14: 20.5-23 ft. coated with tar material with tar odors. Phenanthrene and barium detected. detected .MW-14S: Metals MW-20S, MWRiver is SB-61: 22.5-44 ft. tar blebs, odors, and sheen. Fill observed. Sheens and/or MW-26S: ETPH , VOCs and PAHs not detected 21S, MW-26S, located SB-66: 20-30 ft. tar odors. isolated lens of coal tar were detected. Barium detected. MW-26D, MWupgradient onSB-15: 31.5-34 ft. veins coated with tar. observed in soil borings TBDeep: 26BR, MW- 29S, site and MW-20S: 35-38 ft. black stained and sheen with tar odor. 115 through TB-120 and TBIntermediate: MW-13D: Metals MW-29D, MWapproximately 126 at depths ranging MW-14M: ETPH above SWPC . detected. 40S, MW-41S, 600 feet to the No visual impacts in SB-62 and SB-67. between 21.6 to 42 feet Elevated concentrations of benzene and tarMW-14D Metals detected. MWwest. below grade. related VOC detected. VOC (tetrachloroethylene) 42S, MW-42M, Slight tar like odor observed in MW-29D, no visual impacts. Low level Acenaphthylene above SWPC. MW-42M: ETPH and SVOC (bis2MWdetections of benzene and naphthalene. Surface Soil: PAHs detected above GWPC and ethylhexylphthalate) 43S, MW-43M above the Res DEC and GB SWPC, Benzene above GWPC. PAHs, tar detected. Detections of tar-related VOCs in MW-40S, MW-41S, and MW-42S PMC along West Street related VOCs, metals (barium, thallium, zinc). detected below the water table. detected PAHs, ETPH, VOCs, cyanide were not detected in SB-14, SB-15, SB-16, SB-17 in samples collected just above apparent water table. Deep: MW-14D: ETPH, cyanide, Acenaphthylene (PAH) above SWPC. Metals and VOCs detected. MW-13D: Metals and naphthalene detected MW-26D: Acenaphthylene above SWPC. Metals and VOCs detected. MW-43M: VOCs, PAHs and ETPH not detected. Barium, nickel, and zinc detected. Bedrock: MW-26BR Naphthalene and barium detected 17 Off-site Tar Impacts Maple Street ROW Impacted area within the Maple Street ROW from 15 to 32 feet. Possible migration of impacts from the Retorts VOCs TB-97, TB-99, TB(AOC-1) Former Gas (BTEX), 101, TB-103, TBSubsurface Soils SVOCs, Total Holders #1, #2, (AOCs 3,+). 104, TB-105, TBGroundwater Cyanide, 106, TB-111A, TBPossible off-site fuel oil ETPH 11B, and TB-111C impacted in TB-101 and TB103 from up gradient source of fuel oil. SB-18, SB-19, SB- 64 Groundwater not investigated MW-28S MW-23S ETPH, VOCs, and PAHs detected in SB-18 above the GB PMC. The DEC Subsurface Soils had does not apply to SB-18 due to the sample depth greater than 15'. SPLP concentrations of VOCs, VOCs and PAHs detected. SVOCs, pesticides (Aldrin, Petroleum staining/ sheen and odors 19-23ft. alpha- BHC, and 2Tar staining/ odors from 24-29 ft. Hexanone) at concentrations above the GB- PMC but were ETPH and PAHs were detected above the RES and I/C DEC and GB PMC in located below the water SB-19. table. Cyanide and metals Petroleum staining/ sheen and odors 11-19 ft. were detected. Tar staining/ odors from 19-26.5 ft. Tar impacts (sheen and odors) encountered from 15 ETPH, PAHs, and VOCs were not detected in SB-64 No visual impacts in to 32 feet. SB-64 Page 7 of 9 Groundwater not tested. MW-23S: Metals detected MW-28S: Metals and naphthalene detected Hockanum River located up gradient of location. Phase II (offsite) 1993 Phase III Investigation (2018) Off-site petroleum impacts are noted within the Maple Street ROW. Petroleum impacts also ere noted at #12 and #14 Maple Street. Impacts could be associated with former 1,000-gallon UST at former 8 Maple Street residence or other off- site source. Remedial evaluation impacts will be assessed in the Remedial Evaluation.
  5. Page 32 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 32 of 259 Table 1. Conceptual Site Model Summary 2022 Annual Report Rockville Former MGP Site AOC # 18 19 20 21 22 AOC Description COCs Petroleum Impacts VOCs #12 and #14 Maple (BTEX), Street SVOCs, ETPH Suspected Fill #12 and #14 Maple Street PAHs Possible Release Potentially Mechanisms and Migration Affected Media Pathways Petroleum-impacted soils from 15 to 27 feet below grade from an up gradient source that migrated via groundwater flow onto the properties. Previous Investigation Soil Locations Phase II/III Soil Locations TB-203, TB-204, TB206, TB-219, TB221, TB-224 Subsurface soils (#8 Maple Street) Not investigated Groundwater not Groundwater during Phase III investigated TB-200 and TB217 (#12 Maple Street) PAHs detected in the shallow subsurface soils (TB-217) Surface soils possibly from historic fill Subsurface soils used in the development of the property. TB-217 Not investigated Groundwater not during Phase III investigated Off-site Surface Soils 175 Union Street [PAHs Detected above RSR Criteria] PAHs PAHs PAHs detected in surface soils and shallow subsurface soils at the Maple Street School property. PAHs are detected in surface soils at nearby off-site properties (175 Union Street and Tolland AWC) Phase III Investigation Groundwater Locations Previous COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Not investigated during Phase III Groundwater not tested. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (offsite) 1994 Phase III Investigation (2018) Phase I ESA identified a 1,000 leaking underground storage tank used for heating oil at the former 8 Maple Street Residence. Not investigated during Phase III Groundwater not tested. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (offsite) 1994 Phase III Investigation (2018) Possible historic fill associated with the development of property or potential off- site source. Not investigated during Phase III MW-15S: Metals and cyanide exceeded SWPC. VOC (MTBE detected). MW-15D: Metals detected above the SWPC. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (offsite) 1994 Phase III Investigation (2018) Access to property was not provided. Tar impacts were assessed with a soil boring within Maple Street ROW (AOC-17) Remedial evaluation pending the completion of the Phase III investigation. Groundwater not tested. Hockanum River located up gradient of location. Phase IISurface Soil collection in 1995 Possible historic fill associated with the development of the school property or potential offsite source. Groundwater not tested. Hockanum River located up gradient of location. Phase IISurface Soil collection in 1995 Possible historic fill associated with the development of the property or potential offsite source. Phase II/III COCs in Soil Subsurface soils contained detections of PAHs. MW-23S MW-23S Boring log was not available during the CSM development. Subsurface soils contained detections of PAHs, with a detection of (Benzo (a)pyrene) above the Res DEC, I/C DEC and GB PMC. Boring log was not available during the CSM development to assess for presence of fill. MW-23S Subsurface soils contained detections of VOCs and PAHs at concentrations above the GB PMC. However, these impacts are likely below the water table and the GB PMC is not applicable. Surface soils R453, R454, R455, R456 R501-A, R-501-B, R-501-C, R-501-D R502-A, R-502-B, R-502-C, R-502-D R503-A, R-503-B, Not investigated Groundwater not R-503-C, R-503-D during Phase III investigated R504-A, R-504-B, R-504-C, R-504-D R505-A, R-505-B, R-505-C, R-505-D R506-A, R-506-B, R-506-C, R-506-D Groundwater not investigated Surface soils and shallow subsurface soils Surface soils R426-A,R426B,R426-C, R426-D R437-A,R437B,R437-C, R437-D R438-A,R438B,R438-C, R438-D Not investigated Groundwater not R446-A,R446during Phase III investigated B,R446-C, R446-D R452-A,R452B,R452-C, R452-D RBG2-B and RBG2C Groundwater not investigated Surface soils and shallow subsurface soils Tar-impacted soils (sheen and VOCs Off-site Tar odor) between 30 and 37 feet. TB-207, TB-210, TB(BTEX), Subsurface soils Not investigated Impacts (Residence SVOCs, Total Tar migrated beneath Maple 211, TB-215, MWGroundwater during Phase III Avenue onto the western 15D #14 Maple Street) Cyanide, portion of the property. ETPH Off-site Surface Soils Maple Street School [PAHs Detected above RSR Criteria] Previous Investigation Groundwater Locations MW-15S MW-15D Not investigated during Phase III Not investigated during Phase III Page 8 of 9 Groundwater not tested. Groundwater not tested.
  6. Page 33 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 33 of 259 Table 1. Conceptual Site Model Summary 2022 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Potentially Mechanisms and Migration Affected Media Pathways Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Shallow: Tar globules / staining in MW-20S. MW19S/MW-21S/MW-28S: metal and PAHs detected MW-13S and MW-26S (Plasticizers detected possible lab contamination) MW-27S: ETPH, metals, and naphthalene detected MW-23S: Metals detected MW-14S: Cyanide, metals, and PAHs detected MW-31S: Barium and nickel detected MW-29S: ETPH and benzene above SWPC and RES & I/C VC. Benzene and ETPH in compliance with the RES VC via soil vapor testing. Naphthalene above SWPC. 23 Off-site Groundwater Impacts VOCs Groundwater impacts from spills or leaks occurring at the site and migrating offsite. Groundwater NA See AOC 16 MW-13S, MW13D, MW-14S, MW-14D, MW19S, MW-20S, MW-21S, MW23S, MW-26S, MW-26D, MWMW-13S, MW26BR, MW- 27S, 13D, MW-14S, MW-28S, MWMW-14D, MW30S, MW-31S, 15S, MW-15D, MWMW-19S, MW40S, MW-41S, 20S, MW-21S, MWMW-23S 42M, MW-42M, MW-43S, MW43M Soil Vapor Assessment SV-01, SV-02, SV03, SV-05 Soils not assessed See AOC 16 MW-41S: ETPH was detected above SWPC and RES & I/C VC. ETPH is in compliance with the RES VC via soil vapor testing. Acenaphthylene above SWPC. PAHs, metals, and VOCs detected MW-42S: VOCs and ETPH not detected. Hockanum Shallow: Metals and Phenanthrene, barium, and chromium detected. River is cyanide detected above MW-43S: VOCs and ETPH not detected. located Phase II (offSWPC. VOCs and PAHs Phenanthrene and barium detected. upgradient onsite) 1994 detected MW-26S: ETPH , VOCs and PAHs not site and Phase III ESA detected. Barium detected. approximately (2018-2020) Deep: Metals detected 275 feet to 400 above SWPC. VOCs and Intermediate: feet to the MW-14M: ETPH above SWPC . PAHs detected west. Elevated concentrations of benzene and tarrelated VOC detected. Acenaphthylene above SWPC. MW-42M: ETPH above GWPC and SWPC, Benzene above GWPC. PAHs, tar related VOCs, metals (barium, thallium, zinc). detected MW-43M: VOCs, PAHs and ETPH not detected. Barium, nickel, and zinc detected. Deep: MW-14D: metals and VOCs detected. ETPH, Cyanide, and PAHs detected above the SWPC. MW-26D metals and tar-related VOCs detected, PAH (acenaphthylene) detected above SWPC. ETPH not detected Bedrock: MW-26BR Naphthalene and barium detected. VOCs and ETPH not detected. NOTES: MGP=- manufactured gas plant VOC = Volatile Organic Compound BTEX- Benzene, toluene, ethyl benzene and xylenes ETPH- Extractable Total Petroleum Hydrocarbons PAH = Polycyclic Aromatic Hydrocarbon TPH = Total Petroleum Hydrocarbons PCBs= Polychlorinated Biphenyls SWPC- Surface Water Protection Criteria Res DEC- Residential Direct Exposure Criteria I/C DEC - Industrial Commercial Direct Exposure Criteria CSM = Conceptual site model, described by the Connecticut Department of Environmental Protection as "a representation of an environmental system that is used as a tool for understanding and for explaining to others the basis and rationale for site investigation and the conclusions drawn about the environmental conditions at a site. A CSM describes, explains, and provides and understanding of the nature and distribution of contaminants necessary to evaluate potential risks to human health and the environment. The CSM is an iterative approach to site characterization. The number of iterations and quantity and quality of information is a function of the complexity of site conditions and data quality objectives". This interim CSM is subject to change. AOC = Area of concern, defined by the Connecticut Department of Environmental Protection as "locations or areas at a site where hazardous waste and or hazardous substances (including petroleum products) have been used, stored, treated, handled, disposed, spilled, and/or released to the environment". Page 9 of 9 Additional Phase III ESA investigation is proposed to assess seasonal groundwater conditions at St. Joseph's Church property and to assess the nature and extent west of groundwater impacts to the west of West Street.
  7. Page 34 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 34 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 Figures GEI Consultants, Inc. 1
  8. Page 35 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 35 of 259 SITE 0 SOURCE: MAP CREATED ROCKVILLE, CT QUADRANGLE, 7.5-MINUTE USGS TOPOGRAPHIC MAP, 2021 AND ELLINGTON, CT QUADRANGLE, 7.5-MINUTE USGS TOPOGRAPHIC MAP, 2021. 4000 SCALE: 1" = 2000' 2022 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut 2000 SITE LOCATION MAP Project 2200138 December 2022 \\geiconsulta B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\00_CAD\Figures\2022AR\2200138_2022AR_SLM.dwg - 12/21/2022 Fig. 1
  9. Page 36 of 150

    S The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 36 of 259 hh h D MW-16S S MW-39S MW-38S D h Dh D h D MW-30S D MW-5D hh MW-5S h D D D D D D D D MW-17S h MW-27S ABANDONED MONITORING WELL D h Gas Holder #3 110,000 (Ft3) D MW-24S MONITORING WELL h MW-1D D D D D D D D D D D D D D D D D D D D D D D um R ive r D D D D D D D D D D D D D D D D D D D D D D D D D D D D D D S S MW-28S S S & " S S S MAPLE STREET & " S S S & " S S hS " & D & " D D D MW-10SR MW-7D h MW-7S h D h MW-10D MW-10M h h h MW-10S h h STREAM D D D MW-10BR Engine & Pump Room MW-20S D Meter Room D MW-9S Gas Holder #2 22,000 (Ft3) D T RE E T D h MW-1S h h D Gas Holder #1 22,000 (Ft3) D D D D D LEGEND: D MW-9D h h Purifying D D D Retorts / Generating Room House D Hockan D D h MW-32S D D D IN S D T MA D D WE S D D S Storage MW-37BR hhh MW-37S D D h MW-6D h MW-37D D h Control House D D [Outer Substation Area] Coal Shed Control House MW-35S D D Shed D D MW-6S Transformer House MW-2BR S D h h MW-11S D D MW-11D Dynamo Room Unknown h MW-25S D h h h MW-21S h D D MW-2SR h h MW-13S D D h MW-2D/2S (OBSTRUCTION) MW-13D D MW-34S D D [Inner Substation] (Active) S D &h " D h MW-8SR D MW-3S D MW-33S Tower MW-18D h MW-3D MW-3BR h hh h RW-03M h MW-3DR D D MW-12D D D h MW-08S (DESTROYED) Gas Control h MW-4SR D D D S D h D D D D MW-36S hh h MW-4D Rockville h Substation MW-4S h D D D D D D D D D D h D D D D MW-12S D MW-12SR D D D D D D D D D D D D Store House D D MW-19S D D S D D D D D h S FENCE LINE SANITARY SEWER MANHOLE SANITARY SEWER HISTORIC S STRUCTURE S & " SITE BOUNDARY APPROXIMATE PARCEL BOUNDARY S SOURCES: 1. DATA PROVIDED BY TIGHE & BOND. 2. WORLD IMAGERY LAYER, Source: Esri, Maxar, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community 0 50 SCALE, FEET 100 2022 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut SITE LAYOUT AND HISTORICAL STRUCTURES Project 2200138 December 2022 Fig. 2 J:\Projects\Eversource Energy\13 Maple St Rockville\2022AR\2200138_2022AR_SLYT.mxd
  10. Page 37 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 37 of 259 MW-42M h h MW-42S MW-43S hMW-31S T STREE WEST MW-29S MW-40S h U̧ IA-05 MW-26BR MW-26S SV-05 SV-03 IA-04 SV-04 U̧ R446-B R452-C IA-06 (1st Floor) SV-01 OA-01 ! A h hMW-43M R452-D R452-B SV-02 IA-01 U̧ P R446-A h R452-A h MW-29D h U̧ IA-03 h h h MW-26D MW-41S IA-02 U̧ ! R446-D A R446-C R437-C R437-A ! R437-B A ! R438-B A R426-B ! R426-D A R438-D R437-D MW-14S SB-61 h MW-17S SB-23 W SED-C X WSED-03 WX SED-BX W WX X MW-2D/2S (OBSTRUCTION) MW-2SR ! MW-11D Ah MW-11S W SED-A X h ! A SB-80 W X ! A SED-05 WX SB-33 ! WX X W SB-81 A ! A TB-24 W X W SED-01 WX X ! SB-46 TB-47 ! A WX X W TP-03 é " ! A TB-2 SB-51 ! ! A A ! A TB-3 ! A * # * # # * # * HA-02 SB-52 ! A ! TB-4 A ! A A ! ! A A TB-18 # * h! A ! A SB-75 ! A ! ATB-16 A !! A SB-03 A h h AA A h h h A TP-07 TB-14 ! A TB-13 ! A MW-1S TB-X5 ! A SB-63 hMW-1D h hMW-20S TB-11 A SB-01 R416-C R414-B R416-B ! A R416-A ! A R414-A ! A MW-27S h ! TB-62 A SB-20 A ! A SB-28 R415-A R5002 ! A TB-115 TB-113 ! A SB-83 ! R414-C R415-B ! A ! A h MW-10BR TB-8 MW-10D ! SB-05 ! ! ! TB-X4! TB-9 MW-10M MW-10S MW-10SR TB-7 ! A SB-02 MW-24S ! A ! A ! A TP-06 SB-84 TB-17 ! A TB-61 TB-60 R415-C ! A TB-116 hhMW-37S MW-37D h ! A R5001 SB-62 ! A MW-37BR TB-51 TB-42 ! SB-29 A TB-6 ! ! A TB-53 ! A ! A TB-117 ! A ! A hMW-21S TB-126 ! A TB-59 TB-58 TB-X6 ! A ! TB-50 ! SB-12A A SB-74 SB-73 ! A SB-04 SB-06 SB-30 ! A MW-32S ! A TB-19 SB-85 ! TP-04 ! A ! A HA-06 TB-127 ! TB-56 A ! A TP-05 SB-31 TB-5 ! A SB-65 HA-01A TB-45 TP-02 SB-09A SB-49 HA-01 HA-03 ! A hMW-9SA ! h ! A TB-21 ! A TB-20 TB-52 MW-25S * HA-05 # *HA-04 # * # ! SB-07 A ! A MW-9D TP-01 ! W X ! A TB-118 SB-21 ! A SB-47 SB-76 ! A TB-119 ! A ! A ! !A A h TB-40 HA-08 # * MW-35S ! A h ! SB-50 TB-X1 A SB-32 SB-24 A h! TB-22 ! A ! A h ! A ! AA MW-6D SB-08 SED-02 !SB-82 WX X ! W A SW-02 MW-6S SW-01 ! A HA-09 SB-77 ! A SB-48 ! A TB-28 ! A SB-10 TB-39S # * ! A TB-49A h MW-13S h TB-126 ! A SB-22 ! A MW-33S !h A SB-44 HA-07 A h h SED-06 SB-79 !SB-34 h MW-2BR A W X é " WES T TB-X3 ! A AA h A é " MAIN ! A SB-58 SB-78 MW-34S ! SB-43! ! SB-35 ! A SB-45 TB-34 é " ! A ! ATB-63 ! TB-38 é " MW-8SR h TB-43 MW-13D ! A MW-3DR ! A ! TB-120 TB-55 STREET STRE ET SW-03 ! A SB-57 SB-25 hMW-08S (DESTROYED) ! A TB-32 A MW-18D UNION TB-64 h ! A MW-4SR ! TB-36! MW-4S MW-36S ! A MW-12S MW-12SR hh MW-12D h TB-37 h h hA A ! A h hMW-3D MW-3BR h hRW-03M h ! A TB-121 h TB-54!MW-3S ! A TB-46 ! A MW-4D SB-56 SB-13 SB-59 ! A TB-130 ! h A ! A SB-26 ! A MW-19S TB-55A SB-53 A ! A ! A ! A ! A TB-X2 ! SB-55 SB-67 ! A SB-36 SB-54 ! A R426-C SB-41 ! ATB-35 é " ! A h h ! A SB-11 h!MW-30S ! A A SB-38 TB-34 SB-37 SB-40 ! A MW-5D MW-5S h ! ! h A SB-42A ! A ! A TB-33 R426-A ! A é " SB-27 MW-38S SB-39 MW-14M TB-123 h MW-16S MW-39S ! MW-14I hh h ! A ! A WX X WSED-04 W X MW-14D SB-66 SB-60 SW-04 R438-A R438-C ! A MW-7D ! ! Ah A TB-12 ! A LEGEND: h MW-7S h ABANDONED MONITORING WELL ! A h MONITORING WELL ! A hMW-28S ! A SOIL BORING é " TEST PIT # * HAND AUGER R503-A W X SEDIMENT SAMPLE R503-D W X SURFACE WATER SAMPLE SB-64 TB-97 ! A TB-99 TB-101 ! A ! A TB-202 ! A STREET TB-104 ! A TB-105 ! A ! A TB-203 TB-224 ! A MAPLE TB-103 ! A SB-28 ! A TB-206 ! A ! A ! A ! A TB-210 TB-207 TB-200 TB-106 TB-111A TB-111B ! A ! A ! A TB-211 ! A R453 ! A ! A Unknown ! A TB-221 ! A TB-111C R454 ! A TB-215 ! A TB-217 TB-216 ! A ! A ! A R505-C R505-A R506-C TB-219 R505-B R506-D ! R506-A A R506-B R505-D R456 R455 ! A ! A R504-C R504-A R503-C ! R504-B A ! A R503-B R504-D R502-B R501-C hMW-15D h MW-15S ! R502-A INDOOR AIR SAMPLE ! R502-D A R502-C P U̧ R501-A ! R501-B A R501-D OUTDOOR AMBIENT AIR SAMPLE SUB-SLAB AIR SAMPLE STREAM ! A SITE BOUNDARY MW-23S h APPROXIMATE PARCELS 0 30 SCALE, FEET J:\Projects\Eversource Energy\13 Maple St Rockville\2022AR\2200138_2022AR_PREV.mxd 60 2022 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut Consultants Project 2200138 PREVIOUS INVESTIGATION LOCATIONS December 2022 Fig. 3

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)