Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Words on different pages
  1. Page 2 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 2 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 Submitted to: Eversource Energy Service Company 107 Selden Street Berlin, CT 06037 Submitted by: GEI Consultants, Inc. 455 Winding Brook Drive, Suite 201 Glastonbury, CT 06033 [phone removed] December 2025 Project No. 2200138 ________________________________________ Sean Connolly Project Manager ________________________________________ Jonathan Yeich, LEP Senior Project Manager
  2. Page 3 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 3 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2025 Table of Contents 1. Introduction .........................................................................................................1 2. Background ..........................................................................................................2 2.1. 2.2. 2.3. 2.4. Site Description Site History 2.2.1. Operational History 2.2.2. Previous Environmental Reports and Site Status Previously Identified Data Gaps and Status Significant Environmental Hazard (SEH) Reporting Background 3. 2025 Site Activities ............................................................................................7 4. Conceptual Site Model ......................................................................................9 5. Schedule ............................................................................................................. 10 3.1. 3.2. 3.3. 2 2 2 3 4 5 NAPL Gauging & Recovery Significant Environmental Hazard Activities In-situ Solidification Treatability Study 7 7 8 Tables Table 1 Well Gauging and NAPL Summary Table 2 Conceptual Site Model Summary Figures Figure 1 Site Location Map Figure 2 Site Layout and Historical Structures Figure 3 Phase II/III ESA and Previous Investigation Locations Figure 4A Shallow Groundwater Contour Plan Figure 4B Intermediate Groundwater Contour Plan Figure 4C Deep Groundwater Contour Plan Figure 4D Bedrock Groundwater Contour Plan Appendices Appendix A Significant Environmental Hazard Status Update Form: Soil SC/JY:bdp \\geiconsultants.com\data\Data_Storage\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\01_ADMIN\2025 Annual Report\GEI_2025 Rockville Annual Report_2025-12-23.docx GEI Consultants, Inc. i
  3. Page 4 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 4 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2025 1. Introduction On behalf of The Connecticut Light and Power Company (CL&P) dba Eversource Energy (Eversource), GEI Consultants, Inc. (GEI) prepared this 2025 Annual Report for the Rockville former manufactured gas plant (MGP) site located at 13 Maple Street, in the Rockville section of Vernon, Connecticut (Site). The Site location is shown on Figure 1. This report serves as the annual update as required by the Voluntary Remediation Program (VRP) which the Site is in. The report summarizes pertinent background information for the Site, identifies remaining data gaps, summarizes project tasks completed in the calendar year, summarizes the conceptual site model (CSM), and provides an updated schedule. GEI Consultants, Inc. 1
  4. Page 5 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 5 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2025 2. Background 2.1. Site Description The 3.43-acre Site is bounded by a wooded lot, a church, and residential properties to the north, Maple Street to the east, the Hockanum River and West Main Street to the south, and residential properties with frontage on West Street (Route 527) to the west. The Site is currently used as an electrical substation, Eversource’s Substation 14W. The substation is enclosed by two perimeter fences that limit access to authorized personnel only. The Inner Substation Area includes the active electrical substation infrastructure including high voltage power lines, towers, transformers, and electrical control houses. Subsurface electrical power supply duct banks and substation grounding grid are located beneath a crushed gravel cover inside the Inner Substation Area. Access to the Inner Substation Area is restricted by a high security fence equipped with barbed wire. Eversource requires notification and specialized training prior to entry to the Inner Substation Area and appropriate escort by qualified personnel. The remainder of the parcel outside the Inner Substation Area is referred to as the Outer Substation Area (Figure 2). The Outer Substation Area includes a grassed area surrounding the eastern and northern sides of the Site. A series of electrical duct banks extend from the switch gear beyond the northeastern Inner Substation Area into the Outer Substation Area that feed distribution poles along the site boundary with Maple Street. The western portion of the Outer Substation Area is a fenced area where a highpressure gas regulator / control house was located prior to recent demolition. The Hockanum River is within the Outer Substation Area and abuts the Inner Substation Area to the south. Wooded and overgrown areas are located on the northern portion of the Site adjacent to the St. Joseph’s Church paved parking lot and along the southern portion of the Site between the Hockanum River and West Main Street. The Site is zoned “NR-10”, which is a designation provided to historic district neighborhood parcels. Surrounding land use within a 500-foot radius includes mixed residential, commercial, and light industrial land use, schools, and a church. 2.2. Site History 2.2.1. Operational History The Site was formerly a MGP that operated from 1863 until the mid-1930s when gas production ceased. The original MGP consisted of a distillation works and a gas holder, with coal gas produced by the retort process. By 1877, a second gas holder was erected, as well as a 1.5-story brick building to house gas production. In 1890, three gas engines were installed and the coal-gas made on-Site was consumed by electrical generators for arc lighting. In the mid-1890s, the MGP was converted to make carbureted water-gas. A third gas holder was erected at the MGP in 1922. Gas production ceased prior to the mid1930s. The footprint of the former MGP structures is shown in Figure 2. The former MGP was acquired by CL&P in 1935 and later converted to be used as an electrical substation and natural gas regulator station. The GEI Consultants, Inc. 2
  5. Page 6 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 6 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2025 operations of the gas regulator station were decommissioned in 2023 and the associated gas regulation shed was demolished in 2024. 2.2.2. Previous Environmental Reports and Site Status Several investigations were conducted at the Site during the 1990s as identified below: MGP Site Investigation, March 1992, NUSCO MGP Off-Site Investigation Phase I Interim Report, May 1993, NUSCO MGP Off-Site Investigation, April 1994, NUSCO Human Health Risk Assessment, December 1994, NUSCO Field Summary Report, April 1995, NUSCO Analysis of Remedial Alternatives, October 1996, RETEC On September 2, 2015, Eversource entered the Site into the VRP, pursuant to Connecticut General Statutes (CGS) 22a-133x, by submitting an Environmental Condition Assessment Form (ECAF) and fee to the CT DEEP. Acknowledgment of the ECAF and fee was provided in a letter from CT DEEP dated September 24, 2015. Since CT DEEP did not indicate that the Commissioner’s review and approval of the investigation was required within 30 days of the date of their letter, the Site was automatically delegated to a Licensed Environmental Professional (LEP). A data summary of the investigations listed above is provided in the ECAF and the “Site Status and Condition Report” prepared by GEI, both of which are dated August 31, 2015, and submitted to CT DEEP on September 2, 2015. A Water-Supply Well Receptor Survey was also performed as part of the ECAF with no water supply wells identified within a 500-foot radius of the Site. Eversource retained Tighe & Bond as the environmental consulting firm in December 2015. Tighe & Bond conducted various Site investigation activities and submitted Annual Reports to CT DEEP from December 2016 through December 2021. Sample locations associated with investigations performed by Tighe & Bond are shown on the attached Figure 3. CT DEEP Significant Environmental Hazard (SEH) Notification Forms were also submitted as required based on findings indicating that SEH conditions were present in certain areas. In 2020, an Off-Site Soil Vapor Assessment was completed and submitted to the church pastor of off-site St. Joseph’s Church. In 2021, Exponent Ecological and Biological Sciences (Exponent) completed a Screening Level Ecological Risk Assessment (SLERA) that was submitted to CT DEEP. These activities have been summarized in prior annual reports. In early 2022, Eversource retained GEI to plan and implement a Supplemental Phase II/III Environmental Site Assessment (ESA) Work Plan for the Site. Annual reporting for the Site continued following the supplemental Phase II/III investigation work completed in 2022. The 2022 Annual Report summarized the findings of the supplemental investigation which included the following: Drilling and well installation. SEH Delineation Soil Sampling. GEI Consultants, Inc. 3
  6. Page 7 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 7 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2025 Sediment and Surface Water sampling within and along the Hockanum River. As part of the 2022 Phase II/III ESA Work Plan, GEI completed four (4) quarters of groundwater sampling of a select list of monitoring wells including the downgradient wells installed as part of the work plan in 2022 to delineate the impacted groundwater plume. Monitoring work also included non-aqueous phase liquid (NAPL) gauging and recovery at on-Site wells previously identified as having the potential to collect NAPL. The results of the quarterly groundwater monitoring and NAPL recovery efforts were summarized in the 2023 and 2024 Annual Reports. Activities performed during 2025 are further discussed in Section 3. 2.3. Previously Identified Data Gaps and Status Several data gaps were identified in 2022 based on GEI’s understanding of the Site and prior investigation efforts. The Supplemental Phase II/III ESA Work Plan, the contents of which were summarized in the 2022 Annual Report submittal to CT DEEP, identified proposed activities to address these data gaps. The identified data gaps are summarized below, along with a summary of the status of each including 2025 updates in bold: Characterization of the nature and extent of the groundwater plume within the intermediate groundwater zone is needed to the west/northwest of MW-42M, which exceeds the Surface Water Protection Criteria (SWPC) for extractable total petroleum hydrocarbons (ETPH) and the Groundwater Protection Criteria (GWPC) for benzene and ETPH. Additional wells were installed in 2022 and quarterly monitoring in 2023 was completed to delineate the affected groundwater area. Attached to the 2024 Annual Report is an Initial Notification for Intended Use of Alternative Groundwater Protection Criteria (GWPC), which describes the basis and rationale for the use of alternative GWPC values consistent with the Remediation Standard Regulations (RSRs). Additional groundwater data at St. Joseph’s Church and proposed additional downgradient wells are needed to evaluate seasonal changes to constituents of concern (COCs) in groundwater downgradient of the Site. Additional wells were installed in 2022 and quarterly monitoring in 2023 was completed to delineate the affected groundwater area. As indicated above, we included an Initial Notification for Intended Use of Alternative with the 2024 Annual Report. Additional groundwater data at the northwestern and western portions of the Outer Substation Area is needed to evaluate seasonal changes to COCs in groundwater at monitoring wells MW03DR and MW-39S. Wells RW-03M, MW-03DR, and MW-37S need to be gauged to evaluate if measurable volumes of NAPL have accumulated at these locations. Additional monitoring of these wells was performed in 2025 (see Section 3). Volatile organic compounds (VOCs) and petroleum-impacted groundwater in well MW-35S is within 15 feet of the ground surface of the electrical control house slab, thus warranting a soil vapor assessment beneath the control house. Soil vapor testing was performed in the control house in March 2022. The detected concentrations of VOCs and ETPH were below both the RES VC and I/C VC for soil vapor and therefore meet the CT DEEP RSR Section 22a-133k3(c)(1)(A) Alternative Demonstration of Compliance with Volatilization Criteria for GEI Consultants, Inc. 4
  7. Page 8 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 8 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2025 Groundwater for Soil Vapor Below a Building. A summary memo was included as Appendix B to the 2022 Annual Report. Additional delineation of shallow soils (0 to 2 feet below ground surface) was needed around previous soil sample locations SB-76 and SB-78 to determine the extent of soil with benzo(a)pyrene concentrations exceeding the SEH Condition Notification Threshold Concentration. The SEH Conditions have been delineated as discussed in Section 2.4. An annual SEH Status Update Form was submitted in 2025 (see Section 3.3). The SLERA completed by Exponent in 2021 indicated a potential for Site-related COCs in the Hockanum River portion of the Site to present adverse ecological effects to benthic invertebrates, fish, and semi-aquatic wildlife. The SLERA recommended further evaluation in a Baseline Ecological Risk Assessment (BERA). GEI recommended the performance of a refined SLERA in lieu of a BERA and additional data collection would be required in support of this. Additional data collection was performed in 2022 and a refined SLERA was submitted to CT DEEP on May 31, 2023 (see the 2023 Annual Report). As part of activities planned for 2026, the existing data gaps will be re-evaluated and initial planning to establish a remedy for the Site will be completed including an in-situ solidification (ISS) treatability study for source material identified within gas holders 1 and 2. The results of the data gap analysis will determine if the nature and extent of impacts associated with the former MGP site has been sufficiently defined. Any additional information including the results of the ISS study required to select and design a remedy for the Site and to demonstrate compliance with the CT DEEP RSRs for soil, groundwater, and NAPL impacts will likely be included as part of the remedial action plan (RAP) and/or a pre-design investigation for the Site. 2.4. Significant Environmental Hazard (SEH) Reporting Background During sampling for the Phase III ESA in 2018, a soil sample was detected above CT DEEP’s Significant Environmental Hazard Condition Notification Threshold for benzo(a)pyrene (BaP). The sample was collected from surface soils at SS-102 located in the Inner Substation Area and was determined to be associated with historical fill. The exceedance was reported to CT DEEP in a SEH Notification Form (SEH ID:13641) on February 26, 2018. In response, CT DEEP issued an SEH Acknowledgment Letter on March 16, 2018, which stated that an immediate action to limit short-term risk was not required because the area was secured by permanent fencing. The letter required that the site investigation, remediation, and annual inspection reporting be continued in accordance with the plan provided in the SEH Notification Form. Annual SEH Status Update Forms have been submitted to the CT DEEP since 2019 to provide an update on any SEH sampling, mitigation measures, and/or abatement activities. Additional locations exceeding the SEH Condition Threshold Concentration for BaP have been identified at the following locations and reported to the CT DEEP: In 2018, during the Phase III ESA, BaP concentrations were detected above the SEH Condition Notification Threshold Concentration in surficial soils at HA-01A, HA-02, and HA-03 located around SS-102 and in the one-to-two-foot interval at HA-18 located in the Outer Substation Area. GEI Consultants, Inc. 5
  8. Page 9 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 9 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2025 In 2020, on-going Phase III ESA sampling identified BaP above the SEH Condition Notification Threshold Concentration within historical fill in soil borings SB-76 and SB-78 located within the Inner Substation Area. In 2021, pre-characterization sampling to support the installation of a utility conduit duct bank found an SEH exceedance for BaP at OSS-4 in the Outer Substation Area. After excavation of the duct bank trench through the OSS-4 sample area, four sidewall samples including OSS-4NW, OSS4NE, OSS-4SE and OSS-4SW, were collected from the trench. BaP results from these samples indicated the SEH condition was abated. The soils from the OSS-4 area were removed and disposed of offsite along with the other soils generated from the project under the same waste profile. In March 2022, additional delineation sampling around SB-76 and SB-78 was performed. The additional sampling defined the limits of the SEH condition at boring SB-78 and approximately 18 tons of soil was excavated in May 2022, as summarized in the 2022 SEH Status Update Form submitted to the CT DEEP on May 25, 2022. The March 2022 delineation sampling around boring SB-76 did not completely define the limits of the SEH condition in this area of the Site. Additional delineation sampling was completed in December 2022 which included collection of soil samples from the 0- to 1-foot and 1- to 2-foot depth intervals at an adjacent location SB-76A1 and submitted under chain-of-custody to Phoenix Laboratories for analysis of PAHs by EPA Method 8270D. The 2022 Annual Report indicated that the preliminary results for these samples were below SEH criteria. This was confirmed after receipt of final results and data quality review in 2023 such that the area around SB-76 is delineated as a result of the December 2022 sampling. The SEH sampling activities and data are further discussed in the 2023 CT DEEP SEH Status Update Form submitted to the CT DEEP on May 19, 2023. The remaining SEH conditions at the Site are within the outer or inner substation fence, inspected on an annual basis, and will be abated as part of the Site-wide remedy. The most recent SEH Status update was submitted to CT DEEP on May 29, 2025 (see Section 3.3). GEI Consultants, Inc. 6
  9. Page 10 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 10 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2025 3. 2025 Site Activities This section summarizes key project-related activities performed from January 2025 through December 2025, including the following: NAPL gauging and recovery Significant Environmental Hazard Activities In-situ Solidification Treatability Study Each of these is discussed in further detail in the following subsections. 3.1. NAPL Gauging & Recovery GEI’s 2022 Work Plan included NAPL gauging of certain monitoring wells where NAPL was previously detected. This monitoring effort was continued through 2025 to understand NAPL thickness and recovery trends and to periodically remove NAPL from the existing well network if present and recoverable. Initially, a comprehensive well gauging event was performed in January 2023 (discussed in the 2023 Annual Report) and one of its objectives was to obtain an updated assessment regarding the presence of NAPL in the monitoring well network. Wells that were initially identified to contain NAPL included MW-2D, MW-3D, MW-10D, MW-24S, and MW-32S (Figure 3), all of which contained a tar-like dense non-aqueous phase liquid (DNAPL) with the except for MW-32S, which was observed to contain light non-aqueous phase liquid (LNAPL). MW-32S was therefore included in the subsequent NAPL gauging and recovery program. Table 1 summarizes the NAPL gauging and recovery data from 2025. As indicated, a trace (less than 0.01 feet) thickness of LNAPL was observed in monitoring well MW-32S during the March 2025 event. LNAPL was not detected in MW-32S during the three subsequent quarterly events. Approximately 0.1 gallons of LNAPL was recovered from the well in 2025. LNAPL was not detected in any other monitoring wells gauged at the Site. DNAPL was detected in the four wells listed above at thicknesses ranging from trace (less than 0.01 feet) to 1.5 feet in MW-24S (May 2025). Recoverable DNAPL was removed from the wells during each event totaling approximately 5 gallons of DNAPL during 2025. Recovered NAPL was contained on-Site in a 55-gallon drums pending waste characterization, off-Site transport, and disposal. We anticipate a waste shipment and disposal event in 2026. 3.2. Significant Environmental Hazard Activities A SEH Status Update Form: Soil for SEH ID:13641 was submitted on May 29, 2025, documenting the existing SEH conditions, a copy of which is included as Appendix A. As discussed in Section 2.3, the surface soil SEH conditions at the Site are protected within the outer or inner substation fence and will be abated as part of the Site-wide remedy. GEI Consultants, Inc. 7
  10. Page 11 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 11 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2025 3.3. In-situ Solidification Treatability Study In July 2025, Strategic Environmental Services, Inc mobilized to the Site with an excavator to perform test pits TP-101 through TP-104 proximate to the presumed locations of the three former gas holders to collect samples for an in-situ solidification treatability study to understand if stabilization of source area material (soil/material located within the former gas holder foundations) is a feasible remedial option as part of the Site wide remedy. GEI was on-Site to observe subsurface conditions and document the construction and position of the former gas holder foundation structures still in place during the test pit excavation. Test pit locations are depicted on Figure 3 included with this report. Subsurface conditions included sand and gravel with varying amounts of fill including brick and concrete. NAPL coated/saturated soils were observed below 5 feet deep in gas holder #1 and below 8 feet deep in gas holder #2. Both gas holders #1 and #2 were observed to be constructed of brick masonry and were constructed as in-ground gas holders (main structure was constructed below grade) with a round configuration (previously depicted as having an octagonal-like shape). The base of the gas holders was not encountered due to unstable soil collapsing the test pit excavations before reaching the bottom depth of the gas holder foundation. Gas holder number #3 was verified as being constructed primarily above grade as an intact concrete slab was observed 3 feet below the existing ground surface. The test pits were backfilled with the excavated soil which was placed back in each test pit at the approximate depth the soil was excavated from. Several soil samples were collected and sent to specialized laboratories to identify a solidification mix design that is applicable to both holders and understand field constructability during remediation. The solidification mix design testing is currently in process and the results of the study will be included under separate cover or included as part of the RAP for the Site. GEI Consultants, Inc. 8

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)