Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Words on different pages
  1. Page 22 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 22 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 14 15 Tar impacts and Fill Observed (Northern portion of Site) Site wide groundwater impacts VOCs (BTEX), SVOCs, Total Cyanide, ETPH SB-01 TB-12, TB-36, TBSB-12 37,TB-40, TB-42 SB-13 TB-46, TB- 49A,TBSB-20 50, TB-51, SB-21 TB-52, TB-53, TBSB-22 54, TB-55 Impacted area to the north SB-45 TB-55A, TB-56, of former Gas Holders #1 Surface soils SB-59 TB-58 , TB-59, and #2, Possible Subsurface TB-60, TB-61, TB- SB-60 (offmigration for spills or leaks Soils site) SB-64 62, MW-1, MWfrom adjacent holders that Groundwater 3S, MW-3D, MW- (off-site) SBmigrated northward. 68 4S, MW-7S TBX5, SB-73 TBX6 SB-74 SS-3B. SS3-C, SB-75 SS3MW-37S/D E, SS3-D, SS1-C, MW-03DR CSS-1, CSS-2 VOCs, SVOCs, Groundwater impacts from Metals, spills or leaks occurring at PCBs, the site. Groundwater Groundwater ETPH, flows to the north away Chromium, from the Hockanum River. Barium, ETPH GEI Consultants, Inc. NA NA MW-1S, MW1D, MW-3S, MW3D, MW-4S, MW-4D Shallow: MW-4S: Cyanide, metals, VOCs, and PAHs Shallow Subsurface Soils: PAHs detected in SB-21 above the RES DEC, detected Shallow: I/C DEC and GB PMC. SPLP PAHs were not detected indicating PAHs MW-1S:Metals detected MW-4SR: Acenaphthylene (PAH) detected are not leachable. above the SWPC. Cyanide detected. above the SWPC. PAHs detected in SB-22. MW-25S: Cyanide, metals, and PAHs MW-3S: Metals and detected PAHs detected above PAHs, ETPH, VOCs, cyanide were not detected in SB-01, SB -12 and MW-3S/MW-7S: Metals and VOCs the SWPC. VOCs Surface Soil: PAHs SB-13 in samples collected just above apparent water table. detected. PAHs and ETPH detected above detected. detected above the Res the SWPC MW-4S: Metals DEC and GB PMC. Elevated concentrations of ETPH, VOCs, and SVOCs detected in SB-13 MW-1S: Metals, ETPH and PAHs detected detected above the Metals and cyanide Additional Phase III (25.5- 27.5') below water table (~15ft.) MW-1S, MW-1D, above the SWPC. SWPC. cyanide, VOCs detected. Phase I ESA ESA investigation is MW-3S, MW-3D, (1,1,1-TCA) and SVOC MW-24S: Measurable tar observed in well. (2017) Phase proposed to assess the SB-45: Metals detected MW-3DR MW(bis2Subsurface soils: Hockanum II (1990/1991) seasonal groundwater SB-59: PAHs, Cyanide, and VOCs detected 3BR, MW-4S, ethylhexylphthalate) SVOCs detected above Human Health conditions and River is Deep: MW-4SR, detected. the Res and I/C DEC Risk assessment of the located up MW-1D: ETPH and VOCs detected. PAHs Fill observed: Brick observed at 0.5-3.0 ft. in SB-21 and SB-59. MW-4D, MW-7S, and GB PMC and recoverability of tar. gradient on - Assessment and metals (copper and nickel) detected Tar impacts were encountered SB-12: from 25-30 ft. (Staining, sheen and MW-7D, MWVOCs and pesticide (1994) Remedial evaluation site above the SWPC. Deep: coated soils) and 37.5-39ft. (Strong tar odor) 18D, MW-24S, (lindane) detected Phase III ESA pending the completion MW-3DR: ETPH and acenaphthylene MW-1D: Metals SB-13: 20-39 ft. (Staining and heavily tar coated soils and odors) SB-01: MW-25S, MWabove the GB PMC. (1996-2020) of the Phase III detected above SWPC. detected above the 29 to 31 ft. Sheen and tar odor. 37D, MW- 37BR Metals detected. investigation. MW-4D/MW-7D: Metals detected. MW-18D: SWPC. SVOCs SB-45: Tar odors 30-41 ft. Tar blebs observed from 30-38 ft. ETPH, VOCs, and PAHs detected. SB-59: Coal and slag 2-3 ft. Tar odors 30 to 45 ft. PAHs,VOCs, and Fill observed and tar detected above the SWPC. Metals MW-3D: Metals cyanide detected (2 to 3) odors and tar sheen. detected. detected above the SB-60: Tar odor 40 to 45 ft. Naphthalene and Xylene (VOCs) detected. MW-37D: Metals detected. SWPC. SVOCs and SB-64: No visual impacts or odors. VOC (1,1,1-TCA) MW-37S/D: Sheen and odors observed below water table. detected. Bedrock: SB-68: Tar product observed (23-34 ft), sheen observed (23-59 ft). VOCs, MW4D: Lead detected MW-3BR: PAH (acenaphthylene) above PAHs, and ETPH detected above the SWPC. SWPC. ETPH and VOCs detected. Metals MW-03DR: Tar product observed in auger cuttings (23') detected. MW-37BR: Metals and VOCs detected. MW-1S, MW-1D, MW-2SR, MW2BR, MW-2D, MW-3S, MW-3BR, MW4S, MW-4SR, MW4D, MW-1S, MWMW-5S, MW-5D, 1D, MW-6S, MW-6D, MW-2S, MWMW-7S,MW-7D, 2D, MW-8SR, MWMW-3S, MW9S, MW-9D, MW3D, 10SR, MW-10M, MW-4S, MWMW- 10BR,MW4D, 11S, MWMW-5S, MW11D, MW-12S, 5D, See AOCs above for MWMW-6S, MWsite investigation 12D, MW-16S, 6D, information for soils MWMW-8S, MW17S, MW-18D, 9S, MWMW-9D, MW19S, MW-24S, 10S, MW-10M, MWMW- 10D, MW25S, MW-26S, 11S, MWMW11D, MW-12S, 26D, MW-26BR, MWMW-27S, MW12D 28S, MW-29S, MW-29D, MW30S, MW-33S, MW-34S, MW35S, MW-36S, MW-37D, MW37BR, MW- 38S, MW-39S See AOCs above for site investigation information for soils Shallow: ETPH, VOCs, PAHs, and /or Cyanide above the SWPC. in MW-1S, MW-5S, MW7S, MW-8SR, MW-9S, and MW- 10M, MW-29S, MW-30S, MW-33S, MW-34S, MW-35S, MW-38S, and MW-39S. See above AOCs for individual well summary of COCs. Shallow: ETPH, VOCs, Tar globules and staining observed in MWPAHs, metals, and 2S, MW-10SR, and MW-24S Cyanide above the during development. Measurable tar SWPC. See above observed in MW-10SR and MW-24S Hockanum AOCs for individual River is wells located up Deep: gradient on VOCs, ETPH, PAH (acenaphthylene) Deep: ETPH, VOCs, site/ Losing above the SWPC in MW-18D. MW- 3DR: PAHs, metals, and Stream ETPH and acenaphthylene detected above Cyanide above the SWPC. SWPC.. See above Tar globules and staining observed in MWAOCs for individual 2D, MW-3D and MW-10D wells Phase I ESA (2017) Additional Phase III Phase II ESA investigation is Investigation proposed to assess the (1992) seasonal groundwater Phase III conditions Investigation (2016- 2020) Bedrock: PAH (acenaphthylene) above SWPC [MW3BR] . ETPH and VOCs detected. Metals detected. See AOCs above for individual well information. Page 6 of 9 Project 2200138 December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  2. Page 23 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 23 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former Site (On-Site) Off-siteMGP AOCs Shallow: MW-13S: Metals and bis2ethylhexylphthalate) MW-14S: PAHs, metals and cyanide detected. MW-19S: Metals detected MW-21S: Metals and PAHs detected MW20S: Tar globules / staining in MW-20S. MW-29S: ETPH and benzene above SWPC and RES & I/C VC. Benzene and ETPH in compliance with the RES VC via soil vapor testing. Naphthalene above SWPC. 16 Off-site Tar Impacts St. Josephs School/Church Parking Lot VOCs (BTEX), SVOCs, Total Cyanide, ETPH Tar impacted area to the north of the property line. Possible migration of impacts to the north from the MGP. Shallow fill possible in the development of the property. MW-41S: ETPH was detected above SWPC and RES & I/C VC. ETPH is in compliance with the RES VC via soil vapor SB-14, SB-15, Subsurface soils: PAHs PAHs, ETPH, VOCs, cyanide were not detected in SB-14, SB-15, SB-16, Soil Borings TBShallow: testing. Acenaphthylene above SWPC. SBdetected above the GB SB-17 in samples collected just above apparent water table. 113, TB-115, TBMW-13S: Copper PAHs, metals, and VOCs detected 16, SB-17, PMC VOCs MW-13S, MW116, TB-117, TBdetected above the MW-42S: VOCs and ETPH not detected. MW(ethylbenzene, toluene, EPTH, VOCs, and PAHs detected in the deep soil samples collected from 13D, MW-14S, 118, TB-119, TBSWPC. Metals, SVOC Phenanthrene, barium, and chromium 19S, MWand xylene detected). SB-14 and MW-20S within tar-impacted intervals below the water table. MW-14M, MW120, TB-121, TBAdditional Phase III (bis2detected. 20S, SB14D, MW-19S, 125, TB-126, TBESA investigation is ethylhexylphthalate) Hockanum MW-43S: VOCs and ETPH not detected. Fill observed. Sheens 61, SB-62, SBSB-14: 20.5-23 ft. coated with tar material with tar odors. MW-20S, MW127, TB-130 Phase II (offproposed to further detected .MW-14S: River is Phenanthrene and barium detected. and/or isolated lens of 66, SB-61: 22.5-44 ft. tar blebs, odors, and sheen. 21S, MW-26S, Subsurface Surface Soil R426site) 1993 assess seasonal Metals detected located MW-26S: ETPH , VOCs and PAHs not coal tar were observed SB-67, MW- MW-13S, MWSB-66: 20-30 ft. tar odors. MW-26D, MWSoils A, R426-B, R426Phase III groundwater conditions upgradient ondetected. Barium detected. in soil borings TB-115 29D, MW-14M 13D, MW-14S, SB-15: 31.5-34 ft. veins coated with tar. 26BR, MW- 29S, Groundwater C, R426-D R437-A, Investigation at St. Joseph's Church site and Deep: (Boring) MWMW-14D through TB-120 and TBMW-20S: 35-38 ft. black stained and sheen with tar odor. MW-29D, MWSurface soils R437-B, R437-C, (2017property and the extent approximately MW-13D: Metals Intermediate: 40S 126 at depths ranging R437-D R438-A, 40S, MW-41S, 600 feet to the 2020) of off-site groundwater detected. MW-14M: ETPH above SWPC . (Boring) MWbetween 21.6 to 42 feet No visual impacts in SB-62 and SB-67. R438-B, R438-C, MWwest. impacts in intermediate MW-14D Metals 41S below grade. Elevated concentrations of benzene and tarR438-D R446-A, 42S, MW-42M, groundwater zone. detected. VOC (Boring) related VOC detected. Slight tar like odor observed in MW-29D, no visual impacts. Low level R446-B, R446-C, MW(tetrachloroethylene) MW-42S Surface Soil: PAHs Acenaphthylene above SWPC. MW-42M: detections of benzene and naphthalene. R446-D R452-A, 43S, MW-43M and SVOC (bis2(Boring) MWETPH above GWPC and detected above the Res R452-B, R452-C, ethylhexylphthalate) 43S/M DEC and GB PMC Detections of tar-related VOCs in MW-40S, MW-41S, and MW-42S SWPC, Benzene above GWPC. PAHs, tar R452-D detected. (Boring) along West Street detected below the water table. related VOCs, metals (barium, thallium, zinc). detected Deep: MW-14D: ETPH, cyanide, Acenaphthylene (PAH) above SWPC. Metals and VOCs detected. MW-13D: Metals and naphthalene detected MW-26D: Acenaphthylene above SWPC. Metals and VOCs detected. MW-43M: VOCs, PAHs and ETPH not detected. Barium, nickel, and zinc detected. Bedrock: MW-26BR Naphthalene and barium detected 17 Off-site Tar Impacts Maple Street ROW VOCs (BTEX), SVOCs, Total Cyanide, ETPH GEI Consultants, Inc. Impacted area within the Maple Street ROW from 15 to 32 feet. Possible migration of impacts from the Retorts (AOC-1) Former Gas Holders #1, #2, (AOCs 3,+). Possible off-site fuel oil impacted in TB-101 and TB- 103 from up gradient source of fuel oil. Subsurface Soils Groundwater TB-97, TB-99, TB101, TB-103, TBSB-18, SB-19, Groundwater 104, TB-105, TBSB- 64 not investigated 106, TB-111A, TB11B, and TB-111C MW-28S MW-23S Subsurface Soils had ETPH, VOCs, and PAHs detected in SB-18 above the GB PMC. The DEC concentrations of does not apply to SB-18 due to the sample depth greater than 15'. SPLP VOCs, VOCs and PAHs detected. SVOCs, pesticides Petroleum staining/ sheen and odors 19-23ft. (Aldrin, alpha- BHC, Tar staining/ odors from 24-29 ft. and 2-Hexanone) at concentrations above ETPH and PAHs were detected above the RES and I/C DEC and GB Groundwater not tested. the GB- PMC but were PMC in SB-19. located below the water Petroleum staining/ sheen and odors 11-19 ft. table. Cyanide and Tar staining/ odors from 19-26.5 ft. metals were detected. Tar impacts (sheen and ETPH, PAHs, and VOCs were not detected in SB-64 No visual impacts in odors) encountered SB-64 from 15 to 32 feet. Page 7 of 9 Project 2200138 MW-23S: Metals detected MW-28S: Metals and naphthalene detected Hockanum River located up gradient of location. Off-site petroleum impacts are noted within the Maple Street ROW. Petroleum impacts also ere noted at #12 and #14 Maple Street. Impacts could be Phase II (offassociated with former site) 1993 1,000-gallon UST at Phase III former 8 Maple Street Investigation residence or other off(2018) site source. Remedial evaluation impacts will be assessed in the Remedial Evaluation. December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  3. Page 24 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 24 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Not investigated during Phase III Groundwater not tested. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase I ESA identified a Phase II (off1,000 leaking site) 1994 underground storage Phase III tank used for heating oil Investigation at the former 8 Maple (2018) Street Residence. Not investigated during Phase III Groundwater not tested. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (offPossible historic fill site) 1994 associated with the Phase III development of Investigation property or potential off(2018) site source. Subsurface soils contained detections of VOCs and PAHs at concentrations above the GB PMC. However, these impacts are likely below the water table and the GB PMC is not applicable. Not investigated during Phase III MW-15S: Metals and cyanide exceeded SWPC. VOC (MTBE detected). MW-15D: Metals detected above the SWPC. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (offsite) 1994 Phase III Investigation (2018) Access to property was not provided. Tar impacts were assessed with a soil boring within Maple Street ROW (AOC-17) Remedial evaluation pending the completion of the Phase III investigation. PAHs PAHs detected in surface soils and shallow subsurface soils at the Maple Street School property. R453, R454, R455, R456 R501-A, R-501-B, R-501-C, R-501-D R502-A, R-502-B, R-502-C, R-502-D Not R503-A, R-503-B, investigated Groundwater Groundwater not Surface soils R-503-C, R-503-D during Phase not investigated investigated R504-A, R-504-B, III R-504-C, R-504-D R505-A, R-505-B, R-505-C, R-505-D R506-A, R-506-B, R-506-C, R-506-D Surface soils and shallow subsurface soils Not investigated during Phase III Groundwater not tested. Groundwater not tested. Hockanum River located up gradient of location. Phase IISurface Soil collection in 1995 Possible historic fill associated with the development of the school property or potential off-site source. PAHs R426-A,R426B,R426-C, R426-D R437-A,R437B,R437-C, R437-D PAHs are detected in R438-A,R438Not surface soils at nearby offB,R438-C, R438-D investigated Groundwater Groundwater not Surface soils site properties (175 Union R446-A,R446investigated during Phase not investigated Street and Tolland AWC) B,R446-C, R446-D III R452-A,R452B,R452-C, R452-D RBG2-B and RBG2C Surface soils and shallow subsurface soils Not investigated during Phase III Groundwater not tested. Groundwater not tested. Hockanum River located up gradient of location. Phase IISurface Soil collection in 1995 Possible historic fill associated with the development of the property or potential offsite source. COCs Previous COCs in Soil Phase II/III COCs in Soil Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 18 19 20 21 22 Petroleum Impacts #12 and #14 Maple Street Suspected Fill #12 and #14 Maple Street Off-site Tar Impacts (Residence #14 Maple Street) Off-site Surface Soils Maple Street School [PAHs Detected above RSR Criteria] Off-site Surface Soils 175 Union Street [PAHs Detected above RSR Criteria] VOCs (BTEX), SVOCs, ETPH PAHs VOCs (BTEX), SVOCs, Total Cyanide, ETPH GEI Consultants, Inc. Petroleum-impacted soils from 15 to 27 feet below grade from an up gradient source that migrated via groundwater flow onto the properties. PAHs detected in the shallow subsurface soils (TB-217) possibly from historic fill used in the development of the property. Subsurface soils Groundwater Surface soils Subsurface soils Tar-impacted soils (sheen and odor) between 30 and Subsurface 37 feet. Tar migrated soils beneath Maple Avenue Groundwater onto the western portion of the property. TB-203, TB-204, TB-206, TB-219, TB-221, TB-224 (#8 Maple Street) TB-200 and TB217 (#12 Maple Street) TB-217 TB-207, TB-210, TB-211, TB-215, MW-15D Not investigated Groundwater during Phase not investigated III Not investigated Groundwater during Phase not investigated III Not investigated during Phase III MW-15S MW-15D Subsurface soils contained detections of PAHs. MW-23S Boring log was not available during the CSM development. MW-23S Subsurface soils contained detections of PAHs, with a detection of (Benzo (a)pyrene) above the Res DEC, I/C DEC and GB PMC. Boring log was not available during the CSM development to assess for presence of fill. MW-23S Page 8 of 9 Project 2200138 December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  4. Page 25 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 25 of 46 Table 2. Conceptual Site Model Summary 2025 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 23 Off-site Groundwater Impacts VOCs Groundwater impacts from spills or leaks occurring at Groundwater the site and migrating offsite. NA See AOC 16 MW-13S, MW13D, MW-14S, MW-14D, MW15S, MW-15D, MW-19S, MW20S, MW-21S, MW-23S MW-13S, MW13D, MW-14S, MW-14D, MW19S, MW-20S, MW-21S, MW23S, MW-26S, MW-26D, MW26BR, MW- 27S, MW-28S, MW30S, MW-31S, MW40S, MW-41S, MW42M, MW-42M, MW-43S, MW43M, MW-44S, MW-44M, MW45S, MW-45M, MW-46M Soil Vapor Assessment SV-01, SV-02, SV- 03, SV-05 Shallow: Tar globules / staining in MW-20S. MW19S/MW-21S/MW-28S: metal and PAHs detected. MW-13S and MW-26S (Plasticizers detected -possible lab contamination) MW27S: ETPH, metals, and naphthalene detected. MW-23S: Metals detected MW-14S: Cyanide, metals, and PAHs detected. MW-31S: Barium and nickel detected MW29S: ETPH and benzene above SWPC and RES & I/C VC. Benzene and ETPH in compliance with the RES VC via soil vapor testing. Naphthalene above SWPC. MW44S & MW-45S PAHs above GWPC Soils not assessed See AOC 16 Additional Phase III ESA investigation MW-41S: ETPH was detected above completed to assess SWPC and RES & I/C VC. ETPH is in seasonal groundwater compliance with the RES VC via soil vapor conditions at St. testing. Acenaphthylene above SWPC. Joseph's Church PAHs, metals, and VOCs detected property and to assess MW-42S: VOCs and ETPH not detected. the nature and extent of Hockanum Phenanthrene, barium, and chromium Shallow: Metals and groundwater impacts to River is detected. cyanide detected above the west of West Street. located MW-43S: VOCs and ETPH not detected. SWPC. VOCs and Phase II (offDowngradient upgradient onPhenanthrene and barium detected. PAHs detected site) 1994 conditions compliant site and MW-26S: ETPH , VOCs and PAHs not Phase III ESA with SWPC. approximately detected. Barium detected. (2018-2023) Deep: Metals detected Downgradient 275 feet to above SWPC. VOCs concentrations in 400 feet to the Intermediate: and PAHs detected groundwater are below west. MW-14M: ETPH above SWPC . the calculated alternate Elevated concentrations of benzene and tarGWPC (intented to be related VOC detected. utilized for groudnwater Acenaphthylene above SWPC. MW-42M: plum deliniation) and ETPH above GWPC and therefore, no furthur SWPC, Benzene above GWPC. PAHs, tar investigation is related VOCs, metals (barium, thallium, warranted. zinc). detected. MW-43M: VOCs, PAHs and ETPH not detected. Barium, nickel, and zinc detected. MW-43M: Nickel above GWPC. MW-44M & MW-45M: PAHs above GWPC. Deep: MW-14D: metals and VOCs detected. ETPH, Cyanide, and PAHs detected above the SWPC. MW-26D metals and tar-related VOCs detected, PAH (acenaphthylene) detected above SWPC. ETPH not detected. Bedrock: MW-26BR Naphthalene and barium detected. VOCs and ETPH not detected. Notes: MGP = manufactured gas plant VOC = Volatile Organic Compound BTEX = Benzene, toluene, ethyl benzene and xylenes ETPH- Extractable Total Petroleum Hydrocarbons PAH = Polycyclic Aromatic Hydrocarbon TPH = Total Petroleum Hydrocarbons PCBs= Polychlorinated Biphenyls SWPC = Surface Water Protection Criteria Res DEC = Residential Direct Exposure Criteria I/C DEC = Industrial Commercial Direct Exposure Criteria CSM = Conceptual site model, described by the Connecticut Department of Environmental Protection as "a representation of an environmental system that is used as a tool for understanding and for explaining to others the basis and rationale for site investigation and the conclusions drawn about the environmental conditions at a site. A CSM describes, explains, and provides and understanding of the nature and distribution of contaminants necessary to evaluate potential risks to human health and the environment. The CSM is an iterative approach to site characterization. The number of iterations and quantity and quality of information is a function of the complexity of site conditions and data quality objectives". This interim CSM is subject to change. AOC = Area of concern, defined by the Connecticut Department of Environmental Protection as "locations or areas at a site where hazardous waste and or hazardous substances (including petroleum products) have been used, stored, treated, handled, disposed, spilled, and/or released to the environment." GEI Consultants, Inc. Page 9 of 9 Project 2200138 December 2025 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2025 Annual Report\Table\Table 2 - CSM
  5. Page 26 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 26 of 46 2025 Annual Report Rockville Former Manufactured Gas Plant (MGP) Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2025 Figures Figure 1 Site Location Map Figure 2 Site Layout and Historical Structures Figure 3 Phase II/III ESA and Previous Investigation Locations Figure 4A Shallow Groundwater Contour Plan Figure 4B Intermediate Groundwater Contour Plan Figure 4C Deep Groundwater Contour Plan Figure 4D Bedrock Groundwater Contour Plan GEI Consultants, Inc.
  6. Page 27 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 27 of 46 SITE 0 SOURCE: MAP CREATED ROCKVILLE, CT QUADRANGLE, 7.5-MINUTE USGS TOPOGRAPHIC MAP, 2021 AND ELLINGTON, CT QUADRANGLE, 7.5-MINUTE USGS TOPOGRAPHIC MAP, 2021. 4000 SCALE: 1" = 2000' 2025 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut 2000 SITE LOCATION MAP Project 2200138 December 2025 ---- B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\00_CAD\Figures\2025AR\1_2200138_2025AR_SLM.dwg - 12/1/2025 Fig. 1
  7. Page 28 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 28 of 46 h D MW-16S S D D D D h Dh D h D MW-30S D MW-5D hh MW-5S D D h MW-39S MW-38S D D D D D D h h D D D D D D D D D D D D D D D D D D D ? S S D & " D D D D & " MW-27S MONITORING WELL h S FENCE LINE SANITARY SEWER MANHOLE SANITARY SEWER GAS MAIN ABANDONMENT AREA GAS MAIN ABANDONMENT AREA S D D D D D D S MAPLE STREET h MW-7S h ABANDONED MONITORING WELL STREAM MW-7D h MW-10D MW-10M h h h MW-10S h D D D MW-10BR T RE E T D D D um R ive r D D D D D D D S MW-20S D h MW-1D D IN S D D D D D D D D D D D D D D D D D D D D Hockan D D Gas Holder #2 22,000 (Ft3) D D D D D D D D D D D D S S D T MA D D WE S D D D S Gas Holder #1 22,000 (Ft3) MW-9S h MW-1S h h Gas Holder #3 110,000 (Ft3) MW-24S MW-10SR & " LEGEND: D D h h Purifying Engine & Pump Room S hhh MW-37S D D MW-9D Meter Room S D D S h MW-32S Generating Room House MW-37BR MW-37D Coal Shed h Retorts / Storage D D [Outer Substation Area] MW-35S S & " D Shed Control House h MW-6D h D D Dynamo Room MW-2BR MW-6S h MW-25S Transformer House Unknown Control House h D D D h h MW-11S MW-21S D D MW-11D h h MW-13S D S D h MW-2D/2S (OBSTRUCTION) D [Inner Substation] (Active) MW-34S h h h D D D &h " D h MW-8SR MW-13D MW-3BR h hh h RW-3M h MW-3DR D MW-33S Tower MW-2SR D D h MW-8S (DESTROYED) MW-12D h MW-4SR D D D MW-3S D D D D S D h D D D D D D D D MW-36S hh h MW-4D D D h MW-18D h MW-3D Rockville h Substation MW-4S h D MW-12S MW-12SR D D D D D D D D D D D D D D D D D MW-19S D D S D Store House D D D D D D MW-17S h MW-28S hS " & S & " S HISTORIC S STRUCTURE S SITE BOUNDARY APPROXIMATE PARCEL BOUNDARY SOURCES: 1. DATA PROVIDED BY TIGHE & BOND. 2. NEARMAP IMAGERY DATED 10/12/2024. 0 50 SCALE, FEET 100 2025 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut SITE LAYOUT AND HISTORICAL STRUCTURES Project 2200138 December 2025 Fig. 2 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\005_GIS\2025AR\2_2200138_2025AR_SLYT.mxd
  8. Page 29 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 29 of 46 WSW/SD-07 X oc SG-04 H ive mR kan u MW-42M SG-05 r ) " h h MW-42S h ! ) " MW-44S/44M h ! MW-45S/45M W X MW-43S SW/SD-07 h MW-31S h ! MW-46M W X T STREE WEST SW/SD-06 MW-29S MW-40S h h W X h h h MW-26D MW-26S SW/SD-05 U̧ U̧ MW-26BR h ! ! A h h hMW-43M R452-B R452-C IA-03 IA-05 SV-01 IA-04 OA-01 U̧ SV-04 WSW/SD-06 X MW-13M R452-D IA-06 (1st Floor) SV-03 SV-05 MW-46M R452-A h MW-29D h MW-41S R446-A PR446-D R446-B U̧IA-01 ! A R446-C SV-02 U̧IA-02 R438-A R438-C R437-A R437-C ! R437-B A ! R438-B A R438-D R437-D MW-14D MW-14S MW-14I hh h R426-A MW-14M R426-B DOWNGRADIENT OFF-SITE SAMPLE LOCATIONS 0 100 ! R426-D A R426-C 200 SB-60 SW/SD-05 ! D D D SB-41 D ! A TB-123 ! A D D D D D D D D D D D D D D D D D D D ! A TB-59 ! TB-58 A CSS-1 # * h NESTED WELL PAIR ! h INTERMEDIATE WELL J " Ò TEST PIT ! U SOIL VAPOR POINT " ) STAFF GAUGE X W SEDIMENT SAMPLE X W BACKGROUND SEDIMENT SAMPLE # * ADDITIONAL SEH DELINEATION SOIL # * SEH DELINEATION SOIL SAMPLE ! A ! SB-62 A R415-C R5001 ! A R415-A R416-B R416-C ! A ! A R416-A R5002 D D MW-11D W X hh ! MW-37D h A # * SED-06 HA-04 ! A ! TB-53 A h MW-37S ! SS-106 # TB-63 * A TB-116 Coal Shed W X SS5-A # MW-32S HA-06 HA-01 TB-28 ! * MW-11S SW/SD-01 SED-A SB-80 A SB-73 SB-77 Control SS-102 # * h # * hA House CSS-2 # * * W X # ! * SS-103 # # * ! # SB-74 * ! A ! HA-03 A # SS-107 ! * A A HA-02 # * ! HA-09 SB-65 A TB-115 SB-46 SB-75 SB-58 ! HA-01A TB-61 SED-06BX SB-47 # A ! TB-60 * ! SB-10 A TB-51 ! WSED-05 A ! ! A ! A MW-35S HA-07A # A A SED-06C ! h * A TB-45 TB-42 WX * HA-17 Control House SB-76C Retorts / WX W# ! SB-33 "X SB-02 SG-02 ) A U ! SB-04 ! SED-06A ! ! TB-47 A SS3-A A A SB-76 * ! # Generating ! Room A ! SB-07 A A ! A # * ! SB-81 SB-76B # * *A# MW-1S TB-24 SB-63 * SB-76D SB-76A # ! A h ! TP-104 J " MW-9D A MW-1D h ! Ò hMW-20S TP-07 A TP-06 ! SB-48 SB-76A1# SG-01 A * TP-01 h SB-31 TB-19 MW-6S h TP-05 SB-50 TB-22 SB-84 ! SB-03 TB-14 A ! ! TB-13 SW-01 ! A ! " !A ) h JA TB-18 A A ! TB-21 ! ! A TB-X5 ! ! MW-6D h A J " ! TB-17 A J " TP-102 ! A TB-62 TB-20 ! MW-9S " A A SB-24 Gas Holder #3 Ò Ò W X ! TB-X1 Ò A A A SB-06 ! ! SW/SD-B02X SB-32 ! TB-16 A A ! SS1-A A ! TP-101 110,000 (Ft3) Purifying W TP-103 A A W X TP-02 SB-85 h SED-02X SS1-D # WSED-01 X SB-08 A WX ! Storage House WSW-02 # * * Gas Holder #2 MW-24S ! CSS-3 A SB-82 Gas Holder #1 TP-04 SED-09 ! SB-20 TB-113 Engine 22,000 (Ft3) A W X SB-29 # *HA-18 SB-09A Meter & Pump 22,000 (Ft3) SB-83 CSS-5 ! # * CSS-4 A ! # Room Room * A MW-10BR ! SW/SD-B01X MW-7D A ! SB-28 W A! SB-49 A MW-10D TP-03 ! SB-30 A TB-X4 h SB-05 ! ! SB-01 ! h A h A A ! TB-6 ! ! TB-7 ! ! ! A ! TB-8 A ! ! ! TB-12 A A TB-11 A ! AhA A A A A SB-52 ! A SED-07X TB-2 SB-51 TB-3 MW-10M h TB-5 h WX WSED-08 TB-4 TB-9 MW-10S h MW-7S MW-10SR # * # * R414-B D D D R415-B ! TB-117 A MW-37BR SS3-C LEGEND: PHASE II/III SITE INVESTIGATION AND ISS STUDY D * HA-05 # * # # * HA-08 # * # * SB-21 ! A Shed A ! A TB-50 ! A D HA-07 SB-12 TB-X6 ! D SS-101 ! TB-126 A D SS3-B Transformer House # * ! A TB-52 D Unknown ! A hMW-21S D # * ! SB-44 A ! TB-118 A D TB-40 TB-39S SS-100 Dynamo Room ! A h h ! h MW-2SR A SB-34 MW-2BR ! !A A h MW-25S STREET D D A UNION D # * ! TB-127 A D SB-78 SB-78D # !# ! * *A A SB-78A *hMW-34S SB-78B # ! A SS1-B # * D ! A TB-34 SB-43 ! SB-78C MW-13M D h h h MW-13D h MW-13S TB-119 D A ! # * A D D ! A TB-126 D D STRE ET D D MAIN D ! A TB-120 ! TB-55 A SB-22 TB-49A D D WES T ! AMW-3S A h h MW-3D h h RW-03M h ! TB-56 SS1-C ! TB-130 A h MW-18D D TB-54 ! MW-3BR ! A ! TB-121 h A MW-19S D D D SB-13 D D D ! A TB-43 D D SB-25 !h A MW-33S D D D ! A TB-55A MW-3DR D D W X ! A ! A TB-46 D TB-38 ! A SB-45 MW-2D/2S HA-16 (OBSTRUCTION) SB-79 SS-108 # *# * SS-106 D D D D D D D D MW-8SR SB-35 SS-108 SW/SD-02 D D ! A # * SS-104 # * HA-10 # * # * Tower A HA-15 SB-57 D HA-09A D D SS3-D MW-4S h D D D D SB-59 D HA-14 TB-X3 MW-08S (DESTROYED) h MW-36S TB-32 ! SW-03 SED-B # * D SED-C D D D # * ! ! # *A MW-4D h TB-36 # ! TB-37 MW-4SRhA A * h! D D D W WX X W WX X SED-03 ! A D D D D SB-23 D D SS3-E D D WSW/SD-03 X TB-64 D D D D D W X D D SB-26 D D # * SS-105 # * SS-105 D HA-11 SB-53 " SG-03 ) ! A SB-56 SS5-B ! # * Ahh MW-12S MW-12SR h MW-12D D SS5-E ! A Store House D HA-13 MW-17S D # * ! A D D TB-X2 h SB-36 WSW/SD-04 X ! A # * ! A SB-55 SS5-C # * SB-54 # *! A SB-27 ! A D SS5-D SB-67 ! SB-61 A D D D A TB-35 ! SB-66 ! A MW-16S D h MW-39S SB-39 SB-40 h D MW-30S D D h D ASB-11 ! A D ! D SB-38 ! A ! A HA-12 # *SB-37 DA ! ! MW-5D hh MW-5S A ! TB-34 A SB-42 ! TB-33 A D h MW-38S D WX X W W X SW-04 SED-04 ! A ! A D W X SCALE: 1" = 200' R414-C D R414-A D D ! A D D D D D D D D D D D D D D h D é " D é " D D D D é " D D D D D D D D D D D D D D D D D D D MW-27S é " ! é " D D é " ! D é " D D D D D D D D D D D D D D D SS2-A D D D D D D D D D D D D D D D D ABANDONED MONITORING WELL SB-64 ! h MONITORING WELL ! A # * SOIL BORING ! A D D D D D D D ! A TB-97 ! A ! A TB-101 TB-99 TB-224 ! A ! A STREET ! A TB-103 TB-104 TB-203 ! A TB-207 TB-200 ! TB-206 A ! A SB-28 ! A MAPLE ! A ! A TB-210 ! A ! A TB-105 ! A ! A ! A TB-106 TB-111B TB-111A ! h MW-28S A TB-111C TB-211 R454 ! A R453 ! A ! A R505-B ! A R505-D R455 ! R505-C A ! A R505-A R504-A ! A TB-202 R506-D R506-B ! R506-C A R504-C TEST PIT R456 X W SEDIMENT SAMPLE ! A W X SURFACE WATER ! R503-A R503-C Unknown ! R504-B A INDOOR AIR SAMPLE ! R503-B A P U̧ R503-D R502-A R504-D R502-C R506-A SURFACE SOIL ª " D SS2-B ! h D D PREVIOUS SITE INVESTIGATION ! R502-B A R502-D OUTDOOR AMBIENT AIR SAMPLE SUB-SLAB AIR SAMPLE STREAM R501-A R501-C ! R501-B TB-221 ! A TB-219 ! A ! A TB-215 ! A ! A TB-216 D R501-D SITE HISTORIC STRUCTURE h APPROXIMATE PARCELS MW-23S 2025 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\005_GIS\2025AR\3_2200138_2025AR_PREV.mxd FENCE LINE A hMW-15D h MW-15S TB-217 SOURCES: 1. DATA PROVIDED BY TIGHE & BOND. 2. NEARMAP IMAGERY DATED 10/12/2024. D 0 30 SCALE, FEET 60 Eversource Energy Berlin, Connecticut PHASE II/III ESA AND PREVIOUS INVESTIGATION LOCATIONS Consultants Project 2200138 December 2025 Fig. 3
  9. Page 30 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 30 of 46 236.61 SG-5 23 6 237.26 SG-4 MW-45M 234 MW-45S 236.71 MW-44M Riv er MW-44S 232.36 num MW-42M 237.34 MW-39S Ho cka 233.59 MW-42S 236.63 MW-31S 235.18 MW-26S 237.31 MW-30S 237.07 MW-38S MW-5D 238 239.49 MW-36S 235.85 MW-4S 239.55 MW-2SR MW-3BR 235.82 MW-33S MW-9D MW-10BR 235.87 MW-24S MW-7D MW-7S 235.15 MW-10D MW-10M MW-35S 239.45 MW-9S 239.09 MW-10SR 237.90 235.15 MW-37S MW-13S 234.35 MW-21S 234.56 234.87 MW-20S NM MW-1S MW-1D MAPLE ST LEGEND: MW-28S 235.10 SHALLOW MONITORING WELL STREAM GAUGE MONITORING WELL 236 242 MW-6D 240 T WES T M AIN S 233.98 MW-32S MW-37D MW-18D MW-13D MW-3D RW-3M MW-13M 238 242.84 SG-2 SG-1 243.18 MW-37BR MW-2D MW-2BR 238.70 MW-6S 235.47 MW-25S 23 4 234.42 MW-19S ST MW-11D MW-3DR MW-14M ST 238.54 MW-12SR MW-43M UNION 235.84 MW-4SR 239.35 MW-34S 240 242 235.29 MW-3S ST MW-29S 233.90 MW-46M MW-29D MW-14D MW-4D MW-12D WEST 234.07 MW-14S 235.28 MW-17S 241.12 SG-3 239.97 MW-11S MW-26D 233.32 MW-43S GRANT 235.78 MW-16S 237.86 MW-5S 233.61 MW-41S 232.99 MW-40S MW-26BR MW-23S 235.90 236 234.99 0 150 SCALE, FEET 300 GROUNDWATER CONTOUR (FT, NAVD88) GROUNDWATER ELEVATION (FT, NAVD88) MEASURED 4/1/2023 INFERRED DIRECTION OF GROUNDWATER FLOW 2025 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut SHALLOW GROUNDWATER CONTOUR PLAN Consultants Project 2200138 December 2025 Fig. 4A HERIOT, PAULA B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\00_CAD\Figures\2025AR\4A_2200138_2025AR_GWS.dwg - 12/2/2025
  10. Page 31 of 46

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 16 Page 31 of 46 SG-5 3 23 SG-4 MW-44S MW-45M 233.31 23 4 MW-45S Riv er 233 num 235 Ho cka 233.71 MW-42M MW-26BR MW-26S MW-26D MW-38S MW-39S 6 23 MW-10BR MW-10D MW-10M 235.68 MW-10SR MW-1S MW-1D MW-7D MW-20S MW-7S MW-28S MAPLE LEGEND: ST INTERMEDIATE MONITORING WELL USED TO GENERATE GROUNDWATER CONTOURS WES T M AIN S T MW-24S ST MW-37BR MW-37D MW-32S MW-37S ST SG-1 MW-21S MW-25S 235 SG-2 MW-2BR MW-35S MW-6S MW-9D MW-9S MW-6D MW-13M 234.27 RW-3M 235.33 4 MW-34S MW-2D MW-2SR MW-11D MW-11S 23 MW-36S MW-43M 233.55 MW-14M 233.94 MW-13D MW-13S MW-3BR MW-3DR MW-4D MW-4S MW-4SR MW-33S MW-41S MW-29D MW-40S ST GRANT MW-12D WEST MW-29S UNION MW-30S MW-17S SG-3 MW-43S 237.00 MW-46M MW-14D MW-14S MW-19S MW-18D MW-3D MW-3S MW-16S MW-12SR MW-42S 236 MW-31S MW-5D MW-5S 232.80 MW-44M STREAM GAUGE MONITORING WELL 235 GROUNDWATER CONTOUR (FT, NAVD88) 236 INFERRED GROUNDWATER CONTOUR (FT, NAVD88) MW-23S 237.00 GROUNDWATER ELEVATION (FT, NAVD88) MEASURED 4/1/2023 GROUNDWATER FLOW DIRECTION 0 150 SCALE, FEET 300 2025 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut Consultants Project 2200138 INTERMEDIATE GROUNDWATER CONTOUR PLAN December 2025 Fig. 4B HERIOT, PAULA B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\00_CAD\Figures\2025AR\4B_2200138_2025AR_GWI.dwg - 12/2/2025

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)