Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Words on different pages
  1. Page 6 of 203

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 8 Page 6 of 203 Tighe&Bond Section 1 Background The Connecticut Light and Power Company (CL&P) dba Eversource Energy (Eversource) entered the Rockville Former Manufactured Gas Plant (MGP) site located at 13 Maple Street in Rockville, Vernon, Connecticut (the “Site”) into the Voluntary Remediation Program (VRP), pursuant to Connecticut General Statutes (CGS) 22a-133x, on September 2, 2015 by submitting an Environmental Condition Assessment Form (ECAF) and fee to the Connecticut Department of Energy and Environmental Protection (CTDEEP). The Site is designated a Licensed Environmental Professional (LEP)-lead site. Eversource assigned the LEP verification of the Rockville Former MGP Site to Tighe & Bond of Middletown, Connecticut. The LEP of record for this project is: James T. Olsen, LEP (#178) Tighe & Bond, Inc., 213 Court Street, Suite 1100 Middletown, CT 06457 1.1 Site History and Description The Site is located at 13 Maple Street on a 3.43-acre parcel at the northwest corner of the intersection of West Main Street and Maple Street. The Site location is depicted on Figure 1 in Appendix A. The MGP operated from 1863 until the mid-1930s when gas production ceased. The footprint of the former MGP structures are shown in light blue outline on Figure 2. The former MGP was acquired by CL&P in 1935 and later converted to use as an electrical substation and natural gas regulator station, as it remains today. The former MGP occupied the central and eastern portion of the Site. The Site is bounded by the St. Joseph’s Church parking lot and residential properties to the north, Maple Street and residential properties to the east, West Main Street to the south, and residential properties with frontage on West Street/State Route 527 to the west. The Hockanum River transverses the southern portion of the Site from the southeastern corner at West Main Street westward to West Street. A tributary to the Hockanum River flows westward that originates from a plastic stormwater outfall and masonry outfall at Maple Street adjacent to entrance to the Site. A stormwater outfall for roadway drainage is located near the intersection of Maple and West Main Street. The Site is currently developed as the Eversource Substation 14W, which is enclosed by a locked fence that limits access to authorized personnel. Figure 2 includes an aerial photograph that depicts the current layout of the Site, which includes an Inner Substation Area and Outer Substation Area. The Inner Substation Area includes the active electrical substation infrastructure including high voltage power lines, towers, transformers, and electrical control houses. Subsurface electrical power supply ducts and substation grounding grid are located beneath a crushed gravel cover inside the Inner Substation. Access to the Inner Substation is restricted by a high security fence equipped with barbed wire. Eversource requires notification prior to entry and specialized training. Rockville Former MGP 2021 Annual Report 1-1
  2. Page 7 of 203

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 8 Page 7 of 203 Section 1 Background Tighe&Bond The remainder of the Site is referred to as the Outer Substation Area which includes all areas outside the Inner Substation Area (Figure 2). The Outer Substation Area includes a grassed area surrounding the eastern and northern sides of the Site. A fenced area with a rectangular-shaped high-pressure gas regulator/control house is located on the western portion of the Outer Substation Area. The Hockanum River runs along the Outer Substation Area and abuts the Inner Substation Area to the south. Wooded and overgrown areas are located on the northern portion of the Site adjacent to the St. Joseph’s Church paved parking lot and along the southern portion of the Site between the Hockanum River and West Main Street. Groundwater beneath the Site and adjacent properties is classified as GB by CTDEEP which indicates that groundwater is within a historically highly urbanized area or an area of intense industrial activity and where public water supply service is available. Such groundwater may not be suitable for human consumption without treatment due to waste discharges, spills or leaks of chemicals or land use. The area to the west of West Street/Route 527 is classified by CTDEEP as a GA groundwater area. GA areas are designated for the following: potential drinking water supply; fish and wildlife habitat; recreational use; agricultural and industrial supply and other legitimate uses including navigation. Discharges for GA classified areas are restricted to: discharges from public or private drinking water treatment systems, dredging and dewatering, emergency, and clean water discharges. The Hockanum River is classified as a “B” surface water meaning it is suitable for recreational purposes, industrial process and cooling, and fish and wildlife habitat. Figure 3 depicts the GA and GB classified groundwater areas in the vicinity of the Site. 1.2 Regulatory Criteria Analytical testing results discussed in this report were compared to remediation criteria listed in the CTDEEP Remediation Standard Regulations (RSRs) (January 1996, Amended February 2020). The 2020 RSRs do not provide criteria for all substances detected at the Site. Criteria for the Additional Polluting Substances (APS) detected at the Site that are listed in the data summary tables of this report were obtained from “Table 10: DEEP Recommended Criteria Values for Common Additional Polluting Substances and Alternative Criteria Requests, dated December 10, 2015”. CTDEEP’s intent in developing the RSRs was to define the following: • Minimum remediation performance standards; • Specific numeric clean-up criteria; and • A process for establishing alternative site-specific standards, if warranted. The RSRs apply to efforts to remediate contaminated soil, surface water, soil vapors, or a groundwater plume at or emanating from a release area or area of concern (AOC), provided the remedial action is required by the following: Rockville Former MGP 2021 Annual Report 1-2
  3. Page 8 of 203

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 8 Page 8 of 203 Section 1 Background Tighe&Bond • CGS Chapter 445 (Hazardous Waste, Section 22a-134, the CT Transfer Act), or Chapter 446K (Water Pollution Control), or CGS Section 22a-208a(C)(2); or • Relevant subsections of CGS 22a-133 (Voluntary Clean-up) including but not limited, any such action required to be taken or verified by a LEP, except as otherwise provided in the regulations. The Rockville Former MGP is enrolled in the VRP; as such, the RSRs apply to the assessment work conducted at the Site. 1.2.1 Soil Criteria The CTDEEP soil remediation criteria integrates two risk-based goals: (1) the Direct Exposure Criteria (DEC) to protect human health from risks associated with direct exposure to contaminated soil; and (2) the Pollutant Mobility Criteria (PMC) to protect groundwater quality from contaminants that could potentially migrate or leach from soil to groundwater. 1.2.1.1 Direct Exposure Criteria Specific numeric exposure criteria for a broad range of contaminants in soil have been established by the CTDEEP, based on certain exposure assumptions. The DEC apply to accessible soil to a depth of 15 feet. The DEC for substances other than polychlorinated biphenyls (PCBs) do not apply to inaccessible soil at a release area, if such inaccessible soil is less than 15 feet below the ground surface, an environmental use restriction (EUR) is in effect with respect to the subject release area. For PCBs, a maximum concentration of 10 milligrams per kilogram (mg/Kg) can remain in soils considered inaccessible. Inaccessible soil generally means polluted soil, which is the following: • More than 4 feet below the ground surface; • More than 2 feet below a paved surface comprised of a minimum of three inches of bituminous pavement or concrete; • Beneath an existing building; or • Beneath another permanent structure(s) approved by the CTDEEP Commissioner. Buildings can be constructed, and/or clean fill can be placed over contaminated soils rendering them inaccessible. The CTDEEP has established two sets of DEC using exposure assumptions appropriate for residential land use (RES DEC) or for industrial and certain commercial land use (I/C DEC). In general, all sites are required to be remediated to the residential criteria. If the I/C land use criteria are applicable and used, an EUR notification is required in accordance with the RSRs. The RSRs have a provision under Section 22a-133k-2(f)(2)(A) to allow for the use of an engineered control (EC) Variance for exemption from the DEC. An EC is a permanent physical structure designed to safely isolate pollutants which would otherwise not comply with the self-implementing remedial options provided in RSRs listed above. The EC is permitted to be used under certain conditions: 1) If the CTDEEP Commissioner authorized the disposal of solid waste or polluted soil; 2) soil remediation is not technically practicable; removal of such substance or substances from such release area would create an unacceptable risk to human health; or the CTDEEP Commissioner has determined, after Rockville Former MGP 2021 Annual Report 1-3
  4. Page 9 of 203

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 8 Page 9 of 203 Section 1 Background Tighe&Bond public input, that the cost of remediating the polluted soil is significantly greater than the cost of installing and maintaining an EC and outweighs the risk if the EC fails. 1.2.1.2 Pollutant Mobility Criteria The PMC that apply to remediation of a site depends on the groundwater classification of the site. The purpose of these criteria is to prevent contamination to groundwater in “GA” classified areas, and to prevent unacceptable further degradation to groundwater in “GB” classified areas. The applicable PMC for the Site is the PMC for a “GB” classified area. The PMC generally applies to all soil within the unsaturated zone, which represents the soil located from the ground surface to the seasonal high-water table in “GB” classified areas. The criteria do not apply to environmentally isolated soils that are polluted with substances other than volatile organic compounds (VOCs) provided an EUR is recorded for the release area which ensures that such soils will not be exposed (unless approved in writing by the CTDEEP Commissioner). Environmentally isolated soils are defined as certain contaminated soils, which are above the seasonal high-water table, beneath an existing building and not a source of on-going contamination. An EUR must be recorded for the site, which ensures that such soils will not be exposed by building demolition or other activities. Buildings can be constructed over contaminated soils rendering them environmentally isolated. Remediation based upon the listed PMC requires that a substance, other than an inorganic substance or PCB, in soil be remediated to at least that concentration at which the results of a mass analysis of soil for such substances does not exceed the PMC applicable to the groundwater classification (i.e., GB) of the area in which the soil is located (default PMC). An inorganic substance (metals) or PCBs in soil must be remediated to at least that concentration at which the analytical results of leachate produced from either the Toxicity Characteristic Leaching Procedure (TCLP) or the Synthetic Precipitation Leaching Procedure (SPLP) does not exceed the PMC applicable to the groundwater classification of the area in which the soil is located. In addition, the RSRs provide an alternate method for compliance with the PMC. For polluted soils within a GB groundwater area, a SPLP or TCLP concentration of a substance in soil may be remediated to ten-times the groundwater protection criteria (GWPC) provided that non-aqueous phase liquid (NAPL) is present in soils as defined in the calculation provided in the RSRs. Section 22a-133k-2(c)(5)(C) of the RSRs provides an exemption from the PMC for compounds other than VOCs if eighty percent (80%) of the release area has been subject to infiltration, and not obstructed by anthropogenic features, for a minimum of five years [PMC Exemption for Groundwater Infiltration] or the release area has had sufficient infiltration of precipitation such that the concentration of the substance and the areal extent of the groundwater plume will not likely increase if any obstruction to infiltration is removed in the future, with approval of the CTDEEP Commissioner. The PMC exemption is based upon the collection of four consecutive quarters of groundwater samples that do not exceed applicable RSR criteria (i.e., Surface Water Protection Criteria (SWPC) for the Site) from monitoring wells that are representative of the aerial extent of the groundwater plume. Concentrations of compounds in groundwater that are not increasing over time except for seasonal variations. Rockville Former MGP 2021 Annual Report 1-4
  5. Page 10 of 203

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 8 Page 10 of 203 Section 1 Background Tighe&Bond 1.2.2 Groundwater Criteria Groundwater remediation requirements are dependent upon the groundwater classification of the site. The objectives of these standards are the following: • Protect and preserve groundwater in “GA” areas as a natural resource; • Protect existing use of groundwater regardless of the area’s groundwater classification; • Prevent further degradation of groundwater quality; • Prevent degradation of surface water from discharges of impacted groundwater; and • Protect human health and the environment. Portions of the RSRs governing groundwater regulate remediation of groundwater based on each substance present within the plume and by each distinct plume of impact. Several factors influence the remediation goal at a given site, including background water quality, the groundwater classification, the proximity of nearby surface water, existing groundwater uses, and the presence of buildings and their usage. When assessing general groundwater remediation requirements, these factors must be considered. The following RSR criteria apply to the Site since the Site is situated in a “GB” classified area and groundwater impacts extend to a “GA” classified area: • Background Conditions • Groundwater Protection Criteria (GWPC) • Surface Water Protection Criteria (SWPC) • Groundwater Volatilization Criteria (GWVC) 1.2.2.1 Background Conditions CTDEEP requires the remediation of a groundwater plume in a “GA” groundwater classified area to result in the reduction of each substance therein to a concentration equal to or less than the background concentration for groundwater of such substance. Typically, background groundwater conditions are determined by the sampling of groundwater wells that have been identified not to be within any known or suspected release area. 1.2.2.2 Groundwater Protection Criteria “GA” classified groundwater may also be remediated to concentrations less than or equal to the GWPC for each substance. The GWPC can be utilized as remediation criteria if: • The background groundwater concentration is equal to or less than such GWPC; • If a public water supply distribution system is available within 200 feet of the subject site; • If the groundwater plume is not located in an aquifer protection area; and • If the groundwater plume is not located within the area of influence of any public water supply well. Rockville Former MGP 2021 Annual Report 1-5
  6. Page 11 of 203

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 8 Page 11 of 203 Section 1 Background Tighe&Bond Since a public water supply distribution system is available within 200 feet of the Site, groundwater analytical results for monitoring wells within the West Street right-of-way (ROW) have been compared to the GWPC. 1.2.2.3 Surface Water Protection Criteria The SWPC apply to all groundwater that discharges to a surface water; and therefore, applies to the Site. The SWPC ensures that groundwater contamination resulting from onSite sources, which exceed background concentrations, is remediated to levels that adequately protect surface water quality. In general, compliance with the SWPC is achieved when the compound in groundwater directly upgradient from the discharge point emanating from a site is equal to or less than the SWPC established by the CTDEEP. Compliance with the SWPC can also be achieved when the 95% Upper Confidence Limit of the arithmetic mean of all sample results from a groundwater plume are equal or less than the established SWPC. Additionally, site-specific alternative SWPC can be established in accordance with the RSRs. 1.2.2.4 Groundwater Volatilization Criteria The GWVC are designed to protect human health from contaminants that may volatilize from contaminated groundwater into overlying buildings, and apply as follows: • The GWVC for “volatile petroleum substances” (VPS) apply to groundwater within 10 feet of the lowest level of a building or the ground surface. • The GWVC for “volatile organic substances” (VOS) other than VPS apply to groundwater within 30 feet of the lowest level of a building or the ground surface. Different GWVC may apply to a property, depending on land use, either “residential” or “industrial/commercial”, as defined by the RSRs. The less stringent I/C GWVC cannot be used unless an ELUR has been recorded on the property deed restricting the site to industrial/commercial uses. The RSRs allow for alternate compliance methods for groundwater exceeding the VC based upon soil vapor testing beneath the building as noted in Section 22a-133k-3(c)(2). If concentration of volatile compounds in soil vapor are detected less than the Residential Soil Vapor Volatilization Criteria (RES SVVC) then remediation is not required. 1.2.3 Additional Polluting Substances For all detected COCs without 2021 RSR soil and groundwater criteria, a request for approval to utilize the CTDEEP’s pre-evaluated APS “Fast-track” numeric criteria should be submitted to CTDEEP for formal approval as part of a future Final Remedial Action Plan. 1.3 Areas of Concern (AOCs) Tighe & Bond issued the Phase I ESA for the Rockville Former MGP Site in March 2017. The Phase I ESA was completed to identify AOCs at the Site in accordance with the CTDEEP’s Site Characterization Site Guidance Document (SCGD). The following on-Site and off-Site AOCs were identified during the Phase I ESA. Figure 4 depicts the locations Rockville Former MGP 2021 Annual Report 1-6
  7. Page 12 of 203

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 8 Page 12 of 203 Section 1 Background Tighe&Bond of on-Site and off-Site AOCs. Table 1 (Appendix B) provides a summary of the AOCs and information regarding the Conceptual Site Model (CSM) compiled for the Site to date. On-site AOCs: • AOC-1: Former Retorts/Generating Room • AOC-2: Former Purifying House • AOC-3: Former Gas Holder #1 [Gasometer-22,000 ft3 Capacity] • AOC-4: Former Gas Holder #2 [Gasometer-22,000 ft3 Capacity] • AOC-5: Former Gas Holder #3 [Gasometer-110,000 ft3 Capacity] • AOC-6: Former Coal Shed • AOC-7: Former Transformer House • AOC-8: Current Substation • AOC-9: Historic Site Fill • AOC-10: Hockanum River Sediment • AOC-11: Tar impacts and Fill Observed at TB-33 (Southwestern portion of Site) • AOC-12: Creosote/ Tar impacts and Fill Observed (Southeastern portion of Site) • AOC-13: Possible Historic Fill to the south of the Hockanum River • AOC-14: Creosote impacts and Fill Observed (Northern portion of Site) • AOC-15: Site-Wide Groundwater Impacts Off-Site AOCs: • AOC-16: Off-Site Creosote Impacts St. Joseph’s School/Church Parking Lot • AOC-17: Off-site Creosote Impacts Maple Street Right-of Way (ROW) • AOC-18: Off-site Petroleum Impacts #8 and #12 Maple Street • AOC-19: Suspected Fill #12 and #14 Maple Street (not related to Site) • AOC-20: Off-site Creosote Impacts #14 Maple Street • AOC-21: Off-site Surface Soils Maple Street School (not related to Site) • AOC-22: Off-site Surface Soils 175 Union Street (not related to Site) • AOC-23: Off-site Groundwater Impacts 1.4 Significant Environmental Hazard (SEH) Reporting Tighe & Bond initially identified a concentration of benzo(a)pyrene in surficial soils at SS102 within the Inner Substation above CTDEEP’s Significant Environmental Hazard (SEH) Condition Notification Threshold Concentration of 30 mg/kg during Phase III ESA sampling. This detection was determined to be associated with historical fill material identified near a former coal shed structure. Figure 5 depicts the locations of SS-102 and the coal shed associated with the former MGP. Rockville Former MGP 2021 Annual Report 1-7
  8. Page 13 of 203

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 8 Page 13 of 203 Section 1 Background Tighe&Bond This discovery was reported to CTDEEP in a Significant Environmental Hazard Notification CGS 22a-6u(d): Surface Soil Contamination Poses Potential Direct Exposure Risk, Former Rockville Manufactured Gas Plant, 13 Maple Street, Vernon, Rockville, CT, dated February 26, 2018, prepared by Tighe & Bond. CTDEEP issued an SEH acknowledgement letter RE: Notification of Significant Environmental Hazard, Former Rockville Manufactured Gas Plant, 13 Maple Street, Vernon, CT dated March 16, 2018 (SEH Acknowledgement Letter). The SEH Acknowledgement Letter indicated that the reported condition did not require an immediate response to limit short-term risk because a permanent fence surrounds the property limiting access. However, annual inspection reports, site investigation and remediation would need to be continued in accordance with the plan provided in the SEH notification form. The SEH notification was identified as SEH ID:13641 by CTDEEP. Subsequent Phase III ESA investigations in 2018 identified additional locations where concentrations of benzo(a)pyrene exceeded the SEH Condition Notification Threshold Concentration in surficial soils. Locations where Soil samples contained concentrations of benzo(a)pyrene above the SEH threshold included HA-01A, HA-02, and HA-03 advanced to delineate the SEH at SS-102, and at location HA-18 that was advanced to assess historic fill located along the Hockanum River. Soil sampling locations and a summary of benzo(a)pyrene analytical results are provided on Figure 5. The additional locations where benzo(a)pyrene exceeded the SEH Condition Notification Threshold Concentration were reported to CTDEEP and were included in the 2018 Annual Report. In a December 28, 2018 e-mail, CTDEEP indicated that for future discoveries of the same SEH condition, no additional notifications were necessary. Additional discoveries of the same SEH condition would be able to be addressed under the February 26, 2018 SEH Notification. In 2021, Eversource submitted an SEH Status Update Form for Soil to CTDEEP to satisfy the annual reporting requirement. Areas with SEH soils remain secured by fencing and warning signage. These findings were also documented in the VRP Annual Reports for the Site that were submitted to CTDEEP. 1.5 2020/2021 Phase III Data Gaps The 2020 Annual Report for the Rockville Former MGP Site provided a summary of Phase III ESA investigations and data gaps that were encountered in the process of assessing the on-Site and off-Site impacts. Sampling locations from the Phase III ESA and previous investigations are shown on Figure 6. As part of the site characterization process prescribed by CTDEEP, data gaps need to be resolved in order to validate the CSM prior to the remediation of a site. A summary of the data gaps identified in the 2020 Annual Report are provided below. • Off-site Groundwater Delineation to the West of West Street: Off-site delineation is recommended to characterize the nature and extent of the groundwater plume within the intermediate groundwater zone that exceeds the SWPC for ETPH and the GWPC for benzene and ETPH to the west/northwest of MW-42M. This work will likely require additional street access permits to be coordinated with the Town of Vernon and the Connecticut Department of Transportation (CTDOT). • Off-site Groundwater Assessment St. Joseph’s Church/ West Street ROW: The collection of groundwater samples from monitoring wells MW-14M, MW-29S, MW40S, MW-41S, MW-42S, MW-42M, MW-43S, and MW-43M during the 1st Quarter Rockville Former MGP 2021 Annual Report 1-8
  9. Page 14 of 203

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 8 Page 14 of 203 Section 1 Background Tighe&Bond 2022 at minimum is recommended to assess seasonal changes to COCs in groundwater downgradient of the Site. • On-site Groundwater Assessment Northwest and Western Portions of the Outer Substation: The collection of groundwater samples from MW-03DR and MW-39S in the 1st Quarter 2022 is recommended to assess seasonal changes to COCs in groundwater on the western side of the Site. Tar gauging is recommended to be completed in wells RW-03, MW-03DR and MW-37S to evaluate the accumulation of tar in the area of the Site where NAPL has previously been observed. • Delineation of Soils Exceeding SEH Condition Notification Threshold Concentration: Additional shallow hand auger soil borings are recommended to delineate benzo(a)pyrene concentrations exceeding SEH Condition Notification Threshold Concentration at SB-76 and SB-78 within the top 2 feet of surficial soils within the Inner Substation. The SEH delineation findings will be provided in a 2022 Significant Environmental Hazard Status Update Form for Soils scheduled for next year. • Phase III ESA Investigations within the Inner and Outer Substation Areas: Supplemental Phase III ESA and pre-design investigations including supplemental soil and groundwater sampling are recommended within the Inner and Outer Substation Areas to refine the extent of impacts for the CSM and to support the development of the remedial action plan for the Site. • Ecological Risk Assessment: The 2020 Annual Report recommended the completion of an ecological risk assessment to evaluate the impacts to ecological receptors from impacted sediments identified within the Hockanum River. As the first step in the ecological risk assessment process, a screening level ecological risk assessment (SLERA) was completed in early 2021 by Exponent Ecological and Biological Sciences (Exponent). As described below in Section 2.2, the need to complete additional ecological risk assessment is currently being evaluated. Rockville Former MGP 2021 Annual Report 1-9
  10. Page 15 of 203

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 8 Page 15 of 203 Tighe&Bond Section 2 2021 Site Activities Tighe & Bond developed the Phase III ESA investigation approach to assess the nature and extent of impacts associated with the Rockville Former MGP and Site-related AOCs identified during the Phase I ESA. The Phase III ESA built upon previous investigations completed by Northeast Utilities Service Company-Environmental Services Department (NU) between 1990 and 1995 and has used the CTDEEP CSM approach provided in the CTDEEP SCGD. Tighe & Bond has completed Phase III ESA investigations from late 2016 through 2020 using the iterative CSM approach to identify and address data gaps to work toward finalizing the CSM and advancing the Site to remediation. 2.1 Supplemental Phase III ESA In 2021, Tighe & Bond developed a scope of work to address the 2020 data gaps summarized above in Section 1.5. The proposed scope of work included the installation of additional off-site groundwater monitoring wells to investigate and delineate groundwater impacts identified in the shallow and intermediate groundwater beneath the St. Joseph’s Church property and across West Street, soil sampling within the active substation area to delineate SEH impacts at SB-76 and SB-78, and the potential for additional ecological risk assessment activities and completion of a Baseline Ecological Risk Assessment (BERA) of the Hockanum River. Additional Phase III ESA activities and other Site reporting requirements were put out to bid in a competitive bid process. The scope of work was modified to include soil vapor and indoor air sampling within the substation control house due to petroleum impacts observed in the groundwater adjacent to the building. An invitation to bid was sent out to a list of environmental consultants in October 2021. Following the bid process, Eversource will select a consultant to complete the scope of work. Several other tasks and ancillary activities associated with the Site were completed in 2021 as described in the sections that follow. 2.2 Screening Level Ecological Risk Assessment (SLERA) A SLERA was completed in early 2021 by Exponent for that portion of the Hockanum River that flows through the Site and submitted to CTDEEP on March 31, 2021. Based on the screening-level exposure estimate and risk calculations, the information indicates a potential for adverse ecological effects from chemicals of potential ecological concern (CoPECs) in the Hockanum River at the Site to benthic invertebrates, fishes, and semiaquatic wildlife, which requires further evaluation in a baseline ecological risk assessment (BERA). However, Exponent concluded that potential exposure and risk to amphibians at the Site does not require further evaluation. To date, CTDEEP has not provided Eversource with comments or recommendations regarding the need for additional ecological risk assessment (BERA) to address the findings of the SLERA. It is anticipated that a meeting between CTDEEP and Eversource will be scheduled in early 2022 to discuss the results of the SLERA and the need for additional ecological risk assessment for the Site. Rockville Former MGP 2021 Annual Report 2-1

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)