Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Words on different pages
  1. Page 5 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 5 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 1. Introduction On behalf of The Connecticut Light and Power Company (CL&P) dba Eversource Energy (Eversource), GEI Consultants, Inc. prepared this 2022 Annual Report for the Rockville former manufactured gas plant (MGP) site located at 13 Maple Street, in the Rockville section of Vernon, Connecticut (Site). The Site location is shown on Fig. 1. This report serves as the annual update as required by the Voluntary Remediation Program (VRP). The report includes a brief summary of background information for the Site, identifies remaining data gaps, summarizes project tasks completed in the calendar year, presents a refined conceptual site model (CSM), and provides an updated schedule. GEI Consultants, Inc. 1
  2. Page 6 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 6 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 2. Background 2.1 Site Description The 3.43-acre Site is bounded by a wooded lot, a church, and residential properties to the north, Maple Street to the east, the Hockanum River and West Main Street to the south, and residential properties with frontage on West Street (Route 527) to the west. The Site is currently used as an electrical substation, Eversource’s Substation 14W. The substation is enclosed by a perimeter fence that limits access to authorized personnel only. The Inner Substation Area includes the active electrical substation infrastructure including high voltage power lines, towers, transformers, and electrical control houses. Subsurface electrical power supply ducts and substation grounding grid are located beneath a crushed gravel cover inside the Inner Substation Area. Access to the Inner Substation Area is restricted by a high security fence equipped with barbed wire. Eversource requires notification and specialized training prior to entry to the Inner Substation Area and appropriate escort by qualified personnel. The remainder of the parcel outside the Inner Substation Area is referred to as the Outer Substation Area (Fig. 2). The Outer Substation Area includes a grassed area surrounding the eastern and northern sides of the Site. A fenced area with a high-pressure gas regulator/control house is located on the western portion of the Outer Substation Area. The Hockanum River is in the Outer Substation Area and abuts the Inner Substation Area to the south. Wooded and overgrown areas are located on the northern portion of the Site adjacent to the St. Joseph’s Church paved parking lot and along the southern portion of the Site between the Hockanum River and West Main Street. The Site is zoned “NR-10”, which is a designation provided to historic district neighborhood parcels. Surrounding land use within a 500-foot radius includes mixed residential, commercial, and industrial land use, schools, and a church. 2.2 Site History 2.2.1 Operational History The Site was formerly a MGP that operated from 1863 until the mid-1930s when gas production ceased. The original MGP consisted of a distillation works and a gas holder, with coal gas produced by the retort process. By 1877, a second gas holder was erected, as well as a 1.5-story brick building to house gas production. In 1890, three gas engines were installed and the coal-gas made on-Site was consumed by electrical generators for arc lighting. In the mid-1890s, the MGP was converted to make carbureted water-gas. A third gas holder was erected at the MGP in 1922. Gas production ceased prior to the mid-1930s. GEI Consultants, Inc. 2
  3. Page 7 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 7 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 The footprint of the former MGP structures is shown in Fig. 2. The former MGP was acquired by CL&P in 1935 and later converted to be used as an electrical substation and natural gas regulator station, as it remains today. 2.2.2 Previous Environmental Reports and Site Status Several investigations were conducted at the Site during the 1990s as identified below: • • • • • • Analysis of Remedial Alternatives, October 1996, RETEC Field Summary Report, April 1995, NUSCO Human Health Risk Assessment, December 1994, NUSCO MGP Off-Site Investigation, April 1994, NUSCO MGP Off-Site Investigation Phase I Interim Report, May 1993, NUSCO MGP Site Investigation, March 1992, NUSCO On September 2, 2015, Eversource entered the Site into the VRP, pursuant to Connecticut General Statutes (CGS) 22a-133x, by submitting an Environmental Condition Assessment Form (ECAF) and fee to the CT DEEP. Acknowledgment of the ECAF and fee was provided in a letter from CT DEEP dated September 24, 2015. Since CT DEEP did not indicate that the Commissioner’s review and approval of the investigation was required within 30 days of the date of their letter, the Site was automatically delegated to a Licensed Environmental Professional (LEP). A data summary of the investigations listed above is provided in the ECAF and the “Site Status and Condition Report” prepared by GEI, both of which are dated August 31, 2015, and submitted to CT DEEP on September 2, 2015. A Water-Supply Well Receptor Survey was also performed as part of the ECAF; no wells were identified within a 500-foot radius of the Site. Eversource retained Tighe & Bond as the LEP firm in December 2015. Tighe & Bond conducted various Site investigation activities and submitted Annual Reports to CT DEEP from December 2016 and December 2021. Sample locations associated with investigations performed by Tighe & Bond are shown in Fig. 3. CT DEEP Significant Environmental Hazard Forms were also submitted as required. In 2020, an Off-Site Soil Vapor Assessment was completed and submitted to the church pastor. In 2021, Exponent Ecological and Biological Sciences (Exponent) completed a Screening Level Ecological Risk Assessment (SLERA) that was submitted to CT DEEP. These activities have been summarized in prior annual reports. In early 2022, Eversource once again retained GEI to plan and implement a Supplemental Phase II/III Environmental Site Assessment (ESA) Work Plan for the site. GEI Consultants, Inc. 3
  4. Page 8 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 8 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 On March 30, 2022, GEI provided a letter to CT DEEP indicating a change in the LEP of Record for the Site. GEI has recently assigned a new LEP of Record for this Site, Mr. Jeffrey Holden (LEP#423). Activities performed during 2022 are further discussed in Section 3. 2.3 Previously Identified Data Gaps The following data gaps have been identified based on GEI’s current understanding of the Site and prior investigation efforts: • Characterization of the nature and extent of the groundwater plume within the intermediate groundwater zone is needed to the west/northwest of MW-42M, which exceeds the Surface Water Protection Criteria (SWPC) for extractable total petroleum hydrocarbons (ETPH) and the Groundwater Protection Criteria (GWPC) for benzene and ETPH. • Additional groundwater data at St. Joseph’s Church and proposed additional downgradient wells are needed to evaluate seasonal changes to constituents of concern (COCs) in groundwater downgradient of the Site. • Additional groundwater data at the northwestern and western portions of the Outer Substation Area is needed to evaluate seasonal changes to COCs in groundwater at monitoring wells MW-03DR and MW-39S. Wells RW-03M, MW-03DR, and MW-37S need to be gauged to evaluate if measurable volumes of tar have accumulated at these locations. • Volatile organic compounds (VOCs) and petroleum-impacted groundwater in well MW-35S is within 15 ft of the ground surface of the electrical control house slab, thus warranting a soil vapor assessment beneath the control house. • Additional delineation of shallow soils (0-2 ft bgs) was needed (and has been performed) around previous soil sample locations SB-76 and SB-78 to determine the extent of soil with benzo(a)pyrene concentrations exceeding the SEH Condition Notification Threshold Concentration. • The SLERA completed by Exponent in 2021 indicated a potential for Site-related COCs in the Hockanum River portion of the Site to present adverse ecological effects to benthic invertebrates, fish, and semi-aquatic wildlife. The SLERA recommended further evaluation in a Baseline Ecological Risk Assessment (BERA). GEI has recommended that a refined SLERA in lieu of a BERA will be performed. Additional data collection is required in support of the revised SLERA. These data gaps served as the basis for developing the scope of work presented in the Supplemental Phase II/III ESA Work Plan, as further discussed in Section 3. GEI Consultants, Inc. 4
  5. Page 9 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 9 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 Some of these activities were able to be performed in 2022 and the remaining will be performed in 2023. Following completion of the proposed investigation activities for the Supplemental Phase II/III ESA, the existing data gaps will be re-evaluated. The results of the data gap analysis will determine if the nature and extent of impacts associated with the former MGP site has been defined. Any additional information required to select and design a remedy for the Site and to demonstrate compliance with the CT DEEP RSRs for soil, groundwater, NAPL impacts and potential ecological impacts in the Hockanum River will be identified. 2.4 Significant Environmental Hazard (SEH) Reporting Background During sampling for the Phase III Environmental Site Assessment (ESA) in 2018, a sample was detected above CT DEEP’s Significant Environmental Hazard (SEH) Condition Notification Threshold Concentration of 30 mg/kg for benzo(a)pyrene (BaP). The sample was collected from surface soils at SS-102 (shown in Appendix A on Fig. 2) located in the Inner Substation Area and was determined to be associated with historical fill. The exceedance was reported to CT DEEP in a SEH Notification Form (SEH ID:13641) on February 26, 2018. In response, CT DEEP issued an SEH Acknowledgment Letter on March 16, 2018, which stated that an immediate action to limit short-term risk was not required because the area was secured by permanent fencing. The letter required that the site investigation, remediation, and annual inspection reporting be continued in accordance with the plan provided in the SEH Notification Form. Annual SEH Status Update Forms have been submitted to the CT DEEP since 2020 to provide an update on any SEH sampling, mitigation measures, and/or abatement activities. Additional locations exceeding the SEH Condition Threshold Concentration for BaP have been identified at the following locations and reported to the CT DEEP: • In 2018 during the Phase III ESA, BaP was detected above the SEH Condition Notification Threshold Concentration in surficial soils at HA-01A, HA-02, and HA-03 located around SS-102 and in the one-to-two-foot interval at HA-18 located in the Outer Substation Area. • In 2020, on-going Phase III ESA sampling identified BaP above the SEH Condition Notification Threshold Concentration within historical fill in soil borings SB-76 and SB-78 located within the Inner Substation Area. • In 2021, precharacterization sampling to support the installation of a utility conduit duct bank found an SEH exceedance for BaP at OSS-4 in the Outer Substation Area. After excavation of the duct bank trench through the OSS-4 sample area, four sidewall samples including OSS-4NW, OSS-4NE, OSS-4SE and OSS-4SW, were collected from the trench. BaP results from these samples GEI Consultants, Inc. 5
  6. Page 10 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 10 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 indicated the SEH condition was abated. The soils from the OSS-4 area were removed and disposed of offsite along with the other soils generated from the project under the same waste profile. Section 3.3 summarizes recent SEH activities including additional delineation sampling around SB-76 and SB-78 performed in March 2022, excavation around SB-78 performed in May 2022, and submittal of the 2022 SEH Status Update Form to the CT DEEP on May 25, 2022. The 2022 Status Update Form is provided in Appendix A and includes results from the March 2022 sampling and a figure showing the locations of all the SEH investigations and exceedances through May 2022. Additional SEH delineation samples were collected on December 9, 2022, to further delineate the eastern extent of soils exceeding SEH levels around location SB-76. The December 2022 sampling and preliminary results are discussed in Section 3.4.5. GEI Consultants, Inc. 6
  7. Page 11 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 11 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 3. 2022 Site Activities This section summarizes key project-related activities performed through mid-December 2022, including the following: • Preparation of the Supplemental Phase II/III ESA Work Plan • A soil vapor assessment beneath the control house slab • Additional SEH-related sampling and reporting • Implementation of certain components of the Supplemental Phase II/III ESA Work Plan • Management of soil and groundwater generated during construction activities and utility upgrades • Repair and replacement of damaged monitoring wells Each of these is discussed in further detail in the following subsections. 3.1 Supplemental Phase II/III Environmental Site Assessment Work Plan Development GEI developed a Supplemental Phase II/III ESA Work Plan and submitted it to Eversource in June 2022. The Work Plan identified a proposed scope of work to address the data gaps identified in Section 2.3 above. It also included information regarding schedule, project sequencing, and reporting approach. The proposed investigation activities included: • Collecting a soil vapor sample inside the control house for laboratory analysis • Collecting and analyzing soil samples from nine boring locations for additional SEH delineation and overseeing abatement of one area • Obtaining access agreements for off-Site investigations • Advancing four soil borings at off-Site locations • Installing two clustered shallow/intermediate monitoring well pairs and two stand-alone intermediate monitoring wells at the soil boring locations • Installing five staff gauges in the Hockanum River • Collecting twelve co-located surface water and sediment samples to support the revised SLERA GEI Consultants, Inc. 7
  8. Page 12 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 12 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 • Surveying the locations of surface water and sediment samples and the locations and elevations of newly installed monitoring wells and staff gauges • Performing comprehensive groundwater and NAPL gauging in all existing and proposed wells • Collecting four rounds of quarterly groundwater samples at select wells • Performing three additional rounds of quarterly DNAPL gauging at select wells Of these activities, soil vapor sampling and initial SEH delineation sampling were performed in March 2022. The SB-78 SEH area was abated in May 2022 during construction activities. Access agreements were written, agreed upon, and executed with private property owners by the end of October 2022. Various field investigation activities were subsequently performed in November and December 2022 including utility clearances, advancement of soil borings, installation of monitoring wells and staff gauges, collection of additional SEH delineation soil samples in the SB-76 area, collection of sediment and surface water samples, and a field survey to locate investigatory locations and elevations. Planned future activities described in the Supplemental Phase II/III ESA Work Plan include groundwater monitoring, NAPL gauging, and groundwater sampling. The Site activities completed in 2022 are discussed in the following sections. 3.2 Soil Vapor Assessment GEI completed soil vapor sampling in March 2022 (during the winter season) to determine if soil vapor beneath the control house had been impacted by VOCs, specifically volatile fractions of ETPH, referred to as air-phase petroleum hydrocarbons (APH). The soil vapor testing was performed because groundwater collected from MW-35S, in close proximity to the control house, exceeded the residential and industrial/ commercial volatilization criteria (RES VC or I/C VC) for ETPH and volatile petroleum hydrocarbons. Building design plans were reviewed and a private utility mark-out was performed inside the control house to identify the location. One temporary soil vapor point (Vapor Pin®) was installed beneath the control house slab and sampled on March 4, 2022. The Vapor Pin was installed following the manufacturer’s recommended procedures. GEI collected one soil vapor sample, SV-CH-1 (4-hour) and submitted it under chain-of-custody protocols to Phoenix Laboratories in Manchester, Connecticut. The sample was analyzed for VOCs by EPA Method TO-15 and APH via Massachusetts Department of Protection APH Method. After sample collection, the soil vapor point was sealed with a cap and left in place for potential future sampling, if warranted. GEI compiled the results of the soil vapor sampling into a memo and submitted it to Eversource on June 21, 2022. GEI Consultants, Inc. 8
  9. Page 13 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 13 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 The memo included the laboratory data package, a table of the detected compounds compared to the RES VC and I/C VC for soil vapor, and a figure showing the soil vapor sampling location. The detected concentrations of VOCs and ETPH were below both the RES VC and I/C VC for soil vapor and therefore meet the CT DEEP RSR Section 22a-133k3(c)(1)(A) Alternative Demonstration of Compliance with Volatilization Criteria for Groundwater for Soil Vapor Below a Building. The memo is included as Appendix B to this Annual Report. 3.3 Significant Environmental Hazard (SEH) Activities As mentioned in Section 2.3, BaP was detected in soil above the SEH Condition Notification Threshold Concentration of 30 mg/kg in samples SB-76 (0 to 2 ft) and SB-78 (0 to 1 ft) located within the Inner Substation Area collected by Tighe & Bond in 2020. Additional delineation sampling was completed in March 2022 to further delineate SEH exceedances, and excavation was performed in May 2022 around SB-78 during installation of a utility conduit. The SEH sampling and excavation activities were discussed in the 2022 CT DEEP SEH Status Update Form submitted to the CT DEEP. 3.3.1 Supplemental Soil Sampling GEI advanced four (0-2 ft bgs) delineation borings around SB-76 (SB-76A through SB-76D) and four (0-2 ft bgs) delineation borings around SB-78 (SB-78A through SB-78D) on March 4, 2022. Due to frozen ground conditions at the time, each of these eight borings was advanced using a stepwise vacuum-excavation and hand tool sampling approach under the direction of Eversource and GEI field staff. GEI collected soil samples from the 0- to 1-foot and 1- to 2-foot depth intervals from each of the borings, except at SB-76B and SB-76C where only a 1- to 2-foot interval sample was collected from each due to the presence of a footing/obstruction in the 0- to 1-foot interval at these two locations. All fourteen samples were submitted to Phoenix Laboratories under chain-of-custody protocols. Each sample was analyzed for PAHs by EPA Method 8270D. Soil samples SB-78A through SB-78D delineated the extent of SEH exceedance at SB-78. Soil samples SB-76B through SB-76D delineated the southern, western, and northern extent of SEH exceedance at SB-76. One of the samples, SB-76A (1.0 to 2.0 ft), had a concentration of BaP that exceeded the SEH Condition Notification Threshold Concentration. Therefore, the eastern extent of BaP that exceeds the SEH condition at SB-76 and SB-76A was not delineated in the March 2022 sampling. An additional delineation boring, SB-76A1 was advanced to the east of SB-76A during field activities in December 2022 to delineate the eastern extent around SB-76, as discussed in Section 3.4.5. GEI Consultants, Inc. 9
  10. Page 14 of 150

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 20 Page 14 of 259 2022 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2022 The analytical results of the March 2022 SEH delineation soil sampling were provided to the CT DEEP in the 2022 SEH Status Update Form: Soil, a copy of which is included in Appendix A of this Annual Report. 3.3.2 Excavation On May 16, 2022, Eversource and GEI oversaw the excavation of soil around sample location SB-78 that exceeded the SEH condition for BaP. A total of approximately 360 cubic feet (ft3) (18 tons) of soil was excavated to the limits defined by delineation borings SB-78A through SB-78D. At first, approximately 340 ft3 of soil was removed from the 13-foot by 13-foot by 2-foot-deep excavation, after which black stained fill was visually observed along the northwest sidewall. Under direction of Eversource and GEI, an additional 20 ft3 of soil was removed from the black stained area. Excavated soils were directly loaded into a plastic-lined roll off dumpster located within the Site substation fence line. The excavation was performed as part of trenching activities for a cable conduit installation further discussed in Section 3.5. Off-Site disposal was coordinated by Tighe & Bond, and the disposal details and waste manifests are provided in their Soil Management Summary Report included in Appendix C of this Annual Report. 3.3.3 SEH Status Update Form The 2022 CT DEEP SEH Status Update Form was prepared by GEI and submitted by Eversource to the CT DEEP on May 25, 2022. The update included the supplemental soil sampling to delineate the SEH exceedances at SB-76 and SB-78, excavation and abatement of SEH condition soils at SB-78, and an annual update for other previously identified surficial soils that exceeded the SEH Condition Notification Threshold Concentration that were identified during previous investigations at the Site. The analytical results of the soil sampling, a figure showing the excavation and sampling locations, and a photographic log of the Site conditions were provided with the Status Update Form. The SEH Status Update Form is provided in Appendix A. 3.4 Supplemental Phase II/III ESA Investigation Activities Field investigation activities were performed in November and December 2022 in accordance with the Supplemental Phase II/III Environmental Site Assessment Work Plan described in Section 3.1. Investigation activities included utility preclearance, advancement of four soil borings, installation of two clustered shallow/intermediate monitoring wells pairs and two stand-alone intermediate monitoring wells, installation of five surface water staff gauges, collection of an additional SEH sample, and performance of sediment and surface water sampling. The investigation locations are shown on Figures 4 and 5. GEI Consultants, Inc. 10

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)