Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Words on different pages
  1. Page 8 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 8 of 897 Section 1 Background Tighe&Bond Relevant subsections of CGS 22a-133 (Voluntary Clean-up) including but not limited, any such action required to be taken or verified by a LEP, except as otherwise provided in the regulations. The Rockville Former MGP is enrolled in the VRP; as such, the RSRs apply to the assessment work conducted at the Site. 1.2.1 Soil Criteria The CTDEEP soil remediation criteria integrates two risk-based goals: (1) the Direct Exposure Criteria (DEC) to protect human health from risks associated with direct exposure to contaminated soil; and (2) the Pollutant Mobility Criteria (PMC) to protect groundwater quality from contaminants that could potentially migrate or leach from soil to groundwater. Direct Exposure Criteria Specific numeric exposure criteria for a broad range of contaminants in soil have been established by the CTDEEP, based on certain exposure assumptions. The DEC apply to accessible soil to a depth of 15 feet. The DEC for substances other than polychlorinated biphenyls (PCBs) do not apply to inaccessible soil at a release area, if such inaccessible soil is less than 15 feet below the ground surface, an environmental land-use restriction (ELUR) is in effect with respect to the subject release area. For PCBs, a maximum concentration of 10 milligrams per kilogram (mg/Kg) can remain in soils considered inaccessible. Inaccessible soil generally means polluted soil, which is the following: More than 4 feet below the ground surface; More than 2 feet below a paved surface comprised of a minimum of three inches of bituminous pavement or concrete; Beneath an existing building; or Beneath another permanent structure(s) approved by the CTDEEP Commissioner. Buildings can be constructed, and/or clean fill can be placed over contaminated soils rendering them inaccessible. The CTDEEP has established two sets of DEC using exposure assumptions appropriate for residential land use (RES DEC) or for industrial and certain commercial land use (I/C DEC). In general, all sites are required to be remediated to the residential criteria. If the I/C land use criteria are applicable and used, an ELUR notification is required in accordance with the RSRs. The RSRs have a provision under Section 22a-133k-2(f)(2)(A) to allow for the use of an engineered control (EC) Variance for exemption from the DEC. An EC is a permanent physical structure designed to safely isolate pollutants which would otherwise not comply with the self-implementing remedial options provided in RSRs listed above. The EC is permitted to be used under certain conditions: 1). If the CTDEEP Commissioner authorized the disposal of solid waste or polluted soil; 2). soil remediation is not technically practicable; removal of such substance or substances from such release area would create an unacceptable risk to human health; or the CTDEEP Commissioner has determined, after public input, that the cost of remediating the polluted soil is significantly greater than the cost of installing and maintaining an EC and outweighs the risk if the EC fails. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 1-3
  2. Page 9 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 9 of 897 Section 1 Background Tighe&Bond Pollutant Mobility Criteria The PMC that apply to remediation of a site depends on the groundwater classification of the site. The purpose of these criteria is to prevent contamination to groundwater in “GA” classified areas, and to prevent unacceptable further degradation to groundwater in “GB” classified areas. The applicable PMC for the Site is the PMC for a “GB” classified area. The PMC generally applies to all soil within the unsaturated zone, which represents the soil located from the ground surface to the seasonal high-water table in “GB” classified areas. The criteria do not apply to environmentally isolated soils that are polluted with substances other than volatile organic compounds (VOCs) provided an ELUR is recorded for the release area which ensures that such soils will not be exposed (unless approved in writing by the CTDEEP Commissioner). Environmentally isolated soils are defined as certain contaminated soils, which are above the seasonal high-water table, beneath an existing building and not a source of on-going contamination. An ELUR must be recorded for the site, which ensures that such soils will not be exposed by building demolition or other activities. Buildings can be constructed over contaminated soils rendering them environmentally isolated. Remediation based upon the listed PMC requires that a substance, other than an inorganic substance or PCB, in soil be remediated to at least that concentration at which the results of a mass analysis of soil for such substances does not exceed the PMC applicable to the groundwater classification (i.e., GB) of the area in which the soil is located (default PMC). An inorganic substance (metals) or PCBs in soil must be remediated to at least that concentration at which the analytical results of leachate produced from either the Toxicity Characteristic Leaching Procedure (TCLP) or the Synthetic Precipitation Leaching Procedure (SPLP) does not exceed the PMC applicable to the groundwater classification of the area in which the soil is located. In addition, the RSRs provide an alternate method for compliance with the PMC. For polluted soils within a GB groundwater area, a SPLP or TCLP concentration of a substance in soil may be remediated to ten-times the groundwater protection criteria (GWPC) provided that non-aqueous phase liquid (NAPL) is present in soils as defined in the calculation provided in the RSRs. Section 22a-133k-2(c)(4)(C) of the RSRs provides an exemption from the PMC for compounds other than VOCs if eighty percent (80%) of the release area has been subject to infiltration, and not obstructed by anthropogenic features, for a minimum of five years [PMC Exemption for Groundwater Infiltration] or the release area has had sufficient infiltration of precipitation such that the concentration of the substance and the areal extent of the groundwater plume will not likely increase if any obstruction to infiltration is removed in the future, with approval of the CTDEEP Commissioner. The PMC exemption is based upon the collection of four consecutive quarters of groundwater samples that do not exceed applicable RSR criteria (i.e., Surface Water Protection Criteria (SWPC) for the Site) from monitoring wells that are representative of the aerial extent of the groundwater plume. Concentrations of compounds in groundwater that are not increasing over time except for seasonal variations. 1.2.2 Groundwater Criteria Groundwater remediation requirements are dependent upon the groundwater classification of the site. The objectives of these standards are the following: 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 1-4
  3. Page 10 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 10 of 897 Section 1 Background Tighe&Bond Protect and preserve groundwater in “GA” areas as a natural resource; Protect existing use of groundwater regardless of the area’s groundwater classification; Prevent further degradation of groundwater quality; Prevent degradation of surface water from discharges of impacted groundwater; and Protect human health and the environment. Portions of the RSRs governing groundwater regulate remediation of groundwater based on each substance present within the plume and by each distinct plume of impact. Several factors influence the remediation goal at a given site, including: background water quality, the groundwater classification, the proximity of nearby surface water, existing groundwater uses, and the presence of buildings and their usage. When assessing general groundwater remediation requirements, these factors must be considered. The following RSR criteria apply to the Site since the Site is situated in a “GB” classified area and groundwater impacts extend to a “GA” classified area: Surface Water Protection Criteria (SWPC) Groundwater Volatilization Criteria (VC) Background Conditions Groundwater Protection Criteria (GWPC) Surface Water Protection Criteria The SWPC apply to all groundwater that discharges to a surface water; and therefore, applies to the Site. The SWPC ensures that groundwater contamination resulting from onSite sources, which exceed background concentrations, is remediated to levels that adequately protect surface water quality. In general, compliance with the SWPC is achieved when the compound in groundwater directly upgradient from the discharge point emanating from a site is equal to or less than the SWPC established by the CTDEEP. Compliance with the SWPC can also be achieved when the 95% Upper Confidence Limit of the arithmetic mean of all sample results from a groundwater plume are equal or less than the established SWPC. Additionally, site-specific alternative SWPC can be established in accordance with the RSRs. Groundwater Volatilization Criteria The VC apply to all VOC-impacted groundwater within 15 feet of the ground surface or the lowest floor of an overlying building. According to the regulations, the VOC of concern will be remediated to a concentration that is equal to or less than the applicable Residential Volatilization Criteria (Res VC) for groundwater. It is noted that if VOC-impacted groundwater is located beneath a building that solely used for industrial or commercial purposes; then the groundwater may be remediated such that the concentrations are equal to or less than the applicable I/C Volatilization Criteria (I/C VC) in lieu of the RES VC. This is provided, however, that an ELUR be in effect at the site or the portion of the site covered by the building. The ELUR must also ensure that the parcel (or portion thereof beneath the building) will not be used for any residential purpose in the future and that future use is limited to industrial or commercial activity. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 1-5
  4. Page 11 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 11 of 897 Section 1 Background Tighe&Bond The RSRs allow for alternate compliance methods for groundwater exceeding the VC based upon soil vapor testing beneath the building as noted in Section 22a-133k-3(c)(3). If concentration of volatile compounds in soil vapor are detected less than the Residential Soil Vapor Volatilization Criteria (RES SVVC) then remediation is not required. According to the RSRs, soil vapor with detections above the Res VC is not required to be remediated if the building is used for industrial or commercial activity. Background Conditions CTDEEP requires the remediation of a groundwater plume in a “GA” groundwater classified area to result in the reduction of each substance therein to a concentration equal to or less than the background concentration for groundwater of such substance. Typically, background groundwater conditions are determined by the sampling of groundwater wells that have been identified not to be within any known or suspected release area. Groundwater Protection Criteria “GA” classified groundwater may also be remediated to concentrations less than or equal to the GWPC for each substance. The GWPC can be utilized as remediation criteria if: The background groundwater concentration is equal to or less than such GWPC; If a public water supply distribution system is available within 200 feet of the subject site; If the groundwater plume is not located in an aquifer protection area; and If the groundwater plume is not located within the area of influence of any public water supply well. Since a public water supply distribution system is available within 200 feet of the Site, groundwater analytical results for monitoring wells within the West Street ROW have been compared to the GWPC. 1.3 Areas of Concern Tighe & Bond issued the Phase I ESA for the Rockville Former MGP Site in March 2017. The Phase I ESA was completed to identify AOCs at the Site in accordance with the CTDEEP’s Site Characterization Site Guidance Document (SCGD). The following on-Site and off-Site AOCs were identified during the Phase I ESA. Figure 3 depicts the locations of on-Site and off-Site AOCs. Table 1 (Appendix B) provides a summary of the AOCs and information regarding the Conceptual Site Model (CSM) compiled for the Site to date. On-site AOCs: AOC-1: Former Retorts/Generating Room AOC-2: Former Purifying House AOC-3: Former Gas Holder #1 [Gasometer-22,000 ft3 Capacity] AOC-4: Former Gas Holder #2 [Gasometer-22,000 ft3 Capacity] AOC-5: Former Gas Holder #3 [Gasometer-110,000 ft3 Capacity] AOC-6: Former Coal Shed AOC-7: Former Transformer House AOC-8: Current Substation 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 1-6
  5. Page 12 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 12 of 897 Section 1 Background Tighe&Bond AOC-9: Historic Site Fill AOC-10: Hockanum River Sediment AOC-11: Tar impacts and Fill Observed at TB-33 (Southwestern portion of Site) AOC-12: Creosote/ Tar impacts and Fill Observed (Southeastern portion of Site) AOC-13: Possible Historic Fill to the south of the Hockanum River AOC-14: Creosote impacts and Fill Observed (Northern portion of Site) AOC-15: Site-Wide Groundwater Impacts Off-Site AOCs: AOC-16: Off-Site Creosote Impacts St. Joseph’s School/Church Parking Lot AOC-17: Off-site Creosote Impacts Maple Street Right-of Way (ROW) AOC-18: Off-site Petroleum Impacts #8 and #12 Maple Street AOC-19: Suspected Fill #12 and #14 Maple Street (not related to Site) AOC-20: Off-site Creosote Impacts #14 Maple Street AOC-21: Off-site Surface Soils Maple Street School (not related to Site) AOC-22: Off-site Surface Soils 175 Union Street (not related to Site) AOC-23: Off-site Groundwater Impacts 1.4 Significant Environmental Hazards Reporting Tighe & Bond initially identified a concentration of benzo(a)pyrene in surficial soils at SS102 within the Inner Substation above CTDEEP’s Significant Environmental Hazard (SEH) Condition Notification Threshold Concentration of 30 mg/Kg during Phase III ESA sampling. This detection was determined to be associated with historical fill material identified near a former coal shed structure associated with the former MGP. Figure 4 depicts the locations of SS-102 and the coal shed associated with the former MGP. This discovery was reported to CTDEEP in a Significant Environmental Hazard Notification CGS 22a-6u(d): Surface Soil Contamination Poses Potential Direct Exposure Risk, Former Rockville Manufactured Gas Plant, 13 Maple Street, Vernon, Rockville, CT, dated February 26, 2018, prepared by Tighe & Bond. CTDEEP issued an SEH acknowledgement letter RE: Notification of Significant Environmental Hazard, Former Rockville Manufactured Gas Plant, 13 Maple Street, Vernon, CT dated March 16, 2018 (SEH Acknowledgement Letter). The SEH Acknowledgement Letter indicated that the reported condition did not require an immediate response to limit short-term risk because a permanent fence surrounds the property limiting access. However, annual inspection reports, site investigation and remediation would need to be continued in accordance with the plan provided in the SEH notification form. The SEH notification was identified as SEH ID:13641 by CTDEEP. Subsequent Phase III ESA investigations in 2018 identified additional concentrations of benzo(a)pyrene in surficial soils that exceeded the SEH Condition Notification Threshold Concentration from hand auger soil borings HA-01A, HA-02, and HA-03 during the delineation of SS-102 within the Inner Substation and HA-18 that was advanced to assess historic fill located along the embankment adjacent to the Hockanum River within the 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 1-7
  6. Page 13 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 13 of 897 Section 1 Background Tighe&Bond Outer Substation. Soil investigation and a summary of concentrations of benzo(a)pyrene are provided on Figure 4. The additional concentrations of benzo(a)pyrene in surficial soils exceeding the SEH Condition Notification Threshold Concentration were reported to CTDEEP and were included in the 2018 Annual Report. In a December 28, 2018 e-mail, CTDEEP indicated that no additional notifications were required for this same condition in surficial soils unless drinking water or an explosion hazard is discovered associated with the SEH condition. Additional discoveries of the same SEH condition would be able to be addressed under the February 26, 2018 SEH Notification. In 2019 and 2020, Eversource submitted the SEH Status Update Form for Soil to CTDEEP to satisfy the annual reporting requirement. The areas with SEH soils remain secured by fencing and warning signage. These findings were also documented in the VRP Annual Reports for the Site that were submitted to CTDEEP. In 2020, benzo(a)pyrene was detected at concentrations above the SEH Condition Notification Threshold Concentration in the upper 2 feet of soils in samples collected from soil borings SB-76 and SB-78 during the assessment of shallow fill material within the Inner Substation. Benzo(a)pyrene was detected in SB-76 (0 to 2 feet) and SB-78 (0 to 1 foot) at concentrations of 42 mg/Kg and 190 mg/Kg, respectively (Figure 4). These areas will be delineated in 2021. 1.5 2019 Phase III ESA Data Gaps The 2019 Annual Report for the Rockville Former MGP Site provided a summary of Phase III ESA investigations and data gaps that were encountered in the process of assessing the on-Site and off-Site impacts. A summary of Phase III ESA and previous investigations are provided on Figure 5. As part of the SCGD process, data gaps need to be resolved in order to validate the CSM prior to the remediation of a site. A summary of the data gaps identified in the 2019 Annual Report are provided below. Soil Vapor Assessment- St. Joseph’s Church Property: Extractable total petroleum hydrocarbons (ETPH) and benzene were reported above the RES VC and I/C VC in groundwater at MW-29S. A soil vapor assessment was proposed for the basements of the Rectory and the former St. Joseph School/former Strong School building to determine if volatilization from contaminated groundwater has adversely impacted soil vapor beneath the buildings. Off-site Groundwater Assessment- St. Joseph’s Church Property: ETPH, benzene, and naphthalene were also detected in MW-29S above the SPWC at the western boundary of St. Joseph’s Church property along West Street. ETPH and benzene were also detected above the Res VC and I/C VC as noted above. Additional characterization was proposed to refine the nature and extent of the groundwater plume within St. Joseph’s Church parking lot to the northwestern corner of the property. Off-site Groundwater Delineation- West Street and Union Street Areas: Monitoring well MW-31S was proposed to assess groundwater impacts to the west of the Site within the West Street/State Route 527 ROW as part of 2019 Phase III ESA activities. A Connecticut Department of Transportation (CTDOT) encroachment permit was required to install monitoring well MW-31S because West Street/State 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 1-8
  7. Page 14 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 14 of 897 Section 1 Background Tighe&Bond Route 527 is a State-owned road. The permit was unable to be obtained at the time in order to implement the work in 2019. Off-site delineation was needed to characterize the nature and extent of the groundwater plume that exceeds RSR criteria at MW-29S to the west/northwest of St. Joseph’s Church property to the west of West Street and towards the Hockanum River. Additional Soil Assessment within Inner-Substation Area: Further assessment of the Inner Substation Area soils was proposed to assess PMC compliance and finalize the remedial design/approach for the remedial action plan. Soils in the vicinity of MW-32S required additional investigation to assess GB PMC compliance. To assess whether the PMC Exemption for Groundwater Infiltration could be implemented, two remaining quarterly groundwater sampling events for MW-33S through MW36S within the Inner Substation and MW-4SR were required and scheduled for 2020 Pre-characterization samples were proposed to be collected within former Gas Holder #1 (AOC-3) and former Gas Holder #2 (AOC-4) to characterize impacted soils within the holder foundations. Re-Installation of MW-3D within the Northern Portion of the Inner Substation: Tar impacts were observed during the redevelopment and gauging of MW-3D during Phase III ESA activities. MW-3D is screened between 68 and 78 feet below grade. Phase III ESA soil borings advanced adjacent to and upgradient of MW-03D did not encounter separate phase tar impacts at depths below 39 feet below grade. It is possible that the annular backfill/well seal may have been compromised allowing tar to preferentially accumulate in the monitoring well. Installation of a Tar Recovery Well: A tar recovery pilot well was proposed within the northwestern portion of the Site to assess the feasibility of tar recovery within heavily tar-impacted soils that were encountered from 20 to 36 feet near MW-3D. Ecological Risk Assessment: Phase III ESA investigations have identified impacted soils along the steep bank adjacent to the Hockanum River. In addition, previous sediment sampling identified impacted sediments within locations in the Hockanum River and at outfalls discharging to the river. An ecological risk assessment was proposed to assess potential contaminant exposure pathways to ecological receptors. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 1-9
  8. Page 15 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 15 of 897 Tighe&Bond Section 2 2020 Phase III ESA Summary Tighe & Bond developed the Phase III ESA investigation approach to assess the nature and extent of impacts associated with the Rockville Former MGP and Site-related AOCs identified during the Phase I ESA. The Phase III ESA built upon previous investigations completed by Northeast Utilities Service Company-Environmental Services Department (NU) between 1990 and 1995 and has used the CTDEEP CSM approach provided in the CTDEEP SCGD. Tighe & Bond has completed Phase III ESA investigations from late 2016 through this year using the iterative CSM approach to identify and address data gaps to work toward finalizing the CSM and advancing the Site to remediation. In 2020, the Phase III ESA focused on the data gaps identified during the 2019 Phase III ESA, which are summarized above in Section 1.5. Phase III ESA activities included the advancement soil borings to characterize soils and the installation of monitoring wells to characterize groundwater conditions on-Site and off-Site. Targeted investigation of onSite soils was completed to gather remedial design information and assess the potential for tar recovery. A soil vapor assessment was completed at the St. Joseph’s Church rectory and the former St. Joseph’s School/Strong School building to assess compliance for groundwater exceeding the Res VC that was identified at MW-29S. Figure 5 shows on-Site and off-Site investigations areas, previous investigation areas, and Phase III ESA sample locations. A screening-level ecological risk assessment (SLERA) was completed to identify and assess potential impacts to ecological receptors in sediment and surface water within the Hockanum River. To support the SLERA, background sediment and surface waters samples were collected upstream of the Site to assess background conditions within the Hockanum River. 2.1 Methods 2.1.1 Soil and Groundwater Assessment As part of the Phase III ESA, Eversource and Tighe & Bond continued coordination with St. Joseph’s Church property representatives to maintain access during off-Site Phase III ESA activities. Eversource coordinated with the CTDOT to obtain encroachment permits prior to installing monitoring wells MW-31S, MW-42S and MW-42M within the West Street ROW/ State Route 527. Tighe & Bond and our environmental drilling subcontractor, Cisco Geotechnical, LLC (CISCO), marked out Phase III ESA investigation locations and notified Call-Before-YouDig (CBYD)/811 to identify publicly owned utilities prior to the commencing intrusive work. In addition, private subsurface utility mark-out contractor, Underground Survey, LLC, was retained to identify subsurface utilities or obstructions at Phase III ESA locations. Tighe & Bond also completed a review of Rockville 14W substation infrastructure mapping provided by Eversource and completed a walk-down of proposed soil borings with Eversource electric and natural gas representatives to review potential conflicts with critical infrastructure prior to completing work. As a precaution, CISCO used soft-dig methods to pre-clear all soil boring and monitoring well locations to 5-feet below grade to avoid 2020 Voluntary Remediation Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-1
  9. Page 16 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 16 of 897 Section 2 Phase III ESA Summary Tighe&Bond potentially damaging buried subsurface utilities. Soft-dig preclearing was completed at each soil boring and monitoring location. Soils with were logged from 0 to 5 feet except for SB-84 and SB-85 which were advanced adjacent to previous Phase III ESA soil borings. Shallow subsurface soil samples were collected from SB-76 through SB-81 according to the sample collection procedures described below. All field work was completed under a site-specific health and safety plan (HASP). Work activities completed within the Inner Substation Area of the Rockville Substation 14W required completion of Eversource Substation Awareness Training and oversight by an Eversource-Qualified Escort during the work. In accordance with Eversource procedures, an electrically qualified lineman was used to ground drilling equipment to the substation grounding grid during work within the Inner Substation Area. Environmental drilling was completed using either a Geoprobe® 3230 or 7822 drill rig. Soil borings were drilled using direct-push drilling techniques utilizing Geoprobe’s dual tube DT35 sampling system which cased-off the borehole during the advancement of the deep soil borings. At borings for monitoring wells MW-42M and MW-43M, 4 ¼” hollowstem augers were used to case-off and advance the borehole during sampling because cobbles were encountered. Samples were primarily collected using a 2-inch or 3.25-inch sampler which used dedicated acetate liners. Soil samples in shallow soil borings were collected with a standard 2-inch Marco-Core® sampler equipped with dedicated acetate liners. Each boring was drilled continuously to the target completion depth of the soil boring. Soil borings were advanced as shallow as 5 feet below grade within the Inner Substation to as deep as 45 feet below grade off-Site at the St. Joseph’s Church property. Soils were logged for lithology and evidence of visual and/or olfactory impacts. Soils were screened for presence of volatile organic compounds (VOCs) with a photo-ionization detector (PID). Headspace VOC screening samples were collected from each soil sample interval. Analytical samples were collected within soils containing fill materials located above the apparent seasonal high groundwater table to assess compliance with the GB PMC within the Inner Substation and Outer Substation Areas. Soil samples were collected from SB-84 and SB-85 to collect waste characterization data for heavily tar-impacted soils encountered within the foundations of former Relief Holder #1 and Relief Holder #2, respectively. Soil samples were also collected at monitoring well locations to assess soils within the screen interval and at the completion of the soil boring to delineate the lateral extent of tar impacts at the northern portion of the Site and off-Site at St. Joseph’s Church property and West Street ROW. Following completion, deep soil borings advanced below the water table were abandoned via tremie grouting if visual tar impacts were present. Shallow soil borings above the water table were abandoned with a combination of bentonite chips and/or clean sand. Within paved areas, soil borings were repaired with asphalt patch. Soil boring logs are provided in Appendix C. Following the collection of samples, soil boring sampling equipment was decontaminated by steam cleaning over a temporary decontamination pad located within the Outer Substation Area of the Site prior to commencing sampling at the next Phase III ESA sample location. Excess soils were containerized in United States Department of Transportation (USDOT) 55-gallon drums that were staged on a covered and bermed drum pad at the Site. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-2
  10. Page 17 of 897

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 9 Page 17 of 897 Section 2 Phase III ESA Summary Tighe&Bond Groundwater monitoring wells were installed using 4 ¼” hollow-stem augers using the Geoprobe® 3230. Each overburden monitoring well consisted of a 2-inch diameter, 0.010”-slotted poly-vinyl chloride (PVC) screen that were 10-feet in length affixed to a PVC riser that extended to the ground surface. Standard monitoring well construction methods were used including a sand filter pack constructed 2 feet above the top of the screen and a bentonite seal. For water table monitoring wells, the boring annulus above the water table was backfilled with clean sand or native soil cuttings above the bentonite seal. The annulus of the deep overburden monitoring well, MW-3DR, was grouted with a bentonite-grout slurry above the bentonite to seal the borehole above the well screen in order to assess water quality of the deep overburden aquifer. The tar recovery well, RW03M, was installed with using 6 ¼” hollow-stem augers using the Geoprobe® 3230. The tar recovery well was constructed using 4-inch diameter, 0.020”-slotted PVC screen that were 10-feet in length affixed to a PVC riser that extended to the ground surface. A sand pack was installed to 2-feet above the recovery well screen. The annulus was sealed with a bentonite and grouted to seal the formation. Each monitoring well was secured with a locking expandable plug. On-Site monitoring wells were completed with stick-up steel protective casing and off-Site monitoring wells were completed with flush-mounted steel road boxes with locking covers. Monitoring well logs are provided in Appendix C. Water table monitoring wells, designated with a “S” were installed to straddle the groundwater table which ranged between approximately 6.7 feet below grade in MW-38S along the western Site boundary to as deep as 34 feet below grade in MW-23S within the USPS Access Road to the east of Maple Street during previous Phase III ESA gauging events (Figure 5). The difference in elevation is attributable in part to a significant increase in elevation, approximately 22 feet, to the north across the Site. Within the Inner Substation Area, depth to groundwater ranged from approximately 7.5 feet in MW-36S in the southern portion of the substation to approximately 14.5 feet in MW-32S in the northern portion of the Inner Substation. Monitoring wells screened in the intermediate zone of the overburden aquifer, designated with an “M” were screened between 23 feet to 37 feet below grade at the St. Joseph’s Church Property. Monitoring wells (designated “D”) are screened in glacial materials in the overburden aquifer between 64 to 83 feet below grade at or near the bedrock interface. Bedrock monitoring wells, denoted with a “BR”, were screened within bedrock, Portland Arkose, that is located 28 to 84 feet below grade. Newly installed monitoring wells except for the two well pairs, MW-42S/MW-42M and MW43M/MW-43M, were surveyed by Kratzert, Jones and Associates, Inc. (Kratzert) a Connecticut-licensed surveyor and incorporated into the Site-wide survey. Tighe & Bond completed an elevation survey of these four monitoring wells to obtain elevation data for groundwater gauging and measurements. These two well pairs will be surveyed by Kratzert in conjunction with monitoring well sampling activities during the 1st Quarter 2021. Newly installed groundwater monitoring wells were developed to remove silt with either a Waterra Hydro-lift pump or an electric submersible pump and intermittently surged with a surge block and check value. Each newly installed monitoring well was gauged with an oil-water interface probe to determine if separate NAPL/tar had accumulated in the wells. Development waters were containerized in a 55-gallon USDOT drums that were staged on a drum pad at the Site. 2020 Voluntary Remedial Program Annual Report Rockville Former MGP Site, Rockville, Vernon, CT 2-3

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)