Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

5 pages match
  1. Page 28 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 28 of 335 concentrations above which effects are likely to be observed. Below is a summary of the calculated HQs for the various COPEC classes: Analyte Total HMW-PAHs Total LMW-PAHs Total PAHs Site EPC (mg/kg) 31.7 8.7 40.1 Raccoon HQs Based on LOAEL 0.62 0.002 0.06 As presented, all calculated HQs for the raccoon are below 1.0. Based on these results, it can be assumed that the PAH COPECs do not pose a statistically significant ecological risk and will not be evaluated further for impacts to piscivorous mammals. It should also be noted that these HQs were calculated utilizing a highly conservative AUF of 100% which would be highly unlikely based on the size of the Site compared to the researched home range of the common raccoon (presented in Table 3). 3.5 Adjustment for Bioavailability & Equilibrium Partitioning The toxicity of many organic constituents, including PAHs, is considered to be correlated with the dissolved contaminant concentration present in sediment pore water rather than the total contaminant concentration found in sediment. This is because a fraction of the total contaminant concentration is tightly bound to sediment particles and not readily bioavailable (DiToro & McGrath 2000; USEPA 2009). Therefore, toxicity estimates based on interstitial or pore water concentrations provide a more accurate measure of the potential for adverse effect from exposure to sediment-associated organic contaminants. For organic compounds in sediment, the key influencing factor for solid- and liquid-phase portioning is the presence of organic carbon (USEPA 2003). Typically, bioavailability assessments of PAHs are conducted to calculate sample-specific equilibrium partitioning sediment benchmark toxic units (ESBTUs) for PAHs based on measured TOC concentrations in sediment samples. The equilibrium partitioning methodology uses TOC concentrations in Site sediment to predict the fraction of a contaminant that is dissolved in pore water and therefore, bioavailable to benthic invertebrates and other sediment-dwelling aquatic organisms. When higher concentrations of TOC are present in sediment, a smaller fraction of the contaminant will be dissolved in sediment pore water because the contaminant will sorb to the organic carbon and will therefore be less toxic to sediment-dwelling aquatic organisms. A review of TOC concentrations from both onsite and background/reference locations indicated relatively low TOC concentrations which typically equate to less binding of the PAHs to the solid-phase portioning (and thus greater portioning into the pore water). Based GEI Consultants, Inc. 20
  2. Page 29 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 29 of 335 on the findings of the RSLERA, as well as the low TOC concentrations observed, it was not deemed beneficial to conduct a bioavailability/equilibrium portioning assessment at this time. Analyte P-Value of t-Test HWM PAHs 0.22 LMW PAHs 0.40 Total PAHs 0.26 Review of the ProUCL background analysis outputs (which are included as Appendix D) indicated that, for all three data sets (HMW, LMW and total PAHs), Site sediment data was equal to or less than the background sediment data, which indicates that there is no significant increase in sediment impacts due to Site-related COPECs. GEI Consultants, Inc. 21
  3. Page 30 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 30 of 335 Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 4. Background Assessment The Hockanum River is a recipient of discharges and runoff from multiple urban, industrial, and historical sources. To evaluate the potential for background sediments upstream of the Site to contain COPECs at concentrations that could be influencing chemical concentrations downstream via sediment transport and deposition to the Site, a background contribution analysis was conducted. To assist in this analysis, background sediment samples collected over the various investigations from 2017 through 2022 were assessed and compared to sediments samples collected from the Site over the same period of time. The following table presents a breakdown of the two data sets and the various locations are shown on Figures 4 and 5. Site Sediment Locations Background Sediment Locations SED-02 SD-01 SED-01 SED-104 SED-03 SD-02 SED-07 SED-105 SED-04 SD-03 SED-08 SD-B01 SED-05 SD-04 SED-09 SD-B02 SED-06 SD-05 SED-101 SD-B03 SED-201 SD-06 SED-102 SD-B04 SED-202 SD-07 SED-103 SD-B05 The concentrations of PAHs in background and sediment from the Site were compared statistically to determine if PAH concentrations detected in onsite samples are significantly higher than background. Total HMW PAHs, total LMW PAHs and total PAH concentrations from Site and background sediments were assessed via inferential statistics calculated using a two-sample hypothesis t test (α=0.05) available in ProUCL v. 5.2 (Singh and Maichle 2015). A null hypothesis stating the Site data sets equal to or less than the background data sets were used to make the inferential determination. A two-sample t-test will generate a “P-value” which is a measure of the probability of obtaining the observed results, assuming that the null hypothesis is true. The lower the P-value, the greater the statistical significance of the observed difference and the less likely that the null hypothesis is correct. A P-value greater that 0.05 is considered an indicator that the null hypothesis is true. The following are the calculated P-values from the three t-tests: GEI Consultants, Inc. 22
  4. Page 31 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 5. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 31 of 335 Uncertainty Analysis Estimation of risks to ecological receptors that may result from exposure to constituents in the environment is a complex process. Uncertainty is inherent in each step of the risk assessment process because each parameter used in estimating risk has a degree of variability and uncertainty associated with it. In each step of the risk assessment process, beginning with the data collection and analysis and continuing through risk characterization, conservative assumptions are made that are intended to be protective of ecological receptors and to ensure that risks are not underestimated. The risk values generated in this RSLERA are not precise, deterministic estimates, but conditional estimates controlled by upper-bound assumptions regarding exposure and toxicity. The calculated risk values provide an upper bound estimate of the potential ecological risk values, as it is not possible to obtain an accurate or precise estimate of actual ecological risks. This section summarizes the major factors contributing to the uncertainty associated with this RSLERA in an effort to minimize their effects on the interpretation of results. Sources of uncertainty may include Site characterization and data quality, selection of COPECs, calculation of EPCs, exposure estimate variables and background impacts and are discussed in further detail in this section. 5.1 Site Characterization and Receptor Selection The ecosystems potentially at risk were based initially on a comprehensive review of historical investigations and observations made during previous ecological investigations and Site reconnaissance. Aquatic habitat associated with the Hockanum River was identified and considered in this evaluation. In general, the Site is isolated and surrounded by roadways and residential and commercial development. The Site is less than 3.5 acres in size and consists almost entirely of developed land used for an electrical substation. The uncertainty associated with failing to identify a potentially exposed ecological resource is minimal. This RSLERA focuses on calculated impacts to benthic invertebrates and fish (visa vie benthic invertebrates) via direct contact and semi-aquatic mammals via dietary modeling as assessment endpoints. The absence of elevated risk to benthic biota and semi-aquatic mammals and a diverse food web in this industrialized reach that is lacking extensive riparian or fringing wetland habitat suggest, with reasonable confidence, that risk to other potential receptors remains insignificant. GEI Consultants, Inc. 23
  5. Page 32 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 5.2 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 32 of 335 Data Sufficiency Data sufficiency may contain a level of uncertainty for a variety of reasons. Uncertainty may be related to the number of samples used to characterize a given area and whether potential areas of high contamination have been sampled. Samples collected for the purposes of ecological evaluation need to be representative of all areas of potential impacts at the Site. The extent of sediment data collected from 2017 through 2022 provided widespread areal and temporal coverage creating data sets sufficient for use in this RSLERA. The Site in question is relatively small and the samples collected were spatially distributed to provide a comprehensive evaluation of the Site. Sediment sample locations were also biased toward areas with the highest potential to contain depositional material most likely to have higher COPEC concentrations. As a result, the samples collected as part of the ecological investigation process may actually overestimate the potential for ecological risk at the Site as receptors will utilize all aspects of the Hockanum River as it pertains to the Site, not just areas of high deposition. More importantly, it is not expected that additional analytical information would afford a greater understanding of the ecological risks in these areas. The uncertainty associated with data sufficiency is comprehensively addressed throughout the RSLERA process and is considered to have a minimal effect on the conclusions of the RSLERA and, if anything, could potentially overestimate ecological risk at the Site. 5.3 Uncertainty Associated with the Calculation of EPCs It is conventional to use less conservative exposure estimates in subsequent stages of the ERA process (like a refined SLERA or Baseline Ecological Risk Assessment) as compared to earlier stages (SLERA) of the ERA process where, for example, the maximum detected concentration is used in the screening level exposure estimate to ensure that potential impacts from toxic or bioaccumulative chemicals are not overlooked. However, ecological receptors would not be exposed to the maximum concentration for an extended period of time, particularly for mobile species. The actual EPC varies depending on receptor behavior and is likely to be lower than the maximum concentration. EPCs generated by calculating the 95% UCL were used for risk characterization in the RSLERA. These represent a more conservative EPC value than the average concentration. Therefore, risk estimates derived using the 95% UCL poses limited levels of uncertainty in the ERA. Given the conservative nature of utilizing a 95% UCL vs another statistical output (like a geometric mean), the level of uncertainty associated with establishment of the exposure estimates is believed to be biased conservatively. GEI Consultants, Inc. 24
  6. Page 33 of 335Match

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 5.4 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 33 of 335 Uncertainty Associated with Exposure Estimates There is uncertainty associated with each measured variable used in exposure models. When combining variables in models, uncertainty associated with these variables is cumulative, and is expressed in the model results. These effects should be considered when interpreting model results. Since uncertainty is unavoidable for this type of assessment, wherever possible, steps were taken to build conservatism into the model. Conservatism is the product of combining upper bound values of each variable incorporated in the model, potentially resulting in an overestimation of the actual values and minimizing the likelihood of underestimating the risk. Dose models required several assumptions, which could result in either overestimation or underestimation of risks to receptors. Body weights and feeding rates used are considered suitable and representative for estimating exposure. In addition, receptors are assumed to feed exclusively on specified food sources, although raccoon may feed opportunistically on a variety of food types that may vary seasonally. In addition, a very conservative AUF of 1.0 was utilized in the dose models for this RSLERA. Overall, based on the nature of the modeling process, the level of uncertainty associated with establishment of the exposure estimates cannot be accurately determined but is believed to be biased conservatively. 5.5 Uncertainty Associated with TRV Selection TRVs, which are used to place a “value” on the effects of contaminant exposure on a receptor, are predominantly based on results of reported laboratory toxicity studies for specific chemicals on a limited number of species, resulting in two main sources of uncertainty. First, laboratory conditions may not accurately reflect the effects of natural conditions on a constituent’s toxicity to receptors in the environment. Environmental stresses and synergistic effects of multiple constituents could increase toxicity, while environmental compatibility and antagonistic effects of multiple constituents could decrease toxicity. Second, uncertainty exists as toxicity values are available for only a limited number of species. TRVs were not adjusted for body size differences between the experimental animal and the receptors evaluated herein (no allometric adjustments). This direct application of TRVs determined from evaluation of the experimental animal (e.g., mouse to mink) does not account for physiological differences between that species and the ROI utilized in the RSLERA (common raccoon) may lead to an overestimation or underestimation of risk. In addition, NOAEL TRVs are relatively unreliable because, by definition, no effects were measured. More confidence with these values exists if the LOAEL is close to the NOAEL. However, all of the toxicity studies from which these TRVs were derived were conducted with chemical forms that likely overestimate bioavailability under natural conditions. Laboratory animals are selected and bred to be sensitive while natural stresses select for more GEI Consultants, Inc. 25
  7. Page 34 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 34 of 335 robust organisms in the wild. This is particularly true of organisms that populate urban settings. Due to the uncertainty involved with extrapolations between species, individuals, and laboratory studies, the less conservative exposure scenarios were developed using a LOAEL. The relative HQs and the differences between the NOAEL and LOAEL HQ calculations are discussed as part of the risk characterization. Estimates of the potential for adverse effects in any ecological evaluation inevitably contain a level of uncertainty. Sources of uncertainty can include, but are not limited to, sampling error, the representative nature of the chosen sampling locations, the potential migration pathways, data analyses and associated detection limits, and representativeness of ESCs. 5.6 Uncertainty Associated with Calculation of Total PAH Values The total PAH values were calculated as the sum of the detected PAHs and the non-detected PAHs (the MDL was utilized as a surrogate value for non-detected PAHs). This is appropriate as PAHs usually exist as mixtures and if one is present, most others are likely present as well. Based on this approach, the summed total PAH values may overestimate risk for sediment which further lends to the conservative nature of the RSLERA process. 5.7 Uncertainty Associated with Sediment Sample Depths The biologically active zone was defined as 0 – 0.5 feet, consistent with USEPA protocol (USEPA 2015). However, it is possible for the depth of the biotic zone to vary based on substrate morphology. For instance, in silty sediments the biotic zone may extend only an inch or two due to anoxic conditions. This may introduce under- or over-estimation of risk if the contaminants are concentrated in the bottom or top interval of the sample, respectively. Also, the probability of sediment movements of a magnitude sufficient to mobilize or uncover subsurface sediment in the future is unknown. Such remobilization could occur as a result of dredging or extreme weather events. While the conclusions are of high confidence for current conditions, the presence of much higher concentrations of PAHs in deeper sediment introduces uncertainty about future conditions. Confidence in sediment stability under future conditions would be necessary to evaluate if remobilization of subsurface contamination may be relevant. GEI Consultants, Inc. 26
  8. Page 35 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 6. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 35 of 335 Conclusions Based on the RSLERA activities presented in this report, the following key conclusions can be drawn: Previous investigations indicated the presence of potential MGP-related constituents in Hockanum River media in the vicinity of the Site, including PAHs in sediment and metals in surface water. Initial screening of surface water data to ESCs did not show detected concentrations in exceedance of these conservative screening values. Based on the lack of ESC exceedances, the need to further assess potential ecological impacts from surface water was not warranted. Ecological receptors of interest for the Site were determined to include benthic invertebrates, fish, and semi-aquatic mammals. Exposure estimates of total PAHs calculated for direct contact by benthic invertebrate and fish communities to sediment indicated HQ slightly above 1.0 (HQ = 1.76). An additional line of evidence to assess potential Site-related impacts to the benthic invertebrate and fish communities was the evaluation of background or reference location total PAH concentrations on benthic invertebrates. Exposure estimates of background total PAHs concentrations for direct contact by benthic invertebrate and fish communities to sediments presented an HQ (Background HQ = 1.79) consistent with the Site HQ (Site HQ = 1.76). Exposure estimates of PAHs calculated for the common raccoon indicated LOAEL HQs less than 1.0 utilizing the most conservative scenario of a 100% AUF. A background assessment revealed no statistical difference between Site sediment PAH concentrations and background/reference PAH concentrations. Based on this information, no further investigation, evaluation or action with respect to ecological receptors is warranted regarding Site sediments or surface water in the Hockanum River. GEI Consultants, Inc. 27
  9. Page 36 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 7. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 36 of 335 References [CT DEEP] Connecticut Department of Energy and Environmental Protection. 2015. Ecological Risk Assessment Guidance, [accessed February 2, 2023]. https://portal.ct.gov/DEEP/Remediation--Site-Clean-Up/Guidance/Ecological-RiskAssessment-Guidance Di Toro, D.M., Zarba, C.S., Hansen, D.J., Berry, W.J., Swartz, R.C., Cowan, C.E., Pavlou, S.P., Allen, H.E., Thomas, N.A. and Paquin, P.R. (1991), Technical basis for establishing sediment quality criteria for nonionic organic chemicals using equilibrium partitioning. Environmental Toxicology and Chemistry, 10: 1541-1583. https://doi.org/10.1002/etc.5620101203 Edmisten-Watkin, G, and Stelljes, M, 1993. A Proposed Approach to Quantitatively Assess Potential Ecological Impacts to Terrestrial Receptors from Chemical Exposure. Environmental Toxicology and Risk Assessment. ASTM International , 1993. Exponent. 2021. Screening-Level Ecological Risk Assessment, Rockville Former Manufactured Gas Plant Site 13 Maple Street/West Main Street Rockville, Vernon, Connecticut REM ID: 12390. March 2021. GEI. 2022. Supplemental Phase II/III Environmental Site Assessment Work Plan. Rockville Former MGP Site. June 2022 ITRC (Interstate Technology & Regulatory Council). 2011. Incorporating Bioavailability Considerations into the Evaluation of Contaminated Sediment Sites. CS-1. Washington, D.C.: Interstate Technology & Regulatory Council, Contaminated Sediments Team. www.itrcweb.org. Macdonald, D, Ingersoll C, and Berger T, 2000. Development and Evaluation of ConsensusBased Sediment Quality Guidelines for Freshwater Ecosystems. Archives of Environmental Contamination and Toxicology. 39 (20-21). Rhomberg, L, and Wolff, S, 1998. Empirical Scaling of Single Oral Lethal Doses Across Mammalian Species Based on a Large Database. Risk Analysis. 18 (741-753). Sample, B, and Arenal, C, 1999. Allometric models for interspecies extrapolation for wildlife toxicity data. Bulletin of Environmental Contamination and Toxicology. 62 (653-663). Tighe & Bond. 2017. Phase I Environmental Site Assessment, Eversource Former Rockville MGP Site, 13 Maple Street/West Main Street, Rockville, Vernon, CT. March. [USEPA] United States Environmental Protection Agency. 1992. Framework for Ecological Risk Assessment, USEPA/630/R-92/001, Risk Assessment Forum, Washington, DC, February 1992. GEI Consultants, Inc. 28
  10. Page 37 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 37 of 335 [USEPA] United States Environmental Protection Agency. 1994. Final Site Inspection Report for Northeast Utilities-Vernon, Vernon, Connecticut. CERCLIS No. CTD983870353. TDD No. 9304-40-ACS. [USEPA] United States Environmental Protection Agency. 1997. Ecological Risk Assessment Guidance for Superfund: Process for Designing and Conducting Ecological Risk Assessments - Interim Final. EPA 540-R-97-006. [USEPA] United States Environmental Protection Agency. 1998. Guidelines for Ecological Risk Assessment. Office of Solid Waste and Emergency Response. [USEPA] United States Environmental Protection Agency. 2001. The Role of ScreeningLevel Risk Assessments and Refining Contaminants of Concern in Baseline Ecological Risk Assessments, Office of Solid Waste and Emergency Response, USEPA 540/F01/014, June 2001. [USEPA] United States Environmental Protection Agency. 2003. Procedures for the Derivation of Equilibrium Partitioning Sediment Benchmarks (ESBs) for the Protection of Benthic Organisms: PAH Mixtures. EPA-600-R-02-013 [USEPA] United States Environmental Protection Agency. 2007. Ecological Soil Screening Levels for Polycyclic Aromatic Hydrocarbons (PAHs) – Interim Final OSWER Directive 9285.7-78. USEPA Office of Solid Waste and Emergency Response. June 2007. [USEPA] United States Environmental Protection Agency (USEPA). 2009. Burgess, R.M. Evaluating Ecological Risk to Invertebrate Receptors from PAHs in Sediments at Hazardous Waste Sites. USEPA, Ecological Risk Assessment Support Center, Cincinnati, OH. EPA-600-R-06-162F. October 2009. [USEPA] United States Environmental Protection Agency. 2015. Determination of the Biologically Relevant Sampling Depth for Terrestrial and Aquatic Ecological Risk Assessments (Final Report). U.S. Environmental Protection Agency, Ecological Risk Assessment Support Center, Cincinnati, OH, EPA/600/R-15/176, 2015. GEI Consultants, Inc. 29

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)