Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

5 pages match
  1. Page 92 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 92 of 335 March 2021 A large number of chemicals lacked surface water SLs; however, none of these chemicals were detected in any of the surface water samples. In the case of sediment, two detected analytes (CT ETPH and carbazole) were detected in sediment samples but lacked sediment SLs. CT ETPH was retained as a CoPEC but this analyte consists of a number of chemicals that were evaluated individually in the SLERA. For carbazole, while there is no sediment SL for carbazole, this chemical was detected in only two of the nine sediment samples and is not a BCC; therefore, it was eliminated as a CoPEC. For many undetected chemicals, there is often uncertainty as to whether they could elicit adverse ecological effects, because the detection limits for these chemicals exceed sediment and surface water SLs. This is largely because the SLs have been developed to be conservative using various often compounded uncertainty factors. Some of the analytes never detected in a given medium had MRLs in exceedance of the applicable SL (Appendix B). Analytes that were never detected in any media were not retained as CoPECs. This elimination may result in an underestimate of Site risk by an unknown amount. However, the presence of data reported as non-detected above a specific reporting limit in a data set has the potential to affect risk estimates because such data introduce uncertainty as the true concentration is somewhere between the reporting limit and zero. The underestimation of risk would likely be low because if the non-detected chemicals were actually site-related and present at levels of significant concern, they likely would have been found at concentrations above the detection limits at some point in the investigation. 5.3 Uncertainty Associated with Bioaccumulation Factors and Trophic Transfer Factors Concentrations of CoPECs in biota have not been measured at the Site, and Site-specific sediment bioaccumulation tests were not conducted for this assessment. Instead, this assessment used BAFs for plants and invertebrates and trophic transfer factors derived from the literature. However, these literature-derived factors are recognized as being conservative, so it is likely that estimating exposure of wildlife to CoPECs in biota from the literature-derived accumulation or transfer factors led to an overestimate, rather than underestimate, of risk. 5.4 Uncertainty Associated with the Food-Chain Models There are inherent uncertainties in the use of the food-chain model, because the model incorporates simplifying assumptions to represent a complex ecological system. For example, food-chain models assume that chemicals in food and incidentally ingested sediment are completely available to the receptor. This will overestimate risk for constituents for which only a fraction of the ingested dose is bioavailable. 2000174.000 – 9856 29
  2. Page 93 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 93 of 335 March 2021 The actual diets of the wildlife receptors include more diverse food types than are represented in this SLERA. This assessment assumes exposure from consumption of particular prey types can be estimated based on concentrations in particular food items representative of the prey type. There is uncertainty in the ingestion rates of the wildlife receptors. However, studies were used that present conservative estimates of quantity of food and soil/sediment in the diet (Nagy 2001; U.S. EPA 1993; Beyer et al. 1994) to reduce the likelihood of underestimating risk. 5.5 Chemical Concentrations Upstream of the Site in Hockanum River The Site is located in an urbanized watershed and the Hockanum River receives inputs from several point and non-point sources. To investigate whether off-site concentrations of chemicals in sediments and surface waters could be influencing chemical concentrations in sediments and surface waters near the Site, Tighe & Bond collected sediment and surface water samples from five locations in the Hockanum River upstream of the Site (Figure 11) in 2020. The sample collection and analysis is described below (Section 5.5.1). Screening-level calculations of exposure and risk were made for the upstream data using the same methods as described for the Site data in Section 4; the results for the upstream data are described below (Section 5.5.2). 5.5.1 Tighe & Bond Upstream Sediment and Surface Water Sampling 2020 On October 21, 2020, Tighe & Bond collected sediment samples from five locations (SED-101, SED-102, SED-103, SED-104, and SED-105) upstream of the Site. The upstream locations were selected by Exponent, Inc. and Tighe & Bond based on visual inspection of the sediment substrate and its similarity to sediment substrates near the Site. Sediment was collected using decontaminated stainless-steel hand sampling tools from within the top six inches of the sediment surface (surficial samples). The sediment samples were analyzed for CT ETPH, 15 metals (antimony, arsenic, barium, beryllium, cadmium, chromium (total), copper, lead mercury, nickel, selenium, silver, thallium, vanadium, and zinc), 17 PAHs, grain size, and total organic carbon. On October 21, 2020, Tighe & Bond collected surface water samples from two locations (SW100 and SW-101) in the Hockanum River. The surface water stations SW-100 and SW-101 were collocated with two of the upstream sediment SED-101 and SED-104 stations, respectively (Figure 11). The surface water samples were analyzed for CT ETPH, 15 total and dissolved metals (antimony, arsenic, barium, beryllium, cadmium, chromium (total), copper, lead mercury, nickel, selenium, silver, thallium, vanadium, and zinc), 17 PAHs, and water hardness. Several chemicals were detected in sediment and surface water located upstream of the Site. Tables 18 and 19 present the summary statistics for concentrations of chemicals in upstream sediment and surface water, respectively. 2000174.000 – 9856 30
  3. Page 94 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 94 of 335 March 2021 5.5.2 Screening-Level Exposure Estimate and Risk Calculation for Upstream Data 5.5.2.1 Exposure Point Concentrations for Upstream Data Table 20 compares the EPCs for the upstream sediment and surface water samples to that for the Site EPCs for sediment and surface water data. The EPCs for both data sets were calculated either as the MDC or the MRL. The EPCs for the Site sediment data were higher than those for the upstream sediment data. However, the Site surface water EPCs were very similar to the EPCs for the upstream surface water data, with some exceptions due to slightly higher reporting limits in the upstream samples. 5.5.2.2 Results of Screening-level Ecological Risk Assessment using Upstream Data Using the upstream EPCs, HQs were calculated for benthic invertebrates, aquatic life, and wildlife to assess whether upstream concentrations could lead to potential risk (as indicated by HQs > 1) (see Appendix F for the supporting tables for this analysis). HQs for many Site CoPECs, including barium, cadmium, lead, vanadium, zinc and most of the PAHs, were above 1 in the at least one of the assessments for benthic invertebrates, aquatic life, and wildlife upstream of the Site (Table 21). This indicates that background sediments and surface water upstream of the Site contain CoPECs at concentrations that could present possible risk from current and historical inputs to the Hockanum River. These results suggest that the assumptions used in the SLERA are quite conservative (reasons discussed above in this section). The background sediment results also could suggest that concentrations of chemicals upstream above screening levels could be influencing chemical concentrations downstream via sediment transport and deposition at the Site. 2000174.000 – 9856 31
  4. Page 95 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 95 of 335 March 2021 6 Summary and Conclusions On behalf of Eversource, Exponent, Inc., under contract to Tighe & Bond, has prepared this SLERA for the Rockville Former MGP site located at 13 Maple Street/West Main Street in Rockville, Vernon, Connecticut. This SLERA was developed as part of the Phase III ESA to assess potential exposure pathways to ecological receptors at the Hockanum River at the Site, which are being completed under the CTDEEP VRP. The Site encompasses 3.43 acres this is comprised of two parcels of land. The first parcel encompasses 2.88-acres and is located at 13 Maple Street. The parcel is developed for use as an active substation (Rockville 14W) and includes grassed yard and brush/wooded areas on the northern bank of the Hockanum River. The MGP footprint was located primarily in the central portion of the 13 Maple Street Parcel. The second parcel is a 0.55-acre parcel located along West Main Street. The Hockanum River is located this parcel and the property is undeveloped and overgrown and wooded areas are located along the southern riverbank (Figure 2 and 3). The Hockanum River is classified by CTDEEP as Class B waters, meaning that it is designated for use as navigation, recreation, industrial and agricultural water supply, and potential habitat for fish and other aquatic life and wildlife. Based upon Phase III ESA investigation, the Hockanum River is a “losing stream”, where the stream recharges to groundwater at the Site. Groundwater flows northward away from the Hockanum River at the former MGP Site and Rockville 14W substation. The river receives stormwater inputs from two stormwater outfalls on-site as well as from upstream sources. Two historic outfall pipes were also identified based upon historical substation mapping and two outfalls were potentially associated with the former MGP along the northern bank of the river at the Site. An outfall believed to be associated with the former Hockanum Mill is located 270 ft north of the Site at Maple Street on the eastern site boundary. Historically, the Hockanum River was integral to the industrial development of Rockville. The river was dammed and re-channelized for waterpower for multiple textile mills upstream of the site. Fill materials were likely used during initial develop development of the area based upon site investigations. The textile mills operated from the early 1800s through the World War II era with operations declining in the following decades. The mills generated textile processing wastes that could have potentially been discharged textile production waste materials to the river as part of operations. The MGP operated from circa 1863 until circa mid-1930s after which the Site appears to have been primarily used for manufactured gas storage until the 1950s. The Site is located in an area of mixed residential with some commercial use to the south along West Main Street including a home heating oil distributor with aboveground oil tank, Gottier Fuel, which is located at the intersection of Maple Street and West Main Street, directly upstream of the Site. The facility maintains a large above-ground heating oil tank for fuel oil delivery trucks. 2000174.000 – 9856 32
  5. Page 96 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 96 of 335 March 2021 The ecological conceptual site model identified primary sources of CoPECs for on-site historic fill and outfall pipes from the MGP and the historic outfall pipes (including the Hockanum Mill) associated with subsurface piping at the adjacent to the substation. Off-site sources for stormwater runoff and impacted sediments that could impact river ecological receptors including benthic invertebrates, amphibians, fishes, and wildlife (Figure 9). The SLERA identified several CoPECs, including PAHs, barium, cadmium, chromium, copper, lead, mercury, nickel, vanadium and zinc, present at concentrations in sediment and/or surface waters that resulted in HQs (quantitative risk estimates) in exceedance of 1. Upstream sediment and/or surface water samples contained similar PAHs and some similar metals (barium, cadmium, lead, and zinc) present at concentrations that resulted in HQs in exceedance of 1. ETPH was retained as a CoPEC for sediment and surface waters collected on-site and upstream but was assessed under risk from PAH compounds. At the end of the screening-level exposure estimate and risk calculation step, a scientific/ management decision point is reached. Per U.S. EPA guidance (U.S. EPA 1997), the weight of evidence is considered to decide among the following: • There is adequate information to conclude that ecological risks are negligible, and therefore, there is no need for remediation based on ecological risk. • The information is inadequate to make a decision at this point, and the ERA process will continue. • The information indicates a potential for adverse ecological effects, and a more thorough assessment is warranted. Based on the screening-level exposure estimate and risk calculations, Exponent has determined that the last conclusion list above has been reached for the Site. In other words, the available information indicates a potential for adverse ecological effects from CoPECs in the Hockanum River portion of the Site to benthic invertebrates, fishes, and semi-aquatic wildlife, which requires further evaluation in a BERA. However, potential exposure and risk to amphibians at the Site does not require further evaluation. It is important to note that chemical concentrations of CoPECs were also detected in upstream Hockanum River sediment and surface water samples at concentrations above ecological screening levels. These represent on-going sources of CoPECs that could likely be influencing chemical concentrations downstream at the Site. This also suggests that the risk assumptions used in the SLERA for on-site ecological receptors are quite conservative. Therefore, careful consideration should be given with regards to the future BERA in light of elevated concentrations of a number of chemicals found in the Hockanum River upstream of the Site. Exponent recommends completing the BERA to assess the potential on-site ecological risk from CoPECs within the Hockanum River at the Site. For the BERA, sediment samples should be collected from the Site and evaluated in laboratory toxicity testing using a sensitive benthic invertebrate species to obtain better estimates of benthic invertebrate exposure to CoPECs at the Site. Fish tissue samples should also be collected from the Hockanum River and analyzed for CoPECs and compared to tissue-based TRVs for fishes. In addition, tissue samples of plants, 2000174.000 – 9856 33
  6. Page 97 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 97 of 335 March 2021 fishes (same as those for the fishes TRVs comparisons), and invertebrates should be collected from the Hockanum River, analyzed for CoPECs, and used in site-specific food-chain models for the wildlife species. 2000174.000 – 9856 34
  7. Page 98 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 98 of 335 March 2021 7 References Bechtel Jacobs. 1998. Biota sediment accumulation factors for invertebrates: Review and recommendations for the Oak Ridge Reservation. BJC/OR-112. Oak Ridge National Laboratory. Beyer, W.N., E. Conner, and S. Gerould. 1994. Estimates of soil ingestion by wildlife. J. Wildl. Manag. 58:375–382. Bechtel Jacobs. 1998a. Empirical models for the uptake of inorganic chemicals from soil to plants. BJC/OR-133. Oak Ridge National Laboratory. Bechtel Jacobs. 1998b. Biota sediment accumulation factors for invertebrates: Review and recommendations for the Oak Ridge Reservation. BJC/OR-112. Oak Ridge National Laboratory. Buchman, M.F. 2008. NOAA Screening Quick Reference Tables, NOAA OR&R Report 08-1, Seattle WA, Office of Response and Restoration Division, NOAA, 34 p. Calder, W.A., and E.J. Braun. 1983. Scaling of osmotic regulation in mammals and birds. Am. J. Physiol. 224:R601-R606. Chapman, J.A., and G.A. Feldhamer. 1982. Wild Mammals of North America: biology, management, and economics. Johns Hopkins University Press. CT DEEP. 2011. Numerical Water Quality Criteria for Chemical Constituents. State of Connecticut Department of Environmental Protection. Bureau of Water Protection and Land Reuse Planning and Standards Division, 2011 Connecticut Water Quality Standards (CWQS). Dillon, et al. 1995. Trophic transfer and biomagnification potential of contaminants in aquatic ecosystems. Environmental Effects of Dredging Technical Notes US Army Engineer Waterways Experiment Station. EEDP-01-33. January. Nagy, K.A. 2001. Food requirements of wild animals: Predictive equations for free-living mammals, reptiles, and birds. Nutr. Abst. Rev. Ser. B 71:21R–31R. Northeast Utilities Service Company. 1992. Manufactured Gas Plant Site Investigation: Rockville. March. Northeast Utilities Service Company. 1995. Rockville MGP Site Field Summary Report (1994). Submitted to CDM Federal Programs Corporation and Connecticut Department of Environmental Protection. April. Sample, B.E., R.L. Hinzman, B.L. Jackson, and L. Baron. 1996. Preliminary assessment of the ecological risks to wide-ranging wildlife species on the Oak Ridge Reservation. 1996 Update. DOE/OR/01-1407&D2, ORNL. 2000174.000 – 9856 35
  8. Page 99 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 99 of 335 March 2021 Suter, G.W., II and C.L. Tsao. 1996. Toxicological benchmarks for screening potential contaminants of concern for effects on aquatic biota: 1996 revision. ES/ER/TM-96/R2. Oak Ridge National Laboratory. Terres, J.K. 1980. The Audubon Society encyclopedia of North American birds. Alfred A. Knopf, New York. Tighe & Bond. 2017. Phase I Environmental Site Assessment, Eversource Former Rockville MGP Site, 13 Maple Street/West Main Street, Rockville, Vernon, CT. March. U.S. EPA. 1992. Framework for ecological risk assessment. EPA 630/R-92-001. U.S. Environmental Protection Agency, Risk Assessment Forum, Washington, DC. U.S. EPA. 1993. Wildlife exposure factors handbook. Volumes I and II. EPA 600-R-93-187. U.S. Environmental Protection Agency, Washington, DC. U.S. EPA. 1994. Final Site Inspection Report for Northeast Utilities-Vernon, Vernon, Connecticut. CERCLIS No. CTD983870353. TDD No. 9304-40-ACS. U.S. EPA. 1996. Ecotox Thresholds. ECO Update. Publication 9345.0-12FSI. EPA 540/F95/038. Office of Solid Waste and Emergency Response. January. U.S. EPA. 1997. Ecological risk assessment guidance for Superfund: Process for designing and conducting ecological risk assessments. Interim Final. EPA/630/R-92/001 U.S. Environmental Protection Agency, Environmental Response Team, Edison, NJ. February. U.S. EPA. 1998. Guidelines for ecological risk assessment. EPA/630/R-95/002F. U.S. Environmental Protection Agency, Washington, DC. April. U.S. EPA. 2000. Bioaccumulation testing and interpretation for the purpose of sediment quality assessment: status and needs. EPA-823-R-00-001, Office of Water and Office of Solid Waste, Washington, DC. February. U.S. EPA. 2003. Region 5, RCRA Ecological Screening Levels. August. https://archive.epa.gov/region5/waste/cars/web/pdf/ecological-screening-levels-200308.pdf U.S. EPA. 2006. Region III BTAG. Freshwater Sediment and Surface Water Screening Benchmarks. https://www.epa.gov/risk/freshwater-sediment-screening-benchmarks; https://www.epa.gov/risk/freshwater-screening-benchmarks U.S. EPA. 2007. Ecological soil screening levels (Eco-SSLs) for polycyclic aromatic hydrocarbons (PAHs), Interim final. U.S. Environmental Protection Agency, OSWER Directive 9285.7-78. June. 2000174.000 – 9856 36
  9. Page 100 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 100 of 335 Figures
  10. Page 101 of 335

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 6 Page 101 of 335 MA NY Site Location ! ( RI CT 1-mile LEGEND Site boundary Source: Topographic basemap from ESRI ArcGIS provided service, USA_Topo_Maps. Last accessed September 18, 2020. Figure 1. Site location map, Rockville Former MGP Site, Rockville, Vernon, Connecticut September 18, 2020 | C:\temp\2000174\projects\site location.mxd 0 2,000 Feet 0 600 Meters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)