Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Words on different pages
  1. Page 15 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 15 of 46 Table 1. Well Gauging and NAPL Summary 2025 Annual Report Rockville Former MGP Site 3/31/2025 Date: 5/29/2025 8/14/2025 10/15/2025 Monitoring Well Construction Details Location Well ID Top of Well Ground Casing or Measuring Point Elevation (ft. Elevation MSL) (ft. NAVD 88) Midpoint Elevation of Screen Completion Depth (ft. below grade) Screen Interval (ft. below grade) Depth to water (ft.) 236.15 191.24 237.01 235.48 222.01 174.44 235.54 225.24 177.68 171.68 154.14 30 75 17 17 32 60 20 32 78 84 100 20-30 65-75 7-17 7-17 22-32 50-60 10-20 22-32 68-78 74-84 90-100 11.20 18.30 - Groundwater Groundwater DNAPL Depth to DNAPL LNAPL LNAPL and River Total and River Total water Thickness Thickness Thickness Thickness Elevation Depth (ft.) Elevation Depth (ft.) (ft.) (ft.) (ft.) (ft.) (ft.) (ft. NAVD88) (ft. NAVD88) Depth to water (ft.) Groundwater Groundwater DNAPL Depth to DNAPL LNAPL LNAPL and River Total and River Total water Thickness Thickness Thickness Thickness Elevation Depth (ft.) Elevation Depth (ft.) (ft.) (ft.) (ft.) (ft.) (ft.) (ft. NAVD88) (ft. NAVD88) Monitoring Well Locations MW-1S MW-1D MW-2S MW-2SR MW-2D MW-2BR MW-3S RW-03M MW-3D MW-3DR MW-3BR Overgrown Area-Outer Substation Inner Substation Wooded Area- Outer Substation MW-4S MW-4SR Grassed Area- Outer Substation MW-4D MW-5S MW-5D MW-6S Inner Substation 259.37 259.59 249.01 247.10 247.62 247.24 250.12 252.24 251.58 252.58 252.73 261.15 261.24 249.01 247.48 249.01 247.44 250.54 250.68 250.68 249.14 236.42 233.28 - 31.50 79.50 - - Trace Trace - 10.35 17.58 - 237.27 234.00 - 31.50 80.05 - - Trace Trace - 11.00 18.20 - 236.62 233.38 - 31.70 80.70 - - Trace Trace - 11.29 18.43 - 236.33 233.15 - 31.50 89.60 - - Trace Trace - 249.25 248.81 238.81 15 5-15 - - - - - - - - - - - - - - - - - - - - 249.11 248.81 234.11 20 10-20 - - - - - - - - - - - - - - - - - - - - 249.40 248.75 194.25 59.5 49.5-59.5 - - - - - - - - - - - - - - - - - - - - 244.74 244.56 250.31 246.37 246.32 248.76 236.37 223.32 241.76 15 28 12 5-15 18-28 2-12 - - - - - - - - - - - - - - - - - - - - MW-6D 249.69 249.00 219.00 35 25-35 - - - - - - - - - - - - - - - - - - - - MW-7S MW-7D MW-8S MW-8SR MW-9S MW-9D MW-10S MW-10SR MW-10M MW-10D MW-10BR MW-11S MW-11D MW-12S MW-12D MW-13S MW-13M MW-13D MW-14S MW-14M MW-14D MW-16S MW-17S MW-18D MW-19S MW-20S MW-21S MW-23S MW-24S MW-25S MW-26S MW-26D MW-26BR MW-27S MW-28S 262.13 265.01 248.43 246.29 254.17 253.95 257.82 257.68 257.35 257.33 257.33 252.17 251.91 251.54 251.69 252.13 252.16 251.91 245.11 245.62 244.90 246.82 245.72 254.03 251.88 260.52 255.11 268.98 257.07 250.82 243.97 244.28 244.16 260.80 263.85 263.81 261.76 248.56 246.69 255.75 255.63 259.42 258.04 259.08 258.98 257.57 251.20 251.10 250.80 250.90 252.53 252.45 252.45 245.40 245.40 245.36 244.86 246.01 251.16 252.16 260.52 255.30 269.20 257.59 250.99 244.53 244.45 244.32 261.00 264.11 235.81 183.76 238.56 234.69 235.75 190.63 239.42 238.04 204.08 179.98 162.57 238.70 229.60 239.80 231.40 232.53 216.95 184.45 230.40 217.40 173.36 232.86 234.01 174.16 233.16 231.52 230.30 235.20 231.59 231.99 234.53 175.45 162.32 232.00 232.11 33 83 15 17 25 70 25 25 60 84 100 17.5 24 16 22 18.2 30.5-40.5 73 19.58 33 76.21 17 17 82 24 34 30 39 31 24 15 74 87 34 37 23-33 73-83 5-15 7-17 15-25 60-70 15-25 15-25 50-60 74-84 90-100 7.5-17.5 19-24 6-16 17-22 15-25 23.38 23.23 - 233.95 233.84 - 80.85 31.40 - - Trace Trace - 22.59 22.40 - 234.74 234.67 - 80.85 31.50 - - 1.50 - 23.25 23.10 - 234.08 233.97 - 81.30 31.85 - - 0.90 - 23.46 23.41 - 233.66 - 80.00 31.36 - - 1.40 - Grassed Area- Outer Substation West Main Street Parcel St. Joseph Church Parking Lot Outer Substation Area St. Joseph Church Parking Lot USPS ROW Grassed Area- Outer Substation Front of St. Joseph Convent GEI Consultants, Inc. 17 Maple Street Maple Street ROW 63-73 10-20 23-33 67-77 7-17 7-17 72-82 14-24 24-34 20-30 29-39 21-31 14-24 5-15 64-74 77-87 24-34 27-37 1 of 2 Project 2200138 December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 1 - Monitoring Well Gauging Summary Table
  2. Page 16 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 16 of 46 Table 1. Well Gauging and NAPL Summary 2025 Annual Report Rockville Former MGP Site Date: 3/31/2025 5/29/2025 8/14/2025 10/15/2025 Monitoring Well Construction Details Well ID Location Top of Well Ground Casing or Measuring Point Elevation (ft. Elevation MSL) (ft. NAVD 88) Midpoint Elevation of Screen Completion Depth (ft. below grade) Screen Interval (ft. below grade) Depth to water (ft.) 231.24 174.31 237.58 238.00 235.00 233.49 237.39 236.01 236.66 142.05 185.05 157.41 237.21 236.91 230.19 229.46 228.20 210.21 229.60 215.70 228.54 208.59 229.47 209.45 210.30 18 75 12 17 20 19 15 17 15 28 85 105 9 9 20 20 20 38 20 34 20 40 20 40 39 8-18 65-75 2-12 7-17 10-20 9-19 5-15 7-17 5-15 18-28 75-85 95-105 4-9 4-9 10-20 10-20 10-20 28-38 10-20 24-34 10-20 30-40 10-20 30-40 29-39 15.05 - 234.45 - 19.70 - Trace - - 14.05 - 235.45 - 19.75 - - - 14.95 - 234.55 - 19.80 - - - 15.27 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Groundwater Groundwater DNAPL Depth to DNAPL LNAPL LNAPL and River Total and River Total water Thickness Thickness Thickness Thickness Elevation Depth (ft.) Elevation Depth (ft.) (ft.) (ft.) (ft.) (ft.) (ft.) (ft. NAVD88) (ft. NAVD88) Depth to water (ft.) Groundwater Groundwater DNAPL Depth to DNAPL LNAPL LNAPL and River Total and River Total water Thickness Thickness Thickness Thickness Elevation Depth (ft.) Elevation Depth (ft.) (ft.) (ft.) (ft.) (ft.) (ft.) (ft. NAVD88) (ft. NAVD88) Monitoring Well Locations MW-29S MW-29D MW-30S MW-31S MW-32S MW-33S MW-34S MW-35S MW-36S MW-37S MW-37D MW-37BR MW-38S MW-39S MW-40S MW-41S MW-42S MW-42M MW-43S MW-43M MW-44S MW-44M MW-45S MW-45M MW-46M St. Joseph Church Front Lawn Rear of Substation West Street ROW Inner Substation Outer Substation Area Rear of Substation Front of school Front of St. Joseph Church NE of Windsor Ave and West St intersection SW of West St and Union St intersection Walgreens Parking Lot 40 West Café Parking lot 43 West Street 244.09 244.00 244.46 246.16 249.50 247.19 247.09 247.68 246.36 260.21 260.77 260.05 243.31 243.76 245.19 244.46 243.20 243.21 244.60 244.70 243.01 243.33 244.20 244.14 243.88 244.24 244.31 244.58 250.00 250.00 247.49 247.39 248.01 246.66 265.05 265.05 257.41 243.71 243.41 243.54 243.59 244.47 244.45 244.30 - 234.23 - 19.71 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Hockanum River Piezometers and Gauging Locations RG-1 (River Gauge) PZ-1 PZ-1 River Level 245.12 244.54 244.54 PZ-1A 246.79 PZ-1A River Level 246.79 PZ-2A 244.90 PZ-2A River Level 244.90 PZ-3A Hockanum River 244.12 - 1 to 2 ft. below 2 ft. below river river bottom bottom 1 to 2 ft. below 2 ft. below river river bottom bottom - 2 ft. below river bottom 1 to 2 ft. below river bottom PZ-3A River Level 244.90 SG-01 247.70 SG-02 247.48 SG-03 245.40 SG-04 241.72 SG-05 241.16 Notes: NA -Not Applicable * - Data Unavailable "S" denotes a water table monitoring well (Shallow Groundwater Zone) "M" denotes an intermediate monitoring well (Intermediate Groundwater Zone) "D" denotes a deep monitoring well (Intermediate Groundwater Zone) red text- indicates a well was destroyed or unusable. Denotes product observed in the well : measured or observed during development or pumping. Elevation for measuring point was surveyed by Kratzer Jones Associates in 2016 and 2017. Elevations in NAVD 88. MSL- mean sea level-Elevations obtained from Eversource survey information: Rockville Manufactured Gas Plant Site Investigation Report dated March 1992 GEI Consultants, Inc. - 2 of 2 Project 2200138 December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 1 - Monitoring Well Gauging Summary Table
  3. Page 17 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 17 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 1 Coal and oil used to generate manufactured gas. By- products VOCs generated could include (BTEX), Surface soils tar residues, coal ash, Former Retorts/ SVOCs, Subsurface coke, complexed cyanide Generating Room Metals, Total soils compounds during the Cyanide, Groundwater production of gas. ETPH Materials could have been used as fill in the building foundation. TB-34 TB-47 SB-07 SB-43 SB-44 SB-46 SB-47 SB-48 MW-35S SB-76 SB-77 MW-9S/ MW-9D MW-9S/ MW-9D MW-35S Subsurface Soil samples from MW-09 contained VOC (ethylbenzene), SVOCs above GB PMC, metals detected. Pesticides detected (GB PMC exempt) Fill observed (ash, brick) and tar sheen and odors on auger cuttings. ETPH above RES and I/C DEC and GB PMC in SB-07, SB-47, and MW35S ETPH above RES DEC in SB-43 and SB-46 PAHs above RES and I/C DEC and GB PMC in SB-07, SB-43, SB-46, SB47, MW35S, SB-77 and SB-78. Benzo(a) pyrene above SEH Condition Threshold Concentration in SB-76. Fill observed (ash, brick, coal) in SB-07 Staining with petroleum odors (10-11.5 ft.) Tar impacts in SB-07: 16 to 25ft, 33-33.5ft., 39-40 ft. Tar impacts in SB-43 and SB-47 at 11-15ft. Tar impacts in SB-44 at 12-15ft and 24.5-26ft. Tar impacts in SB-46 10-37ft. Tar impacts MW-35S 8-20 ft. Petroleum odors in SB-77 4-6 ft. Fill observed in SB-76 0-4 ft. Fill observed in SB-77 0-2 ft. MW-9S: VOCs (xylenes), PAHs, metals, cyanide above SWPC MW-9D: PAHs and metals above SWPC Shallow: MW-9S: ETPH, VOCs (1,2,4trimethylbenzene and naphthalene), PAHs, cyanide above SWPC. ETPH detected above Res VC and I/C VC. MW-35S: ETPH , MA VPH, MA EPH and PAHs above SWPC. ETPH and MA VPH above Res VC. VOC (naphthalene) detected above the SWPC. Deep: MW-9D: VOC,ETPH and cyanide not detected. Naphthalene and metals detected below the SWPC. Phase I ESA (2017) Phase II Surface water Remedial evaluation Investigation (Hockanum pending the completion (1992) River) of the Phase III upgradient of Phase III ESA investigation. the AOC (2016-2020) Phase II/III ESA (2022) A soil vapor sample (SV-CH-1) taken from beneath the control house was below RES VC and I/C VC for VOCs and ETPH (Phase II/III ESA) 2 Manufactured gas was VOCs passed through lime used (BTEX), to scrub impurities Surface soils Former Purifying SVOCs, (sulphur/cyanide) from the Subsurface House gas (Purifier waste). Metals, Total soils Cyanide, Materials could have been Groundwater ETPH used as fill in the building foundation. TBX1 TB-3 TB-4 TB-5 TB-20 TB-21 TB-22 TP-01 TP-02 TP-03 SB-31 SB-52 Soil samples from MWShallow: ETPH and PAHs above RES and I/C DEC and GB PMC in SB-31 and SB09 contained VOC MW-9S: ETPH, VOCs (1,2,4Phase I ESA 52 DEC does not apply due to samples greater than 15'. PAHs above MW-9S: VOCs (ethylbenzene), SVOCs trimethylbenzene and naphthalene), PAHs, (2017) Surface water RES and I/C DEC and GB PMC, ETPH above RES DEC in TP-03. PAHs (xylenes), PAHs, above GB PMC, metals Remedial evaluation cyanide above SWPC. ETPH detected Phase II (Hockanum detected above RES and I/C DEC and GB PMC. Cyanide detected in all metals, cyanide above detected. Pesticides pending the completion above Res VC and I/C VC. Investigation MW-9S/ MW-9D MW-9S/MW-9D River) but SB-31. SWPC detected (GB PMC of the Phase III upgradient of (1992) exempt) investigation. Deep: the AOC Phase III ESA Fill observed (bricks, metal pieces, metal conduit, cast iron pipe, ash) MW-9D: PAHs and Fill observed (brick) and MW-9D: VOC,ETPH and cyanide not (2016-2020) metals above SWPC sheen and strong odors detected. Naphthalene and metals detected Tar impacts in SB-31 and SB-52 15-31ft on auger cuttings. below the SWPC. Surface soil: PAHs detected. 3 Former Gas Holder #1 [Gasometer22,000 ft3 Capacity] VOCs (BTEX), SVOCs, Total Cyanide, ETPH GEI Consultants, Inc. Residual tar droplets TB-18 (Refusal collected inside the bottom 13.6') of the holder which is likely Surface soils TB-19 (Refusal 14') subgrade based upon its Subsurface TB-6 (Refusal age (pre-1900 and boring soils 15.5') refusal). Groundwater TB-7 (Refusal Possible leaks or spills 16.5') from the holder to the TB-45 CSS-4 soils. SB-04 SB-05 SB-06 SB-29 SB-30 SB-31 SB-85 TP-04 TP-05 MW-10S MW-10M MW-10D MW-9S MW-9D MW-10S MW-10M MW-10D MW-10BR MW-10SR MW-24S MW-32S MW-9S: VOCs Shallow: (xylenes), PAHs, MW-10SR: Not sampled due to visual metals, cyanide above observations of tar globules/ staining during SWPC development. Tar present in subsequent ETPH above RES DEC in SB-29 and SB-30. ETPH and VOCs above gauging. Tar present in MW-24S and MWRES & I/C DEC and/or GB PMC in SB-05, SB-06, SB-31, and TP-05. MW-9D: PAHs and 32S during development. MW-24S DEC does not apply to SB-05 due to sample depth greater than 15'. PAHs metals above SWPC contained in subsequent gauging. above RES and I/C DEC and/or GB PMC in SB-29, SB-30, and SB-31 Phase I ESA (2017) Soil samples from MWPhase II 10 contained VOCs, MW-10S: VOCs and Remedial evaluation Surface water Investigation Intermediate: Fill observed (ash, slag, and/or metal) in SB-06, SB-29, SB-30, SB-31, TPSVOCs, pesticides cyanide detected, PAHs (1992) pending the completion (Hockanum MW-10M: ETPH, VOCs (naphthalene) 04, TP-05 above GB PMC but and metals above Human Health of the Phase III River) detected and PAHs above SWPC below the water table. SWPC. Risk upgradient of investigation and In-situ Heavily tar impacted soils within the Gas Holder #1 (5.75 to 14 feet). Assessment the AOC Stabilization Study TCLP benzene in impacted above characteristic hazardous waste level in Deep: Strong sheen and odor MW-10M: VOCs (1994) SB-85. MW-10D: Not sampled due to visual observed on auger (xylenes) detected, Phase III ESA observations of tar globules/ staining during cuttings. Fill observed (2016-2020) PAHs and metals above Outside holder tar impacts observed in SB-04, SB-05 19.5- 39 feet, 44.5 development TB-18 and TB-19. SWPC ft. to 50 feet, 71 to 74 ft. and SB-31 from 11 to 31 ft and 47 to 49 ft Bedrock: MW-10D: SVOCs and MW-10BR: ETPH, PAHs , VOCs, and metal (zinc) above metals detected. SWPC Page 1 of 9 Project 2200138 December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  4. Page 18 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 18 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 4 5 6 Former Gas Holder #2 [Gasometer22,000 ft3 Capacity] Former Gas Holder #3 [Gasometer110,000 ft3 Capacity) Former Coal Shed VOCs (BTEX), SVOCs, Total Cyanide, ETPH VOCs (BTEX), SVOCs, Total Cyanide, ETPH PAHs, Metals GEI Consultants, Inc. Residual tar droplets collected inside the bottom TBX-4 of the holder which is likely Surface soils TB-16 (Refusal 18') subgrade based upon its Subsurface TB-17 age (pre-1900) and boring soils TB-8 refusal. Groundwater TB-9 Possible leaks or spills TB-42 from the holder to the soils. Residual tar droplets collected inside the bottom of the holder which is likely Surface soils a shallow subgrade based Subsurface upon its age (post 1900). soils Possible leaks or spills Groundwater from the holder to the soils. Coal stockpiled for MGP could be present in the soils. Surface soils Subsurface soils SB-02 SB-03 SB-04 SB-05 SB-28 SB-29 SB-73 SB-74 SB-75 SB-83 SB-84 TP-05 TP-06 SS-3A CSS-3 TB-13 (Refusal 8') TB-14 (Refusal 6.5') TP-07 Soils not investigated SS-102 SS-103 SEH Invest. HA-01 HA-02 HA-03 HA-04 HA-05 HA-06 HA-07 HA-08 HA-09 MW-10S MW-10M MW-10D MW-10S MW-10S2 MW-10M MW-10D MW-10BR MW-24S Groundwater not investigated. Water MW-7S/MW-7D encountered inside the holder foundation. PAHs, ETPH and VOCs above RES & I/C DEC and GB PMC in SB-03 and SB-05. PAHs and ETPH above GB PMC in SB-02. PAHs above RES and I/C DEC and/or GB PMC in SB-28, SB-29, and SB73. SB-73 is in compliance with GB PMC through SPLP testing. Elevated Shallow: Surface soil: PAHs PAHs detected in SB- 75 likely intersects the apparent seasonal high MW-10SR: Not sampled due to visual MW-10S: VOCs and detected. water table. cyanide detected, PAHs observations of tar globules/ staining during Phase I ESA Arsenic above RES and I/C DEC and benzene above GB PMC in SB-28. development and metals above (2017) Soil samples from MWETPH above RES DEC in SB-29 SWPC. Phase II 10 contained VOCs, Total and SPLP benzene above GB PMC and 10X GWPC in SB-83 1 to 3 Remedial evaluation Surface water Investigation Deep: ft. SVOCs, pesticides MW-10M: VOCs pending the completion (1992) (Hockanum MW-10M: ETPH, VOCs (naphthalene) above GB PMC but (xylenes) detected, Human Health of the Phase III River) detected and PAHs above SWPC Fill observed (ash, brick, coal) in SB-05, SB-28, and SB-29, TCLP below the water table Risk investigation and In-situ PAHs and metals above upgradient of MW-10D: Not sampled due to visual benzene in impacted above characteristic hazardous waste level in SBAssessment Stabilization Study SWPC the AOC observations of tar globules/ staining during 84. Strong sheen and odor (1994) development. observed on auger Phase III ESA MW-10D: SVOCs and Fill (wood, glass, metal) observed in TP-05. cuttings (TB-16 and TB(2016-2020) metal (zinc) above Bedrock: 17). Fill (bricks) SWPC MW-10BR: ETPH, PAHs ,VOCs, and Tar impacts: SB-02: 18 to 39 ft. observed in TB- 16. metals detected. SB-03: 10.5 to 15 ft. SB-04: 2.5-37 ft. 44.5-50 ft. SB-05: 19.5 to 39 ft., 71-74 ft. SB-28: 24-36.5 ft. TP-05: 5.75 -6.0 ft. Surface soils: PAHs and metals detected Fill observed Surface soils: PAHs, cyanide and metals detected No visual impacts in soils. Groundwater investigations not completed in AOC. Investigation completed. Phase I ESA Soil remediation is not required. (2017) Phase II Shallow : Groundwater impacts Surface water Investigation MW-7S: ETPH and PAHs detected above are likely associated (1992) (Hockanum the SWPC. VOCs and metals detected. Human Health with AOC-3 and AOC River) 4 (Holder #1 and Risk upgradient of Deep: Holder #2). Assessment the AOC MW-7D: PAHs, VOCs and metals detected Groundwater impacts (1994) Phase III ESA are addressed under (2016-2018) site- wide groundwater AOC- 15. Groundwater investigations not completed in AOC. Delineation SEH soils for benzo (a) pyrene Surface water Phase I ESA was completed in 2018. (Hockanum Groundwater investigations not completed (2017) River) in AOC. Phase III ESA Remedial evaluation upgradient of (2017-2018) pending the completion the AOC of the Phase III investigation. PAHs, ETPH, and lead above the RES and I/C DEC and GB PMC in SS102. PCBs detected. Benzo (a) pyrene detected above the SEH Condition Notification Threshold Concentration. Groundwater Groundwater not not investigated investigated No investigations (within active (within active completed in the AOC. transformer transformer yard) yard) PAHs, ETPH, and arsenic above the RES and I/C DEC and/or GB PMC in SS-103. Cyanide detected. PAHs above the RES and I/C DEC in HA-01 through HA-09. SEH Threshold Notification Concentration for benzo(a)pyrene delineated HA01, HA-2 and HA-03 above the threshold. Fill observed (coal, ash) in shallow soils below the trap-rock gravel cover to 2 feet below grade. Page 2 of 9 Project 2200138 December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  5. Page 19 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 19 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater Groundwater investigations not completed in AOC. Groundwater investigations not completed in AOC. COCs in Surface Water Investigation Status Remediation Status Rockville Former MGP Site (On-Site) PAHs above RES and I/C DEC and GB PMC in SS-100. Arsenic above RES and I/C DEC in SS-100 and SS-101. ETPH and cyanide detected. 7 Former Transformer House PCBs, ETPH Soils not Transformer use. Possible Surface soils investigated (within leaks or spills could have Subsurface active transformer impacted soils. Soils yard) SS-100 SS-101 SB-44 Groundwater Groundwater not not investigated investigated No investigations (within active (within active completed in the AOC. transformer transformer yard) yard) Fill, coal and brick, encountered to 5 feet below grade in SB-44. ETPH and cyanide detected. Visual Impacts (Appear to be associated with AOC -1) 12- 15 ft.: Petroleum odor and sheen 24.5-26: Faint tar odor Arsenic and ETPH above RES and I/C DEC in SS-100, SS-101, SS-104 and SS-106. PAHs, ETPH, and lead above the RES and I/C DEC and GB PMC in SS-102. PCBs detected. PAHs, ETPH, and arsenic above the RES and I/C DEC and/or GB PMC in SS-103. Cyanide detected. ETPH also above RES DEC, I/C DEC and GB PMC in SS-104 and Res DEC in SS- 106. PAHs above RES and I/C DEC and GB PMC in SS-100, SS-104, SS-105 and SS- 106. 8 Current Substation PCBs, ETPH, Metals, Possible leaks or spills from transformers Surface soils Subsurface Soils If significant release: groundwater TB-34 TB-38 TB-39S TB-32 MW-8S SS-100 to SS106 HA-01 to HA-11 SB-43 SB-44 MW-8S MW-2SR, MW2D, MW-2BR, MW5S, MW-5D, MW8SR, MW-16S, MW-17S, MW25S, MW-32S, MW-33S, MW34S, MW-35S, MW-36S HA-01 through HA-07, HA-08 and HA-09: SEH investigation (See AOC 6) . PAHs above the RES and I/C DEC in HA-01 through HA-09. SEH Condition Notification Threshold Concentration for benzo(a)pyrene delineated see AOC-9. Fill observed in top 2 feet of soils. PAHs and metals detected. Fill (sand) observed HA-09A: ETPH exceeds RES DEC, arsenic exceeds the RES and I/C DEC. PAHs exceed RES DEC, I/C DEC and GB PMC. Cyanide detected. PCBs not detected. HA-10: ETPH and PAHs exceed RES DEC, I/C DEC and GB PMC. Cyanide detected below RES DEC and GB PMC. Arsenic exceeds the RES and I/C DEC HA-11: Arsenic exceeds the RES and I/C DEC. ETPH detected. ETPH above RES DEC in MW-35S & MW-36S and above RES & I/C DEC in MW- 32S Arsenic above RES & I/C DEC in MW-35S and MW-36S PAHs above RES & I/C DEC and GB PMC in MW-32S, MW-33S, MW34S, MW35S, and MW-36S. Benzo(a) pyrene detected above the SEH Condition Notification Threshold Concentration in SB-76 (0-2 ft.) and SB-78 (0-1 ft.) Visual Impacts (Appear to be associated with AOC -1) 12- 15 ft.: Petroleum odor and sheen 24.5-26: Faint tar odor GEI Consultants, Inc. Page 3 of 9 Project 2200138 MW-8S: Metals detected above the SWPC. Cyanide detected. Surface water Phase I ESA Remedial evaluation (Hockanum (2017) pending the completion River) Phase III ESA of the Phase III upgradient of (2018) investigation. the AOC Shallow: MW-2SR: Not sampled due to visual observations of tar globules (2017). PAHs detected above SWPC. VOC (naphthalene detected). MW-5S: PAHs detected above SWPC. ETPH detected above the SWPC, RES VC and I/C VC. VOCs, and metals detected. MW-8SR: PAHs detected above the SWPC. Elevated metals detected. Possibly associated with turbidity in sample. MW-16S: Metals and VOC (Chloroform) detected . MW-17S: VOCs (tetrachloroethene)and ETPH detected below SWPC. Metals detected. Phase I ESA Phase III ESA and preSurface water MW-33S: acenaphthylene detected above (2017) design sampling is (Hockanum SWPC and ETPH above SWPC, RES VC Phase II needed for this AOC. River) located and I/C VC. Investigation Remedial evaluation adjacent but MW-34S; ETPH above SWPC, RES (1992) pending the completion up gradient of VC and I/C VC and PAHs (acenaphthylene, Phase III ESA of the Phase III location. Benz(a)anthracene, chrysene) detected (2016-2020) investigation. above the SWPC MW-35S: ETPH , MA VPH, MA EPH and PAHs above SWPC. ETPH and MA VPH above Res VC. VOC (naphthalene) detected above the SWPC. (associated with AOC-3). Deep: MW-2D: Not sampled due to visual observations of tar globules. MW-5D: Metals and ETPH detected Bedrock: MW-2BR: PAHs detected below the SWPC. Metals detected. December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  6. Page 20 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 20 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 9 Historic Site Fill VOCs, Historic placement of fill SVOCs, during the development of Metals, Site. PCBs, ETPH TB-02, TB-03,TB04, TB-06, TB-13, On-site soils TB-14, TB-16, TBborings, SS17, TB-18, TB-19, 100 to SSTB-20, TB-21, TB107, SB-76 to 22, TB-27, TB-31, SB-83, TP-01 TB-32, TB-33, TBto TP-07, HA34, TB-38, TB-39, 01 to HA -18, TB-40, TB-42, TBSB-78A to D, Surface soils 45, TB-47, MWSB-76A to D, Not Applicable Subsurface 02D, MW-04D, MWsoils SB-76A1 05S, MW- 05D, MW-10S, MWHistoric fill 10M, MW- 10D was identified in multiple Historic fill was borings which identified in overlap with multiple borings other AOCs which overlap with other AOCs River Sediment Samples SED-01 SED-02 SED-03 SED-04 SED-05 SED-06 10 Hockanum River Sediment PAHs and Metals Possible historic discharges to the river from the Site, historic discharges from up gradient industries, current storm water run-off and anthropogenic sources. Sediment R-Sed-A/B/C/D Sediments (A,B,C, D) Outfall Sediment Samples SED-07 SED-08 SED-09 11 Coal Tar impacts and Fill Observed at TB-33 (Southwestern portion of Site) VOCs (BTEX), SVOCs, Total Cyanide, ETPH GEI Consultants, Inc. Historic placement of fill. Surface soils Subsurface Soils Groundwater TB-33 TB-34 MW-5S MW-5D Not Applicable Not Applicable MW-5S MW-5D Concentrations of COCs including PAHs, ETPH, and metals above RSR Fill (i.e., ash and bricks criteria covered under separate AOCs. Concentrations of benzo (a) Wells screened below observed) pyrene above SEH Threshold Notification Concentration delineated in SSfill (See AOC-15) 102, HA- 01A, HA-02 HA-03, HA-18, SB-76, SB-78 and SB-76A. The extent of SEH exceedances around SB-78 and SB-76 was delineated during sampling performed in March 2022 (SB-78A to D and SB-76A to D) and December 2022 (SB-76A1) SW-01 SW-02 SW-03 SW-04 Background Sediment Samples SED101 SED-102 SED-103 SED-104 SED-105 SB-11 SB-36 SB-37 SB-38 SB-39 SB-40 SB-41 SB-42 SB-53 MW-16S MW-17S SB-69 SB-70 SB-71 MW-31S (boring) Fill (i.e., ash, bricks, slag, metals, glass, building debris, coal, and site fill) and former MGP plant foundations observed in several Phase III investigation locations. Fill as deep as 15 ft. Background Surface Water Samples SW-100 SW-101 MW-5S MW-5D MW-16S MW17S MW-30S MW-38S MW-39S MW-31S PAHs and metals detected above sediment screening criteria. VOC (methylene chloride) detected. River Sediment Samples ETPH, PAHs, and metals detected. Highest PAH concentrations were detected upstream at SED-01. ETPH detected in all sediment samples. Metals detected in all sediment samples. Elevated copper, lead and zinc detected in SED-06. SED-06A, B, C were collected in the vicinity of SED06. Outfall Sediment Samples VOC (toluene), ETPH, PAHs and metals were detected. Background Sediment Samples PAHs, ETPH and metals detected in SED-101 through 105. VOCs, PAHs and metals detected. Fill (sand) with tar observed. Not applicable Wells screened below fill (See AOC-15) Phase III ESA and predesign sampling is Phase I ESA needed for this AOC. (2017) Remedial evaluation Surface water Phase II pending the completion (Hockanum Investigation of the Phase III River) located (1992) investigation. adjacent but Phase III ESA up gradient of (2018-2020) location. Soils in the vicinity of SBPhase II/III 78 were excavated and ESA (2022) disposed of in May 2022. Barium detected in all surface water samples. Chromium detected in SW-01 and SW-02, Zinc COCs not detected in groundwater. Barium detected in detected below SWPC in adjacent SW- 01, SWmonitoring wells. 02, SW03, and SW04 Investigation is completed. SLERA is currently being prepared and will be submitted to CTDEEP for review Phase I ESA (2017) Phase II Investigation (1992) Phase III Investigation (2016- 2018) Remedial evaluation pending the completion of the Phase III investigation. Background surface water samples: Barium detected. ETPH and PAHs detected above RES and I/C DEC and GB PMC in SBShallow: 11. MW-5S: ETPH and VOCs detected below Naphthalene (VOC) detected above GB PMC and arsenic and lead SWPC. PAHs detected above SWPC. detected above RES and I/C DEC in SB-11. MW-5S: PAH Metals detected. Fill (Ash and Slag) observed in SB-11, SB-36, SB-39 ,SB-40, SB-40A, SB(Acenaphthylene) MW-16S: Metals and Chloroform (VOC) 69, SB- 70, SB-71 to approximately 5 feet. detected above the detected SB-11: Sheen and tar odor observed from 5 to 8 feet. SB-36: Tar odor 12 SWPC. MW-17S: VOC (tetrachloroethene), ETPH Surface water VOC (xylene) and metal detected below SWPC. Metals detected. to 20 feet. Sheen 15 to 20 feet. (Hockanum SB-38: sheen and tar odor 10 to 11 feet. SB-40: sheen and tar odor 8 to (chromium) detected. MW-30S: ETPH and acenaphthylene above River) located 15 feet. SWPC. ETPH above RES VC MW-31S: adjacent but MW-5D: VOC (Benzyl SB-69: ETPH above RES & I/C DEC & GB PMC, arsenic above RES & Metals detected up gradient of Alcohol) and metals I/C DEC 1 to 3 feet. PAHs above RES & I/C DEC & GB PMC 1 to 3 feet MW-38S & MW-39S: Acenaphthylene location. and 4 to 5 feet. above SWPC detected above SWPC. SB-70: Arsenic above RES & I/C DEC. PAHs above RES & I/C DEC & GB SVOC (2-methylphenol) MW-39S: ETPH detected above the SPWC, PMC 3 to 4 feet. detected. RES VC and I/C VC SB-71: ETPH above RES DEC & GB PMC 1 to 3 feet and 8 to 10 feet. PAHs above RES & I/C DEC & GB PMC 1 to 3 feet, 5 to 7 feet and 8 to Deep: 10 feet. MW-5D: Metals and ETPH detected Page 4 of 9 Project 2200138 Phase I ESA (2017) Phase II Investigation (1992) Phase III Investigation (2017- 2020) December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  7. Page 21 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 21 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 12 Tar impacts and Fill Observed (Southeastern portion of Site) VOCs (BTEX), SVOCs, Total Cyanide, ETPH Historic placement of fill (AOC-13). Possible Surface soils migration for spills or leaks Subsurface from adjacent Retorts Soils (AOC-1) or Purifying Groundwater House (AOC- 2). CSS-5 TB-2 TB-3 TB-24 TB-28 MW-6S MW-6D SB-08 SB-09 SB-09A SB-10 SB-24 SB-32 SB-33 SB-48 SB-49 SB-50 SB-51 SB-82 SS-107 SS-108 HA-17 HA-18 SB-76 to SB82 PAHs detected above RES and I/C DEC and GB PMC in SB-08, SB-09A. PAHs detected above the RES DEC and GB PMC in SB-24. ETPH detected above RES DEC in SB-09A. Concentrations of PAHs and ETPH were detected above the RES DEC, I/C DEC and/or the GB PMC in SB32 and SB-51. Concentrations of arsenic were detected in above the RES DEC and I/C DEC. MW-2S MW-2D MW-6S MW-6D MW-2SR MW-2D MW-2BR MW-6S MW-6D Shallow: MW-2SR: Not sampled due to visual HA-17: ETPH and cyanides detected. PAHs detected above the RES Surface Soil: PAHs MW-2S: Dry. Phase I ESA observations of tar globules (2017). DEC., I/C DEC and GB PMC. Lead above the GB PMC. exceeded the Res DEC MW-2D: Metals and (2017) MW-6S: Naphthalene and metals detected HA-18: ETPH, PAHs above the RES DEC/ I/C DEC and GB PMC. Benzo and GB PMC. PAHs detected above Phase II below the SWPC. (a) pyrene above the SEH Threshold Notification Concentration. the SWPC and VOCs Investigation SB-76: to SB-82: PAHs above the RES DEC/ I/C DEC and GB PMC Subsurface soils: Hockanum Remedial evaluation (xylene and (1992) SB-79: Benzene above GB PMC 1-2 ft, PCE above GB PMC and RES VOC(methylene River located Deep: Human Health pending the completion ethylbenzene detected). DEC 1-2 ft, GB PMC 3-4 ft and 5-6 ft chloride), SVOCs, adjacent but MW-6D: PAHs detected below SWPC. Risk of the Phase III SB-81: Dieldrin above GB PMC 0-1 ft cyanide, and metals up gradient of Metals detected. Assessment investigation. MW-6S: Metals SB-82: ETPH above RES DEC, I/C DEC, and GB PMC 2-3 ft detected. location. MW-2D: Not sampled due to visual (1994) detected above the SB-08: Staining and fuel oil odor 11 to 2 ft. Staining and tar odor from 24 observations of tar globules Phase III SWPC. SVOC (bis2Fill (ash and sand fill), to 29 ft. Investigation ethylhexylphthalate) Tar impacts sheen SB-10: Sheen and tar odor 9 to 24.5 ft. Bedrock: (2016- 2020) detected. observed. SB-33: tar odor 7 to 11 ft. Sheen, blebs and tar odor 11.5- 20 ft. MW-2BR: PAHs detected below the SWPC. SB-50: Tar from 11-12 ft. Sheens and tar blebs were observed from 15 to Metals detected. 17 feet. sheens and tar odors were observed from 17 feet to 25 feet SB-51: petroleum orders and grey staining from 14 to 17 feet. Sheen, tar blebs and/or tar odors were observed from 17 to 20 feet. Fill (brick, glass, slag, and/or ash) observed in SB-08, SB-09A and SB24, SB-32, SB-33, SB-48 to SB-51, and SB-76 to SB-82. 13 Possible Historic Fill to the south of the Hockanum River PAHs GEI Consultants, Inc. Possible historic placement of fill. Surface Soil Subsurface Soil SS-5A, SS5B, SS5C, SS-5D TBX2 TB-63 and TB-64 SB-25 SB-26 SB-27 SB-54 SB-55 SB-56 SB-57 Surface Soil: PAHs detected above RES and I/C DEC and GB PMC in SB25, SB-54 and SB-55. MW-11S MW-11D MW-12S MW-12D MW-11S MW-11D MW-12S MW-12D Shallow: Surface soil and MW-11S/ MW-12S: Metals detected MW-11S/ MW-11D MWCyanide was detected in SB-54 and SB-55, Metals were detected in SBshallow subsurface 12S / 12D soils: PAHs exceeded 54, SB-55, SB-56, and SB-57. SPLP metals were detected in SB-54 and Deep: SB-57. the RDEC, IDEC and No analytical data MW-11D/ MW-12D: Metals and/or pyrene GB PMC. (PAH) detected Fill (slag and/or ash) observed in SB-26, SB-27, SB-54, SB-55, SB-56, and SB-57. Page 5 of 9 Project 2200138 Phase II Investigation (1992) Hockanum Human Health Remedial evaluation River located Risk pending the completion adjacent and Assessment of the Phase III downgradient. (1994) investigation. Phase III Investigation (2017- 2018) December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  8. Page 22 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 22 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 14 15 Tar impacts and Fill Observed (Northern portion of Site) Site wide groundwater impacts VOCs (BTEX), SVOCs, Total Cyanide, ETPH SB-01 TB-12, TB-36, TBSB-12 37,TB-40, TB-42 SB-13 TB-46, TB- 49A,TBSB-20 50, TB-51, SB-21 TB-52, TB-53, TBSB-22 54, TB-55 Impacted area to the north SB-45 TB-55A, TB-56, of former Gas Holders #1 Surface soils SB-59 TB-58 , TB-59, and #2, Possible Subsurface TB-60, TB-61, TB- SB-60 (offmigration for spills or leaks Soils site) SB-64 62, MW-1, MWfrom adjacent holders that Groundwater 3S, MW-3D, MW- (off-site) SBmigrated northward. 68 4S, MW-7S TBX5, SB-73 TBX6 SB-74 SS-3B. SS3-C, SB-75 SS3MW-37S/D E, SS3-D, SS1-C, MW-03DR CSS-1, CSS-2 VOCs, SVOCs, Groundwater impacts from Metals, spills or leaks occurring at PCBs, the site. Groundwater Groundwater ETPH, flows to the north away Chromium, from the Hockanum River. Barium, ETPH GEI Consultants, Inc. NA NA MW-1S, MW1D, MW-3S, MW3D, MW-4S, MW-4D Shallow: MW-4S: Cyanide, metals, VOCs, and PAHs Shallow Subsurface Soils: PAHs detected in SB-21 above the RES DEC, detected Shallow: I/C DEC and GB PMC. SPLP PAHs were not detected indicating PAHs MW-1S:Metals detected MW-4SR: Acenaphthylene (PAH) detected are not leachable. above the SWPC. Cyanide detected. above the SWPC. PAHs detected in SB-22. MW-25S: Cyanide, metals, and PAHs MW-3S: Metals and detected PAHs detected above PAHs, ETPH, VOCs, cyanide were not detected in SB-01, SB -12 and MW-3S/MW-7S: Metals and VOCs the SWPC. VOCs Surface Soil: PAHs SB-13 in samples collected just above apparent water table. detected. PAHs and ETPH detected above detected. detected above the Res the SWPC MW-4S: Metals DEC and GB PMC. Elevated concentrations of ETPH, VOCs, and SVOCs detected in SB-13 MW-1S: Metals, ETPH and PAHs detected detected above the Metals and cyanide Additional Phase III (25.5- 27.5') below water table (~15ft.) MW-1S, MW-1D, above the SWPC. SWPC. cyanide, VOCs detected. Phase I ESA ESA investigation is MW-3S, MW-3D, (1,1,1-TCA) and SVOC MW-24S: Measurable tar observed in well. (2017) Phase proposed to assess the SB-45: Metals detected MW-3DR MW(bis2Subsurface soils: Hockanum II (1990/1991) seasonal groundwater SB-59: PAHs, Cyanide, and VOCs detected 3BR, MW-4S, ethylhexylphthalate) SVOCs detected above Human Health conditions and River is Deep: MW-4SR, detected. the Res and I/C DEC Risk assessment of the located up MW-1D: ETPH and VOCs detected. PAHs Fill observed: Brick observed at 0.5-3.0 ft. in SB-21 and SB-59. MW-4D, MW-7S, and GB PMC and recoverability of tar. gradient on - Assessment and metals (copper and nickel) detected Tar impacts were encountered SB-12: from 25-30 ft. (Staining, sheen and MW-7D, MWVOCs and pesticide (1994) Remedial evaluation site above the SWPC. Deep: coated soils) and 37.5-39ft. (Strong tar odor) 18D, MW-24S, (lindane) detected Phase III ESA pending the completion MW-3DR: ETPH and acenaphthylene MW-1D: Metals SB-13: 20-39 ft. (Staining and heavily tar coated soils and odors) SB-01: MW-25S, MWabove the GB PMC. (1996-2020) of the Phase III detected above SWPC. detected above the 29 to 31 ft. Sheen and tar odor. 37D, MW- 37BR Metals detected. investigation. MW-4D/MW-7D: Metals detected. MW-18D: SWPC. SVOCs SB-45: Tar odors 30-41 ft. Tar blebs observed from 30-38 ft. ETPH, VOCs, and PAHs detected. SB-59: Coal and slag 2-3 ft. Tar odors 30 to 45 ft. PAHs,VOCs, and Fill observed and tar detected above the SWPC. Metals MW-3D: Metals cyanide detected (2 to 3) odors and tar sheen. detected. detected above the SB-60: Tar odor 40 to 45 ft. Naphthalene and Xylene (VOCs) detected. MW-37D: Metals detected. SWPC. SVOCs and SB-64: No visual impacts or odors. VOC (1,1,1-TCA) MW-37S/D: Sheen and odors observed below water table. detected. Bedrock: SB-68: Tar product observed (23-34 ft), sheen observed (23-59 ft). VOCs, MW4D: Lead detected MW-3BR: PAH (acenaphthylene) above PAHs, and ETPH detected above the SWPC. SWPC. ETPH and VOCs detected. Metals MW-03DR: Tar product observed in auger cuttings (23') detected. MW-37BR: Metals and VOCs detected. MW-1S, MW-1D, MW-2SR, MW2BR, MW-2D, MW-3S, MW-3BR, MW4S, MW-4SR, MW4D, MW-1S, MWMW-5S, MW-5D, 1D, MW-6S, MW-6D, MW-2S, MWMW-7S,MW-7D, 2D, MW-8SR, MWMW-3S, MW9S, MW-9D, MW3D, 10SR, MW-10M, MW-4S, MWMW- 10BR,MW4D, 11S, MWMW-5S, MW11D, MW-12S, 5D, See AOCs above for MWMW-6S, MWsite investigation 12D, MW-16S, 6D, information for soils MWMW-8S, MW17S, MW-18D, 9S, MWMW-9D, MW19S, MW-24S, 10S, MW-10M, MWMW- 10D, MW25S, MW-26S, 11S, MWMW11D, MW-12S, 26D, MW-26BR, MWMW-27S, MW12D 28S, MW-29S, MW-29D, MW30S, MW-33S, MW-34S, MW35S, MW-36S, MW-37D, MW37BR, MW- 38S, MW-39S See AOCs above for site investigation information for soils Shallow: ETPH, VOCs, PAHs, and /or Cyanide above the SWPC. in MW-1S, MW-5S, MW7S, MW-8SR, MW-9S, and MW- 10M, MW-29S, MW-30S, MW-33S, MW-34S, MW-35S, MW-38S, and MW-39S. See above AOCs for individual well summary of COCs. Shallow: ETPH, VOCs, Tar globules and staining observed in MWPAHs, metals, and 2S, MW-10SR, and MW-24S Cyanide above the during development. Measurable tar SWPC. See above observed in MW-10SR and MW-24S Hockanum AOCs for individual River is wells located up Deep: gradient on VOCs, ETPH, PAH (acenaphthylene) Deep: ETPH, VOCs, site/ Losing above the SWPC in MW-18D. MW- 3DR: PAHs, metals, and Stream ETPH and acenaphthylene detected above Cyanide above the SWPC. SWPC.. See above Tar globules and staining observed in MWAOCs for individual 2D, MW-3D and MW-10D wells Phase I ESA (2017) Additional Phase III Phase II ESA investigation is Investigation proposed to assess the (1992) seasonal groundwater Phase III conditions Investigation (2016- 2020) Bedrock: PAH (acenaphthylene) above SWPC [MW3BR] . ETPH and VOCs detected. Metals detected. See AOCs above for individual well information. Page 6 of 9 Project 2200138 December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  9. Page 23 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 23 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former Site (On-Site) Off-siteMGP AOCs Shallow: MW-13S: Metals and bis2ethylhexylphthalate) MW-14S: PAHs, metals and cyanide detected. MW-19S: Metals detected MW-21S: Metals and PAHs detected MW20S: Tar globules / staining in MW-20S. MW-29S: ETPH and benzene above SWPC and RES & I/C VC. Benzene and ETPH in compliance with the RES VC via soil vapor testing. Naphthalene above SWPC. 16 Off-site Tar Impacts St. Josephs School/Church Parking Lot VOCs (BTEX), SVOCs, Total Cyanide, ETPH Tar impacted area to the north of the property line. Possible migration of impacts to the north from the MGP. Shallow fill possible in the development of the property. MW-41S: ETPH was detected above SWPC and RES & I/C VC. ETPH is in compliance with the RES VC via soil vapor SB-14, SB-15, Subsurface soils: PAHs PAHs, ETPH, VOCs, cyanide were not detected in SB-14, SB-15, SB-16, Soil Borings TBShallow: testing. Acenaphthylene above SWPC. SBdetected above the GB SB-17 in samples collected just above apparent water table. 113, TB-115, TBMW-13S: Copper PAHs, metals, and VOCs detected 16, SB-17, PMC VOCs MW-13S, MW116, TB-117, TBdetected above the MW-42S: VOCs and ETPH not detected. MW(ethylbenzene, toluene, EPTH, VOCs, and PAHs detected in the deep soil samples collected from 13D, MW-14S, 118, TB-119, TBSWPC. Metals, SVOC Phenanthrene, barium, and chromium 19S, MWand xylene detected). SB-14 and MW-20S within tar-impacted intervals below the water table. MW-14M, MW120, TB-121, TBAdditional Phase III (bis2detected. 20S, SB14D, MW-19S, 125, TB-126, TBESA investigation is ethylhexylphthalate) Hockanum MW-43S: VOCs and ETPH not detected. Fill observed. Sheens 61, SB-62, SBSB-14: 20.5-23 ft. coated with tar material with tar odors. MW-20S, MW127, TB-130 Phase II (offproposed to further detected .MW-14S: River is Phenanthrene and barium detected. and/or isolated lens of 66, SB-61: 22.5-44 ft. tar blebs, odors, and sheen. 21S, MW-26S, Subsurface Surface Soil R426site) 1993 assess seasonal Metals detected located MW-26S: ETPH , VOCs and PAHs not coal tar were observed SB-67, MW- MW-13S, MWSB-66: 20-30 ft. tar odors. MW-26D, MWSoils A, R426-B, R426Phase III groundwater conditions upgradient ondetected. Barium detected. in soil borings TB-115 29D, MW-14M 13D, MW-14S, SB-15: 31.5-34 ft. veins coated with tar. 26BR, MW- 29S, Groundwater C, R426-D R437-A, Investigation at St. Joseph's Church site and Deep: (Boring) MWMW-14D through TB-120 and TBMW-20S: 35-38 ft. black stained and sheen with tar odor. MW-29D, MWSurface soils R437-B, R437-C, (2017property and the extent approximately MW-13D: Metals Intermediate: 40S 126 at depths ranging R437-D R438-A, 40S, MW-41S, 600 feet to the 2020) of off-site groundwater detected. MW-14M: ETPH above SWPC . (Boring) MWbetween 21.6 to 42 feet No visual impacts in SB-62 and SB-67. R438-B, R438-C, MWwest. impacts in intermediate MW-14D Metals 41S below grade. Elevated concentrations of benzene and tarR438-D R446-A, 42S, MW-42M, groundwater zone. detected. VOC (Boring) related VOC detected. Slight tar like odor observed in MW-29D, no visual impacts. Low level R446-B, R446-C, MW(tetrachloroethylene) MW-42S Surface Soil: PAHs Acenaphthylene above SWPC. MW-42M: detections of benzene and naphthalene. R446-D R452-A, 43S, MW-43M and SVOC (bis2(Boring) MWETPH above GWPC and detected above the Res R452-B, R452-C, ethylhexylphthalate) 43S/M DEC and GB PMC Detections of tar-related VOCs in MW-40S, MW-41S, and MW-42S SWPC, Benzene above GWPC. PAHs, tar R452-D detected. (Boring) along West Street detected below the water table. related VOCs, metals (barium, thallium, zinc). detected Deep: MW-14D: ETPH, cyanide, Acenaphthylene (PAH) above SWPC. Metals and VOCs detected. MW-13D: Metals and naphthalene detected MW-26D: Acenaphthylene above SWPC. Metals and VOCs detected. MW-43M: VOCs, PAHs and ETPH not detected. Barium, nickel, and zinc detected. Bedrock: MW-26BR Naphthalene and barium detected 17 Off-site Tar Impacts Maple Street ROW VOCs (BTEX), SVOCs, Total Cyanide, ETPH GEI Consultants, Inc. Impacted area within the Maple Street ROW from 15 to 32 feet. Possible migration of impacts from the Retorts (AOC-1) Former Gas Holders #1, #2, (AOCs 3,+). Possible off-site fuel oil impacted in TB-101 and TB- 103 from up gradient source of fuel oil. Subsurface Soils Groundwater TB-97, TB-99, TB101, TB-103, TBSB-18, SB-19, Groundwater 104, TB-105, TBSB- 64 not investigated 106, TB-111A, TB11B, and TB-111C MW-28S MW-23S Subsurface Soils had ETPH, VOCs, and PAHs detected in SB-18 above the GB PMC. The DEC concentrations of does not apply to SB-18 due to the sample depth greater than 15'. SPLP VOCs, VOCs and PAHs detected. SVOCs, pesticides Petroleum staining/ sheen and odors 19-23ft. (Aldrin, alpha- BHC, Tar staining/ odors from 24-29 ft. and 2-Hexanone) at concentrations above ETPH and PAHs were detected above the RES and I/C DEC and GB Groundwater not tested. the GB- PMC but were PMC in SB-19. located below the water Petroleum staining/ sheen and odors 11-19 ft. table. Cyanide and Tar staining/ odors from 19-26.5 ft. metals were detected. Tar impacts (sheen and ETPH, PAHs, and VOCs were not detected in SB-64 No visual impacts in odors) encountered SB-64 from 15 to 32 feet. Page 7 of 9 Project 2200138 MW-23S: Metals detected MW-28S: Metals and naphthalene detected Hockanum River located up gradient of location. Off-site petroleum impacts are noted within the Maple Street ROW. Petroleum impacts also ere noted at #12 and #14 Maple Street. Impacts could be Phase II (offassociated with former site) 1993 1,000-gallon UST at Phase III former 8 Maple Street Investigation residence or other off(2018) site source. Remedial evaluation impacts will be assessed in the Remedial Evaluation. December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  10. Page 24 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 24 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Not investigated during Phase III Groundwater not tested. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase I ESA identified a Phase II (off1,000 leaking site) 1994 underground storage Phase III tank used for heating oil Investigation at the former 8 Maple (2018) Street Residence. Not investigated during Phase III Groundwater not tested. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (offPossible historic fill site) 1994 associated with the Phase III development of Investigation property or potential off(2018) site source. Subsurface soils contained detections of VOCs and PAHs at concentrations above the GB PMC. However, these impacts are likely below the water table and the GB PMC is not applicable. Not investigated during Phase III MW-15S: Metals and cyanide exceeded SWPC. VOC (MTBE detected). MW-15D: Metals detected above the SWPC. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (offsite) 1994 Phase III Investigation (2018) Access to property was not provided. Tar impacts were assessed with a soil boring within Maple Street ROW (AOC-17) Remedial evaluation pending the completion of the Phase III investigation. PAHs PAHs detected in surface soils and shallow subsurface soils at the Maple Street School property. R453, R454, R455, R456 R501-A, R-501-B, R-501-C, R-501-D R502-A, R-502-B, R-502-C, R-502-D Not R503-A, R-503-B, investigated Groundwater Groundwater not Surface soils R-503-C, R-503-D during Phase not investigated investigated R504-A, R-504-B, III R-504-C, R-504-D R505-A, R-505-B, R-505-C, R-505-D R506-A, R-506-B, R-506-C, R-506-D Surface soils and shallow subsurface soils Not investigated during Phase III Groundwater not tested. Groundwater not tested. Hockanum River located up gradient of location. Phase IISurface Soil collection in 1995 Possible historic fill associated with the development of the school property or potential off-site source. PAHs R426-A,R426B,R426-C, R426-D R437-A,R437B,R437-C, R437-D PAHs are detected in R438-A,R438Not surface soils at nearby offB,R438-C, R438-D investigated Groundwater Groundwater not Surface soils site properties (175 Union R446-A,R446investigated during Phase not investigated Street and Tolland AWC) B,R446-C, R446-D III R452-A,R452B,R452-C, R452-D RBG2-B and RBG2C Surface soils and shallow subsurface soils Not investigated during Phase III Groundwater not tested. Groundwater not tested. Hockanum River located up gradient of location. Phase IISurface Soil collection in 1995 Possible historic fill associated with the development of the property or potential offsite source. COCs Previous COCs in Soil Phase II/III COCs in Soil Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 18 19 20 21 22 Petroleum Impacts #12 and #14 Maple Street Suspected Fill #12 and #14 Maple Street Off-site Tar Impacts (Residence #14 Maple Street) Off-site Surface Soils Maple Street School [PAHs Detected above RSR Criteria] Off-site Surface Soils 175 Union Street [PAHs Detected above RSR Criteria] VOCs (BTEX), SVOCs, ETPH PAHs VOCs (BTEX), SVOCs, Total Cyanide, ETPH GEI Consultants, Inc. Petroleum-impacted soils from 15 to 27 feet below grade from an up gradient source that migrated via groundwater flow onto the properties. PAHs detected in the shallow subsurface soils (TB-217) possibly from historic fill used in the development of the property. Subsurface soils Groundwater Surface soils Subsurface soils Tar-impacted soils (sheen and odor) between 30 and Subsurface 37 feet. Tar migrated soils beneath Maple Avenue Groundwater onto the western portion of the property. TB-203, TB-204, TB-206, TB-219, TB-221, TB-224 (#8 Maple Street) TB-200 and TB217 (#12 Maple Street) TB-217 TB-207, TB-210, TB-211, TB-215, MW-15D Not investigated Groundwater during Phase not investigated III Not investigated Groundwater during Phase not investigated III Not investigated during Phase III MW-15S MW-15D Subsurface soils contained detections of PAHs. MW-23S Boring log was not available during the CSM development. MW-23S Subsurface soils contained detections of PAHs, with a detection of (Benzo (a)pyrene) above the Res DEC, I/C DEC and GB PMC. Boring log was not available during the CSM development to assess for presence of fill. MW-23S Page 8 of 9 Project 2200138 December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)