Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Words on different pages
  1. Page 31 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 31 of 897 Section 2 Phase III ESA Summary Tighe&Bond 2.3 Off-Site Investigation and Findings In 2020, off-Site Phase III ESA investigations were completed to further assess the extent of tar-related groundwater impacts previously encountered in MW-29S and to assess seasonal variations in groundwater concentrations at the St. Joseph’s Church property (AOC-16) and within West Street ROW to the west of the Site (AOC-23). Off-site Phase III ESA investigations included: Advancement of four soil borings that were converted to monitoring wells, MW14M, MW-40S, MW-41S, and MW-43 S/MW-43M to depths of 40 to 45 feet below grade at the St. Joseph Church property; Advancement of one soil boring at the MW-42S/MW-42M location within the landscaped island within the West Street ROW; Advancement of one soil boring at the MW-31S location within the sidewalk of the West Street ROW; Installation of five shallow monitoring wells, MW-31S and MW-40S through MW43S; Installation of three monitoring wells, MW-14M, MW-42M, and MW-43M within the intermediate groundwater zone; Completion of a soil vapor assessment at St. Joseph Church Rectory and former St. Joseph School/Former Strong School Building that included the installation of five soil vapor points (SV-01 through SV-05). Sample locations are provided on Figure 5. Off-site Phase III ESA analytical samples included: Twelve subsurface soil samples; Twelve groundwater samples, including one duplicate; Soil vapor assessment samples: installation of five soil vapor points (SV-01 through SV-05) and collection of five soil vapor samples including one duplicate, collection of seven indoor air samples (IA-01 though IA-06) including one duplicate, and collection of one outdoor air sample (OA-1). A preliminary CSM table for off-Site AOCs are provided in Table 1. Soil and groundwater analytical data is provided on Tables 3 and 4, respectively. A summary of groundwater flow direction and a summary of applicable RSR criteria exceedances in the shallow groundwater table, intermediate and deep groundwater zones are provided on Figures 9, 10, and 11, respectively. Soil vapor and ambient air sampling locations are depicted on Figure 6. Soil vapor and ambient air analytical testing results are provided on Tables 6 and 7, respectively. 2.3.1 Subsurface Soils Tar impacts, sheens or staining, were observed in the soil boring for MW-14M within the St. Joseph Church parking lot. In the boring for MW-14M, tar-related impacts were encountered as shallow as 20 feet below grade, which corresponds to approximately 6 feet below the water table. Isolated lenses of sheens and/or staining were observed from 23 to 27.5 feet below grade and soils with tar blebs were observed from 27.5 to 28.5 feet below grade and 31 to 32 feet below grade. Naphthalene-like odors and/or elevated 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-17
  2. Page 32 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 32 of 897 Section 2 Phase III ESA Summary Tighe&Bond headspace VOC measurements were noted in the MW-14M boring ranging from 20 to 37 feet below grade. No visual tar impacts were observed in soil borings for the remainder of the off-Site monitoring wells at St. Joseph’s Church Property and within the West Street ROW. Soils with naphthalene-like odors and elevated headspace VOC measurements were noted from 28 to 38 feet in the soil borings for MW-40S, MW-41S and MW-42S/MW-42M (Figure 5 and Figure 9). No visual impacts, odors or elevated headspace VOC measurement were observed at the soil borings advanced within the West Street ROW at MW-31S or MW-42S/MW-42M. Two samples were collected from each soil boring at the interval with the greatest level of apparent impacts as well as a soil sample at the bottom interval of the soil boring. Soil samples were submitted for laboratory analysis of ETPH, VOCs, and PAHs. ETPH and PAH were detected in MW-14M (27.5 to 29.5-feet) at concentrations that would exceed the RES DEC and/or GB PMC; however, these RSR criteria are not applicable since the sample was collected below 15 feet and below the water table. ETPH and PAH concentrations were not reported above the laboratory detection limit in the remaining samples. Several tar-related VOCs including, benzene, ethylbenzene, naphthalene, 1,2,4trimethylbenzene and/or xylenes were reported in each of the soil samples except for the MW-14 (43 to 45-feet), and both soil samples collected from MW-43S/43M. 2.3.2 Groundwater Shallow (Water table) Monitoring Wells Tar-related VOCs were detected in MW-29S and 41S at the St. Joseph Church Property. Benzene was detected above the RES VC in MW-29S and just below the RES VC in MW41S. ETPH was detected at above the SWPC, RES VC, and I/C VC in both samples. A soil vapor assessment was completed for the St. Joseph Church Rectory and Former St. Joseph School/Former Strong School Building that demonstrated that concentrations of benzene and ETPH in groundwater are in compliance with the RES VC based upon soil vapor testing discussed below. Concentrations of acenaphthylene were detected at concentrations of 2 µg/L and 1.8 µg/L above the established SWPC of 0.3 µg/L in both MW-29S and MW-41S, respectively (Table 4). The remaining PAH compounds were detected in MW-29S and MW-41S at concentrations below RSR criteria. One PAH compound, phenanthrene, was detected in MW-42S at 0.06 µg/L below the APS criteria of 14 µg/L. VOCs, ETPH, and PAHs were not detected above the laboratory reporting limits in MW26S, MW-40S, or MW-43S at the St. Joseph Church Property or within the West Street ROW in MW-31S (Figure 5 and Figure 9). Metals including, barium, chromium, nickel and/or zinc were reported above the laboratory detection limit but below the RSR criteria and cyanide was not detected in the off-Site shallow monitoring wells. Off-Site groundwater beneath the St. Joseph Church property flows to the north-northwest to northward beneath the St. Joseph Church property and the West Street ROW. Based upon laboratory analysis, groundwater impacts within the shallow groundwater aquifer 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-18
  3. Page 33 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 33 of 897 Section 2 Phase III ESA Summary Tighe&Bond have been delineated downgradient of MW-29S and MW-41S. Concentrations of VOCs, ETPH and PAHs attenuate with groundwater flow to the north and are not detected at the intersection of West Street and Union Street. Groundwater sampling is scheduled in the 1st Quarter 2021 for newly installed monitoring wells MW-40S through MW-43S to assess potential seasonal variations in groundwater concentrations and to validate this finding. Intermediate Monitoring Wells Three intermediate monitoring wells, MW-14M, MW-42M, and MW-43M, were installed to assess groundwater downgradient of tar-impacted soils located beneath the parking lot at the St. Joseph Church Property (Figure 10). Naphthalene-like odors were observed during the development and sampling of MW-14M and MW-42M. No tar was detected during gauging with an oil-water interface probe in either well. ETPH and acenaphthylene, and naphthalene (reported as a VOC) were detected at concentrations that exceed the SWPC in MW-14M. Several other tar-related VOCs and PAHs were detected in MW-14M above the laboratory reporting limits but at concentrations below RSR criteria. ETPH, VOCs and PAHs were not detected above the laboratory reporting limits in MW-43M at the St. Joseph Church property that is situated downgradient of MW-14M. However, ETPH was detected above the SWPC in MW-42M on the west side of the West Street ROW, cross-gradient of MW-14M. MW-42M is located at the boundary between the GB and GA groundwater classified areas. As such, concentrations in MW-42M were also compared to the GWPC. Concentrations of ETPH and benzene were detected above the GWPC in MW42M. Barium, nickel, thallium and zinc were reported below the SWPC and cyanide was not detected in MW-14M, MW-42M and MW-43M. Deep Monitoring Wells Groundwater samples were collected from deep monitoring wells, MW-26D and MW-29D to assess seasonal fluctuations within the deep groundwater zone downgradient of the Site at the St. Joseph Church Property (Figure 11). Acenaphthylene, a PAH, was detected in MW-26D at 12 µg/L which exceeds the established SWPC of 0.3 µg/L. Multiple PAHs and tar-related VOCs were also detected at concentrations below the SWPC in MW-26D. ETPH was not detected in MW-26D. ETPH, VOCs, and PAHs were not detected above laboratory reporting limits in MW-29D. Barium was reported in both samples below the RSR criteria. Cyanide was not detected above the laboratory reporting limit in either of groundwater samples. Bedrock Monitoring Well (MW-26BR) ETPH, VOCs, PAHs, and cyanide were not detected in MW-26BR. Barium was reported at a concentration below the SWPC. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-19
  4. Page 34 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 34 of 897 Section 2 Phase III ESA Summary Tighe&Bond 2.3.3 Soil Vapor Assessment St. Joseph Church Rectory and Former St. Joseph/Strong School Building Soil Vapor Analytical Results Concentrations of detected VOCs and APH in soil vapor are summarized on Table 6. Soil vapor results were compared to the RES SVVC. Soil vapor sample locations are provided on Figure 6. Benzene was only detected in one location, SV-01, at a concentration of 0.00071 milligram per cubic meter (mg/m3). This concentration is well below the RES SVVC of 3 mg/m3. APHs was detected in soil vapor at each of the soil vapor points at levels that are magnitudes below the established RES SVVC (Table 6). Other VOCs were detected in soil vapor at concentrations well below the RES SVVC including multiple chlorinated VOCs (e.g., trichloroethylene, trichlorofluoromethane, methylene chloride and chloroform) and solvents (e.g., methyl butyl ketone and methyl ethyl ketone). Chlorinated VOCs and solvents are not associated with tar impacts and are related to other commercial sources. Petroleum-related compounds (i.e., toluene, xylene, ethanol, isopropanol, cyclohexane, and heptane) were detected in soil vapor. Based upon the suite of detected compounds including ethanol (a gasoline additive), it is likely that soil vapor impacts are related to fuel storage and incidental spills and petroleum fuel storage at the adjacent convenience stores/ gas stations. Helium was not detected in soil vapor samples, SV-01, SV-02 and SV-02A, which indicates soil vapor was not impacted by leakage (short circuiting) around the points. Ambient (Indoor) Air Sampling Results Detected concentrations of VOCs and APH in ambient indoor air samples are summarized in Table 7. Indoor air samples were compared to Residential Target Indoor Air Concentrations (RES TACs) in Appendix G of the RSRs. The RES TACs are provided by the CTDEEP in the RSRs as maximum indoor air concentration benchmarks that can be used to develop site-specific volatilization criteria in a residential setting. APH was detected in each indoor air sample collected ranging from 23 to 26 microgram per cubic meter (µg/m3) well below the RES TAC of 130 µg/m3. Benzene was not detected in any of the indoor air samples. Other chlorinated VOCs including acetone, chloromethane, and methylene chloride, were detected in air at concentrations well below established RES TACs. Ethanol and isopropanol were detected in each indoor air sample; however, there are no RES TACs for these compounds. Ethanol and isopropanol are alcohol compounds that are found in fuels as well as cleaning products. As discussed above, ethanol is a gasoline fuel additive but is also commonly found in hand sanitizers and disinfectant wipes. Isopropanol is commercially available as rubbing alcohol. To provide context, indoor air VOC results were compared to concentrations provided in the 2003 New York State Department of Health-Study of VOCs in the Air of Fuel Oil Heated Homes. Concentrations of acetone, chloromethane, ethanol and methylene chloride were 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-20
  5. Page 35 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 35 of 897 Section 2 Phase III ESA Summary Tighe&Bond detected within indoor air at the Rectory and former St. Joseph School at levels below indoor air concentrations in upper 95 th percentile of data for the NYSDOH’s study, thus the VOC levels fall within the range indoor air concentrations in a residential setting in the NYSDOH study. No information was available for isopropanol concentrations within indoor air in the NYSDOH study. Ambient (Outdoor) Air Sampling Results Detected concentrations of VOCs and APH in outdoor air sample (OA-01) are summarized in Table 7. There is no RSR guidance for outdoor ambient air concentrations. Benzene was not detected in OA-01. Chlorinated VOCs (acetone and chloromethane) and alcohols (ethanol and isopropanol) were detected in outdoor air. APH was detected in OA-01 at 21 ug/m3. As previously discussed above, chlorinated VOCs, alcohols, and APH compounds were also detected in each indoor air sample. 2.4 Hockanum River Background Sediment and Surface Water Results 2.4.1 Sediment Five background sediment samples were collected from the Hockanum River including SED-101 through SED-105 as shown on Figure 6. PAHs, ETPH, metals were detected in each of the upstream sediment samples, SED-101 through SED-105 (Table 8). Total PAH concentrations increased from upstream sediment sample SED-104 to downstream sediment samples. Total PAH concentrations ranged from 11.02 mg/Kg in SED-104 collected beneath the Spring Street bridge to 28.28 mg/Kg in SED-101 collected to the south of the West Main Street bridge adjacent to the Site (Table 8, Figure 6). Concentrations of ETPH ranged from 350 mg/Kg in SED-102 to 890 mg/Kg in SED-104. Total organic carbon ranged from not detected in coarse-grained sediment at SED-102 to as high as 7,400 mg/Kg in SED-101. Metals including, arsenic, barium, total chromium, copper, lead, nickel, vanadium and zinc, were detected in each of the sediment samples. Overall, the highest concentrations of metals were detected in SED-103 near the former Hockanum Mills property and SED-102. To provide context, sediment concentrations were compared to published screening concentrations on National Oceanic And Atmospheric Administration (NOAA) Screening Quick Reference Tables (SQuiRTs) including threshold effects level (TELs), threshold effects concentrations (TECs), probable effects levels (PELs), and probable effects concentrations (PECs) provided on NOAA’s website. These benchmark concentrations are provided on Table 8. TELs and TEC represent concentrations at the lower end of potential toxicity while PELs and PECs and indicate higher potential sediment toxicity. Concentrations of one or more of the following compounds were above NOAA Benchmarks for multiple PAHs and metals (lead and arsenic). Six individual PAH compounds including, benzo(a)anthracene, benzo(a)pyrene, chrysene, fluoranthene, phenanthrene, and pyrene exceeded the PEC in each of the upstream sediment sample locations. Total PAHs exceeded the PEC at SED-01. It is likely that these sediments will act as a continuing source for PAH and metals concentrations with sediment transport downstream toward the Site. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-21
  6. Page 36 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 36 of 897 Section 2 Phase III ESA Summary Tighe&Bond 2.4.2 Surface Water Two surface water samples, SW-100 and SW-101, were collected at the SED-101 location just south of the West Main Street Bridge and at the SED-104 location beneath the Spring Street bridge. PAHs and ETPH were not detected in SW-100 and SW-101 (Table 9). Total and dissolved barium were detected in SW-100 and SW-101 at concentrations between 51 µg/L and 58 µg/L. There are no established water quality standards for barium. No other metals were detected. Hardness was detected at 58 mg/L in both surface water samples. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-22
  7. Page 37 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 37 of 897 Tighe&Bond Section 3 Quality Assurance/ Quality Control Quality assurance/quality control (QA/QC) measures were implemented as part of the Phase III ESA including the collection of field QA/QC samples and laboratory sample analysis via RCP analytical methods. A summary of the Phase III ESA QA/QC measures are provided below. A full data quality assessment/ data usability evaluation will be completed as part of the Final Phase III ESA report. Field QA/QC samples included the collection of blind duplicate samples for sample media including, soil, groundwater, soil vapor and indoor air and the submittal of trip blank samples for groundwater samples where VOC analysis was required. Blind duplicate sample results are provided next to the primary sample on Tables 3, 4, 6 and 7, respectively. Phase III ESA samples were analyzed by Phoenix and Eurofins (TestAmerica) in accordance with applicable CTDEEP RCPs. Each laboratory analytical data package contains a Laboratory Analysis QA/QC Certification Form which indicates that the laboratory followed the specified QA/QC performance criteria. Phase III ESA analytical samples were submitted within laboratory-provided and preserved sample jars and were analyzed within analytical method within holding times except for two samples SB-79 (1 to 2 feet) and SB-80 (0 to 1 feet) that are discussed below. A chain-of-custody accompanied the samples from collection to the laboratory. Each RCP analytical data package contains a summary of laboratory QA/QC within the back of each data analytical data package. Tighe & Bond completed a review of the analytical data based upon the CTDEEP’s Laboratory QA/QC Data Usability Assessment and Data Usability Evaluation Guidance Document, revised December 2010. Non-conformances in the laboratory analysis were primarily associated with non-target compounds that are not COCs at the Site. For instances where non-conformances were identified for Site-related COCs (i.e., ETPH, SVOCs/PAHs, and lead), some slight variability and biases were identified. A summary of all non-conformances is included as Table 10 in Appendix B. A description of Site-related COC non-conformances is provided below. The following non-conformances were identified for Phase III soil samples: ETPH o ETPH was analyzed just out of the holding time for soil sample SB-79 (1 to 2 feet). A low bias is possible and ETPH was reported below the RES DEC. The soil sample was analyzed to confirm presence or absence of ETPH as such, the data is considered usable. VOCs o VOCs were analyzed out of hold time for soil sample SB-80 (0 to 1 feet). A low bias is possible. Only one VOC, methylene chloride, was detected in the sample. The intention of the sample was to confirm presence or absence of VOCs in the area of surficial soils to screen for a potential release in the Inner Substation Area, as such, the data is considered usable. 2020 Voluntary Remediation Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 3-1
  8. Page 38 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 38 of 897 Section 3 User Provided Information Tighe&Bond PAHs o Metals o In laboratory report J221363, the laboratory reporting limits for arsenic, beryllium, mercury, and thallium in surface water samples SW-100 and SW101 exceed the Human Health Criteria. These compounds were not detected in groundwater in upgradient monitoring wells MW-11 and MW-12S or in MW-6S along the riverbank. Therefore, they are not considered COCs for surface water. In laboratory report J221363, PAH compounds in sediment samples SED101, SED-102, and SED-103, were diluted resulting in low surrogate recoveries. In these samples the concentrations of naphthalene, acenaphthene, and 2-methylnaptalene were approximated and flagged with estimated “J” qualifier. Several other PAHs within the samples were not impacted by variance, as such the approximated concentrations do not affect the data. Primary/Duplicate Sample Relative Percent Difference (RPD) Ethylbenzene and xylenes were detected outside the 50% RPD benchmark in the CTDEEP’s DQA/DUE benchmark in MW-37S (26 to 29 feet)/DUP-6-24-20 and SB-73 (10 to 11.5 feet)/DUP-7-2-20 pairs. Benzene was detected in MW-37S (26 to 29 feet) but not the duplicate. This is likely explained by the elevated detection limit in DUP-6-24-20. The variability VOC analysis is likely related to the nature of the VOC collection technique as evidenced by the RDPs for ETPH and PAHs in the same samples ranged from 3% to 30%, which indicates that the sampling methods were representative. In SB-73 (10 to 11.5 feet)/DUP-7-2-20 pair, RPDs for PAHs ranged between 9% and 19% well below the 50% CTDEEP DQA/DUE benchmark. However, ETPH was detected at 87 mg/Kg in the duplicate but not in SB-73 (10 to 11.5 feet). This variance is not significant because the concentration is less than 2 times the reporting limit. There were some variations in the RPD for groundwater. RPDs for MW-35S and its duplicate MW-DUP were below the CTDEEP DQA/DUE benchmark of 30% except for MA VPH (Aliphatic C9-C12) which has an RPD of 35%. This variation is not considered significant as the remainder of the RPDs for compounds tested were within the acceptable range. A variance for the RPDs for MW-42M and its duplicate, GW-DUP-1, were below noted for ETPH and two PAHs (acenaphthene and anthracene). The variability is likely related to elevated turbidity observed during sampling. The RPDs for metals and VOCs ranged from 0% to 10%. Trip Blanks Trip blanks were included with groundwater samples collected for VOCs except for MW35S during the December 19. 2019 sampling event. VOCs were not detected in trip blanks submitted with groundwater samples indicating that groundwater samples were not impacted during transit. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 3-2
  9. Page 39 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 39 of 897 Section 3 User Provided Information Tighe&Bond Based on the review of the non-conformances and the laboratory certification documentation, each lab report meets CTDEEP RCP except for the analysis of ETPH in SB79 (1 to 2 feet) and VOCs in SB-80 (0 to 1 feet). As discussed above, these samples were collected for determining the presence or absence of a release in surficial soils. The non-conformances identified do not adversely affect the usability of the laboratory data. In those areas where COCs were involved, the data quality is only slightly affected by these non-conformances and is sufficient to satisfy the data quality objectives (DQOs) for the Phase III ESA. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 3-3
  10. Page 40 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 40 of 897 Tighe&Bond Section 4 Conceptual Site Model A CSM is a representation of an environmental system at a site that is used as a tool to identify releases, migration pathways, potential receptors, and ultimately risk. The CSM is used to develop work plans and provide a framework to address issues that arise during the investigation of a site. The CSM is refined throughout the site characterization process as new data are acquired. The final CSM will fully define the environmental system at the site and validate the hypotheses regarding the environmental fate of released contaminants. A final, validated CSM includes the following components: Description of the site and environmental setting; Identification of AOCs and associated COCs; Potential release mechanisms for COCs at each AOC; Evaluation of migration pathways and locations at which environmental media are most likely to have been impacted by a release; Identification of AOCs at which releases have occurred as well as AOCs at which no releases have occurred; Evaluation of the nature and three-dimensional extent of contaminants; and Data and rationale to support conclusion. Table 1 provides a preliminary CSM summary that was developed for the Rockville Former MGP Site and has been updated based upon the findings of the 2020 Phase III ESA activities. A full CSM will be provided as part of the Final Phase III ESA Report. Based upon Phase III ESA information and the CSM, additional investigations are needed to refine the nature and extent of impacts at the Site and assess off-Site groundwater impacts as discussed below in Section 6. 2020 Voluntary Remediation Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 4-1

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)