Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

5 pages match
  1. Page 5 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 5 of 335 5. Uncertainty Analysis 5.1 Site Characterization and Receptor Selection 5.2 Data Sufficiency 5.3 Uncertainty Associated with the Calculation of EPCs 5.4 Uncertainty Associated with Exposure Estimates 5.5 Uncertainty Associated with TRV Selection 5.6 Uncertainty Associated with Calculation of Total PAH Values 5.7 Uncertainty Associated with Sediment Sample Depths 23 23 24 24 25 25 26 26 6. Conclusions 27 7. References 28 Tables 1. Surface Water Data Summary 2. Sediment Data Summary 3. Selected TRV Data 4. Food Chain Modeling Input Data 5. Benthic Invertebrate Exposure Estimates 6. Raccoon Exposure Estimates Figures 1. Site Location Map 2. Surface Water Sample Locations (2022) 3. Far Upstream Surface Water Sample Locations (2022) 4. Sediment Sample Locations (2017 – 2022) 5. Far Upstream Sediment Sample Locations (2017 - 2022) Appendices A. Exponent 2021 Screening-Level Ecological Risk Assessment B. Laboratory Data Packages C. ProUCL Site EPC Output D. ProUCL Background Assessment Output BAB/SEM:vjb \\geiconsultants.com\data\Data_Storage\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\02_PM\09_Eco Eval\2023 SLERA UPDATE\20230522_2200138 Rockville MGP RSLERA FINAL.docx GEI Consultants, Inc. ii
  2. Page 6 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 6 of 335 Executive Summary This Refined Screening-Level Ecological Risk Assessment (RSLERA) was prepared by GEI Consultants, Inc. (GEI) on behalf of The Connecticut Light and Power Company dba Eversource Energy (Eversource) to document a reevaluation of potential risk to ecological receptors at the Rockville former manufactured gas plant (MGP) site located at 13 Maple Street, in the Rockville section of Vernon, Connecticut (Site). A summary of the RSLERA activities is provided below. A previous ecological investigation conducted by Exponent Ecological and Biological Sciences (Exponent 2021) concluded the need for additional ecological evaluation of potential adverse effects to aquatic and aquatic-dependent biota from surface water and sediment in the Hockanum River, which flows through a portion of the Site. Specifically, concentrations of inorganics in sediment and surface water, as well as polycyclic aromatic hydrocarbons (PAHs) in sediment, were concluded by Exponent to require further evaluation. To address Exponent’s conclusion regarding the need for additional ecological evaluation, GEI implemented a phased approach introducing an “intermediate tier” of ecological risk assessment. This “intermediate tier” consists of a RSLERA with the inclusion of “Step 3a” as detailed in the United States Environmental Protection Agency’s (USEPA) ecological risk assessment guidance (USEPA 2001). Prior to the development of the RSLERA sediment and surface water sampling approach, GEI conducted a detailed review of the 2021 SLERA findings to refine the list of COPECs carried forward for further evaluation in the RSLERA. The review of the historic sediment data collected from 2017 through 2021 included comparison of both Site and background sediment inorganic concentrations to the USEPA Region IVs Freshwater Sediment Screening Values. The results of this screening indicated that only one Site location (SED-06) had inorganic concentrations exceeding the screening values (copper at 2,190 mg/kg; lead at 153 mg/kg). The observed concentration of lead at SED-06 (153 mg/kg) indicated a “slight” exceedance of the conservative USEPA Region IV Freshwater Sediment Screening Value for lead of 128 mg/kg. Sediment sample location SED-06 is located immediately downgradient from background sample location SED-09, which is associated with the municipal storm sewer outfall located at the corner of Maple Street and W. Main Street that discharges stormwater runoff from both roadways and does not receive runoff from the Site. The lead concentration in background sample SED-09 was 267 mg/kg, which is greater than the onSite, downstream sample at SED-06. Based on this assessment, and the fact lead concentrations in all other on-Site sediments were below the screening value, it was GEI Consultants, Inc. iii
  3. Page 7 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 7 of 335 concluded that the concentrations observed at SED-06 are impacted by discharge from municipal storm sewer located upstream of the Site or other non-Site related sources. The elevated copper concentration at SED-06 in 2017 was evaluated further by Tighe & Bond in 2018 with an attempt to re-create and delineate the exceedance. Tighe & Bond collected three follow-up samples in the location of 2017’s SED-06 location (SED-06A, SED-06B, and SED-06C). The 2018 investigation was not able to replicate the copper concentration observed at SED-06 in 2017. Concentrations from SED-06A (22.1 mg/kg), SED-06B (28.9 mg/kg) and SED-06C (83.7 mg/kg) were all below the USEPA Region IV Freshwater Sediment Screening Values and significantly below the concentration observed in SED-06 in 2017 (2,190 mg/kg). Based on the likely relationship for the observed lead exceedance at SED-06 to off-Site sources (e.g., the municipal storm sewer outfall), the inability to replicate the copper exceedance at SED-06, it was determined that inorganics in sediment did not warrant further evaluation at the Site and were not included in the additional sampling efforts to refine the ecological risk assessment. To further evaluate the potential risk for PAH impacts to the aquatic community, GEI collected additional sediment and surface water data from the sections of the Hockanum River adjacent to and downstream of the Site, as well as from additional upstream (background) locations. In total, seven co-located surface water and sediment samples were collected from the on-site and downstream reach (SW/SD-01 through SW/SD-07), and five upstream/background samples (SW/SD-B01 through SW/SD-B05), including from potentially contributing stormwater outfalls, were collected to quantify background contribution. Measurement ecological endpoints were established to assess the potential for surface water and sediment PAHs to pose a toxicological risk to benthic invertebrates, fish and semiaquatic mammals. In addition, a background contribution evaluation was conducted to determine if concentrations of PAHs detected the sections of the Hockanum River adjacent to the Site could be influenced by off-site sources of PAHs. Based on these RSLERA activities presented, the following key conclusions were drawn: Inorganic concentrations present in sediment were not found to pose an unacceptable risk to ecological receptors at the Site. In one instance where a “slight” exceedance of the conservative ecological screening criteria for lead was observed, it was determined that the likely contributing source of the lead exceedance was an upstream municipal storm sewer outfall and not from historic Site-related activities. GEI Consultants, Inc. iv
  4. Page 8 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 8 of 335 Initial screening of surface water data to ESCs did not show detected concentrations in exceedance of these conservative screening values. Based on the lack of ESC exceedances, the need to further assess potential ecological impacts from surface water was not warranted. Exposure estimates of total PAHs calculated for direct contact by benthic invertebrate and fish communities to sediment indicated HQ slightly above 1.0 (HQ = 1.76). An additional line of evidence to assess potential Site-related impacts to the benthic invertebrate and fish communities was the evaluation of background or reference location total PAH concentrations on benthic invertebrates. Exposure estimates of background total PAHs concentrations for direct contact by benthic invertebrate and fish communities to sediments presented an HQ (Background HQ = 1.79) consistent with the Site HQ (Site HQ = 1.76). Exposure estimates of PAHs calculated for the common raccoon indicated LOAEL HQs less than 1.0 utilizing the most conservative scenario of a 100% AUF. A background assessment revealed no statistical difference between Site sediment PAH concentrations and background/reference PAH concentrations. Based on this information, no further investigation, evaluation or action with respect to ecological receptors is warranted regarding Site sediments or surface water in the Hockanum River. GEI Consultants, Inc. v
  5. Page 9 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 1. Introduction 1.1 Purpose and Scope The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 9 of 335 This Refined Screening-Level Ecological Risk Assessment (RSLERA) was prepared by GEI Consultants, Inc. (GEI) on behalf of The Connecticut Light and Power Company dba Eversource Energy (Eversource) and consistent with Connecticut Department of Energy and Environmental Protection (CT DEEP) approach for conducting ecological risk evaluations (CT DEEP 2015). Its purpose is to document a reevaluation of potential risk to ecological receptors at the Rockville former manufactured gas plant (MGP) site located at 13 Maple Street, in the Rockville section of Vernon, Connecticut (Site). A Site Location Map is provided as Figure 1. This RSLERA is a component of the larger Supplemental Phase II/III Environmental Site Assessment (ESA). A previous ecological investigation conducted by Exponent Ecological and Biological Sciences (Exponent 2021) concluded the need for additional ecological evaluation of potential adverse effects to aquatic and aquatic-dependent biota from surface water and sediment in the Hockanum River, which flows through a portion of the Site. Specifically, concentrations of inorganics in sediment and surface water, as well as polycyclic aromatic hydrocarbons (PAHs) in sediment, were concluded by Exponent to require further evaluation. These conclusions were presented in a 2021 Screening-Level Ecological Risk Assessment (SLERA) submitted to CT DEEP. A copy of the 2021 SLERA is included as Appendix A (Exponent 2021). To address Exponent’s conclusion regarding the need for additional ecological evaluation, GEI has implemented a phased approach introducing an “intermediate tier” of ecological risk assessment. This “intermediate tier” consists of a RSLERA with the inclusion of “Step 3a” as detailed in the United States Environmental Protection Agency’s (USEPA) ecological risk assessment guidance (USEPA 2001). The use of a Step 3a RSLERA allows for the ability to make appropriate risk management decisions prior to the need for potentially further ecological investigation and possible preparation of a Baseline Ecological Risk Assessment. CT DEEP’s regulatory approach for conducting ecological risk assessments is to utilize the USEPA’s ecological risk assessment framework. Per this directive (CT DEEP 2015), the RSLERA is based on USEPA guidance and considers the following key guidance documents: The USEPA Framework for Ecological Risk Assessment (Framework) (USEPA 1992) GEI Consultants, Inc. 1
  6. Page 10 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 10 of 335 The USEPA Ecological Risk Assessment Guidance for Superfund (ERAGS) (USEPA 1997). Guidelines for Ecological Risk Assessment (Guidelines) (USEPA 1998). The Role of Screening-Level Risk Assessments and Refining Contaminants of Concern in Baseline Ecological Risk Assessments (USEPA 2001). The RSLERA was prepared as described by USEPA guidance (USEPA 1992, 1997) and includes a site description and habitat characterization, identification of complete exposure pathways, and a screening-level exposure estimate and risk calculation (USEPA 1997). 1.2 Site Setting and Background The 3.43-acre Site is bounded by a wooded lot, a church, and residential properties to the north, Maple Street to the east, the Hockanum River and West Main Street to the south, and residential properties with frontage on West Street (Route 527) to the west. The Site is currently used as an electrical substation, Eversource’s Substation 14W. The substation is enclosed by a locked fence that limits access to authorized personnel only. The Inner Substation Area includes the active electrical substation infrastructure including high voltage power lines, towers, transformers, and electrical control houses. Subsurface electrical power supply ducts and substation grounding grid are located beneath a crushed gravel cover inside the Inner Substation. The remainder of the Site is referred to as the Outer Substation area, which includes all areas outside the Inner Substation. The Outer Substation includes a grassed area surrounding the eastern and northern sides of the Site. A fenced area with a high-pressure gas regulator/control house is located on the western portion of the Outer Substation Area. The Hockanum River runs through the Outer Substation Area and abuts the Inner Substation Area to the south. Wooded and overgrown areas are located on the northern portion of the Site adjacent to the St. Joseph’s Church paved parking lot and along the southern portion of the Site between the Hockanum River and West Main Street. The Site is zoned “NR-10,” which is a designation provided to historic district neighborhood parcels. Surrounding land use within a 500-foot radius includes mixed residential, commercial, and industrial land use, schools, and a church. Historically, an MGP was located at the Site and operated from 1863 until the 1950s when natural gas was brought to the region. Gas production occurred until the mid-1930s after which the Site appears to have been primarily used for gas storage. A portion of the gas produced was also used to generate electricity at the plant. The MGP manufactured gas from coal using both coal gas and water gas productions methods. The primary by-products of the gasification process were tar, coke, and ammonia liquors that were recycled or sold where possible. Gas purifier wastes were also produced as part of gas manufacturing. Chemicals associated with these by-products include PAHs, volatile organic compounds (VOCs), GEI Consultants, Inc. 2
  7. Page 11 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 11 of 335 sulfides, cyanides, and ammonia. Inorganic chemicals such as metals can be found in higher concentrations in purifier wastes at MGP sites; however, purifier waste deposits have not been encountered during any ESA investigations at the Site. 1.3 Ecological Setting As discussed in the previous section, a portion of the Hockanum River enters the Site in the southeast corner of the property and runs in a westerly direction along the southern portion of the Site. In addition to the Hockanum River, the remainder of the Site consists almost entirely of developed land used as part of the previously discussed electrical substation. There are two small areas of undeveloped land consisting of narrow tree-lined areas along the southern and northern banks of the Hockanum River. The Site is surrounded by streets and developed land. Based on the current conditions, the Site currently provides fragmented habitat for aquatic life and semi-aquatic wildlife associated with the section of the Hockanum River as it passes through the Site. As detailed in Exponent’s 2021 SLERA, the Hockanum River begins at the outlet of Shenipsit Lake in Rockville and flows through Vernon, Ellington, Manchester, and East Hartford for about 23 miles before terminating at the Connecticut River. The portion of the Hockanum River present at the Site is narrow (approximately 21 to 25 ft wide) and shallow (approximately 0.5 ft in depth in areas with riffles and runs and approximately 3 ft in depth in pooled areas). The Hockanum River has been characterized as a losing river in the vicinity of the Site, which means there is no inflow of groundwater to the river but surface water from the river moves into the surrounding groundwater (Tighe & Bond 2017). The areas surrounding upstream and downstream portions of the Hockanum River have historically been heavily impacted by industrial activities, and the riverbank has been redeveloped as parks and hiking trails. The Hockanum River also receives engineered stormwater discharges from municipal storm sewer systems at multiple points both upstream and downstream of the Site. Most notably, there is a municipal storm sewer outfall discharging to the Hockanum River located in the southeast corner, upstream of the Site that is not associated with current or former operations at the Site. The municipal storm sewer outfall is located at the corner of Maple Street and W. Main Street (Figure 2) and discharges stormwater runoff from both roadways. The Hockanum River is classified by CT DEEP as a Class B water, meaning that it is designated for use as navigation, recreation, industrial and agricultural water supply. The Hockanum River can support aquatic life, such as benthic invertebrates and fish, amphibians, and a variety of water-dependent birds and mammals. GEI Consultants, Inc. 3
  8. Page 12 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 1.4 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 12 of 335 Critical Habitat and Species of Special Concern Based on GEI’s review of the CT DEEP Natural Diversity Data Base (NDDB), which was updated in December 2022, the Site is not located within a Natural Diversity Area. The NDDB represents the approximate location of endangered, threatened, and special concern species and significant natural communities in Connecticut. This finding is consistent with previous investigations and a USEPA report (USEPA 1994) that indicated that there were no Federally Endangered Species or Connecticut Species of Concern at the Site. The closest record was more than a mile downstream. In addition, the NDDB freshwater mussel map shows that the Site is not near any state listed freshwater mussel species. Another species of concern in Connecticut is northern long-eared bat and the Site is not located in an area with known places of hibernation for this bat species. 1.5 Summary of Previous Ecological Assessment Activities Multiple ecological investigations have been conducted on behalf of property owners in the site vicinity since the early 1990s. Two ecological investigations conducted in 1992 and 1994, and further detailed in Exponent’s 2021 SLERA, included the sampling of sediment, surface water and fish tissue for characterization for ecological and human health risk. Since these two initial investigations, extensive sampling of the Hockanum River both within the Site and upstream/downstream of the Site has been conducted by Tighe & Bond (Tighe & Bond 2017) and Exponent (Exponent 2021). In view of the extensive additional sampling conducted since the original investigations, the 1992 and 1994 data were not considered representative of current conditions and were not considered as part of the data set for the 2021 SLERA or for this evaluation. The following summarizes the major reports and investigations pertinent to ecological assessments at the Site and which are used as part of the RSLERA: On November 13, 2017, Tighe & Bond collected sediment samples from six locations in the Hockanum River (SED-01, SED-02, SED-03, SED-04, SED-05, and SED-06). The sediment samples were analyzed for CT extractable total petroleum hydrocarbons (ETPH), metals (antimony, arsenic, barium, beryllium, cadmium, chromium [total], copper, lead mercury, nickel, selenium, silver, thallium, vanadium, and zinc), cyanide (total), polychlorinated biphenyl (PCB) Aroclors, semi-volatile organic compounds (SVOCs), volatile organic compounds (VOCs) and total organic carbon (TOC). In addition to six sediment samples, Tighe & Bond also collected surface water samples from four locations (SW-01, SW-02, SW-03, and SW-04) in the Hockanum River that were analyzed for CT ETPH, 15 metals (antimony, arsenic, barium, beryllium, GEI Consultants, Inc. 4
  9. Page 13 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 13 of 335 cadmium, chromium [total], copper, lead, mercury, nickel, selenium, silver, thallium, vanadium, and zinc), cyanide (total), SVOCs, and VOCs. On August 28, 2018, Tighe & Bond collected sediment samples from six locations (SED-06A, SED-06B, SED-06C, SED-07, SED-08, and SED-09) near the Site. The purpose of the sampling was to further investigate a sediment location where the 2017 sediment sample SED-06 contained an elevated concentration of copper (2,190 mg/kg), as well as to identify possible off-site sources of contamination. Section 4 discusses the potential off-site sources and samples that characterize contributions from these potential sources. On October 21, 2020, Tighe & Bond collected sediment samples from five locations (SED-101, SED-102, SED-103, SED-104, and SED-105) upstream of the Site. The upstream locations were selected by Exponent and Tighe & Bond based on visual inspection of the sediment substrate and its similarity to sediment substrates near the Site. The sediment samples were analyzed for CT ETPH, 15 metals (antimony, arsenic, barium, beryllium, cadmium, chromium [total], copper, lead, mercury, nickel, selenium, silver, thallium, vanadium, and zinc), PAHs, grain size, and TOC. In addition to this round of sediment sampling, Tighe & Bond collected surface water samples from two locations (SW-100 and SW-101) in the Hockanum River. The surface water stations SW-100 and SW-101 were co-located with upstream sediment samples SED-101 and SED-104, respectively. The surface water samples were analyzed for CT ETPH, 15 total and dissolved metals (antimony, arsenic, barium, beryllium, cadmium, chromium [total], copper, lead, mercury, nickel, selenium, silver, thallium, vanadium, and zinc) and PAHs. On February 8, 2021, Tighe & Bond collected two additional sediment samples (SED-201 and SED-202) from the Hockanum River. These samples corresponded to locations of former substation outfall pipes noted on historical plans and were sampled to determine if they could have contributed to chemical contamination of the river in those areas. Only sediment samples were collected because the pipe outfalls could not be located. These sediment samples were analyzed for CT ETPH, 15 metals (antimony, arsenic, barium, beryllium, cadmium, chromium [total], copper, lead mercury, nickel, selenium, silver, thallium, vanadium, and zinc), cyanide (total), PCB Aroclors, PAHs, grain size, and TOC. 1.6 Conclusions of 2021 SLERA Data collected as discussed in Section 1.2 was utilized by Exponent to prepare the 2021 SLERA (Appendix A). The findings of the SLERA indicated potential adverse effects to aquatic and aquatic-dependent biota for the portion of the Hockanum River within and adjacent to the Site. Contaminants of potential ecological concern (COPEC) were identified to be PAHs and various metals based on screening-level comparisons to standard, GEI Consultants, Inc. 5
  10. Page 14 of 335

    Refined Screening Level Ecological Risk Assessment Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 May 2023 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 14 of 335 conservative ecological screening criteria for surface water and sediment. Exponent also identified upstream (background) concentrations of PAHs in sediment and metals in surface water that could contribute to the potential impacts to the sediment and surface water observed. Therefore, Exponent (2021) recommended the need for additional ecological evaluation of sediment and surface water. Based on Exponent’s SLERA conclusion, GEI has prepared this RSLERA to refine the findings of the 2021 SLERA. To conduct this refinement, GEI collected additional sediment and surface water data as detailed in Section 2. These data, as well as the previous evaluated data from the 2021 SLERA, were used to assess and identify potential for risk in the RSLERA, including risk to benthic invertebrates, aquatic life (including fish) and wildlife (i.e., semi-aquatic terrestrial receptors). It should be noted that due to the transient nature of surface water through the Site, historic surface water data, was not utilized as part of this RSLERA as it is not indicative of current site conditions. GEI Consultants, Inc. 6

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)