Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

3 pages match
  1. Page 11 of 145

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 10 Page 11 of 145 March 2021 Acronyms and Abbreviations % BAF BCC BERA CTDEEP CL&P CoPEC dba Eco-SSL ECOTOX EPC ERA ERAGS Eversource ETPH SL ESV ft FWS HQ LOAEL MDC MGP MRL NDDB NOAEL PAH PCB RCRA RSV RSR SLERA SVOC TEC TEL TPH TRV U.S. EPA VOC VRP 2000174.000 – 9856 percent bioaccumulation factor bioaccumulative chemical compound baseline ecological risk assessment Connecticut Department of Energy and Environmental Protection Connecticut Light and Power Company chemical of potential ecological concern doing business as ecological soil screening level ECOTOXicology database exposure point concentration ecological risk assessment Ecological Risk Assessment Guidance for Superfund Eversource Energy Extractable Total Petroleum Hydrocarbons screening level ecological screening value feet U.S. Fish and Wildlife Service hazard quotient lowest-observed-adverse-effect level maximum detected concentration manufactured gas plant maximum reporting limit Natural Diversity Data Base no-observed-adverse-effect level polycyclic aromatic hydrocarbons polychlorinated biphenyl Resource Conservation Recovery Act refined screening value Remediation Standard Regulations screening-level ecological risk assessment semi-volatile organic compound threshold effect concentration threshold effect level total petroleum hydrocarbon toxicity reference value United States Environmental Protection Agency volatile organic compound Voluntary Remediation Program vii
  2. Page 12 of 145

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 10 Page 12 of 145 March 2021 1 Introduction On behalf of The Connecticut Light and Power Company (CL&P) dba Eversource Energy (Eversource), Exponent, Inc., under contract to Tighe and Bond, Inc. (Tighe & Bond), has prepared this screening-level ecological risk assessment (SLERA) for the Rockville Former Manufactured Gas Plant (MGP) site located at 13 Maple Street/West Main Street in Rockville, Vernon, Connecticut, referred to as the Site. The Site location is provided on Figure 1. This SLERA was developed as a component of the Phase III Environmental Site Assessment (ESA) of the Site, which is being conducted by Tighe & Bond, Inc. (Tighe & Bond) to assess potential exposure pathways to ecological receptors at the Hockanum River. The Phase III ESA is being completed under the Connecticut Department of Energy and Environmental Protection (CTDEEP) Voluntary Remediation Program (VRP). The SLERA was prepared, as described by United States Environmental Protection Agency (U.S. EPA) guidance (U.S. EPA 1992, 1997), for the Rockville Former MGP Site. The SLERA includes a site description and habitat characterization, identification of complete exposure pathways, and a screening-level exposure estimate and risk calculation (U.S. EPA 1997). The SLERA is based on U.S. EPA guidance per CTDEEP recommendation and considers the following key guidance documents: • The U.S. EPA Framework for Ecological Risk Assessment (Framework) (U.S. EPA 1992) – The Framework describes a consistent approach for conducting an ecological risk assessment (ERA), it also identifies key issues, and defines terms used in ERA. The ERA process was developed to be flexible while providing a logical and scientific structure to accommodate a broad array of stressors. Guidance documents followed to further the ERA concepts presented in the Framework. • The U.S. EPA Ecological Risk Assessment Guidance for Superfund (ERAGS) (U.S. EPA 1997) – ERAGS is specific guidance establishing the fundamental tiered process for conducting an ERA at hazardous waste sites. This SLERA focuses on the first two steps of the ERA process. • Guidelines for Ecological Risk Assessment (Guidelines) (U.S. EPA 1998) – The Guidelines focus on the processes of ERA to improve the quality and consistency of ERAs conducted for hazardous waste sites. The objective of a SLERA is either to provide a defensible conclusion that negligible ecological risk exists or show that certain chemicals and exposure pathways can be eliminated from further consideration in the ERA process (U.S. EPA 1997). The pathways assessment is a critical step in this process, because it can be used to determine which complete exposure pathways do not exist, and could not exist in the future, and therefore, to conclude that present or future ecological impacts are negligible for these incomplete pathways. The ERAGs Guidance (U.S. EPA 1997) states that a SLERA may reach one of the following conclusions: 2000174.000 – 9856 1
  3. Page 13 of 145

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 10 Page 13 of 145 March 2021 • There is adequate information to conclude that ecological risks are negligible, and therefore, no need exists for remediation based on ecological risk. • The information is inadequate to make a decision at this point, and the ERA process will continue. • The information indicates a potential for adverse ecological effects, and a more thorough assessment is warranted. If a SLERA supports the first conclusion (i.e., negligible risk), the ERA process ends with an appropriately performed and documented SLERA. According to the ERAGs Guidance (U.S. EPA 1997), the SLERA contains two steps: • Step 1. Screening-level problem formulation. The intent of the first step is to develop the ecological conceptual site model (CSM) that describes how biota may be exposed to hazardous chemicals present in Site media. This step involves assessing the habitat quality, environmental media of concern, and exposure pathways that could result in biota exposure to hazardous chemicals. • Step 2. Screening-level exposure estimate and risk calculation. The purpose of the second step is to evaluate whether maximum exposure estimates of chemicals of potential ecological concern (CoPECs) warrant further evaluation in a sitespecific ERA (also called a baseline ecological risk assessment [BERA]). The outcome of this second step is highly conservative because it is based on conservative assumptions of exposure. Because of this conservativeness, this step is used to eliminate any CoPECs or pathways that do not present a potential for adverse effects to biota present at the Site. 2000174.000 – 9856 2
  4. Page 14 of 145

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 10 Page 14 of 145 March 2021 2 Site Conditions This section provides a brief summary of the site description, site history, previous investigations, and available data. This section also describes the habitats present at the Site and species of concern. Finally, this section presents an evaluation of ecological habitats and exposure pathways. 2.1 Site Description and History The Site is located at 13 Maple Street/West Main Street, Rockville, Vernon, Connecticut. The Site is the former MGP property, which is currently used by Eversource as an electrical substation (Rockville 14W) to supply electricity to the surrounding community (Figure 2). The Site is on 3.43 acres of land, which consists of a 2.88-acre parcel located at 13 Maple Street and a second 0.55-acre parcel located at West Main Street. The 2.88-acre parcel contains the active substation, whereas the 0.55-acre parcel on the south side of the substation parcel contains a portion of the Hockanum River (Figure 3). The Hockanum River flows through the southern portion of the Site and is classified by CTDEEP as Class B waters, meaning that it is designated for use as navigation, recreation, industrial and agricultural water supply, and potential habitat for fish and other aquatic life and wildlife. The river receives stormwater discharges from outfalls along Maple Street at the Site as well as multiple upstream stormwater outfalls. Historical outfall pipes were noted along the river at the Site as discussed below in Sections 2.2.3 through 2.2.5. The Site is in a developed part of Vernon, Connecticut, and mostly surrounded by properties that are zoned as Historic District Neighborhood. To the west of the Site are residential lots, to the northeast of the Site is the Town of Vernon Maple Street School, to the north of the Site are paved areas for St. Joseph Church, and to the south of the Site is West Main Street and developed lots (Figure 2). Formerly, a MGP was located at the Site and operated from 1863 until the 1950s when natural gas was brought to the region (Tighe & Bond 2017). Gas production occurred until circa mid1930s after which the Site appears to have been primarily used for gas storage. A portion of the gas produced was also used to generate electricity at the plant. The MGP manufactured gas from coal using both coal gas and water gas productions methods. The primary by-products of the gasification process were tar, coke, and ammonia liquors that were recycled or sold where possible. Gas purifier wastes were also produced as part of gas manufacturing. Chemicals associated with these by-products include polycyclic aromatic hydrocarbons (PAHs), volatile organic compounds (VOCs), sulfides, cyanides, and ammonia. Inorganic chemicals such as metals can be found in higher concentrations in purifier wastes at MGP sites; however, purifier waste deposits have not been encountered during the Phase III ESA investigations. 2000174.000 – 9856 3
  5. Page 15 of 145

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 10 Page 15 of 145 March 2021 Historically, the Hockanum River was integral to the industrial development of Rockville. The river was dammed and re-channelized for waterpower for multiple textile mills. Fill materials were likely used during initial development of the area based upon the Phase III ESA investigations completed between the Hockanum River and West Main Street at the Site. Eleven historical mill complexes operated upstream of the Site, including the nearby Hockanum Mill and Springville Manufacturing Company mill complexes. Based upon textile manufacturing processes at the time waste products likely could have included dyes (including coal-tar derived dyes), chromium salts, copper sulfate, zinc chloride, mineral oils, sulfuric acid and soda ash. Prior to the development of the sewer system in the late 1890s, process wastes from textile manufacturing could have been discharged to the ground or possibly directly to the river; however, the specific waste disposal practices are unknown. Following World War II, the textile industry in the region began to decline which continued through the following decades after which, many of the mills were left abandoned or underutilized. 2.2 Previous Investigations and Available Data The Phase I Environmental Site Assessment Report for the Site (Tighe & Bond 2017) describes in detail previous investigations that took place at the Site. The relevant investigations and available data for this SLERA are described in this section. 2.2.1 Manufactured Gas Plant Site Investigation: Rockville, March 1992 In 1990, the Northeast Utilities Service Company conducted a site investigation to assess impacts to the Site and its surroundings from the former Rockville MGP (Northeast Utilities Service Company 1992). The investigation included soil and groundwater sampling as well as the collection of four river sediment and five surface water samples from the Hockanum River. One sediment and surface water station was located upstream of the former MGP (Station A), two stations were located adjacent to former MGP (Stations B and C), and one station was located downstream of the former MGP (Station D) (Figure 4). Sediment samples were collected by grab sample within 6 ft of the shore and surface water samples were collected by grab sample. The sediment and surface water samples were analyzed for VOCs, semi-volatile organic compounds (SVOCs) including PAHs, metals and cyanide. Chemical concentration data for sediment and surface water samples from the 1990 sampling event are available only for analytes that were detected at least once in the respective medium. 2.2.2 Rockville Manufactured Gas Plant Site, Field Summary Report (1994), April 1995 In summer and fall of 1994, the Northeast Utilities Service Company conducted various field sampling at the former Rockville MGP Site (Northeast Utilities Service Company 1995). The field sampling was conducted to support the development of a human health risk assessment for 2000174.000 – 9856 4
  6. Page 16 of 145

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 10 Page 16 of 145 March 2021 the Site, and samples included surficial soil as well as sediment and fish from the Hockanum River. Three sediment samples were collected: two samples were collected from stations (RSED-A and R-SED-B) adjacent to the former MGP and one station (R-SED-C) at the edge of the property downstream of the former MGP (Figure 4). Sediment samples were collected from the 5 to 12 inches below the riverbed because the river bottom at depths between 0 and 5 inches was very hard. The sediment samples were analyzed for VOCs, PAHs, total petroleum hydrocarbons (TPH), Aroclor polychlorinated biphenyls (PCBs), Resource Conservation Recovery Act (RCRA)-13 metals, pH, and cyanide (total and amenable). Fish (white sucker) samples were collected by seine net. The fish were generally 10 to 16 inches long and weighed approximately one to two pounds. Fish were composited into seven fish samples and were analyzed for PAHs, Aroclor PCBs, RCRA-8 metals, and total cyanide. 2.2.3 Tighe & Bond Sediment and Surface Water Sampling in 2017 Tighe & Bond collected sediment and surface water samples from the Hockanum River in 2017 since sediment samples collected previously were approximately 26 to 30 years old and no longer represent current conditions near the Site. On November 13, 2017, Tighe & Bond collected sediment samples from six locations (SED-01, SED-02, SED-03, SED-04, SED-05, and SED-06) in the Hockanum River and one field duplicate sample from location SED-02 (Figure 5). Sediment was collected using decontaminated stainless-steel hand sampling tools from within the top six inches of the sediment surface (surficial samples) in areas typically downstream of rocks in depositional zones. This sampling strategy increased the opportunity to detect potential chemicals in the sediment. The following are descriptions of the sediment samples and locations: • SED-01: Brown, medium to coarse sand, some gravel, and little silt. The sample was collected at the upstream Site boundary in an area of finer sediment at the bridge. • SED-02: Brown, fine to medium sand, trace silt, and abraded asphalt in sand. Bricks and concrete were observed nearby. The sample was collected at the confluence of stream and downstream from the outfalls from Maple Street, discussed below in Section 2.2.4. • SED-03: Brown, medium to coarse sand, little gravel, trace silt, and trace pieces of fill (glass and brick were present). The sample was collected near the previous sediment sample SED-B. • SED-04: Brown/ Dark Brown, medium to coarse sand, little gravel, and little pieces of fill (glass and brick were present). The sample was collected at the downstream Site boundary near the previous sediment sample SED-C. • SED-05: Brown, medium to coarse sand, some gravel, trace silt, and possible paint chips. Bricks and concrete were observed nearby. The sample was 2000174.000 – 9856 5
  7. Page 17 of 145

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 10 Page 17 of 145 March 2021 collected downstream of SED-02 and upstream of samples SED-03, SED-04, and SED-06. • SED-06: Brown, medium to coarse sand, some gravel, and trace silt. The sample was collected adjacent to cast iron steel outfall pipes in the northern back of the river and near the previous sediment sample SED-A. The sediment samples were analyzed for CT extractable total petroleum hydrocarbons (ETPH), 15 metals (antimony, arsenic, barium, beryllium, cadmium, chromium (total), copper, lead mercury, nickel, selenium, silver, thallium, vanadium, and zinc), cyanide (total), PCB Aroclors, SVOCs, VOCs and total organic carbon. On November 13, 2017, Tighe & Bond collected surface water samples from four locations (SW-01, SW-02, SW-03, and SW-04) in the Hockanum River and one field duplicate sample from station SW-01 (Figure 5). The SW-01, SW-02, SW-03, and SW-04 surface water stations were collocated with the sediment SED-01, SED-02, SED-03 and SED-04 stations, respectively. The surface water samples were analyzed for CT ETPH, 15 metals (antimony, arsenic, barium, beryllium, cadmium, chromium (total), copper, lead mercury, nickel, selenium, silver, thallium, vanadium, and zinc), cyanide (total), SVOCs, and VOCs. 2.2.4 Tighe & Bond Sediment Sampling in 2018 Tighe & Bond collected additional sediment samples from the Hockanum River in 2018 to investigate: 1) a sediment location where the 2017 sediment sample (SED-06) contained an elevated concentration of copper (2,190 mg/kg) and, 2) possible sources of off-site contamination to Hockanum River near the Site. On August 28, 2018, Tighe & Bond collected sediment samples from six locations (SED-06A, SED-06B, SED-06C, SED-07, SED-08, and SED-09) near the Site and one field duplicate sample from station SED-07 was sampled (Figure 5). The following are descriptions of the new sediment samples and locations: • SED-7: Medium to coarse sand. The sample was collected at the base of the plastic outfall pipe from Maple Street that conveys stormwater drainage from the Maple Street right-of-way and upgradient properties. • SED-8: Medium to coarse sand. The sample was collected from within the stone masonry constructed outfall at Maple Street. The outfall was associated with the former Hockanum Mill, located approximately 270 ft to the east, and reportedly discharged to the Hockanum River during the operation of the mill. • SED-9: Fine silty sand. The sample was collected from concrete outfall pipe located near the intersection of the Maple Street and West Main Street and likely receives stormwater drainage from near the intersection of Maple and West Main Street. 2000174.000 – 9856 6
  8. Page 18 of 145

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 10 Page 18 of 145 March 2021 Sediment was collected using decontaminated stainless-steel hand sampling tools from within the top six inches of the sediment surface in areas typically downstream of rocks in depositional zones. The sediment samples SED-06A, SED-06B, and SED-06C were only analyzed for copper to determine if the copper concentrations in the 2017 SED-06 sample could be replicated and delineated. The sediment samples SED-07, SED-08 and SED-09 and the field duplicate sample were analyzed for CT ETPH, CTDEEP RSR 15 metals list (antimony, arsenic, barium, beryllium, cadmium, chromium (total), copper, lead mercury, nickel, selenium, silver, thallium, vanadium, and zinc), cyanide (total), PCB Aroclors, SVOCs, and VOCs. 2.2.5 Tighe & Bond Sediment Sampling in 2021 Tighe & Bond collected additional sediment samples from the Hockanum River in 2021 to investigate the locations of former outfall pipes associated with substation piping based upon historical plans along the Hockanum River to determine if they could have contributed to chemical contamination of the river in those areas. Only sediment samples were collected since the pipe outfalls could not be located. On February 28, 2021, Tighe & Bond collected sediment samples from two locations (SED-201, and SED-202) just downstream of the two pipes along the Hockanum River at the Site (Figure 5). The following are descriptions of these sediment samples: • SED-201: Medium to coarse sand with little gravel and brick fragments. • SED-202: Fine to medium sand and organic materials with little silt. Sediment was collected using decontaminated stainless-steel hand sampling tools from within the top six inches of the sediment surface. The sediment samples SED-201 and SED-202 were analyzed for CT ETPH, 15 metals (antimony, arsenic, barium, beryllium, cadmium, chromium (total), copper, lead mercury, nickel, selenium, silver, thallium, vanadium, and zinc), cyanide (total), PCB Aroclors, 17 PAHs, grain size, and total organic carbon. 2.3 Habitat Characterization The Site is approximately 3.4 acres and currently contains an active electrical substation that is surrounded by a chain-link fence. Along the southern portion of the Site is a portion of the Hockanum River, which flows in a northwestern direction across that portion of the Site. Much of the Site is developed land used for the electrical substation. The remaining area includes the Hockanum River and narrow wooded areas along the Hockanum River to the western and southern portions of the Site. The Site is surrounded by streets and developed land. To the north of the Site is the former St. Joseph School, St. Joseph Church, the church parking lot, and residences. To the east of the Site is Maple Street and residences. To the south of the Site is West Main Street and other developed lots including a home heating oil supplier Gottier Fuel, which has a large aboveground fuel oil storage tank adjacent to the Hockanum River. To the west of the Site are residences. Thus, the Site currently provides fragmented habitat for aquatic 2000174.000 – 9856 7
  9. Page 19 of 145

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 10 Page 19 of 145 March 2021 life and semi-aquatic wildlife associated with the section of the Hockanum River that flows through the Site. The Hockanum River begins at the outlet of Shenipsit Lake in Rockville and flows through Vernon, Ellington, Manchester, and East Hartford for about 23 miles before terminating at the Connecticut River. The portion of the Hockanum River present at the Site was narrow (approximately 21 to 25 ft wide) and shallow (approximately 0.5 ft in depth in areas with riffles and runs and approximately 3 ft in depth in pooled areas) when Exponent, Inc. (Exponent) conducted a site visit on September 28, 2020. The river is what is called a losing stream, meaning that groundwater does not flow into it, but surface water from the stream moves into the surrounding groundwater (Tighe & Bond 2017). Historically, the river was used heavily for industry, but the stretches of the riverbank have been redeveloped as parks and hiking trails. The Hockanum River can support aquatic life, such as benthic invertebrates and fish, amphibians, and a variety of water-dependent birds and mammals. 2.4 Species of Special Concern and Sensitive Habitats According to the CTDEEP Natural Diversity Data Base (NDDB), which was updated in June 2020, the Site is not located within a Natural Diversity Area (Figure 6). The NDDB represents the approximate location of endangered, threatened, and special concern species and significant natural communities in Connecticut. This is consistent with previous investigations and an EPA report (U.S. EPA 1994) that indicated that there were no Federally Endangered Species or Connecticut Species of Concern at the Site. The closest record was more than a mile downstream. In addition, the NDDB freshwater mussel map shows that the Site is not near any state listed freshwater mussel species (Figure 7). Another species of concern in Connecticut is northern long-eared bat and the Site is not located in area with known places of hibernation for this bat species (Figure 8). 2.5 Evaluation of Ecological Habitats and Exposure Pathways The following conditions must be met for an area to be considered habitat in the context of an ERA at a site and for that area to be carried forward for further evaluation, within the SLERA: • Upland (terrestrial) habitat − A hazardous constituent release to soil occurred (as documented or inferred from information from previous investigations) − The upland habitat is undeveloped and is of sufficient size to support potential ecological receptors − The upland habitat is sufficiently accessible to potential ecological receptors 2000174.000 – 9856 8
  10. Page 20 of 145

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 10 Page 20 of 145 March 2021 − The upland habitat will continue to support potential ecological receptors into the foreseeable future. • Aquatic habitat − A hazardous constituent release to the water body occurred (as documented or inferred from information from previous investigations) − The water body is of sufficient size and hydroperiod to support potential ecological receptors − The water body is sufficiently accessible to potential ecological receptors − The water body will continue to support potential ecological receptors into the foreseeable future. The upland areas present at the Site are currently developed and mostly covered by the electrical substation footprint where the former MGP was located. Small, fragmented wooded areas are found near the Hockanum River on the southern and western portion of the Site, but they provide little to no significant habitat to terrestrial receptors as these areas are discontinuous corridors surrounded by developed lots and streets. Therefore, the upland areas on the Site will not be evaluated in the SLERA. For aquatic habitats on Site, the stretch of the Hockanum River on the Site provides habitat for aquatic life and some wildlife that may use aquatic areas to feed. Hazardous constituents from the MGP activities may have been historically transported to the river. Previous investigations found fill materials in the southern boundary of the Inner Substation fence along the bank of the Hockanum River. In addition, two cast iron pipes were found near the current southeast corner of the inner substation fence; however, the use of the pipes is unknown (Tighe & Bond 2017). Of note, the river also received stormwater runoff from paved roads and historically received wastes from mills upstream of the Site. The Hockanum River is of sufficient size and flows year-round to support potential ecological receptors. In addition, the river is accessible to potential ecological receptors, such as amphibians, fish, benthic invertebrates, birds and mammals. However, this stretch of the Hockanum River is within a developed area and those species that are more tolerant to human activities are more likely to use this stretch of the river. The Hockanum River will continue to support aquatic life and limited semi-aquatic wildlife into the foreseeable future. 2000174.000 – 9856 9

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)