Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Words on different pages
  1. Page 27 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 27 of 1282 Section 2 Phase III ESA Summary Tighe&Bond not detected in SB-67 (23 to 25 feet). The soil samples were collected at similar elevations as SB-61 based upon surface elevation changes. At the eastern portion of the property in SB-62, visual evidence of coal tar impacts was not observed in SB-62 which defines the eastern extent of impacts within the St. Joseph Church Parking Lot. VOCs, PAHs and ETPH were not detected in a sample collected from SB-62 (31 to 33 feet). At the western portion of the property, no visual impacts or elevated PID readings were observed during the installation of MW-26S and MW-26D within overburden soils. 17 Maple Street One soil boring, SB-63, was advanced to 45 feet below grade in the backyard of 17 Maple Street. No evidence of coal tar impacts was observed, and no elevated PID measurements of VOCs in soils from SB-63. A soil sample was collected at 35 to 37 feet below grade which coincides with coal tar impacted layer observed in the nearby monitoring MW-20S in the St. Joseph Church Parking Lot. VOCs, PAHs, and ETPH were not detected. These results are consistent with results from SB-17 that was advanced further to the west within the backyard area on the property in the 2017 investigation. Maple Street ROW Area One soil boring, SB-64, was advanced to 50 feet below grade within the Maple Street ROW. Previous investigations encountered a combination of apparent petroleum and coal tar impacts were noted within Phase III ESA SB-18 and previous soil borings within the Maple Street ROW. During the 2017 Phase III ESA investigation, staining with strong petroleum odors were in nearby soil boring SB-18 from 19 to 23 feet below grade. Fuel oil impacts were previously encountered from 15 to 27 feet below grade on 8 Maple and 12 Maple Street properties further to the south during a previous site investigation by Northeast Utilities Service Co. During the Phase I ESA, a 1,000-gallon leaking underground storage tank (LUST) used for heating oil storage at the former 8 Maple Street Residence was identified in CTDEEP Spill report (Case No. 2003-06991) during the Phase I ESA. A fuel distribution company, Gottier Fuel is located upgradient of the site at 221 West Main Street. A soil sample was collected from SB-64 (38.5 to 40 ft) at the depth consistent with coal tar impacts observed in MW-20S within the St. Joseph Church driveway to the northwest. VOCs were not detected with the PID during field screening of soil samples from the boring. VOCs, ETPH and PAHs were not detected in the sample. 2.3.2 Off-site Groundwater Impacts Off-site groundwater impacts (AOC-23) are summarized below by respective areas: St. Joseph Church property, 17 Maple Street and the Maple Street ROW. St. Joseph Church Property Four monitoring wells (MW-14S, MW-14D, MW-19S, and MW-21S) were sampled during the spring sampling event. MW-13S and MW-13D were not sampled during the spring 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 2-13
  2. Page 28 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 28 of 1282 Section 2 Phase III ESA Summary Tighe&Bond event because MW-13D was paved over and MW-13S was filled with sediment because of a damaged manhole on the flush-mounted road box. MW-14S and MW-14D were also noted as having damaged road boxes. MW-13S, MW-13D, MW-14S, and MW-14D were developed in 2018 as part of the Phase III ESA. Seven monitoring wells were sampled during the 2018 sampling event. Four existing monitoring wells, MW-13S, MW-13D, MW-14S, and MW-14D and three newly installed monitoring wells, MW-26S, MW-26D and MW-26BR were sampled during the fall event in 2018. MW-20S was not sampled during 2018 Phase III ESA activities because coal tar was observed during the development of the monitoring well in 2017. Shallow (Water table) Monitoring Wells 2018 Spring Sampling Event VOCs and ETPH were not detected in MW-14S, MW-19S and MW-21S. Low levels of PAHs (naphthalene, phenanthrene, and/or acenaphthene) at concentrations below the SWPC. Bis(2-Ethylhexyl)phthalate, a plasticizer, was detected in MW-19S. This detection could be related to a possible lab contaminant. Total cyanide was detected at 14 µg/L in MW-14S below the SWPC. Total cyanide was not detected in MW-19S and MW-21S. Metals, including barium, total chromium, nickel, and/or zinc, were detected but were at concentrations below the SWPC. 2018 Fall Sampling VOCs, PAHs and ETPH were not detected in MW-13S, MW-14S, and MW-26S. Total cyanide was detected at 14 µg/L in MW-14S. Total cyanide was not detected in MW-13S and MW-26S. Bis(2-Ethylhexyl)phthalate, a plasticizer, was detected in MW-13S and diethylphthalate was detected in MW-13S. These are identified by CTDEEP as common laboratory contaminants. Metals, including barium, total chromium, copper, nickel, and/or zinc, were detected but were at concentrations below the SWPC. Total cyanide was not detected in MW-13S and MW-26S. Deep Monitoring Wells 2018 Spring Sampling Event Petroleum-related VOCs and PAHs were detected in MW-14D at concentrations below RSR criteria. Total cyanide was detected at 69 µg/L above the SWPC of 52 µg/L. ETPH was detected at 160 µg/L, Metals, including barium, total chromium, copper, nickel, and/or zinc, were detected but were at concentrations below the SWPC. 2018 Fall Sampling 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 2-14
  3. Page 29 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 29 of 1282 Section 2 Phase III ESA Summary Tighe&Bond Petroleum-related VOCs and 1,1,1-Trichloroethane, a chlorinated VOC, were detected in MW-14D at concentrations below RSR criteria. Naphthalene and chloroform (chlorinated VOC) was detected at 1.3 µg/L, respectively in MW-26D below the RSR criteria. VOCs were not detected in MW-13D. Acenaphthylene was detected above the SWPC in MW-14D and MW-26D. The remaining detections of PAHs were detected in each monitoring well at concentrations below the SWPC. ETPH was detected at 320 µg/L in MW-14D above the SWPC of 250 µg/L. ETPH was not detected in MW-13D and MW-26D. Total cyanide was not detected in deep monitoring wells during the fall sampling. Metals, including barium, nickel, vanadium and/or zinc, were detected but were at concentrations below the SWPC. Total chromium was detected between 4 µg/L and 53 µg/L. Bedrock Monitoring Well VOCs, ETPH and cyanide were not detected in MW-26BR. Naphthalene was detected at 0.1 µg/L, the laboratory detection limit and well below the SWPC of 210 µg/L. Barium was detected below the SWPC and total chromium was detected at 2 µg/L. 17 Maple Street MW-27S was installed on October 1, 2018. VOCs and cyanide were not detected in MW27S. Naphthalene (PAH) was detected at 0.15 µg/L and ETPH was detected at 69 µg/L. Both concentrations were below the SWPC. Metals, barium, nickel and zinc, were detected but at concentrations below the SWPC. Maple Street ROW MW-28S was installed on July 30, 2018 and was sampled as part of the 2018 fall sampling event. VOCs, ETPH, and cyanide were not detected in MW-28S. Naphthalene (PAH) was detected at 0.1 µg/L below the SWPC of 210 µg/L. Barium and nickel were detected at concentrations below the SWPC. MW-23S was sampled as part of the 2018 spring sampling event. MW-23S is along the U.S.P.S Access Road to the east of the site. VOCs, PAHs, ETPH and cyanide were not detected in MW-23S. Metals, including barium, total chromium, nickel, vanadium, and zinc, were detected but were at concentrations below the SWPC. 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 2-15
  4. Page 30 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 30 of 1282 Tighe&Bond Section 3 Quality Assurance/ Quality Control Quality assurance/quality control (QA/QC) measures were implemented as part of the Phase III ESA including the collection of field QA/QC samples and laboratory sample analysis via RCP analytical methods. A summary of the Phase III ESA QA/QC measures are provided below. A full data quality assessment/ data usability evaluation will be completed as part of the Final Phase III ESA report. Field QA/QC samples included the collection of blind duplicate samples for each sample media (soil, groundwater, sediment) and the collection/submittal of blank samples (equipment blank and trip blank samples) for groundwater. Duplicate sample results are provided next to the primary sample on Table 2 through Table 4, respectively. Phase III ESA samples were analyzed by Phoenix in accordance with CTDEEP’s RCPs. Each laboratory analytical data package contains a Laboratory Analysis QA/QC Certification Form which indicates that the laboratory followed the specified QA/QC performance criteria. Phase III ESA analytical samples were submitted within laboratoryprovided and preserved sample jars and were analyzed within analytical method within holding times. A chain of custody accompanied the samples from collection to the laboratory. The RCP analytical data packages provide a summary of QA/QC within the back of each data analytical data package. Tighe & Bond conducted an initial assessment of each laboratory report summarizing any preliminary issues such as proper reporting units, meeting necessary reporting limits, and following proper sample management. These tables are provided at the beginning of Appendix D. During our initial review of the laboratory reports the following issues were identified: • Dilutions were required for several SVOCs, VOCs, and ETPH in various soil samples due to matrix interference or the presence of target and/or non-target compounds. Due to the dilutions, various samples had elevated reporting limits. • Some soil samples exhibited suppression of the last internal standard in the lowlevel VOCs analysis; the affected compounds were reported from the high-level VOA. This resulted in some elevated reporting limits. • The VOA for soil sample HA-10 (2-2.5') was received with pH <12. pH was adjusted at the lab; however, bias cannot be ruled out. Several non-conformances were identified for non-target compounds that are not COCs at the site. In instances where non-conformances were identified for site-related COCs (i.e., metals and SVOCs), slight variability and biases were identified. A summary of all non-conformances is included as Table 6 in Appendix B. A description of site-related COC non-conformances is provided below. The following non-conformances were identified for soil samples: • Metals (Arsenic, Nickel, Mercury, Barium, Copper, and Lead) o In samples DUP-102, HA-10 (2-2’), HA-11 (1-2’), SB-34 2-4 FT, SB-35 (57 FT), SB-38 (5-7 FT), SB-39 (3-5 FT), SB-40A (5.5-7.5 FT), SB-41 1-3 FT, SB-42 2-4 FT, SB-44 (10-12`), SB-44 1-3 FT, SB-45 0-2 FT, SB-46 (5-7 FT), SB-47 2-4 FT, SB-53 (3-5 FT), SB-65 1-3 FT, laboratory 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 3-1
  5. Page 31 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 31 of 1282 Section 3 User Provided Information Tighe&Bond sample/duplicate RPDs exceeded the method criteria; as such, variability is possible. Copper was reported in a laboratory blank causing a possible high bias in sample SB-33(5-7ft). The bias does not affect data usability because the sample results were either not detected or well below applicable criteria. • PAHs o Some PAH compounds in samples SB-36 (2 to 4 feet) and SB-37(2 to 4 feet) had elevated Laboratory Control Sample (LCS) and Laboratory Control Sample Duplicate (LCSD) RPDs; as such, variability is possible. The data usability is not likely affected because sample results appear consistent with nearby samples. The following non-conformances were identified for groundwater samples: • CT ETPH o • In laboratory report GCA58993, the sample collected from MW-14D had poor surrogate recovery; as such, a low bias is possible. CT ETPH was reported in MW-14D at a concentration of 160 µg/L. The applicable criteria for CT ETPH is 250 µg/L; as such, it is plausible that without the bias, MW14D could have exceeded the applicable criteria. In the fall sampling event CT ETPH was reported above applicable criteria in MW-14D. SVOCs o In laboratory report GCA51710, the sample collected from MW-4S had elevated surrogate recovery; as such, a high bias is possible. Data usability was not likely affected because SVOCs were not reported above laboratory reporting limits in the sample from MW-4S. o In laboratory report GCB96386, the samples collected from MW-14D, MW14S, and the filtered and unfiltered samples from MW-26D and MW-30S had poor surrogate recovery; as such, a low bias is possible. Four of the six samples had SVOCs at concentrations above applicable criteria, the remaining two samples did not have SVOCs reported at concentrations above laboratory reporting limits. Results for these samples were consistent with previous sampling events. It is unlikely that the data usability was affected. o In laboratory report GCA61339, naphthalene was reported in the laboratory blank referenced to samples MW-3BR, MW-10BR, MW-18D, and MW-23S; as such, a high bias for naphthalene is possible. Data usability is not likely affected because naphthalene was not reported at concentrations near the applicable criteria in the above samples. There were some variations in the relative percent difference (RPD) for soils and groundwater. The majority of the RPDs were within the acceptable range for the majority of the compounds. There were some compounds in soils and groundwater that were detected outside the 50% RPD for soils and groundwater. This is attributable to collection of shallow subsurface soils within soils within fill material which is highly variable. Variations in groundwater could be attributable to slight variations in turbidity during sampling. Equipment blanks were collected during the spring and fall groundwater sampling events. Zinc was detected at 7 µg/L and bis(2-Ethylhexyl) phthalate was detected at 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 3-2
  6. Page 32 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 32 of 1282 Section 3 User Provided Information Tighe&Bond 2.6 µg/L in the May 30, 2018 sampling event. These are identified as common laboratory contaminants by the CTDEEP. Naphthalene was detected at 0.14 µg/L just above the detection limit of 0.10 µg/L in the equipment blank for the bladder bump for the October 24, 2018 sampling. Groundwater wells sampled with this equipment could have a high bias. VOCs were not detected in trip blanks. Based on the review of the non-conformances and the laboratory certification documentation, each lab report meets CTDEEP RCP. The non-conformances identified do not adversely affect the usability of the laboratory data. In those areas where COCs were involved, the data quality is only slightly affected by these non-conformances and is sufficient to satisfy the data quality objectives (DQOs) for the project. 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 3-3
  7. Page 33 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 33 of 1282 Tighe&Bond Section 4 Conceptual Site Model A CSM is a representation of an environmental system at a site that is used as a tool to identify releases, migration pathways, potential receptors, and ultimately risk. The CSM is used to develop work plans and provide a framework to address issues that arise during the investigation of a site. The CSM is refined throughout the site characterization process as new data are acquired. The final CSM will fully define the environmental system at the site and validate the hypotheses regarding the environmental fate of released contaminants. A final, validated CSM includes the following components: • Description of the site and environmental setting; • Identification of AOCs and associated COCs; • Potential release mechanisms for COCs at each AOC; • Evaluation of migration pathways and locations at which environmental media are most likely to have been impacted by a release; • Identification of AOCs at which releases have occurred as well as AOCs at which no releases have occurred; • Evaluation of the nature and three-dimensional extent of contaminants; and • Data and rationale to support conclusion. Table 5 provides a preliminary CSM summary that was developed for the Rockville MGP site and has been updated based upon the findings of the 2018 Phase III ESA activities. A full CSM will be provided as part of the Phase III ESA Report. Based upon the CSM, additional investigations are needed to assess the nature and extent of impacts at the site and off-site AOCs as discussed below in Phase III ESA data gaps. The following off-site AOCs related to surface soil impacts were not assessed during the Phase III ESA: AOC-19 Suspected Fill #12 and #14 Maple Street, AOC-21 Off-site Surface Soils Maple Street School and AOC-22 Off-site Surface Soils 175 Union Street. Historic PAH impacts in surface soils were determined to attributable to off-site source (airborne deposition) based upon information encountered during the preparation of the Phase I ESA for the site. Off-site Petroleum Impacts #8 and #12 Maple Street (AOC-18) were not assessed during the Phase III ESA because the petroleum impacts appear to be tied to a LUST record for a 1,000-gallon heating oil UST at #8 Maple Property that was encountered during the Phase I ESA 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 4-1
  8. Page 34 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 34 of 1282 Tighe&Bond Section 5 Well Receptor Survey Tighe & Bond completed a Water Supply Well Receptor Survey during November 2017 in general accordance with CTDEEP’s Water Supply Well Receptor Survey Guidance Document dated September 2009 (revised January 2015). The findings were provided in the 2017 Annual Report. The 2017 Annual Report recommended additional efforts will be made to assess if the water supply well record identified for 13 Windsor Avenue was still in service and being utilized by the property owner (Figure 10). The private well record is provided below: Date 3-30-1971 Property 13 Windsor Avenue Distance (Approx.) ~690 feet (west) DCP Well Report Information Domestic Well Permit (#3902) for servicing 5 people. Bedrock well was completed to a depth of 127 feet below grade. Property currently has water service from the CT Water Co. Eversource contacted the property owner to assess if the water supply well was still in service. The owner, Mr. John Regina, indicted that the buildings were connected to city water since the mid-1980s, and water from the well was terminated. 2018 Annual Report, Rockville MGP Site, Rockville/Vernon, CT 5-1
  9. Page 35 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 35 of 1282 Tighe&Bond Section 6 Phase III ESA Data Gaps During the completion of the Phase III ESA in 2018, data gaps were identified in process of assessing the on-site and off-site impacts. CTDEEP requires that data gaps be fully investigated as part of the conceptual site model process prior to the remediation of a site. Tighe & Bond has identified the data gaps during the Phase III ESA: • Off-site Delineation of Coal Tar Impacts to West of Site: Coal tar impacts sheens and odors were encountered in soil boring in SB-40/ MW-30S at the western boundary of the site. Impacts were encountered between 8 feet below grade and extended to 15 feet below grade. Concentrations of ETPH exceeds the SWPC and RES VC and acenaphthylene (PAH) was detected above the SWPC. Access was not provided to the 59/61 West Street property owner during the 2018 Phase III ESA. A sanitary sewer line is located adjacent to the impacted soil area. The sanitary sewer continues to the west where it crosses West Street. Additional delineation of soil and groundwater impacts are needed to the west of the site within the West Street ROW. • Delineation of Benzo(a) Pyrene above the SEH Threshold Concentrations at HA18: Benzo(a) pyrene was detected above the SEH Condition Threshold Concentration in a 1 to 2-foot sample collected from HA-18. Delineation of the concentrations of benzo(a) pyrene exceeding the SEH threshold is needed. On December 28, 2018, CTDEEP indicated that discovery of additional soils above the SEH Condition Threshold Concentration are covered under the February 26, 2018 SEH Notification and that a separate SEH Notification is not required. • Assessment of Extent of PMC Soils within the Inner Substation Area: Soil containing fill materials were observed within surficial soil and soil borings completed within the Inner Substation. Concentrations of PAHs and EPTH were detected above the GB PMC. However, these COCs were not detected in groundwater monitoring wells above the SWPC downgradient of the Inner Substation. The RSRs allow for an exemption to the PMC if quarterly groundwater monitoring for COCs is in compliance with the SWPC. Additional assessment is proposed to assess these soils for this RSR exemption. • On-site Deep Tar Delineation and Groundwater Assessment: Tar impacts were encountered surrounding the Gas Holder #1 and Gas Holder #2 (AOC-3 and AOC-4) and downgradient impacts (AOCs). Bedrock slopes northward toward the St. Joseph Church property. Coal tar blebs were observed in MW-03D and deep groundwater impacts with concentrations exceeding RSR criteria were detected at the northern property line. Investigation is needed to assess the deep extent of coal tar along the northern site boundary. • Off-site Groundwater Assessment- St. Joseph’s Church: ETPH and cyanide were detected in MW-14D above the SPWC and acenaphthylene was detected in MW26D and MW-14D downgradient of the site. Additional characterization of concentrations in groundwater is needed to assess seasonal changes to 2018 Annual Report, Rockville MGP Site, Rockville/Vernon, CT 6-1
  10. Page 36 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 36 of 1282 Section 6 Phase III ESA Data Gaps Tighe&Bond concentrations and extent of impacts. In addition, further groundwater assessment is recommended to assess if ETPH concentrations that are above the GWPC attenuate prior West Street which is the dividing line between GA and GB groundwater areas. Tighe & Bond will utilize the groundwater information to explore an alternate SWPC at downgradient wells to achieve compliance with the SWPC and assessment for the suitability of monitored natural attenuation at the site. • Water Supply Service: Water supply service was not provided by the Connecticut Water Company for four properties downgradient within a 1,000-foot radius of the site during the water supply well receptor survey completed by Tighe & Bond in 2017. Rockville/Vernon: • 8 Charter Road Residence Ellington: • 7 Ertel Drive • 2 Charter Road • 4 Charter Road Residence Residence Residence Additional efforts will be made to assess if these properties have active water service during 2019. 2018 Annual Report, Rockville MGP Site, Rockville/Vernon, CT 6-2

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)