Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Words on different pages
  1. Page 21 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 21 of 897 Section 2 Phase III ESA Summary Tighe&Bond Summa® Canister that was equipped with a laboratory-calibrated flow controller provided by Phoenix. Soil vapor and ambient air samples were analyzed using CTDEEP’s RCP analytical methods. A summary of soil vapor and ambient air sample collection methods are discussed below: Soil Vapor Sampling Soil vapor samples were collected using laboratory-provided tubing that was connected from each soil Vapor Pin® to a dedicated flow controller and Summa® Canister. Prior to sampling, each soil vapor sampling location was covered with a bucket enclosure that was enriched with a 19% to 29.5% atmosphere of ultra-pure helium tracer gas as a QA/QC measure to assess for potential air leakage around the Vapor Pin® and the basement slab (“short circuiting”). Each Vapor Pin® was pumped using a calibrated pump with a flow rate of 0.2 liters a minute to draw in soil vapor from below the concrete floor/building slab for field screening using a RAE Systems ppbRAE-3000 handheld PID to screen for total VOCs and portable helium meter to assess for detections of helium tracer gas prior to the collection of the soil vapor sample. Because of infiltration of helium during pre-sampling screening, SV-01 was re-installed as a temporary sampling point that was sealed with a combination of hydrated bentonite clay and melted bee’s wax. Minimal levels of helium, less than 0.01% to 0.08%, were detected in soil vapor points during pre-sampling screening indicating that short circuiting was negligible around the soil vapor points. Pre-sampling screening of soil vapor with a PID detected total VOC concentrations ranging between 2 parts per million (ppm) and 4 ppm. During the pre-sampling screening, it was determined that SV-04 was unable to be sampled due to insufficient air flow. It is possible that SV-04 was installed into the concrete foundation/ footing for the school building. This point was unable to be re-installed during sampling because of finished floor coverings in the remaining areas of the ground-level floor of the St. Joseph’s School building. Soil vapor points SV-01 and SV-02 were sampled using a laboratory-provided flow controller calibrated for a 24-hour sample period, to assess the residential occupancy at the Rectory. A duplicate soil vapor sample, SV-02A) was collected at SV-02 as a QA/QC measure. Within the former St. Joseph School building, soil vapor samples SV-03 and SV05 were collected using a laboratory-provided flow controller calibrated for an 8-hour sample period, to assess a typical 8-hour workday duration. Upon completion of soil vapor samples, the final concentration of helium was measured within the bucket enclosures at each soil vapor location. In general, concentrations of helium within the enclosures were similar to initial concentrations except for SV-02, which was measured significantly lower at 8.5% helium. Once sampling was complete, the Vapor Pins® were sealed with a flexible plastic push cap and covered with a flush-mounted cover with the exception of SV-01, which was abandoned following sampling because it was unable to be re-installed within the basement slab of the Rectory. Each soil vapor sample was submitted to Phoenix and analyzed for VOCs via EPA Method TO-15 and APH via MADEP APH Method. Soil vapor samples SV-01 and SV-02 were submitted for analysis of helium tracer gas to assess the temporary soil vapor point construction at SV-01 and to assess the apparent 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-7
  2. Page 22 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 22 of 897 Section 2 Phase III ESA Summary Tighe&Bond helium leakage from the enclosure at SV-02 during the collection of the soil vapor samples in the basement of the Rectory. Ambient (Indoor/ Outdoor) Air Sampling Ambient air samples were collected of indoor air and outdoor air as part of the soil vapor assessment. Six indoor air samples (IA-01 through IA-06) were collected to assess indoor air concentrations within the Rectory and St. Joseph School buildings. One outdoor air sample (OA-1) was collected to determine outdoor air concentrations and to assess the potential influence of outdoor air on indoor air concentrations. The approximate locations are provided on Figure 6. Ambient air samples were collected concurrently with the soil vapor samples. Indoor air samples and the outdoor air sample were collected using a Summa® canister equipped with laboratory-calibrated flow controllers. Summa® canisters in the Rectory were equipped with a 24-hour calibrated flow controller and Summa ® canisters in former St. Joseph’s School were equipped with an 8-hour flow controller similar to soil vapor samples discussed above. IA-01 and IA-02 were collected near SV-01 and SV-02 in the Rectory basement. One duplicate indoor air sample, IA-02A, was collected. Indoor air sample location, IA-06, was added to sample indoor air at the first floor of the Rectory. IA-06 was added to sampling program to assess air concentrations in the first-floor living area of the Rectory above the basement and crawl space area. At the former St. Joseph School building, IA-03 and IA05 were collected adjacent to SV-03 and SV-05, respectively and IA-04 was collected in a classroom area. OA-01 was affixed to a chain-link fence between the former St. Joseph’s School building and Rectory (Figure 6). The outdoor ambient air sample was collected using a Summa® canister equipped with a 24-hour calibrated flow controller to assess outdoor air quality during soil vapor assessment. Ambient air samples were submitted to Phoenix for analysis of VOCs and APH using the same analytical methods that were used for soil vapor samples. 2.1.2 SLERA A SLERA was completed to assess potential risks and complete exposure pathways to ecological receptors from chemicals detected within sediments and surface waters of the Hockanum River that transverses the Site. Tighe & Bond retained Exponent® to complete the SLERA in accordance CTDEEP guidance and USEPA guidance including Framework for Ecological Risk Assessment (Framework) (EPA 1992) and Ecological Risk Assessment Guidance for Superfund (ERAGS) (EPA 1997). The SLERA includes a Site description and habitat characterization, identification of complete exposure pathways, and a screeninglevel exposure estimate and risk calculation. The SLERA retained PAHs and metals as chemicals of potential ecological concern (CoPECs) based upon previous NU and Phase III ESA sampling data. The SLERA will also consider background sediment and surface water data collected during 2020 that is discussed below. A draft SLERA is currently in internal review and is scheduled to be provided under separate cover in the first quarter of 2021. 2.1.3 Background Hockanum River Sediments and Surface Waters Five background sediment samples, SED-101 through SED-105, and two surface water samples, SW-100 and SW-101, were collected within the Hockanum River upstream of the Site as shown on Figure 7. Sediment samples were biased towards depositional areas in the river. Sediment deposits with varying grain size distributions were collected. Sample 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-8
  3. Page 23 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 23 of 897 Tighe&Bond Section 2 Phase III ESA Summary locations were situated within publicly accessible areas as distant as possible from stormwater outfalls to the river. A summary of sediment and surface water locations are provided below. Sediment/ Surface Water Sample SED-101 SW-101 SED-102 SED-103 SED-104 SW-101 SED-105 Rationale Distance Upstream from the Site (approx.) Sand bar within the center of the Hockanum River adjacent to the West Main Street Bridge. 50 feet Upstream surface water sample to assess ambient water conditions. Coarse sand and gravel sediments within the western portion of the Hockanum River near to the West Main Street Bridge. Sand-gravel-silt sediment deposits within the central portion of the Hockanum River adjacent to the Morrison Street Bridge crossing. Fine sand with silt sediment deposit beneath the Spring Street Bridge crossing. Upstream surface water sample to assess ambient water conditions. Fine to medium sand with silt sediment deposit along the northern channel of the Hockanum River. 60 feet 752 feet 1,625 feet 1,610 feet Each sediment sample was collected utilizing stainless steel spatulas and placed into a stainless-steel bowl and homogenized. Each sediment sample was logged for physical characteristics and then placed into laboratory-provided sampling jars. Surface water samples, SW-100 and SW-101, were collected at SED-101 and SED-104 locations to assess water quality immediately upstream of the Site and at the furthest upstream sediment sample location. Surface water samples were collected by direct collection methods into laboratory-provided/ preserved bottles. Metals were field filtered using a 0.45-micron groundwater capsule for dissolved metals. Sediment and surface water samples were placed into iced filled coolers. Samples were maintained under chain-of-custody prior to delivery to the analytical testing laboratory, Eurofins (TestAmerica) service center in West Springfield, Massachusetts for shipment to contract labs located in Edison, New Jersey; Pittsburgh, Pennsylvania; and Burlington, Vermont. These laboratories are CTDPH-approved commercial environmental laboratories PH-0200, PH-0688 and PH-0751, respectively. Sediments were analyzed for PAHs, ETPH, CTDEEP RSR metals, total organic carbon (TOC) and grain size. Surface waters were analyzed for PAHs, ETPH, alkalinity and total and dissolved RSR metals. Sediment samples and surface water were analyzed by RCP analytical methods, as applicable. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-9
  4. Page 24 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 24 of 897 Section 2 Phase III ESA Summary Tighe&Bond 2.2 On-Site Investigations and Findings On-site Phase III ESA investigations were completed between June and December 2020 and included: Advancement of thirteen soil borings: SB-73 through SB-85 and the soil boring for installation of monitoring well MW-37S; Installation of one shallow monitoring well MW-37S; Installation of one, 4-inch tar recovery well RW-03M; and Re-installation of one deep monitoring well, MW-03DR. Sample locations are provided on Figure 5. Phase III ESA analytical samples included: Thirty-five soil samples, including two blind duplicate samples, and Twenty-eight groundwater samples, including two blind duplicate samples A summary of detected soil and groundwater analytical results and applicable RSR exceedances are provided on Table 3 and Table 4, respectively. Analytical laboratory data reports are provided in Appendix E. Sample locations are provided on Figure 5. Figure 8 and Figure 9 provide the inferred shallow groundwater flow within the Inner Substation and the Outer Substation at the northern Site boundary as well as summary of groundwater analytical exceedances of RSR criteria. A preliminary CSM table is provided as Table 1. 2.2.1 Subsurface Soils PMC Assessment of Soils within the Inner Substation Area Nine soil borings, SB-73 through SB-81, were advanced within the southeastern and northeastern portions of the Inner Substation Area (Figure 5) to assess PMC compliance of soils associated with former Gas Holder #1 (AOC-3) and former Gas Holder No #2 (AOC-4) and within historic fill material (AOC-9 Historic Site Fill). Southeastern Area of Inner Substation Fill materials including coal, asphalt, brick, coal ash and slag, were observed to depths of 2 to 6 feet within SB-76 through SB-81. Concentrations of PAHs were detected above the RES DEC, I/C DEC and/or GB PMC in soil samples collected within the fill material except for SB-81 (3 to 4 feet). PAHs were also detected in SB-76 through SB-81 at concentrations above RSR criteria in red-brown sand and gravel that did not appear to contain apparent fill materials. However, based upon the PAH detections it is likely that this material represents fill material used in the development of the Inner Substation. PAH concentrations that exceeded RSR criteria were primarily related to heavy molecular weight PAH compounds including benzo(a)anthracene, benzo(a)pyrene, benzo(b)fluoranthene, benzo(g,h,i)perylene, benzo(k)fluoranthene, chrysene, dibenz(a,h)anthracene, indeno(1,2,3-cd)pyrene, and pyrene. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-10
  5. Page 25 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 25 of 897 Section 2 Phase III ESA Summary Tighe&Bond Concentrations of benzo(a)pyrene, were detected above the SEH Condition Notification Threshold Concentration of 30 mg/Kg in SB-76 (0 to 2 feet) and SB-78 (0 to 1 foot) within historic fill material. This is consistent with previous detections of benzo(a)pyrene in surficial soils that exceeded the SEH Condition Notification Threshold Concentration during the Phase III. As discussed above, these detections are addressed under the SEH Notification for the Site dated February 26, 2018 [SEH ID 13641]. The concentrations of benzo(a)pyrene within the upper 2-feet of soils at SB-76 and SB-78 are proposed to be delineated in 2021 and will be provided to CTDEEP in the upcoming 2020 SEH Status Update Form for Soils for the Site scheduled for 2021. VOCs were detected above the GB PMC in a shallow soil sample collected at SB-79 (1 to 2 feet). Benzene was detected at a concentration of 0.51 mg/Kg which exceeds the GB PMC of 0.20 mg/Kg. SPLP VOC testing was completed to assess compliance with the GB PMC. SPLP benzene was not detected in the sample; consequently, the soils are in compliance with the GB PMC. Tetrachloroethylene (PCE), a chlorinated solvent was also detected in soils from 1 to 2 feet in SB-79 above the RES DEC and the GB PMC. PCE was also detected above the GB PMC in soil samples collected from 3 to 6 feet below grade at SB-79. SPLP VOC analysis revealed that PCE was detected below the 10-times the GWPC and therefore the concentrations of PCE are in compliance with the GB PMC. The source of the PCE is uncertain but appears to be surficial in nature based upon the highest concentrations in shallow soils with decreasing PCE concentrations at depth. Pesticides were not detected within Inner Substation soils except for SB-81 where dieldrin was detected above the GB PMC. Northeastern Area of Inner Substation Three soil borings, SB-73, SB-74 and SB-75 were advanced to the west and northwest of former Gas Holder #2 (AOC-4) and former Gas Holder #1 (AOC-3), respectively (Figure 5). The borings were advanced to assess soil conditions above the seasonal high-water table for compliance with the GB PMC. ETPH and PAHs were previously detected at concentrations above the GB PMC at MW-32S in the 11 to 13 feet sample interval; however, it is possible that the bottom of the sample intersected the seasonal high-water table. No visual tar impacts were observed in soils above the apparent water table in the soil borings. VOCs were also not detected in headspace soil screenings except for a low VOC detection of 2.7 ppm in soils in the SB-73 11 to 12 feet sample interval. Soil samples were collected above the apparent water table based upon field observations made during the boring advancement in the summer of 2020. ETPH was either not detected or was detected below the GB PMC in each soil sample collected from SB-73, SB-74 and SB-75 (Table 3). PAHs were not detected in SB-74 (12 to 14 feet). PAHs were detected above the RES DEC, I/C DEC and/or the GB PMC in SB73 (10 to 11.5 feet). SPLP testing revealed that leachable PAHs were not detected in the SB-73 (10 to 11.5 feet) sample and is therefore in compliance with the GB PMC. PAHs were detected at concentrations above the GB PMC in SB-75 (15 to 16 feet). The concentrations of PAHs in SB-75 (15 to 16 feet) were detected at levels above the RES DEC and I/C DEC; however, the soil sample was collected below 15 feet deep where the DEC is not applicable. This sample was collected in the summer during the drought conditions. It is likely the bottom of the SB-75 (15 to 16 foot) sample interval intersected 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-11
  6. Page 26 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 26 of 897 Section 2 Phase III ESA Summary Tighe&Bond the seasonal high-water table based upon observations at adjacent soil borings. Based upon this information, the GB PMC is not applicable. Outer Substation Area Four soil borings, SB-82, SB-83, SB-84 and SB-85 were advanced within the Outer Substation Area (Figure 5). SB-82 and SB-83 were advanced to assess soils containing fill for RSR compliance with the GB PMC. SB-84 and SB-85 were advanced to collect waste characterization soil data for heavily tar-impacted soils within the subgrade foundations of former Gas Holder #2 (AOC-4) and Former Gas Holder #1 (AOC-3), respectively as part of on-going remedial evaluations for the Site. SB-82 was advanced to assess fill material encountered in soil borings SB-08 and TB-X1 (Figure 5). Two soil samples, SB-82 (2 to 3 feet) and SB-82 (4 to 5 feet), were analyzed for ETPH, PAHs, PCBs, total and SPLP RSR metals and total cyanide. ETPH was detected at a concentration of 4,500 mg/Kg in the 2 to 3 feet sample which exceeds the established RES DEC, I/C DEC, and/or GB PMC of 2,500 mg/Kg. ETPH was detected at concentration of 140 mg/Kg in the 4 to 5 feet sample. Several PAHs were reported at concentrations above the RES DEC, I/C DEC, and/or GB PMC in both samples. Total and SPLP metals were detected in both samples at concentrations below applicable RSR criteria. Total cyanide was detected at concentrations of 2.36 mg/Kg and 1.04 mg/Kg, in SB-82 (2 to 3 feet) and SB-82 (4 to 5 feet), well below the RES DEC. PCBs were not detected in either sample. SB-83 was advanced adjacent to former Gas Holder #2 (AOC-4) to assess the soils for GB PMC compliance for benzene that was previously detected at 3 ug/Kg in SB-28 (1 to 3 feet). Three soil samples were collected from SB-83 from depths including 0 to 1 foot, 1 to 3 feet, and 3 to 5 feet. Each soil sample was analyzed VOCs. Benzene was reported above the GB PMC at a concentration of 14 mg/Kg in the 1 to 3 feet sample interval. Several other coal tar-related VOCs were detected at concentrations above the laboratory reporting limits but below the RSR criteria. SPLP VOC testing of the SB-83 (1 to 3 feet) sample revealed that benzene was detected at a concentration of 23 ug/L which exceeds the alternate GB PMC compliance level of 10-times the GWPC (10 µg/L); consequently, the concentration of benzene is not in compliance with the GB PMC. VOCs were not reported above the laboratory reporting limit in the 0 to 1 foot or the 3 to 5 feet samples. Soil borings SB-84 and SB-85 were advanced within the footprint of the former Gas Holder #2 (AOC-4) and former Gas Holder #1 (AOC-3), respectively. TCLP benzene was detected in SB-84 (11 to 13.5 feet) and SB-85 (12 to 14 feet) at 4.2 mg/L and 32 mg/L, respectively (Table 5). These concentrations are above the EPA’s established characteristic hazardous waste limit of 0.5 mg/L for benzene. A TCLP SVOC, 3 & 4-methylphenol (m & p-Cresol) and TCLP metals, including barium, arsenic and lead were detected at concentrations below their respective EPA characteristic hazardous waste limits. The remaining waste characterization parameters including flashpoint, ignitability, reactivity (sulfide and cyanide), corrosivity, and pH, were detected at levels below EPA hazardous waste criteria limits. This data will be used to evaluate potential disposal options. A summary of the waste characterization results is provided in Table 5. At the northern Site boundary, an analytical sample was collected at MW-37S (26 to 29 feet) from soils exhibiting sheens within the screen interval of MW-37S (Figure 5) Concentrations of ETPH and PAHs were detected at levels that would exceed the GB PMC and the RES DEC; however, the soil sample was collected below the water table and 15 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-12
  7. Page 27 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 27 of 897 Section 2 Phase III ESA Summary Tighe&Bond feet and the PMC and DEC are not applicable. Concentrations of tar-related VOCs were detected in the sample. 2.2.2 Groundwater During the 2020 Phase III ESA, on-Site groundwater data was collected to assess compliance with the PMC Exemption for Groundwater Infiltration for historic fill material (AOC-9) within the Inner Substation, southeastern portion of the Outer Substation (AOC12) and western Site boundary (AOC-11). Groundwater sampling and analysis was completed to collect seasonal data to assess concentrations in monitoring wells MW-37D, MW-37BR and MW-10BR and re-installed monitoring well MW-03DR. Groundwater beneath the Site generally flows to the north to north-northwest as shown in the shallow groundwater contours presented on Figures 8 and 9. Off-Site intermediate and deep groundwater flows to the north-northwest as shown on Figures 10 and 11. A summary of RSR exceedances in shallow and deep groundwater monitoring wells are also provided on Figures 8 through 11. Shallow (Water table) Monitoring Wells Inner Substation Sampling Events The Inner Substation monitoring wells, MW-33S through MW-36S and MW-04SR, located immediately downgradient of the Inner Substation, were sampled during two quarterly events on December 19, 2019 (3rd Quarterly sampling event) and March 18, 2020 (4th Quarterly sampling event). In addition, MW-34S was also sampled two additional quarters on June 30 and September 22, 2020 to gather additional groundwater data to support assessment for the PMC Exemption for Groundwater Infiltration for historic fill material (AOC-9). Concentrations of one or more PAH compounds exceeded the SWPC in monitoring wells MW-33S, MW-34S, and MW-35S (Table 4, Figure 8). A summary of PAH detections and exceedances are provided below: o MW-33S: acenaphthylene (March 18, 2020 only) o MW-34S: benzo(a)anthracene (September 22, 2020 only) o MW-35S: acenaphthylene, benzo(a)anthracene, benzo(a)pyrene, benzo(k)fluoranthene, chrysene, and/ or phenanthrene (December 19, 2019 and 1st Quarter 2020) o MW-36S: individual PAHs were not detected o MW-4SR: individual PAHs were not detected Petroleum/ tar-related VOCs were detected in MW-35S at concentrations below the SWPC and RES VC in the sampling events except for during the December 19, 2019 sampling event where naphthalene was detected at a concentration of 370 ug/L which is above the established SWPC of 210 ug/L. ETPH was detected at concentrations that exceeded the SWPC, Res VC, and I/C VC in MW33S during the March 18, 2020 sampling event and MW-35S during both sampling events. The highest concentration of ETPH was detected in MW-35S, which was screened across soils that exhibited petroleum odors and tar-impacts. Groundwater at MW-35S was also 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-13
  8. Page 28 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 28 of 897 Section 2 Phase III ESA Summary Tighe&Bond analyzed for MADEP EPH and VPH to further assess ETPH concentrations above the RES VC and I/C VC. VPH Aliphatic C5-C8 and Aliphatic C9-C12 carbon ranges were reported at concentrations exceeding the RES VC and/or the I/C VC. EPH Aromatic C11-C22 and VPH Aromatic C9-C10 were present at concentrations that exceed the SWPC. ETPH was not detected above the laboratory reporting limit in MW-34S, MW-04SR, or MW-36S during the sampling events. Lead was not detected in MW-33S through MW-36S or MW-4SR. Southeastern Outer Substation Area (MW-06S and MW-09S) Four consecutive quarterly groundwater samples were collected from MW-6S on March 18, 2020 (1st Quarter), June 9 (2nd Quarter), and September 22 (3rd Quarter) and December 3, 2020 (4th Quarter). Groundwater samples were collected from MW-09S during the 1st and 2nd Quarters; however, sampling was discontinued after a review of the groundwater data revealed that that PAH and ETPH compounds were not likely to support the PMC Exemption for Groundwater Infiltration. ETPH and PAH were not detected in MW-06S in any of the quarterly events. MW-6S is installed at the top of the bank above the Hockanum River that was historically filled. ETPH was reported in MW-09S at a concentration of 4,700 ug/L during the March 18 sampling event which exceeds the SWPC and RES VC and I/C VC of 250 ug/L. Several PAHs including, acenaphthene, acenaphthylene, benzo(a)anthracene, 2methylnaphthalene, naphthalene, and phenanthrene were reported at concentrations above the SWPC during both sampling events except for benzo(a)anthracene which was only reported above the SWPC in the June 9 sampling event. Western Site Boundary (MW-39S) Four consecutive quarterly groundwater samples were collected from MW-39S on March 18, 2020 (1st Quarter), June 9, 2020 (2nd Quarter), and September 22, 2020 (3rd Quarter) and December 3, 2020 (4th Quarter). A naphthalene-like odor was noted in groundwater samples collected from MW-39S. ETPH was reported at a concentration of 350 ug/L during the 1 st Quarter sampling event. This concentration exceeds the SWPC and RES VC and I/C VC criteria of 250 ug/L. However, ETPH was either detected at concentrations below the RSR criteria or not detected during the remaining sampling events. Acenaphthylene was detected during each event at concentrations ranging from 3 ug/L to 4.3 ug/L, which exceed the established SWPC of 0.3 µg/L. No other PAHs were detected during the quarterly sampling events. Deep Monitoring Wells (MW-03DR and MW-37D) Tar-related VOCs were detected below RSR criteria in MW-03DR. A naphthalene-like odor and sheens were noted during the development and sampling of MW-03DR. Acenaphthylene and ETPH were detected at concentrations exceeding the SWPC in MW03DR. VOCs, ETPH and PAHs were not detected in groundwater at MW-37D. Metals, including barium, nickel and/or zinc were detected at concentrations below the SWPC in MW-03DR and MW-37D. Cyanide was not detected in either monitoring well. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-14
  9. Page 29 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 29 of 897 Section 2 Phase III ESA Summary Tighe&Bond Bedrock Monitoring Wells (MW-37BR and MW-10BR) Petroleum/ tar-related VOCs were not detected in MW-37BR. However, concentrations of chlorinated compounds including 1,1,1-trichloroethane and 1,1-dichloroethane were detected below the SWPC. Chlorinated solvents are not associated with MGP operations. PAHs and ETPH were not detected in either MW-10BR or MW-37BR. Barium and silver were detected at concentrations below the SWPC. Cyanide was not detected in MW-37BR. Tar Gauging Tar was not detected with an oil-water interface probe in wells RW-03M andMW-03DR during development or during quarterly gauging events on September 22 and December 3, 2020. Strong naphthalene-like odor was observed on the measuring tape for both RW03M and MW-03DR. Sheens and naphthalene-like odors were observed during development of these two wells. Heavy sheens were observed, and tar staining was noted on tubing used during the development of MW-37S. Naphthalene-like odors were observed on the oil water interface probe during tar gauging activities completed on December 3, 2020. On December 9, 2020, Tighe & Bond used an oil-water interface probe to gauge monitoring wells that were screened within tar-impacted intervals and monitoring wells where tar was previously detected within the Outer Substation and on St. Joseph Church Property. Tar was measured at thicknesses of 0.1 feet in MW-03D and MW-10D and at 1.13 feet in MW24S. Light non-aqueous phase liquid (LNAPL) was observed in MW-10SR. A summary of measured product thickness is provided on Table 2. Monitoring wells MW-23S, MW-10SR and MW-10D are located adjacent to former Gas Holder #2 (AOC-4). MW-03D is located in the northwest portion of the Site. As discussed above, tar was not detected in MW03DR which is located adjacent to MW-03D. Further gauging of MW-03DR will be completed to assess if the tar blebs observed in MW-03D are associated with leakage around the well seal. 2.2.3 Assessment of PMC Exemption for Groundwater Infiltration Inner and Outer Substation Area Substation Areas Tighe & Bond completed an assessment to determine if the PMC Exemption for Groundwater Infiltration could be applicable to concentrations of PAHs and ETPH that were detected at levels that exceed the GB PMC in historic fill material above the seasonal highwater table at the Site. The following monitoring wells screened in areas of historic fill were used as part of the evaluation: MW-33S, MW-34S, MW-35S and MW-36S within the Inner Substation Area, MW-4SR directly downgradient of the Inner Substation, MW-6S (along the Hockanum River Bank), and MW-39S along the western Site Boundary (Figure 5). These areas meet the condition to demonstrate that eighty percent (80%) of the release area has been subject to infiltration, and not obstructed by anthropogenic features, for a minimum of five years. Groundwater samples were collected in four consecutive quarters in these wells during the Phase III. The table below summarizes Phase III ESA soils that exceeded the GB PMC and groundwater that exceeded the SPWC. Heavy molecular weight PAHs, including benzo(a)anthracene, benzo(a)pyrene, benzo(b)fluoranthene, benzo(g,h,i)perylene, benzo(k)fluoranthene, chrysene, dibenz(a,h)anthracene, indeno(1,2,3-cd)pyrene were detected above the GB PMC in soils 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-15
  10. Page 30 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 30 of 897 Tighe&Bond Section 2 Phase III ESA Summary but not in groundwater at MW-6S, MW-33S MW-36S, MW-39S and MW-4SR. This is consistent with heavier molecular weight PAHs having a lower solubility. Exceedances were noted in two monitoring wells, MW-34S and MW-35S, which were screened across soils that contained tar impacts associated with the former Generator House (AOC-3). It is probable that the tar impacts in these wells are contributing to groundwater exceedances of the SWPC. Based upon the sampling, the PMC Exemption for Groundwater Infiltration can be applied to historic fill at the Site. Monitoring Well / Boring ID MW-4SR/ SB-23/ SS3-E GB PMC Exceedance of PAHs/ ETPH in Soils Above the Water table ETPH and Light Heavy Molecular Molecular Weight PAHs Weight PAHs Benzo(b)fluoranthene Benzo(k)fluoranthene Chrysene SWPC Exceedance in Groundwater No exceedances PAHs and ETPH Not Detected MW-33S No exceedances Acenaphthylene ETPH MW-36S No exceedances PAHs and ETPH Not Detected MW-34S/ SB-78 MW-35S Benzo(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(g,h,i)perylene Benzo (k) fluoranthene Chrysene Dibenz(a,h)anthracene Indeno(1,2,3-cd) pyrene Pyrene (MW-35S only) Acenaphthylene Fluoranthene Fluoranthene Phenanthrene Benzo(a)anthracene 2-Methylnaphthalene Acenaphthene Acenaphthylene Benzo (a)anthracene Benzo(a)pyrene Benzo(b)fluoranthe ne Benzo(k)fluoranthe ne Chrysene Indeno(1,2,3cd)pyrene Phenanthrene ETPH Aromatic C9-C10 Hydrocarbons Notes Quarterly groundwater monitoring demonstrates PAHs in soil are not leachable. Monitoring well is screened across soils with tar-related impacts and downgradient of tar impacted soils that are contributing to SWPC exceedance of ETPH and Acenaphthylene. Quarterly groundwater monitoring demonstrates PAHs in soil are not leachable. Monitoring wells were screened in soils that contained tar-related impacts which are resulting in exceedances of SWPC for PAHs and ETPH Quarterly groundwater monitoring demonstrates MW-6S/ PAHs and ETPH Not PAHs in soil are not SB-32 ETPH Detected leachable. Quarterly groundwater monitoring demonstrates MW-39S/ No Acenaphthylene PAHs in soil are not SB-71 exceedances ETPH leachable Bolding indicates constituent was exceeded during the quarterly groundwater sampling event that was also detected as a concentration exceeding the GB PMC in soils 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-16

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)