Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Words on different pages
  1. Page 4 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 4 of 1282 14-0755-044 December 31, 2018 Mr. Robert Robinson, District Supervisor Remediation Division Bureau of Water Protection and Land Reuse Connecticut Department of Energy and Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Re: 2018 Annual Report Former Rockville Manufactured Gas Plant Rockville, Vernon, Connecticut REM ID No. 12390 Dear Mr. Robinson: Tighe & Bond, Inc. (Tighe & Bond), on behalf of The Connecticut Light and Power Company (CL&P) dba Eversource Energy (Eversource), submits the 2018 Annual Report for the investigation and remediation at the Former Manufactured Gas Plant (MGP) located in the Rockville section of Vernon, Connecticut. Site location is provided in Figure 1. This letter provides the annual update for the Voluntary Remediation Program (VRP) activities for the Rockville Former MGP site that were completed during the 2018 Calendar Year. Significant progress was made to assess the nature and extent of the former Rockville MGP site impacts during 2018. Site activities completed in 2018 included the implementation of a Phase III ESA field program at on-site and off-site properties, groundwater gauging and sampling and completion of follow-up water supply well receptor survey findings. The following 2018 Annual Report includes a brief summary of site background, activities completed during 2018, summary of Phase III ESA data, water supply well receptor survey findings, summary of Phase III ESA data gaps, and an updated VRP schedule. If you have any questions or comments, please contact Jim Olsen, LEP at [phone removed] or or Lynn Willey, LEP at [phone removed] or at at [email removed] [email removed]. Very truly yours, TIGHE & BOND, INC. James T. Olsen, PG, LEP Vice President 213 Court Street, Suite 1100 Lynn E. Willey, PG, LEP Senior Environmental Scientist • Middletown, CT 06457 www.tighebond.com • Tel [phone removed]
  2. Page 5 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 5 of 1282 Table of Contents Tighe&Bond Cover Letter Section 1 Background 1.1 Site History and Description ............................................................1-1 1.2 Regulatory Criteria .........................................................................1-2 1.2.1 Soil Criteria .........................................................................1-2 1.2.2 Groundwater Criteria ............................................................1-3 1.3 Phase I ESA ...................................................................................1-5 1.4 Significant Environmental Hazards Notification and Investigation .........1-6 1.5 2017 Annual Report ........................................................................1-7 Section 2 Phase III ESA Summary 2.1 Methods ........................................................................................2-1 2.2 On-Site Investigations and Findings..................................................2-3 2.2.1 Subsurface Soils ..................................................................2-4 2.2.2 Groundwater .......................................................................2-7 2.3 Off-Site Investigation and Findings ................................................. 2-11 2.3.1 Subsurface Soils ................................................................ 2-12 2.3.2 Off-site Groundwater Impacts .............................................. 2-13 Section 3 Quality Assurance/ Quality Control Section 4 Conceptual Site Model Section 5 Well Receptor Survey Section 6 Phase III ESA Data Gaps Section 7 VRP Schedule Appendices Appendix A Figures Figure 1 Site Location Map Figure 2 Current Site Features and Historic Structures Figure 3 Potential Areas of Concern Figure 4 Significant Environmental Hazard (SEH) Investigation Sample Locations Figure 5 Sample Location Summary Figure 6 Bedrock Surface Elevation and Contour Map Figure 7 Shallow Water Table Contours and 2018 Analytical Exceedance Summary Figure 8 Deep Aquifer Contours and 2018 Analytical Exceedance Summary i
  3. Page 6 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 6 of 1282 Tighe&Bond Table of Contents Figure 9 Figure 10 Appendix B Bedrock Aquifer Contours and 2018 Analytical Exceedance Summary Water Well Receptor Survey Tables Table 1 Monitoring Well Construction, Groundwater Gauging and Hockanum River Gauging Information Summary Table 2 Soil Analytical Data Exceedance Summary Table 3 Groundwater Analytical Data Summary Table 4 Sediment Analytical Data Summary Table 5 Areas of Concern (AOCs)/ Site Conceptual (CSM) Summary Table 6 Summary of Laboratory Control Data Appendix C Low-Flow Sampling Data Forms Appendix D Phase III Laboratory Analytical Data (Soil, Groundwater, and Sediment) ii
  4. Page 7 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 7 of 1282 Tighe&Bond Section 1 Background Eversource entered the Voluntary Remediation Program (VRP), pursuant to Connecticut General Statutes (CGS) 22a-133x, on September 2, 2015 by submitting an Environmental Condition Assessment Form (ECAF) and fee to the Connecticut Department of Energy and Environmental Protection (CTDEEP). The site is designated a Licensed Environmental Professional (LEP)-lead site. Eversource has assigned the LEP verification of the Rockville Manufactured Gas Plant (MGP) site to Tighe & Bond of Middletown, Connecticut. The following will be the LEP for this project: James T. Olsen, LEP (#178) Tighe & Bond, Inc., 213 Court Street, Suite 1100 Middletown, CT 06457 1.1 Site History and Description The MGP operated from 1863 until the mid-1930s when gas production ceased. The site was acquired by The Connecticut Light & Power (CL&P) in 1935 and later converted to exclusive use as an electrical substation, as it remains today. The site is 3.43 acres in size and is bounded by the St. Joseph Church parking lot and residential properties to the north, Maple Street and residential properties to the east, West Main Street to the south, and residential properties with frontage on West Street (Route 527) to the west. Site location is provided in Figure 1 (Appendix A). The Hockanum River transverses the southern portion of the site from the southeastern corner intersection at West Main Street westward to West Street. A tributary to the Hockanum River flows from westward from two outfalls at Maple Street. The site is currently developed as Eversource Substation 14W enclosed by a gated and locked fence limiting access to authorized personnel. Figure 2 provides the current layout of the site. The site consisted of an Inner Substation area which includes the active electrical substation infrastructure (i.e., high voltage power lines, towers, transformers, and electrical control houses. Subsurface electrical power supply ducts and grounding grid are located beneath a crushed gravel cover inside the Inner Substation. Access to the Inner Substation is restricted by Eversource and requires specialized training prior to entry. The remainder of the site is referred to as the Outer Substation area which includes all areas outside the Inner Substation (Figure 2). The Outer Substation includes a grassed area surrounding the eastern and northern sides of the substation. A fenced area with the rectangular-shaped high-pressure gas control house located on the western portion of the Outer Substation Area. The Hockanum River is located in the Outer Substation area and abuts the Inner Substation to the south. Wooded and overgrown areas are located on the northern portion of the site adjacent to the St. Joseph Church’s paved parking lot and along the southern portion of the site between the Hockanum River and West Main Street. 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 1-1
  5. Page 8 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 8 of 1282 Section 1 Background Tighe&Bond Groundwater beneath the site and adjacent properties has been classified as GB by CTDEEP which indicates that groundwater is within a historically highly urbanized area or an area of intense industrial activity and where public water supply service is available. Such groundwater may not be suitable for human consumption without treatment due to waste discharges, spills or leaks of chemicals or land use. The Hockanum River is classified as B meaning it is only suitable for recreational purposes, industrial process and cooling, and fish and wildlife habitat. 1.2 Regulatory Criteria Analytical results discussed in this report were compared to remediation criteria listed in the CTDEEP Remediation Standard Regulations (RSRs) (January 1996, Amended June 2013). The 2013 RSRs do not provide soil and groundwater criteria for all substances detected at the Site. Criteria for the Additional Polluting Substances detected at the site that are listed in the data summary tables of this report were obtained from “Table 10: DEEP Recommended Criteria Values for Common Additional Polluting Substances and Alternative Criteria Requests, dated December 10, 2015”. CTDEEP’s intent in developing the RSRs was to define the following: • Minimum remediation performance standards; • Specific numeric clean-up criteria; and • A process for establishing alternative site-specific standards, if warranted. The RSRs apply to efforts to remediate contaminated soil, surface water, soil vapors, or a groundwater plume at or emanating from a release area or AOC, provided the remedial action is required by the following: • CGS Chapter 445 (Hazardous Waste, Section 22a-134, the PTA), or Chapter 446K (Water Pollution Control), or CGS Section 22a-208a(C)(2); or • Relevant subsections of CGS 22a-133 (Voluntary Clean-up) including but not limited, any such action required to be taken or verified by a LEP, except as otherwise provided in the regulations. The site is enrolled in the VRP; as such, the RSRs apply to the assessment work conducted at the site. 1.2.1 Soil Criteria The CTDEEP soil remediation criteria integrates two risk-based goals: (1) the Direct Exposure Criteria (DEC) to protect human health from risks associated with direct exposure to contaminated soil; and (2) the Pollutant Mobility Criteria (PMC) to protect groundwater quality from contaminants that could potentially migrate or leach from soil to groundwater. Direct Exposure Criteria Specific numeric exposure criteria for a broad range of contaminants in soil have been established by the CTDEEP, based on certain exposure assumptions. The DEC apply to accessible soil to a depth of 15 feet. The DEC for substances other than PCBs do not apply to inaccessible soil at a release area, if such inaccessible soil is less than 15 feet below the ground surface, an environmental land-use restriction (ELUR) is in effect with respect to the subject release area. For PCBs, a maximum concentration of 10 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 1-2
  6. Page 9 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 9 of 1282 Section 1 Background Tighe&Bond milligrams per kilogram (mg/Kg) can remain in soils considered Inaccessible soil generally means polluted soil, which is the following: inaccessible. • More than 4 feet below the ground surface; • More than 2 feet below a paved surface comprised of a minimum of three inches of bituminous pavement or concrete; • Beneath an existing building; or • Beneath another permanent structure(s) approved by the CTDEEP Commissioner. Buildings can be constructed, and/or clean fill can be placed over contaminated soils rendering them inaccessible. The CTDEEP has established two sets of DEC using exposure assumptions appropriate for residential land use (RES DEC) or for industrial and certain commercial land use (I/C DEC). In general, all sites are required to be remediated to the residential criteria. If the I/C land use criteria are applicable and used, an ELUR notification is required in accordance with the RSRs. Pollutant Mobility Criteria The PMC that apply to remediation of a site depends on the groundwater classification of the site. The purpose of these criteria is to prevent contamination to groundwater in “GA” classified areas, and to prevent unacceptable further degradation to groundwater in “GB” classified areas. The applicable PMC for the Site is the PMC for a “GB” classified area. The PMC generally applies to all soil within the unsaturated zone, which represents the soil located from the ground surface to the seasonal high-water table in “GB” classified areas. The criteria do not apply to environmentally isolated soils that are polluted with substances other than VOCs provided an ELUR is recorded for the release area which ensures that such soils will not be exposed (unless approved in writing by the CTDEEP Commissioner). Environmentally isolated soils are defined as certain contaminated soils, which are above the seasonal high-water table, beneath an existing building and not a source of on-going contamination. An ELUR must be recorded for the site, which ensures that such soils will not be exposed by building demolition or other activities. Buildings can be constructed over contaminated soils rendering them environmentally isolated. Remediation based upon the listed PMC requires that a substance, other than an inorganic substance or PCB, in soil be remediated to at least that concentration at which the results of a mass analysis of soil for such substances does not exceed the PMC applicable to the groundwater classification (i.e., GB) of the area in which the soil is located (default PMC). An inorganic substance (metals) or PCBs in soil must be remediated to at least that concentration at which the analytical results of leachate produced from either the Toxicity Characteristic Leaching Procedure (TCLP) or the Synthetic Precipitation Leaching Procedure (SPLP) does not exceed the PMC applicable to the groundwater classification of the area in which the soil is located. In addition, the RSRs provide an alternate method for compliance with the PMC. For polluted soils within a GB Groundwater area, a SPLP or TCLP concentration of a substance in soil may be remediated to ten-times the groundwater protection criteria provided that non-aqueous phase liquid (NAPL) is present in soils as defined in the calculation provided in the RSRs. 1.2.2 Groundwater Criteria Groundwater remediation requirements are dependent upon the groundwater classification of the site. The objectives of these standards are the following: 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 1-3
  7. Page 10 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 10 of 1282 Section 1 Background Tighe&Bond • Protect and preserve groundwater in “GA” areas as a natural resource • Protect existing use of groundwater regardless of the area’s groundwater classification • Prevent further degradation of groundwater quality • Prevent degradation of surface water from discharges of impacted groundwater • Protect human health and the environment. Portions of the RSRs governing groundwater regulate remediation of groundwater based on each substance present within the plume and by each distinct plume of impact. Several factors influence the remediation goal at a given site, including: background water quality, the groundwater classification, the proximity of nearby surface water, existing groundwater uses, and the presence of buildings and their usage. When assessing general groundwater remediation requirements, these factors must be considered. Since the site is situated within a “GB” classified area, the following criteria apply to the site: • Surface Water Protection Criteria (SWPC) • Groundwater Volatilization Criteria (VC) Surface Water Protection Criteria The SWPC apply to all groundwater that discharges to a surface water; and therefore, applies to the site. The SWPC ensures that groundwater contamination resulting from on-site sources, which exceed background concentrations, is remediated to levels that adequately protect surface water quality. In general, compliance with the SWPC is achieved when the compound in groundwater directly upgradient from the discharge point emanating from a site is equal to or less than the SWPC established by the CTDEEP. Compliance with the SWPC can also be achieved when the 95% Upper Confidence Limit of the arithmetic mean of all sample results from a groundwater plume are equal or less than the established SWPC. Additionally, site-specific alternative SWPC can be established in accordance with the RSRs. Groundwater Volatilization Criteria The VC apply to all VOC-impacted groundwater within 15 feet of the ground surface or the lowest floor of an overlying building. According to the regulations, the VOC of concern will be remediated to a concentration that is equal to or less than the applicable Residential Volatilization Criteria (Res VC) for groundwater. It is noted that if VOCimpacted groundwater is located beneath a building that solely used for industrial or commercial purposes; then the groundwater may be remediated such that the concentrations are equal to or less than the applicable Industrial/Commercial Volatilization Criteria (I/C VC) in lieu of the RES VC. This is provided, however, that an ELUR be in effect at the site or the portion of the site covered by the building. The ELUR must also ensure that the parcel (or portion thereof beneath the building) will not be used for any residential purpose in the future and that future use is limited to industrial or commercial activity. 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 1-4
  8. Page 11 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 11 of 1282 Section 1 Background Tighe&Bond 1.3 Phase I ESA Tighe & Bond issued the Phase I ESA for the Rockville Former MGP site in March 2017. The Phase I ESA was completed to identify areas of environmental concern (AOCs) at the site in accordance with the CTDEEP’s Site Characterization Site Guidance Document (SCGD). The following on-site and off-site AOCs were identified during the Phase I ESA. Figure 3 provides a summary of the on-site and off-site AOC locations. On-site AOCs: • AOC-1: Former Retorts/Generating Room • AOC-2: Former Purifying House • AOC-3: Former Gas Holder #1 [Gasometer-22,000 ft3 Capacity] • AOC-4: Former Gas Holder #2 [Gasometer-22,000 ft3 Capacity] • AOC-5: Former Gas Holder #3 [Gasometer-110,000 ft3 Capacity] • AOC-6: Former Coal Shed • AOC-7: Former Transformer House • AOC-8: Current Substation • AOC-9: Historic Site Fill • AOC-10: Hockanum River Sediment • AOC-11: Coal Tar impacts and Fill Observed at TB-33 (Southwestern portion of site) • AOC-12: Creosote/Coal Tar impacts and Fill Observed (Southeastern portion of site) • AOC-13: Possible Historic Fill to the south of the Hockanum River • AOC-14: Creosote impacts and Fill Observed (Northern portion of Site) • AOC-15: Site-Wide Groundwater Impacts Off-Site AOCs: • AOC-16: Off-Site Creosote Impacts St. Joseph’s School/Church Parking Lot • AOC-17: Off-site Creosote Impacts Maple Street Right-of Way (ROW) • AOC-18: Off-site Petroleum Impacts #8 and #12 Maple Street • AOC-19: Suspected Fill #12 and #14 Maple Street (not related to site) • AOC-20: Off-site Creosote Impacts #14 Maple Street • AOC-21: Off-site Surface Soils Maple Street School (not related to site) • AOC-22: Off-site Surface Soils 175 Union Street (not related to site) • AOC-23: Off-site Groundwater Impacts Tighe & Bond concluded that based upon available information the site does not qualify as an “Establishment” as defined by Section 22a-134 (the CT Transfer Act) of the Connecticut General Statutes (CGS). 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 1-5
  9. Page 12 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 12 of 1282 Section 1 Background Tighe&Bond Tighe & Bond proposed that a Phase III ESA be completed to assess the nature and extent of coal tar/creosote impacts and to assess if releases occurred at other identified AOCs at the site. In addition, Tighe & Bond proposed the collection of additional water service records for properties within 500-feet of the site as part of an updated Water Well Receptor Survey which was completed as part of the 2017 Phase III ESA activities at the site. 1.4 Significant Environmental Hazards Notification and Investigation Tighe & Bond identified that benzo(a)pyrene was detected in SS-102 (0-6”) at a concentration of 45 milligrams/kilogram (mg/Kg) which is above CTDEEP’s Significant Environmental Hazard (SEH) Condition Notification Threshold Concentration of 30 mg/Kg during the 2017 Phase III ESA. SEH soil delineation activities are provided in Significant Environmental Hazard Soil Delineation, Former Rockville Manufactured Gas Plant, Rockville Substation 14W, 13 Maple Street, Rockville, CT, dated February 25, 2018, prepared by Tighe & Bond. SS-102 was collected from the top six inches of soil below the crushed gravel cover within the active Inner Substation Area. The SS-102 sample location is situated within the footprint of the former Coal Shed associated with the MGP. Historic fill material, and a large piece of coal were observed within soils during the collection of SS-102. A SEH Notification Form was submitted to CTDEEP on February 26, 2018 because the SEH Condition in surface soils was not mitigated within 90-days of identification. CTDEEP issued an SEH acknowledgement letter RE: Notification of Significant Environmental Hazard, Former Rockville Manufactured Gas Plant, 13 Maple Street, Vernon, CT dated March 16, 2018 (SEH Acknowledgement Letter). The SEH Acknowledgement Letter indicated that the reported condition did not require an immediate response to limit short-term risk because a permanent fence surrounds the property limiting access. However, annual inspection reports, site investigation and remediation would need to be continued in accordance with the plan provided in the SEH notification form. The SEH shallow soil investigation included the advancement of hand auger soil borings, HA-1 through HA-09 to 2 feet below grade around SS-102 within and adjacent to the footprint of the former coal house within the Inner Substation. The soil boring locations are provided on Figure 4. Fill materials observed in soil included brick, coal fragments, slag, wood, asphalt, glass fragments and ash. Hand auger refusal was encountered at HA-03 on a suspected foundation within the footprint of the former Coal Shed. Concentrations of benzo(a)pyrene were detected above the SEH Condition Notification Threshold Concentration of 30 mg/Kg in the three SEH investigation sample locations and depth intervals: • • • HA-01A (1.0-1.5 feet): 53 mg/Kg HA-02 (1.5-2.0 feet): 33 mg/Kg HA-03 (0.5 -1.0 feet): 32 mg/Kg PAHs were detected above the Res DEC, I/C DEC, and GB PMC at each of the hand auger locations (HA-01 through HA-09). The findings of the SEH Soil delineation were provided to CTDEEP in a letter report dated September 25, 2018. 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 1-6
  10. Page 13 of 500

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 17 Page 13 of 1282 Section 1 Background Tighe&Bond 1.5 2017 Annual Report The 2017 Annual Report for the Rockville Former MGP site provided a summary of the first round of Phase III ESA investigations at the site. The 2017 Annual Report provided a summary of soil, groundwater, sediment and surface water sampling that was completed at the site under the VRP. A summary of Phase III ESA and previous investigations are provided in Figure 5. The Annual Report identified data gaps that were identified in process of assessing the on-site and off-site impacts. CTDEEP requires that data gaps be fully investigated as part of the Conceptual Site Model (CSM) process prior to the remediation of a site. The following data gaps were presented in the 2017 Annual Report: • Off-site Delineation of Coal Tar Impacts to North and West of Site: Coal tar impacts were encountered to the north of the site within the St. Joseph Church Parking lot within SB-15 and MW-20S between approximately 31.5 and 38 feet below grade below the water table. Coal tar impacts were encountered in SB-13 between 20 and 40 feet below grade at the northwestern site boundary. Concentrations of PAHs were detected above the SWPC in deep monitoring MW18D and in bedrock well MW-03BR at the northwest corner of the site and in MW7S on the northeast corner of the site. ETPH was detected above the SWPC in MW-18D and MW-7S. Additional delineation of soil and groundwater impacts was identified for the northwest portion of the site and off-site to the north and west. • Assessment of Soils in Vicinity of Gas Holder #1 and Gas Holder #2: Coal tar impacted soils were encountered inside the former Gas Holders above the water table. Impacted soils were encountered outside the former Gas Holders in SB-04 and SB-05 near the apparent water table. Additional investigations were proposed to assess coal tar impacts above the seasonal high-water table for compliance with the GB PMC. • Delineation of Coal Tar/Petroleum Impacts Along the Sewer Line: Visuallyimpacted soils with petroleum odors and coal-tar odors were observed near the brick sewer line that transverses the site from Maple Street to West Street from 5 feet to 20 feet below grade. Concentrations of ETPH, PAHs and/or metals (arsenic and lead) exceeded RSR criteria in soils and PAHs exceeded the SPWC in MW-5S at the southwestern corner of the Inner Substation. Additional off-site delineation of soil and groundwater impacts to the west were proposed to assess the extent of impacts along the sewer line. • Assessment of Extent of Impacted Soils within the Inner Substation Area: Soil containing fill materials were observed within surficial soil and soil borings completed within the Inner Substation. Concentrations of PAHs, ETPH, and metals (arsenic and lead) were detected above RSR criteria. Further delineation of vertical and lateral extent of impacts in subsurface soils within the Inner Substation was recommended. • Extent of Impacted Soils within the Southern Outer Substation Area: Fill materials were encountered within the southern portion of the Outer Substation in the vicinity of the substation driveway beneath the grassed area to the east of 2018 Annual Report, Rockville MGP, Rockville/Vernon, Connecticut 1-7

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)