Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Words on different pages
  1. Page 61 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 61 of 897 TABLE 1 Areas Of Concern (AOCs)/ Site Conceptual (CSM) Summary Rockville Former MGP Site 13 Maple Street and Off-site Areas of Investigation Rockville, Vernon, CT AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Surface soils Subsurface Soils Soils not investigated (within active transformer yard) Phase III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations SS-100 SS-101 SB-44 Groundwater not investigated (within active transformer yard) Groundwater not investigated (within active transformer yard) Previous COCs in Soil Phase III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Groundwater investigations not completed in AOC. Groundwater investigations not completed in AOC. Surface water (Hockanum River) upgradient of the AOC Phase I ESA (2017) Phase III ESA (2018) Remediation Status PAHs above RES and I/C DEC and GB PMC in SS-100. Arsenic above RES and I/C DEC in SS-100 and SS-101. ETPH and cyanide detected. 7 Former Transformer House PCBs, ETPH Transformer use. Possible leaks or spills could have impacted soils. No investigations completed in the AOC. Fill, coal and brick, encountered to 5 feet below grade in SB-44. ETPH and cyanide detected. Visual Impacts (Appear to be associated with AOC -1) 12- 15 ft.: Petroleum odor and sheen 24.5-26: Faint tar odor Arsenic and ETPH above RES and I/C DEC in SS-100, SS-101, SS-104 and SS-106. PAHs, ETPH, and lead above the RES and I/C DEC and GB PMC in SS-102. PCBs detected. PAHs, ETPH, and arsenic above the RES and I/C DEC and/or GB PMC in SS-103. Cyanide detected. ETPH also above RES DEC, I/C DEC and GB PMC in SS-104 and Res DEC in SS106. PAHs above RES and I/C DEC and GB PMC in SS-100, SS-104, SS-105 and SS106. Surface soils Subsurface Soils 8 Current Substation PCBs, ETPH, Metals, Possible leaks or spills from transformers If significant release: groundwater TB-34 TB-38 TB-39S TB-32 MW-8S SS-100 to SS-106 HA-01 to HA-11 SB-43 SB-44 MW-8S MW-2SR, MW-2D, MW-2BR, MW-5S, MW-5D, MW-8SR, MW-16S, MW-17S, MW-25S, MW-32S, MW-33S, MW-34S, MW-35S, MW-36S HA-01 through HA-07, HA-08 and HA-09: SEH investigation (See AOC 6) . PAHs above the RES and I/C DEC in HA-01 through HA-09. SEH Condition Notification Threshold Concentration for benzo(a)pyrene delineated see AOC-9. Fill observed in top 2 feet of soils. PAHs and metals detected. Fill (sand) observed HA-09A: ETPH exceeds RES DEC, arsenic exceeds the RES and I/C DEC. PAHs exceed RES DEC, I/C DEC and GB PMC. Cyanide detected. PCBs not detected. HA-10: ETPH and PAHs exceed RES DEC, I/C DEC and GB PMC. Cyanide detected below RES DEC and GB PMC. Arsenic exceeds the RES and I/C DEC HA-11: Arsenic exceeds the RES and I/C DEC. ETPH detected. ETPH above RES DEC in MW-35S & MW-36S and above RES & I/C DEC in MW32S Arsenic above RES & I/C DEC in MW-35S and MW-36S PAHs above RES & I/C DEC and GB PMC in MW-32S, MW-33S, MW-34S, MW35S, and MW-36S. Benzo(a) pyrene detected above the SEH Condition Notification Threshold Concentration in SB-76 (0-2 ft.) and SB-78 (0-1 ft.) Visual Impacts (Appear to be associated with AOC -1) 12- 15 ft.: Petroleum odor and sheen 24.5-26: Faint tar odor Table-1 AOC Summary.xlsx Shallow: MW-2SR: Not sampled due to visual observations of tar globules (2017). PAHs detected above SWPC. VOC (naphthalene detected). MW-5S: PAHs detected above SWPC. ETPH detected above the SWPC, RES VC and I/C VC. VOCs, and metals detected. MW-8SR: PAHs detected above the SWPC. Elevated metals detected. Possibly associated with turbidity in sample. MW-16S: Metals and VOC (Chloroform) detected . MW-17S: VOCs (tetrachloroethene)and ETPH detected below SWPC. Metals detected. MW-33S: acenaphthylene detected MW-8S: Metals detected above SWPC and ETPH above SWPC, above the SWPC. RES VC and I/C VC. Cyanide detected. MW-34S; ETPH above SWPC, RES VC and I/C VC and PAHs (acenaphthylene, Benz(a)anthracene, chrysene) detected above the SWPC Surface water (Hockanum River) located adjacent but up gradient of location. Remedial evaluation pending the completion of the Phase III investigation. Phase III ESA and predesign sampling is needed for this AOC. Phase I ESA (2017) Remedial evaluation Phase II Investigation (1992) pending the completion Phase III ESA (2016-2020) of the Phase III investigation. MW-35S: ETPH , MA VPH, MA EPH and PAHs above SWPC. ETPH and MA VPH above Res VC. VOC (naphthalene) detected above the SWPC. (associated with AOC-3). Deep: MW-2D: Not sampled due to visual observations of tar globules. MW-5D: Metals and ETPH detected Bedrock: MW-2BR: PAHs detected below the SWPC. Metals detected. Page 3 of 10
  2. Page 62 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 62 of 897 TABLE 1 Areas Of Concern (AOCs)/ Site Conceptual (CSM) Summary Rockville Former MGP Site 13 Maple Street and Off-site Areas of Investigation Rockville, Vernon, CT AOC # 9 AOC Description Historic Site Fill COCs VOCs, SVOCs, Metals, PCBs, ETPH Possible Release Mechanisms and Migration Pathways Historic placement of fill during the development of Site. Potentially Affected Media Surface soils Subsurface soils Previous Investigation Soil Locations Phase III Soil Locations TB-02, TB-03,TB04, TB-06, TB-13, TB-14, TB-16, TB17, TB-18, TB-19, On-site soils TB-20, TB-21, TB22, TB-27, TB-31, borings, SS-100 to TB-32, TB-33, TB- SS-107, SB-76 to 34, TB-38, TB-39, SB-83, TP-01 to TB-40, TB-42, TB- TP-07, HA-01 to HA -18 45, TB-47, MW02D, MW-04D, Historic fill was MW-05S, MWidentified in 05D, MW-10S, multiple borings MW-10M, MWwhich overlap with 10D other AOCs Historic fill was identified in multiple borings which overlap with other AOCs Previous Investigation Groundwater Locations 10 Possible historic discharges to the river from the Site, historic discharges from up PAHs and Metals gradient industries, current storm water run-off and anthropogenic sources. Sediment R-Sed-A/B/C/D Sediments (A,B,C, D) Outfall Sediment Samples SED-07 SED-08 SED-09 Background Sediment Samples SED-101 SED-102 SED-103 SED-104 SED-105 Table-1 AOC Summary.xlsx Previous COCs in Soil Phase III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Wells screened below fill (See AOC-15) Surface water (Hockanum River) located adjacent but up gradient of location. Fill (i.e., ash, bricks, slag, metals, glass, building debris, coal, and site fill) and former MGP plant foundations observed in several Phase III investigation locations. Fill as deep as 15 ft. Not Applicable River Sediment Samples SED-01 SED-02 SED-03 SED-04 SED-05 SED-06 Hockanum River Sediment Phase III Investigation Groundwater Locations Not Applicable Not Applicable Fill (i.e., ash and bricks observed) Concentrations of COCs including PAHs, ETPH, and metals above RSR criteria covered under separate AOCs. Concentrations of benzo (a) pyrene above SEH Threshold Notification Concentration for benzo(a)pyrene delineated in SS-102, HA01A, HA-02 HA-03, HA-18, SB-76 and SB-78. River Sediment Samples SW-01 ETPH, PAHs, and metals detected. Highest PAH concentrations were detected SW-02 upstream at SED-01. ETPH detected in all sediment samples. Metals detected in all SW-03 sediment samples. Elevated copper, lead and zinc detected in SED-06. SED-06A, B, PAHs and metals detected above SW-04 C were collected in the vicinity of SED-06. sediment screening criteria. VOC (methylene chloride) Background Surface Outfall Sediment Samples detected. Water Samples VOC (toluene), ETPH, PAHs and metals were detected. SW-100 SW-101 Background Sediment Samples PAHs, ETPH and metals detected in SED-101 through 105. Wells screened below fill (See AOC-15) Not applicable COCs not detected in groundwater. Barium detected below SWPC in adjacent monitoring wells. Investigation Status Remediation Status Phase III ESA and predesign sampling is Phase I ESA (2017) needed for this AOC. Phase II Investigation (1992) Remedial evaluation Phase III ESA (2018-2020) pending the completion of the Phase III investigation. Barium detected in all surface water samples. Chromium Investigation is detected in SW-01 completed. Phase I ESA (2017) and SW-02, Zinc detected in SW- Phase II Investigation (1992) SLERA is currently 01, SW-02, SW- Phase III Investigation (2017being prepared and will 2020) 03, and SW-04 be submitted to CTDEEP for review Background surface water samples: Barium detected. Page 4 of 10
  3. Page 63 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 63 of 897 TABLE 1 Areas Of Concern (AOCs)/ Site Conceptual (CSM) Summary Rockville Former MGP Site 13 Maple Street and Off-site Areas of Investigation Rockville, Vernon, CT AOC # 11 AOC Description Coal Tar impacts and Fill Observed at TB-33 (Southwestern portion of Site) COCs VOCs (BTEX), SVOCs, Total Cyanide, ETPH Possible Release Mechanisms and Migration Pathways Historic placement of fill. Potentially Affected Media Surface soils Subsurface Soils Groundwater Previous Investigation Soil Locations Phase III Soil Locations TB-33 TB-34 MW-5S MW-5D SB-11 SB-36 SB-37 SB-38 SB-39 SB-40 SB-41 SB-42 SB-53 MW-16S MW-17S SB-69 SB-70 SB-71 MW-31S (boring) Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater Shallow: MW-5S: ETPH and VOCs detected below SWPC. PAHs detected above SWPC. Metals detected. MW-16S: Metals and Chloroform MW-5S: PAH (VOC) detected (Acenaphthylene) detected MW-17S: VOC (tetrachloroethene), Fill (Ash and Slag) observed in SB-11, SB-36, SB-39 ,SB-40, SB-40A, SB-69, SBabove the SWPC. ETPH detected below SWPC. Metals 70, SB-71 to approximately 5 feet. VOC (xylene) and metal detected. SB-11: Sheen and tar odor observed from 5 to 8 feet. (chromium) detected. MW-30S: ETPH and acenaphthylene SB-36: Tar odor 12 to 20 feet. Sheen 15 to 20 feet. above SWPC. ETPH above RES VC SB-38: sheen and tar odor 10 to 11 feet. MW-5D: VOC (Benzyl MW-31S: Metals detected SB-40: sheen and tar odor 8 to 15 feet. Alcohol) and metals MW-38S & MW-39S: Acenaphthylene SB-69: ETPH above RES & I/C DEC & GB PMC, arsenic above RES & I/C DEC 1 detected above SWPC. above SWPC to 3 feet. PAHs above RES & I/C DEC & GB PMC 1 to 3 feet and 4 to 5 feet. SVOC (2-methylphenol) MW-39S: ETPH detected above the SB-70: Arsenic above RES & I/C DEC. PAHs above RES & I/C DEC & GB PMC 3 detected. SPWC, RES VC and I/C VC to 4 feet. SB-71: ETPH above RES DEC & GB PMC 1 to 3 feet and 8 to 10 feet. PAHs above Deep: RES & I/C DEC & GB PMC 1 to 3 feet, 5 to 7 feet and 8 to 10 feet. MW-5D: Metals and ETPH detected COCs in Surface Water Investigation Status Remediation Status ETPH and PAHs detected above RES and I/C DEC and GB PMC in SB-11. Naphthalene (VOC) detected above GB PMC and arsenic and lead detected above RES and I/C DEC in SB-11. MW-5S MW-5D MW-5S MW-5D MW-16S MW17S MW-30S MW-38S MW-39S MW-31S VOCs, PAHs and metals detected. Fill (sand) with tar observed. Surface water (Hockanum River) located adjacent but up gradient of location. Phase I ESA (2017) Remedial evaluation Phase II Investigation (1992) pending the completion Phase III Investigation (2016of the Phase III 2018) investigation. PAHs detected above RES and I/C DEC and GB PMC in SB-08, SB-09A. PAHs detected above the RES DEC and GB PMC in SB-24. ETPH detected above RES DEC in SB-09A. Concentrations of PAHs and ETPH were detected above the RES DEC, I/C DEC and/or the GB PMC in SB-32 and SB-51. Concentrations of arsenic were detected in above the RES DEC and I/C DEC. 12 Tar impacts and Fill Observed (Southeastern portion of Site) VOCs (BTEX), SVOCs, Total Cyanide, ETPH Historic placement of fill (AOC-13). Possible migration for spills or leaks from adjacent Retorts (AOC1) or Purifying House (AOC2). Surface soils Subsurface Soils Groundwater CSS-5 TB-2 TB-3 TB-24 TB-28 MW-6S MW-6D SB-08 SB-09 SB-09A SB-10 SB-24 SB-32 SB-33 SB-48 SB-49 SB-50 SB-51 SB-82 SS-107 SS-108 HA-17 HA-18 SB-76 to SB-82 Surface Soil: PAHs exceeded the Res DEC and GB PMC. MW-2S MW-2D MW-6S MW-6D MW-2SR MW-2D MW-2BR MW-6S MW-6D Subsurface soils: VOC(methylene chloride), SVOCs, cyanide, and metals detected. Fill (ash and sand fill), Tar impacts sheen observed. HA-17: ETPH and cyanides detected. PAHs detected above the RES DEC., I/C DEC and GB PMC. Lead above the GB PMC. HA-18: ETPH, PAHs above the RES DEC/ I/C DEC and GB PMC. Benzo (a) pyrene above the SEH Threshold Notification Concentration. SB-76: to SB-82: PAHs above the RES DEC/ I/C DEC and GB PMC SB-79: Benzene above GB PMC 1-2 ft, PCE above GB PMC and RES DEC 1-2 ft, GB PMC 3-4 ft and 5-6 ft SB-81: Dieldrin above GB PMC 0-1 ft SB-82: ETPH above RES DEC, I/C DEC, and GB PMC 2-3 ft SB-08: Staining and fuel oil odor 11 to 2 ft. Staining and tar odor from 24 to 29 ft. SB-10: Sheen and tar odor 9 to 24.5 ft. SB-33: tar odor 7 to 11 ft. Sheen, blebs and tar odor 11.5- 20 ft. SB-50: Tar from 11-12 ft. Sheens and tar blebs were observed from 15 to 17 feet. sheens and tar odors were observed from 17 feet to 25 feet SB-51: petroleum orders and grey staining from 14 to 17 feet. Sheen, tar blebs and/or tar odors were observed from 17 to 20 feet. MW-2S: Dry. MW-2D: Metals and PAHs detected above the SWPC and VOCs (xylene and ethylbenzene detected). Shallow: MW-2SR: Not sampled due to visual observations of tar globules (2017). MW-6S: Naphthalene and metals detected below the SWPC. Phase I ESA (2017) Hockanum River Phase II Investigation (1992) Remedial evaluation located adjacent pending the completion Human Health Risk Deep: of the Phase III Assessment (1994) MW-6D: PAHs detected below SWPC. but up gradient of location. investigation. Phase III Investigation (2016Metals detected. MW-6S: Metals detected 2020) MW-2D: Not sampled due to visual above the SWPC. SVOC observations of tar globules (bis2-ethylhexylphthalate) detected. Bedrock: MW-2BR: PAHs detected below the SWPC. Metals detected. Fill (brick, glass, slag, and/or ash) observed in SB-08, SB-09A and SB-24, SB-32, SB-33, SB-48 to SB-51, and SB-76 to SB-82. 13 Possible Historic Fill to the south of the Hockanum River Table-1 AOC Summary.xlsx PAHs Possible historic placement of fill. Surface Soil Subsurface Soil SS-5A, SS5B, SS5C, SS-5D TBX2 TB-63 and TB-64 SB-25 SB-26 SB-27 SB-54 SB-55 SB-56 SB-57 MW-11S MW-11D MW-12S MW-12D MW-11S MW-11D MW-12S MW-12D Surface soil and shallow Surface Soil: PAHs detected above RES and I/C DEC and GB PMC in SB-25, SB-54 subsurface soils: PAHs and SB-55. exceeded the RDEC, IDEC and GB PMC. Cyanide was detected in SB-54 and SB-55, Metals were detected in SB-54, SB-55, SB-56, and SB-57. SPLP metals were detected in SB-54 and SB-57. MW-11S/ MW-11D MW-12S / 12D No analytical data Shallow: MW-11S/ MW-12S: Metals detected Deep: MW-11D/ MW-12D: Metals and/or pyrene (PAH) detected Phase II Investigation (1992) Remedial evaluation Hockanum River Human Health Risk pending the completion located adjacent Assessment (1994) of the Phase III and downgradient. Phase III Investigation (2017investigation. 2018) Fill (slag and/or ash) observed in SB-26, SB-27, SB-54, SB-55, SB-56, and SB-57. Page 5 of 10
  4. Page 64 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 64 of 897 TABLE 1 Areas Of Concern (AOCs)/ Site Conceptual (CSM) Summary Rockville Former MGP Site 13 Maple Street and Off-site Areas of Investigation Rockville, Vernon, CT AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Shallow: MW-4S: Cyanide, metals, VOCs, and PAHs detected Shallow: MW-4SR: Acenaphthylene (PAH) MW-1S:Metals detected detected above the SWPC. Cyanide above the SWPC. detected. PAHs, ETPH, VOCs, cyanide were not detected in SB-01, SB -12 and SB-13 in MW-3S: Metals and MW-25S: Cyanide, metals, and PAHs samples collected just above apparent water table. PAHs detected above the detected SWPC. VOCs detected. MW-3S/MW-7S: Metals and VOCs Surface Soil: PAHs detected Elevated concentrations of ETPH, VOCs, and SVOCs detected in SB-13 (25.5detected. PAHs and ETPH detected above the Res DEC and GB 27.5') below water table (~15ft.) MW-4S: Metals detected above the SWPC PMC. Metals and cyanide MW-1S, MW-1D, above the SWPC. cyanide, MW-1S: Metals, ETPH and PAHs detected. MW-3S, MW-3D, SB-45: Metals detected VOCs (1,1,1-TCA) and detected above the SWPC. MW-3DR MW-3BR, SB-59: PAHs, Cyanide, and VOCs detected SVOC (bis2MW-24S: Measurable tar observed in Subsurface soils: SVOCs Hockanum River MW-4S, MW-4SR, ethylhexylphthalate) well. detected above the Res and I/C is located up MW-4D, MW-7S, Fill observed: Brick observed at 0.5-3.0 ft. in SB-21 and SB-59. detected. Deep: DEC and GB PMC and VOCs gradient on -site MW-7D, MW-18D, Tar impacts were encountered SB-12: from 25-30 ft. (Staining, sheen and coated Deep: MW-1D: ETPH and VOCs detected. and pesticide (lindane) detected MW-24S, MW-25S, soils) and 37.5-39ft. (Strong tar odor) MW-1D: Metals detected PAHs and metals (copper and nickel) above the GB PMC. Metals MW-37D, MWSB-13: 20-39 ft. (Staining and heavily tar coated soils and odors) above the SWPC. detected above the SWPC. detected. 37BR SB-01: 29 to 31 ft. Sheen and tar odor. SVOCs detected. MW-3DR: ETPH and acenaphthylene SB-45: Tar odors 30-41 ft. Tar blebs observed from 30-38 ft. detected above SWPC. Fill observed and tar odors and SB-59: Coal and slag 2-3 ft. Tar odors 30 to 45 ft. PAHs,VOCs, and cyanide detected MW-3D: Metals detected MW-4D/MW-7D: Metals detected. tar sheen. (2 to 3) above the SWPC. SVOCs MW-18D: ETPH, VOCs, and PAHs SB-60: Tar odor 40 to 45 ft. Naphthalene and Xylene (VOCs) detected. and VOC (1,1,1-TCA) detected above the SWPC. Metals SB-64: No visual impacts or odors. detected. detected. MW-37S/D: Sheen and odors observed below water table. MW-37D: Metals detected. SB-68: Tar product observed (23-34 ft), sheen observed (23-59 ft). VOCs, PAHs, MW4D: Lead detected Bedrock: and ETPH detected above the SWPC. MW-3BR: PAH (acenaphthylene) MW-03DR: Tar product observed in auger cuttings (23') above SWPC. ETPH and VOCs detected. Metals detected. MW-37BR: Metals and VOCs detected. Investigation Status Remediation Status Shallow Subsurface Soils: PAHs detected in SB-21 above the RES DEC, I/C DEC and GB PMC. SPLP PAHs were not detected indicating PAHs are not leachable. PAHs detected in SB-22. 14 15 Tar impacts and Fill Observed (Northern portion of Site) VOCs (BTEX), SVOCs, Total Cyanide, ETPH Impacted area to the north of former Gas Holders #1 and #2, Possible migration for spills or leaks from adjacent holders that migrated northward. Groundwater impacts from VOCs, SVOCs, spills or leaks occurring at the Site wide groundwater Metals, PCBs, site. Groundwater flows to the impacts ETPH, Chromium, north away from the Barium, ETPH Hockanum River. TB-12, TB-36, TB37,TB-40, TB-42 TB-46, TB49A,TB-50, TB-51, TB-52, TB-53, TB54, TB-55 TB-55A, TB-56, Surface soils TB-58 , TB-59, Subsurface Soils TB-60, TB-61, TBGroundwater 62, MW-1, MW3S, MW-3D, MW4S, MW-7S TBX5, TBX6 SS-3B. SS3-C, SS3E, SS3-D, SS1-C, CSS-1, CSS-2 Groundwater NA SB-01 SB-12 SB-13 SB-20 SB-21 SB-22 SB-45 SB-59 SB-60 (off-site) SB-64 (off-site) SB-68 SB-73 SB-74 SB-75 MW-37S/D MW-03DR NA MW-1S, MW-1D, MW-3S, MW-3D, MW-4S, MW-4D MW-1S, MW-1D, MW-2SR, MW-2BR, MW-2D, MW-3S, MW-3BR, MW-4S, MW-4SR, MW-4D, MW-5S, MW-5D, MW-6S, MW-6D, MW-1S, MW-1D, MW-7S,MW-7D, MW-2S, MW-2D, MW-8SR, MW-9S, MW-3S, MW-3D, MW-9D, MW-10SR, MW-4S, MW-4D, MW-10M, MWMW-5S, MW-5D, 10BR,MW-11S, MWMW-6S, MW-6D, 11D, MW-12S, MWMW-8S, MW-9S, 12D, MW-16S, MWMW-9D, MW-10S, 17S, MW-18D, MWMW-10M, MW19S, MW-24S, MW10D, MW-11S, MW25S, MW-26S, MW11D, MW-12S, MW26D, MW-26BR, 12D MW-27S, MW-28S, MW-29S, MW-29D, MW-30S, MW-33S, MW-34S, MW-35S, MW-36S, MW-37D, MW-37BR, MW38S, MW-39S Phase I ESA (2017) Phase II (1990/1991) Human Health Risk Assessment (1994) Phase III ESA (1996-2020) Additional Phase III ESA investigation is proposed to assess the seasonal groundwater conditions and assessment of the recoverability of tar. Remedial evaluation pending the completion of the Phase III investigation. Shallow: ETPH, VOCs, PAHs, and /or Cyanide above the SWPC. in MW-1S, MW-5S, MW7S, MW-8SR, MW-9S, and MW10M, MW-29S, MW-30S, MW-33S, MW-34S, MW-35S, MW-38S, and MW-39S. See above AOCs for individual well summary of COCs. See AOCs above for site investigation information for soils Shallow: ETPH, VOCs, PAHs, metals, and Cyanide above the SWPC. See above AOCs for individual wells See AOCs above for site investigation information for soils Deep: ETPH, VOCs, PAHs, metals, and Cyanide above the SWPC.. See above AOCs for individual wells Tar globules and staining observed in MW-2S, MW-10SR, and MW-24S during development. Measurable tar observed in MW-10SR and MW-24S Deep: VOCs, ETPH, PAH (acenaphthylene) above the SWPC in MW-18D. MW3DR: ETPH and acenaphthylene detected above SWPC. Hockanum River is located up gradient on -site/ Losing Stream Phase I ESA (2017) Phase II Investigation (1992) Phase III Investigation (20162020) Additional Phase III ESA investigation is proposed to assess the seasonal groundwater conditions Tar globules and staining observed in MW-2D, MW-3D and MW-10D Bedrock: PAH (acenaphthylene) above SWPC [MW-3BR] . ETPH and VOCs detected. Metals detected. See AOCs above for individual well information. Table-1 AOC Summary.xlsx Page 6 of 10
  5. Page 65 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 65 of 897 TABLE 1 Areas Of Concern (AOCs)/ Site Conceptual (CSM) Summary Rockville Former MGP Site 13 Maple Street and Off-site Areas of Investigation Rockville, Vernon, CT AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Off-site AOCs Shallow: MW-13S: Metals and bis2ethylhexylphthalate) MW-14S: PAHs, metals and cyanide detected. MW-19S: Metals detected MW-21S: Metals and PAHs detected MW-20S: Tar globules / staining in MW-20S. MW-29S: ETPH and benzene above SWPC and RES & I/C VC. Benzene and ETPH in compliance with the RES VC via soil vapor testing. Naphthalene above SWPC. 16 Off-site Tar Impacts St. Josephs School/Church Parking Lot VOCs (BTEX), SVOCs, Total Cyanide, ETPH Tar impacted area to the north of the property line. Possible migration of impacts to the north from the MGP. Shallow fill possible in the development of the property. Subsurface Soils Groundwater Surface soils Soil Borings TB-113, TB-115, Subsurface soils: PAHs SB-14, SB-15, SBTB-116, TB-117, detected above the GB PMC 16, SB-17, MWTB-118, TB-119, VOCs (ethylbenzene, toluene, 19S, MW-20S, SBTB-120, TB-121, and xylene detected). 61, SB-62, SB-66, TB-125, TB-126, SB-67, MW-29D, MW-13S, MW-13D, TB-127, TB-130 Fill observed. Sheens and/or MW-14M MW-14S, MW-14M, isolated lens of coal tar were (Boring) MW-14D, MW-19S, observed in soil borings TB-115 MW-40S MW-20S, MW-21S, through TB-120 and TB-126 at (Boring) MW-13S, MW-13D, MW-26S, MW-26D, depths ranging between 21.6 to Surface Soil MW-41S MW-14S, MW-14D MW-26BR, MWR426-A, R426-B, 42 feet below grade. (Boring) 29S, MW-29D, MWR426-C, R426-D MW-42S 40S, MW-41S, MWR437-A, R437-B, (Boring) MW42S, MW-42M, MW- Surface Soil: PAHs detected R437-C, R437-D 43S/M (Boring) 43S, MW-43M R438-A, R438-B, above the Res DEC and GB R438-C, R438-D PMC along West Street R446-A, R446-B, R446-C, R446-D R452-A, R452-B, R452-C, R452-D MW-41S: ETPH was detected above SWPC and RES & I/C VC. ETPH is in compliance with the RES VC via soil PAHs, ETPH, VOCs, cyanide were not detected in SB-14, SB-15, SB-16, SB-17 in Shallow: vapor testing. Acenaphthylene above samples collected just above apparent water table. MW-13S: Copper SWPC. PAHs, metals, and VOCs detected above the SWPC. detected EPTH, VOCs, and PAHs detected in the deep soil samples collected from SB-14 and Metals, SVOC (bis2MW-42S: VOCs and ETPH not MW-20S within tar-impacted intervals below the water table. ethylhexylphthalate) detected. Phenanthrene, barium, and detected .MW-14S: chromium detected. SB-14: 20.5-23 ft. coated with tar material with tar odors. Hockanum River Metals detected MW-43S: VOCs and ETPH not SB-61: 22.5-44 ft. tar blebs, odors, and sheen. is located detected. Phenanthrene and barium SB-66: 20-30 ft. tar odors. Phase II (off-site) 1993 upgradient on-site Deep detected. Phase III Investigation (2017and MW-13D: Metals MW-26S: ETPH , VOCs and PAHs not SB-15: 31.5-34 ft. veins coated with tar. 2020) approximately detected. detected. Barium detected. MW-20S: 35-38 ft. black stained and sheen with tar odor. 600 feet to the west. MW-14D Metals detected. Intermediate: No visual impacts in SB-62 and SB-67. VOC (tetrachloroethylene) MW-14M: ETPH above SWPC . and SVOC (bis2Elevated concentrations of benzene and Slight tar like odor observed in MW-29D, no visual impacts. Low level detections of ethylhexylphthalate) tar-related VOC detected. benzene and naphthalene. detected. Acenaphthylene above SWPC. MW-42M: ETPH above GWPC and Detections of tar-related VOCs in MW-40S, MW-41S, and MW-42S detected below SWPC, Benzene above GWPC. PAHs, the water table. tar -related VOCs, metals (barium, thallium, zinc). detected MW-43M: VOCs, PAHs and ETPH not detected. Barium, nickel, and zinc detected. Additional Phase III ESA investigation is proposed to further assess seasonal groundwater conditions at St. Joseph's Church property and the extent of off-site groundwater impacts in intermediate groundwater zone. Deep: MW-14D: ETPH, cyanide, Acenaphthylene (PAH) above SWPC. Metals and VOCs detected. MW-13D: Metals and naphthalene detected MW-26D: Acenaphthylene above SWPC. Metals and VOCs detected. Bedrock: MW-26BR Naphthalene and barium detected Table-1 AOC Summary.xlsx Page 7 of 10
  6. Page 66 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 66 of 897 TABLE 1 Areas Of Concern (AOCs)/ Site Conceptual (CSM) Summary Rockville Former MGP Site 13 Maple Street and Off-site Areas of Investigation Rockville, Vernon, CT AOC # 17 18 19 AOC Description Off-site Tar Impacts Maple Street ROW Petroleum Impacts #12 and #14 Maple Street Suspected Fill #12 and #14 Maple Street Table-1 AOC Summary.xlsx COCs VOCs (BTEX), SVOCs, Total Cyanide, ETPH VOCs (BTEX), SVOCs, ETPH PAHs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase III Soil Locations Impacted area within the Maple Street ROW from 15 to 32 feet. Possible migration of TB-97, TB-99, TBimpacts from the Retorts 101, TB-103, TB(AOC-1) Former Gas SB-18, SB-19, SBHolders #1, #2, (AOCs 3,+). Subsurface Soils 104, TB-105, TB64 Groundwater 106, TB-111A, TB11B, and TB-111C Possible off-site fuel oil impacted in TB-101 and TB103 from up gradient source of fuel oil. Petroleum-impacted soils from 15 to 27 feet below grade from an up gradient source that migrated via groundwater flow onto the properties. PAHs detected in the shallow subsurface soils (TB-217) possibly from historic fill used in the development of the property. Subsurface soils Groundwater TB-203, TB-204, TB-206, TB-219, TB-221, TB-224 (#8 Maple Street) Not investigated during Phase III Previous Investigation Groundwater Locations Groundwater not investigated Phase III Investigation Groundwater Locations MW-28S MW-23S Groundwater not investigated TB-217 Not investigated during Phase III Groundwater not investigated Phase III COCs in Soil ETPH, VOCs, and PAHs detected in SB-18 above the GB PMC. The DEC does not Subsurface Soils had apply to SB-18 due to the sample depth greater than 15'. SPLP VOCs and PAHs concentrations of VOCs, detected. SVOCs, pesticides (Aldrin, alphaPetroleum staining/ sheen and odors 19-23ft. BHC, and 2-Hexanone) at Tar staining/ odors from 24-29 ft. concentrations above the GBPMC but were located below the ETPH and PAHs were detected above the RES and I/C DEC and GB PMC in SB-19. water table. Cyanide and metals Petroleum staining/ sheen and odors 11-19 ft. were detected. Tar staining/ odors from 19-26.5 ft. Tar impacts (sheen and odors) encountered from 15 to 32 feet. Previous COCs in Groundwater MW-23S Boring log was not available during the CSM development to assess for presence of fill. MW-28S: Metals and naphthalene detected COCs in Surface Water Hockanum River located up gradient of location. Investigation Status Remediation Status Off-site petroleum impacts are noted within the Maple Street ROW. Petroleum impacts also ere noted at #12 and #14 Maple Street. Impacts could be associated with former Phase II (off-site) 1993 1,000-gallon UST at Phase III Investigation (2018) former 8 Maple Street residence or other offsite source. ETPH, PAHs, and VOCs were not detected in SB-64 No visual impacts in SB-64 Remedial evaluation impacts will be assessed in the Remedial Evaluation. Not investigated during Phase III Groundwater not tested. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase I ESA identified a 1,000 leaking Phase II (off-site) 1994 underground storage Phase III Investigation (2018) tank used for heating oil at the former 8 Maple Street Residence. Not investigated during Phase III Groundwater not tested. Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (off-site) 1994 Phase III Investigation (2018) Boring log was not available during the CSM development. Subsurface soils contained detections of PAHs, with a detection of (Benzo (a)pyrene) above the Res DEC, I/C DEC and GB PMC. Phase III COCs in Groundwater MW-23S: Metals detected Groundwater not tested. Subsurface soils contained detections of PAHs. MW-23S TB-200 and TB217 (#12 Maple Street) Surface soils Subsurface soils Previous COCs in Soil Possible historic fill associated with the development of property or potential offsite source. Page 8 of 10
  7. Page 67 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 67 of 897 TABLE 1 Areas Of Concern (AOCs)/ Site Conceptual (CSM) Summary Rockville Former MGP Site 13 Maple Street and Off-site Areas of Investigation Rockville, Vernon, CT AOC # 20 21 22 AOC Description Off-site Tar Impacts (Residence #14 Maple Street) Off-site Surface Soils Maple Street School [PAHs Detected above RSR Criteria] Off-site Surface Soils 175 Union Street [PAHs Detected above RSR Criteria] Table-1 AOC Summary.xlsx COCs VOCs (BTEX), SVOCs, Total Cyanide, ETPH PAHs PAHs Possible Release Mechanisms and Migration Pathways Tar-impacted soils (sheen and odor) between 30 and 37 feet. Tar migrated beneath Maple Avenue onto the western portion of the property. PAHs detected in surface soils and shallow subsurface soils at the Maple Street School property. PAHs are detected in surface soils at nearby off-site properties (175 Union Street and Tolland AWC) Potentially Affected Media Subsurface soils Groundwater Surface soils Surface soils Previous Investigation Soil Locations TB-207, TB-210, TB-211, TB-215, MW-15D R453, R454, R455, R456 R501-A, R-501-B, R-501-C, R-501-D R502-A, R-502-B, R-502-C, R-502-D R503-A, R-503-B, R-503-C, R-503-D R504-A, R-504-B, R-504-C, R-504-D R505-A, R-505-B, R-505-C, R-505-D R506-A, R-506-B, R-506-C, R-506-D R426-A,R426B,R426-C, R426-D R437-A,R437B,R437-C, R437-D R438-A,R438B,R438-C, R438-D R446-A,R446B,R446-C, R446-D R452-A,R452B,R452-C, R452-D RBG2-B and RBG2-C Phase III Soil Locations Not investigated during Phase III Previous Investigation Groundwater Locations MW-15S MW-15D Phase III Investigation Groundwater Locations Previous COCs in Soil MW-23S Subsurface soils contained detections of VOCs and PAHs at concentrations above the GB PMC. However, these impacts are likely below the water table and the GB PMC is not applicable. Not investigated during Phase III Phase III COCs in Soil Previous COCs in Groundwater MW-15S: Metals and cyanide exceeded SWPC. VOC (MTBE detected). MW-15D: Metals detected above the SWPC. Phase III COCs in Groundwater COCs in Surface Water Investigation Status Shallow: Adjacent USPS ROW: MW-23S: VOC (chloroform) and metals detected below SWPC Hockanum River located up gradient of location. Phase II (off-site) 1994 Phase III Investigation (2018) Remediation Status Access to property was not provided. Tar impacts were assessed with a soil boring within Maple Street ROW (AOC-17) Remedial evaluation pending the completion of the Phase III investigation. Not investigated during Phase III Groundwater not investigated Groundwater not investigated Surface soils and shallow subsurface soils Not investigated during Phase III Groundwater not tested. Groundwater not tested. Hockanum River located up gradient of location. Phase II- Surface Soil collection in 1995 Possible historic fill associated with the development of the school property or potential off-site source. Not investigated during Phase III Groundwater not investigated Groundwater not investigated Surface soils and shallow subsurface soils Not investigated during Phase III Groundwater not tested. Groundwater not tested. Hockanum River located up gradient of location. Phase II- Surface Soil collection in 1995 Possible historic fill associated with the development of the property or potential offsite source. Page 9 of 10
  8. Page 68 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 68 of 897 TABLE 1 Areas Of Concern (AOCs)/ Site Conceptual (CSM) Summary Rockville Former MGP Site 13 Maple Street and Off-site Areas of Investigation Rockville, Vernon, CT AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Phase II (off-site) 1994 Phase III ESA (2018-2020) Additional Phase III ESA investigation is proposed to assess seasonal groundwater conditions at St. Joseph's Church property and to assess the nature and extent west of groundwater impacts to the west of West Street. Shallow: Tar globules / staining in MW-20S. MW-19S/MW-21S/MW-28S: metal and PAHs detected MW-13S and MW-26S (Plasticizers detected -possible lab contamination) MW-27S: ETPH, metals, and naphthalene detected MW-23S: Metals detected MW-14S: Cyanide, metals, and PAHs detected MW-31S: Barium and nickel detected MW-29S: ETPH and benzene above SWPC and RES & I/C VC. Benzene and ETPH in compliance with the RES VC via soil vapor testing. Naphthalene above SWPC. 23 Off-site Groundwater Impacts VOCs Groundwater impacts from spills or leaks occurring at the site and migrating offsite. Groundwater NA See AOC 16 MW-13S, MW-13D, MW-14S, MW-14D, MW-19S, MW-20S, MW-21S, MW-23S, MW-26S, MW-26D, MW-26BR, MWMW-13S, MW-13D, 27S, MW-28S, MWMW-14S, MW-14D, 30S, MW-31S, MWMW-15S, MW-15D, 40S, MW-41S, MWMW-19S, MW-20S, 42M, MW-42M, MW-21S, MW-23S MW-43S, MW-43M Soils not assessed See AOC 16 Soil Vapor Assessment SV-01, SV-02, SV03, SV-05 MW-41S: ETPH was detected above SWPC and RES & I/C VC. ETPH is in compliance with the RES VC via soil vapor testing. Acenaphthylene above SWPC. PAHs, metals, and VOCs detected MW-42S: VOCs and ETPH not detected. Phenanthrene, barium, and Shallow: Metals and Hockanum River chromium detected. cyanide detected above is located MW-43S: VOCs and ETPH not SWPC. VOCs and PAHs upgradient on-site detected. Phenanthrene and barium detected and detected. MW-26S: ETPH , VOCs and PAHs not approximately Deep: Metals detected 275 feet to 400 detected. Barium detected. above SWPC. VOCs and feet to the west. PAHs detected Intermediate: MW-14M: ETPH above SWPC . Elevated concentrations of benzene and tar-related VOC detected. Acenaphthylene above SWPC. MW-42M: ETPH above GWPC and SWPC, Benzene above GWPC. PAHs, tar -related VOCs, metals (barium, thallium, zinc). detected MW-43M: VOCs, PAHs and ETPH not detected. Barium, nickel, and zinc detected. Deep: MW-14D: metals and VOCs detected. ETPH, Cyanide, and PAHs detected above the SWPC. MW-26D metals and tar-related VOCs detected, PAH (acenaphthylene) detected above SWPC. ETPH not detected Bedrock: MW-26BR Naphthalene and barium detected. VOCs and ETPH not detected. NOTES: MGP=- manufactured gas plant VOC = Volatile Organic Compound BTEX- Benzene, toluene, ethyl benzene and xylenes ETPH- Extractable Total Petroleum Hydrocarbons PAH = Polycyclic Aromatic Hydrocarbon TPH = Total Petroleum Hydrocarbons PCBs= Polychlorinated Biphenyls SWPC- Surface Water Protection Criteria Res DEC- Residential Direct Exposure Criteria I/C DEC - Industrial Commercial Direct Exposure Criteria CSM = Conceptual site model, described by the Connecticut Department of Environmental Protection as "a representation of an environmental system that is used as a tool for understanding and for explaining to others the basis and rationale for site investigation and the conclusions drawn about the environmental conditions at a site. A CSM describes, explains, and provides and understanding of the nature and distribution of contaminants necessary to evaluate potential risks to human health and the environment. The CSM is an iterative approach to site characterization. The number of iterations and quantity and quality of information is a function of the complexity of site conditions and data quality objectives". This interim CSM is subject to change. AOC = Area of concern, defined by the Connecticut Department of Environmental Protection as "locations or areas at a site where hazardous waste and or hazardous substances (including petroleum products) have been used, stored, treated, handled, disposed, spilled, and/or released to the environment". Previous site investigations referred to tar impacts as tar and/or tar. For consistency, these have been changed to tar Table-1 AOC Summary.xlsx Page 10 of 10
  9. Page 69 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 69 of 897 Monitoring Well Construction Well ID Monitoring Well Locations MW-1S MW-1D MW-3S RW-03I Location 10/28/2019 Top of Well Casing or Screen Interval Completion Depth Measuring Point (ft. below (ft. below grade) Elevation grade) (ft. NAVD 88) Overgrown AreaOuter Substation 12/9/2020 Depth to water (ft.) Groundwater and River Elevation (ft. NAVD88) Product/Tar Thickness (ft.) Depth to water (ft.) Groundwater and River Elevation (ft. NAVD88) Product/Tar Thicknees (ft.) Notes 259.37 259.59 250.12 252.24 30 75 20 32 20-30 65-75 10-20 22-32 25.33 25.22 15.63 - 234.04 234.37 234.49 - - 25.55 25.37 15.58 17.75 233.82 234.22 234.54 234.49 - 251.58 78 68-78 17.60 233.98 - 17.67 233.91 0.10 MW-3DR MW-3BR MW-4SR 252.58 252.73 249.11 84 100 20 74-84 90-100 10-20 17.94 14.00 234.79 235.11 - 18.63 18.00 13.90 233.95 234.73 235.21 - MW-10SR 257.68 25 15-25 21.20 236.48 - 20.37 237.31 0.10 Staining and globules of tar observed in development water and during subsequent gauging events. Tar was detected at or near the water table [Light non-aqueous phase liquid (LNAPL)] detected in 2020 257.33 84 74-84 22.52 234.81 0.10 22.70 234.63 0.10 Heavy staining observed on the tape of the meter. Globules of tar observed water pumped during development. Measurable tar obeserved during subsequent gauging events. 252.13 251.91 245.11 245.62 244.90 246.82 254.03 251.88 260.52 255.11 18.2 73 19.58 33 76.21 17 82 24 34 30 15-25 63-73 10-20 23-33 67-77 7-17 72-82 14-24 24-34 20-30 18.69 18.53 11.84 11.71 11.72 20.41 18.31 26.60 21.46 233.44 233.38 233.27 233.19 235.10 233.62 233.57 233.92 233.65 - 18.74 18.54 11.81 12.38 11.71 11.74 20.48 18.32 26.77 21.53 233.39 233.37 233.30 233.24 233.19 235.08 233.55 233.56 233.75 233.58 - MW-3D Wooded Area- Outer Substation Grassed Area- Outer Substation MW-10D MW-13S MW-13D MW-14S MW-14M MW-14D MW-16S MW-18D MW-19S MW-20S MW-21S MW-24S St. Joseph Church Parking Lot Outer Substation Area St. Joseph Church Parking Lot Grassed Area- Outer Substation 257.07 31 21-31 22.40 234.67 - 22.66 234.41 1.13 243.97 244.28 244.16 263.85 244.09 244.00 15 74 87 37 18 75 5-15 64-74 77-87 27-37 8-18 65-75 9.47 10.94 10.85 29.61 11.07 11.00 234.50 233.34 233.31 234.24 233.02 233.00 - 9.39 10.89 10.77 29.86 10.98 10.96 234.58 233.39 233.39 233.99 233.11 233.04 - Rear of Substation 244.46 12 2-12 7.60 236.86 - 7.67 236.79 - West Street ROW 246.16 249.50 247.19 247.09 247.68 246.36 260.21 260.77 260.05 243.31 243.76 245.19 17 20 19 15 17 15 28 85 105 9 9 20 7-17 10-20 9-19 5-15 7-17 5-15 18-28 75-85 95-105 4-9 4-9 10-20 14.62 12.03 8.12 8.63 7.65 26.45 25.91 6.70 6.94 - 234.88 235.16 238.97 239.05 238.71 234.32 234.14 236.61 236.82 - - 10.12 26.33 26.66 26.07 6.79 6.93 12.00 236.04 233.88 234.11 233.98 236.52 236.83 233.19 - MW-26S MW-26D MW-26BR MW-28S MW-29S MW-29D Maple Street ROW St. Joseph Church Front Lawn MW-30S MW-31S MW-32S MW-33S MW-34S MW-35S MW-36S MW-37S MW-37D MW-37BR MW-38S MW-39S MW-40S MW-41S MW-42S MW-42M MW-43S MW-43M Front of St. Joseph Convent Inner Substation Outer Substation Area Rear of Substation Front of school Front of St. Joseph Church NE of Windsor Ave and West St intersection SW of West St and Union St intersection 244.46 20 10-20 - - - 11.66 232.80 - 243.20 20 10-20 - - - 10.36 232.84 - 243.21 37 27-37 - - - 10.26 232.95 - 244.60 20 10-20 - - - 11.96 232.64 - 244.70 34 24-34 - - - 12.09 232.61 - Globules of tar observed in development water. Measurable tar was detected in 2020. Naphthalene-like odors observed on the interface probe. Naphthalene-like odors observed on the interface probe. Odor observed on interface probe during gauging. Staining and globules of tar observed in development water. Measureable tar detected during subsequent gauging events Notes: Only monitoring wells gauged on December 9, 2020 shown "S" denotes a water table monitoring well (Shallow Groundwater Zone) "M" denotes an intermediate monitoring well (Intermediate Groundwater Zone) "D" denotes a deep monitoring well (Deep Groundwater Zone) "BR" denotes a bedrock monitoring well (Bedrock Groundwater Zone) Denotes product observed in the well : measured or observed during development or pumping. Elevation for measuring point was surveyed by Kratzer Jones Associates in 2016, 2017, 2018, 2019, & 2020. Elevations in NAVD 88. Elevation for MW-41S/M & MW-4S/M measuring point was surveyed by Tighe & Bond in on December 9, 2020. Elevations in NAVD 88. J:\E\E0755 - Eversource L&P\E0755-44 Rockville MGP\Report\Summary Report 2020\Appendix B Tables\Table-2 Rockville MGP Site- Well Summary Table-2020.xlsx Page 1 of 1
  10. Page 70 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 70 of 897 TABLE 3 Summary of 2020 Soil Analytical Data Rockville Former MGP Site 13 Maple Street Rockville, CT Last Updated: 12/18/2020 On-Site Location Sample Name Sample Depth Sample Date Lab Sample ID Lab Report ID Parent Sample CT ETPH (mg/Kg) Inner Substation Area CT DEEP RSRs Inner Substation Are SB-73 DUP-7-2-20 SB-74 SB-75 SB-75^' SB-76 SB-76 SB-76 SB-77 SB-77 SB-77 SB-78 SB-78 SB-78 SB-78 SB-79 SB-79 SB-79 SB-79 SB-80 SB-80 SB-80 10 - 11.5 ft 7/2/2020 CG26700 GCG26696 CG26696 87 12 - 14 ft 7/2/2020 CG26697 GCG26696 <51 5 - 7 ft 7/2/2020 CG26698 GCG26696 <51 15 - 16 ft 7/2/2020 CG26699 GCG26696 740 0 - 2 ft 7/1/2020 CG26236 GCG26236 - 2 - 4 ft 7/1/2020 CG26237 GCG26236 - 4 - 6 ft 7/1/2020 CG26238 GCG26236 - 0 - 2 ft 7/1/2020 CG26239 GCG26236 - 2 - 4 ft 7/1/2020 CG26240 GCG26236 - 4 - 6 ft 7/1/2020 CG26241 GCG26236 - 0 - 1 ft 7/1/2020 CG26242 GCG26236 - 1 - 2 ft 7/1/2020 CG26243 GCG26236 - 3 - 4 ft 7/1/2020 CG26244 GCG26236 - 5 - 6 ft 7/1/2020 CG26245 GCG26236 - 0 - 1 ft 7/1/2020 CG26246 GCG26236 - 1 - 2 ft 7/1/2020 CG26247 GCG26236 270 3 - 4 ft 7/1/2020 CG26248 GCG26236 - 5 - 6 ft 7/1/2020 CG26249 GCG26236 - 0 - 1 ft 7/1/2020 CG26250 GCG26236 - 3 - 4 ft 7/1/2020 CG26252 GCG26236 - 5 - 6 ft 7/1/2020 CG26253 GCG26236 - RES DEC^ I/C DEC^ 500 2,500 2,500 NA 10 - 11.5 ft 7/2/2020 CG26696 GCG26696 <52 21 500 82 1,000 500 12 500 500 500 500 NE NE 200 1,000 760 2,500 1,000 110 1,000 1,000 1,000 1,000 NE NE 0.2 10.1 1 56 20 1 67 28 28 19.5 NE NE NA NA NA NA NA NA NA NA NA NA NA NA - - - - - - - - - - - - <0.0057 <0.0057 <0.0110 0.42 <0.0057 0.0067 <0.0057 0.011 0.0063 <0.0057 <0.0057 <0.0057 <0.0079 <0.0079 <0.0160 1.1 <0.0079 0.31 <0.0079 <0.0079 <0.0079 <0.0079 <0.0079 <0.0079 <0.0100 <0.0100 <0.0200 0.24 <0.0100 0.22 <0.0100 <0.0100 <0.0100 <0.0100 <0.0100 <0.0100 - 0.51 <0.0065 <0.0130 0.42 <0.0065 26 0.76 <1.000 <1.000 <0.0065 <0.0065 <0.0065 <0.0100 <0.0100 <0.0210 <0.6000 <0.0100 2 <0.0100 <0.6000 <0.6000 <0.0100 <0.0100 <0.0100 <0.0100 <0.0100 <0.0200 <0.0100 <0.0100 1.1 <0.0100 <0.0100 <0.0100 <0.0100 <0.0100 <0.0100 <0.0054 <0.0054 0.02 <0.0054 <0.0054 <0.0054 <0.0054 <0.0054 <0.0054 <0.0054 <0.0054 <0.0054 <0.0140 <0.0140 <0.0280 <0.6400 <0.0140 1 <0.0140 <0.6400 <0.6400 <0.0140 <0.0140 <0.0140 <0.0180 <0.0180 <0.0350 0.96 <0.0180 0.82 0.38 <0.0180 <0.0180 <0.0180 <0.0180 <0.0180 SPLP VOCs (ug/L) Benzene Naphthalene Tetrachloroethylene (PCE) Toluene NA NA NA NA NA NA NA NA NA NA NA NA 10 2,800 50 10,000 - - - - - - - - - - - - - <1.0 - - - <1.0 <1.0 6.4 <1.0 <1.0 <1.0 6.7 <1.0 <1.0 - - <1.0 - 1.7 6.9 1.1 1.3 PAHs (mg/Kg) Acenaphthene Acenaphthylene Anthracene Benzo(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(g,h,i)perylene Benzo(k)fluoranthene Chrysene Dibenz(a,h)anthracene Fluoranthene Fluorene Indeno(1,2,3-cd)pyrene Methylnaphthalene, 2Naphthalene Phenanthrene Pyrene 1,000 1,000 1,000 1 1 1 8.4 8.4 84 1 1,000 1,000 1 270 1,000 1,000 1,000 2,500 2,500 2,500 7.8 1 7.8 78 78 780 1 2,500 2,500 7.8 1,000 2,500 2,500 2,500 84 84 400 1 1 1 s 1 1 1 56 56 1 5.6 56 40 40 NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA <0.2500 0.67 <0.2500 <0.2500 1.5 0.6 1.1 0.42 0.34 <0.2500 <0.2500 <0.2500 0.96 <0.2500 <0.2500 <0.2500 <0.2500 <0.2400 0.81 <0.2400 <0.2400 1.7 0.67 1.2 0.49 0.38 0.27 <0.2400 <0.2400 1.1 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 1.1 <0.2400 <0.2400 0.77 0.42 0.47 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 0.59 <0.2400 <0.2400 <0.2400 <0.2400 <0.2400 5.7 1.5 0.45 4.3 2.1 2 1.6 1.4 0.7 0.4 0.75 1.9 <0.2400 <0.2400 <0.2400 1.7 0.56 12 12 39 42 31 24 29 35 7.9 57 3.2 25 1.8 3.1 40 55 <0.2600 3.8 3.6 24 25 18 13 19 21 4.3 38 0.65 15 0.32 0.85 15 37 <0.2600 0.97 0.41 10 11 7.3 3.9 5.5 8.7 1.7 7.3 <0.2600 4.3 <0.2600 0.28 0.42 15 <0.2600 2.3 1.5 7 8.7 6.4 5.3 7 7.1 1.5 12 0.5 4.2 0.48 0.91 2.6 12 <0.2400 0.29 <0.2400 0.81 1.7 1.1 0.95 1.1 0.77 0.36 0.94 <0.2400 1.2 <0.2400 <0.2400 0.41 0.99 5.4 64 64 160 150 91 63 57 130 24 290 40 59 20 35 210 280 0.37 150 4.9 150 190 120 110 120 160 3.6 190 1 100 0.49 0.68 3.5 310 1.3 9.3 6.9 20 20 13 9.8 13 18 3.9 32 5.8 11 3 1.1 26 36 0.61 4.7 13 32 30 20 15 21 28 5.9 52 4 16 1 2 39 49 <0.2800 0.6 0.87 3.9 4.5 6.9 4.6 5.1 4 1.7 2.6 0.28 4.6 0.29 0.49 2.6 2.7 <0.2300 1.4 0.6 1.7 3.3 2.4 2.4 2.3 2.1 0.82 1.2 0.26 2.3 <0.2300 <0.2300 0.96 2.4 <0.2600 1.6 0.62 0.97 2.2 1.3 2.2 1.3 1.3 0.8 0.76 0.43 2.2 2.5 2.7 1.2 1.4 <0.2700 2.2 0.75 0.68 1.1 1.3 2.2 0.87 1.4 0.67 0.84 0.42 2 1.3 0.99 0.9 1.5 <0.2900 2.1 1.2 1.9 1.8 1.9 3.8 1.9 2.4 0.78 3.7 <0.2900 3 0.53 1 1.4 5.9 <0.2500 3.3 1.7 5.7 5.3 3.2 4.1 3.2 7.7 1.4 5.1 0.8 3.2 0.54 0.63 4.3 15 <0.2700 0.57 0.29 0.93 1.1 1 1.3 0.97 1.1 0.43 0.62 <0.2700 1.2 0.59 0.87 0.5 0.9 3.3 60 39 79 45 52 45 41 100 8.4 230 22 33 17 38 300 370 SPLP SVOCS (ug/L) Acenaphthylene Anthracene Benzo(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(g,h,i)perylene Benzo(k)fluoranthene Chrysene Dibenz(a,h)anthracene Indeno(1,2,3-cd)pyrene Methylnaphthalene, 2Pyrene NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 4,200 20,000 0.6 2 0.8 4.8 5 48 1 1 280 2,000 <0.29 <0.49 <0.05 <0.19 <0.07 <0.47 <0.29 <0.49 <0.10 <0.10 <0.49 <0.49 <0.28 <0.47 <0.05 <0.19 <0.07 <0.45 <0.28 <0.47 <0.09 <0.09 <0.47 <0.47 - - 2.4 0.57 0.2 1.5 0.71 0.98 0.58 0.5 0.3 1.2 0.58 0.82 - - - - - - - - - - - - - - - - - VOCs (mg/Kg) Benzene Ethylbenzene Methylene Chloride (Dichloromethane) Naphthalene Styrene Tetrachloroethylene (PCE) Toluene Trimethylbenzene, 1,2,4Trimethylbenzene, 1,3,5Xylene (Total) Xylene, m,p-1 Xylene, o-1 GB PMC**~ 10X GWPC Pesticides (mg/Kg) Dieldrin 0.038 0.36 0.007 NA - - - - - <0.0038 - - <0.0037 - - <0.0035 - - - <0.0034 - - - <0.0035 - - Herbicides (mg/Kg) Varies Varies Varies NA - - - - - BRL - - BRL - - BRL - - - BRL - - - BRL - - 1 10 NA NA - - - - - - - - - - - - - - - - - - - - - - PCBs (mg/Kg) PCBs (Total ) Table-3 and 5 Soil Data.xlsx Page 1 of 4

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)