Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

1 page match
  1. Page 11 of 65

    2024 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2024 3. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 11 of 65 2024 Site Activities This section summarizes key project-related activities performed from January 2024 through midDecember 2024, including the following: NAPL gauging and recovery. Gas Regulation Shed Demolition Each of these is discussed in further detail in the following subsections. 3.1. NAPL Gauging & Recovery GEI’s 2022 Work Plan included NAPL gauging of certain monitoring wells where NAPL was previously detected. This monitoring effort was continued through 2024 to understand NAPL thickness and recovery trends and to periodically remove NAPL from the existing well network if present and recoverable. Initially, a comprehensive well gauging event was performed in January 2023 (discussed in the 2023 Annual Report) and one of its objectives was to obtain an updated assessment regarding the presence of NAPL in the monitoring well network. Wells that were initially identified to contain NAPL included MW-2D, MW-3D, MW-10D, MW-24S, and MW-32S (Figure 3), all of which contained a tar-like dense non-aqueous phase liquid (DNAPL) with the except for MW-32S, which was observed to contain light non-aqueous phase liquid (LNAPL). MW-32S was therefore included in the subsequent NAPL gauging and recovery program. Table 1 summarizes the NAPL gauging and recovery data from 2024. As indicated, LNAPL was observed in monitoring well MW-32S during two out of the three of the events where it was gauged (April and August 2024). LNAPL thicknesses measured in MW-32S ranged from not detected to 0.25 feet. Approximately 0.5 gallons of LNAPL was recovered from the well in 2024. LNAPL was not detected in any other monitoring wells at the Site. DNAPL was detected in the four wells listed above at thickness ranging from trace (< 0.01 feet) to 1.75 feet in MW-24S (August 2024). Recoverable DNAPL was removed from the wells during each event totaling approximately 2 gallons of DNAPL during 2024. Recovered NAPL was contained on-Site in a 55-gallon drums pending waste characterization, off-Site transport, and disposal. We anticipate a waste shipment and disposal event in the first quarter of 2025. 3.2. Groundwater Compliance The 2022 Work Plan included four rounds of quarterly groundwater monitoring at the Site following installation of the new wells. Quarterly groundwater monitoring was completed in 2023 and summarized in the 2023 Annual Report. This quarterly monitoring data combined with previous monitoring data completed from 2017 through 2023 indicate delineation of the impacted groundwater plume related to the Site. The following information summarizes the basis for delineation in shallow, intermediate and deep overburden groundwater: GEI Consultants, Inc.
  2. Page 12 of 65

    2024 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2024 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 12 of 65 Shallow Overburden Groundwater Groundwater analytical data including sampling of downgradient shallow monitoring wells MW-40S, MW-42S, MW-43S, MW-44S and MW-45S indicate low or non-detectable concentrations below the GWPC and SWPC except for slight periodic exceedances of certain PAH compounds at monitoring wells MW-44S and MW-45S. Collectively, these results provide for delineation at or near laboratory detection limits or are attributed to unrelated downgradient sources. Specifically, PAH concentrations detected in monitoring wells MW-44S and MW-45S are likely associated with other PAH sources because the concentrations of PAHs at these locations are below detection levels in upgradient wells along the flow path between MW-45S and the Site (i.e., MW-31S, MW-26S, and MW-40S). Intermediate Overburden Groundwater Monitoring data from sampling of intermediate monitoring wells MW-43M, MW-44M and MW-45M indicate contaminant concentrations below the GWPC except for slight periodic exceedances of certain PAH compounds at monitoring wells MW-44M and MW-45M. These detected concentrations were below the associated SWPC. Similar to shallow groundwater described above, we note that downgradient conditions are likely impacted by other PAH sources because they are below detection levels in upgradient wells along the flow path between MW-45S and the Site (i.e., MW-31S, MW-26S, and MW-40S), and naphthalene (an MGP source indicator) did not exceed the GWPC in these downgradient monitoring wells. Deep Overburden Groundwater Monitoring data from sampling of deep overburden monitoring wells MW-13D (in 2018), and MW-29D (in 2019) indicate low PAH concentrations ranging from non-detect to 0.82 ug/L (naphthalene in MW13D) at these downgradient locations. Monitoring well MW-26D did slightly exceed the GWPC for acenaphthylene during 2018 sampling events at concentrations of 0.55 µg/L (October 2018) and 1.2 µg/L (November 2018). However, these concentrations are only marginally above detection levels and functionally delineate the extent of the affected groundwater. Based on the groundwater analytical data collected for the Site to date and downgradient conditions, we believe the Site groundwater plume has been adequately defined. As noted above, attached to this Annual Report (Appendix B) is a preliminary notification of intent to utilize Alternative GWPC for the portion of the plume that falls within the GA groundwater classification area west of West Street. While we believe the extent of the Site-related groundwater plume is delineated based on the existing data, MW-42M is within the GA area and has consistently contained concentrations of one or more PAHs above GWPCs. Accordingly, for the purpose of demonstrating compliance with RSRs once remedial activities are completed, we are proposing to calculate alternative GWPC values applicable for the portion of the plume within the mapped GA groundwater classification area. This approach is described in additional detail in Appendix B, which also serves as an advanced Commissioner notification consistent with Section 22a-133k-3(d)(3) of the RSRs. While we understand all the conditions required by the RSRs for use of the alternative GWPC have not been satisfied, we anticipate all conditions will be met following remedial implementation at the Site. The attached Figures 4A through 4D are included as reference for understanding groundwater flow conditions. GEI Consultants, Inc.
  3. Page 13 of 65

    2024 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2024 3.3. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 13 of 65 Significant Environmental Hazard Activities As mentioned in Section 2.3, BaP was detected in soil above the SEH Condition Notification Threshold Concentration of 30 mg/kg at sample location SB-76 (0 to 2 feet). Delineation of this SEH area was completed in December 2022 and summarized in the 2023 Annual Report and the 2023 CT DEEP SEH Status Update Form submitted to the CT DEEP on May 19, 2023 and attached to the 2023 Annual Report. A SEH Status Update Form was submitted on May 22, 2024, documenting the existing SEH conditions, a copy of which is included as Appendix A. As discussed in Section 2.3, the remaining SEH conditions at the Site are protected within the outer or inner substation fence and will be abated as part of the Site-wide remedy. 3.4. Regulator Station Abandonment and Demolition In September 2023, Yankee Gas Services Company dba Eversource Energy abandoned a natural gas main located at the northeast corner of the Site within the Outer Substation Area (Fig. 2). The gas regulator station associated with this gas main was decommissioned and demolished on August 8, 2024. The building was properly abated prior to demolition and the waste was properly characterized, profiled, transported, and disposed off-Site at permitted disposal facilities. The foundation structure was removed, but no soil was generated as part of the work and remaining depressions were filled in with clean imported fill. GEI Consultants, Inc.
  4. Page 14 of 65

    2024 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2024 4. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 14 of 65 Conceptual Site Model Tighe & Bond created a preliminary CSM summary table that was included in the 2021 Annual Report. That table was modified to reflect additional data/findings from activities previously performed in 2023 and with the understanding that groundwater concentrations are compliant with calculated alternate GWPC as described above in Section 3.2. The revised table is included as Table 2 of this Annual Report. Minor modifications/updates were made to this table to include comparison of the 2023 monitoring data regarding off-Site groundwater impacts (AOC #23) with alternative GWPC. However, none of the updates substantially change the CSM relative to the version included in the 2023 Annual Report and no additional data was generated in 2024 that was utilized for further updates. A revised/updated CSM will be developed to identify releases, migration pathways, potential receptors, and risks of the environmental system at the Site. An updated CSM will be provided as part of the Comprehensive Phase III Report, and reflect the additional data and findings collected through the implementation of the 2022 Work Plan and any other collected data. In doing so, GEI intends to consolidate AOCs to provide a streamlined CSM to clearly document the three dimensional and temporal distribution of contaminants in the context of the geologic, hydrogeologic, and hydrologic framework of the Site. GEI Consultants, Inc.
  5. Page 15 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 15 of 65 2024 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2024 5. Schedule An approximate timeframe for the anticipated Site activities for 2025 is provided below. Timeframes are estimated based on recently completed activities and may be altered if additional data gaps are identified or delays are encountered. The schedule will be updated annually as new data is available. Task Details Approximate Timeframe 1Q25 Well Gauging and NAPL recovery NAPL gauging and recovery at previously selected locations January 2025 2Q25 Well Gauging and NAPL recovery NAPL gauging and recovery at previously selected locations April 2025 3Q25 Well Gauging and NAPL recovery NAPL gauging and recovery at previously selected locations July 2025 4Q25 Well Gauging and NAPL Recovery NAPL gauging and recovery at previously selected locations October 2025 2025 SEH Status Update Form 2025 Annual Report Comprehensive Phase III Report GEI Consultants, Inc. To include any SEH-related activities performed since the 2024 SEH Status Update Form submittal Submittal to CT DEEP to include a summary of all investigation tasks and results completed in the calendar year To be prepared in 2025 By June 1, 2025 End of December 2025 Estimate submittal to CT DEEP in 3rd Quarter 2025
  6. Page 16 of 65

    2024 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2024 Tables Table 1. Well Gauging and NAPL Summary Table 2. Conceptual Site Model Summary GEI Consultants, Inc. The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 16 of 65
  7. Page 17 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 17 of 65 Table 1. Well Gauging and NAPL Summary 2024 Annual Report Rockville Former MGP Site Date: 4/8/2024 8/1/2024 11/14/2024 Monitoring Well Construction Details Well ID Location Top of Well Ground Casing or Measuring Point Elevation (ft. Elevation MSL) (ft. NAVD 88) Midpoint Elevation of Screen Completion Depth (ft. below grade) Screen Interval (ft. below grade) Depth to water (ft.) 236.15 191.24 237.01 235.48 222.01 174.44 235.54 225.24 177.68 171.68 154.14 30 75 17 17 32 60 20 32 78 84 100 20-30 65-75 7-17 7-17 22-32 50-60 10-20 22-32 68-78 74-84 90-100 27.34 7.74 14.44 - Groundwater DNAPL LNAPL and River Total Thickness Thickness Elevation Depth (ft.) (ft.) (ft.) (ft. NAVD88) Depth to water (ft.) Groundwater Groundwater DNAPL Depth to DNAPL LNAPL LNAPL and River Total and River Total water Thickness Thickness Thickness Thickness Elevation Depth (ft.) Elevation Depth (ft.) (ft.) (ft.) (ft.) (ft.) (ft.) (ft. NAVD88) (ft. NAVD88) Monitoring Well Locations MW-1S MW-1D MW-2S MW-2SR MW-2D MW-2BR MW-3S RW-03M MW-3D MW-3DR MW-3BR Overgrown Area-Outer Substation Inner Substation Wooded Area- Outer Substation MW-4S MW-4SR Grassed Area- Outer Substation MW-4D MW-5S MW-5D MW-6S Inner Substation 259.37 259.59 249.01 247.10 247.62 247.24 250.12 252.24 251.58 252.58 252.73 261.15 261.24 249.01 247.48 249.01 247.44 250.54 250.68 250.68 249.14 232.25 239.88 237.14 - 31.08 80.95 - - 0.50 - 9.89 16.70 - 237.73 234.88 - 31.05 79.67 - - 0.52 Trace - 11.56 18.31 - 236.06 233.27 - 31.00 79.90 - - Trace 1.00 - 249.25 248.81 238.81 15 5-15 - - - - - - - - - - - - - - - 249.11 248.81 234.11 20 10-20 - - - - - - - - - - - - - - - 249.40 248.75 194.25 59.5 49.5-59.5 - - - - - - - - - - - - - - - 244.74 244.56 250.31 246.37 246.32 248.76 236.37 223.32 241.76 15 28 12 5-15 18-28 2-12 - - - - - - - - - - - - - - - MW-6D 249.69 249.00 219.00 35 25-35 - - - - - - - - - - - - - - - MW-7S MW-7D MW-8S MW-8SR MW-9S MW-9D MW-10S MW-10SR MW-10M MW-10D MW-10BR MW-11S MW-11D MW-12S MW-12D MW-13S MW-13M MW-13D MW-14S MW-14M MW-14D MW-16S MW-17S MW-18D MW-19S MW-20S MW-21S MW-23S MW-24S MW-25S MW-26S MW-26D MW-26BR MW-27S MW-28S 262.13 265.01 248.43 246.29 254.17 253.95 257.82 257.68 257.35 257.33 257.33 252.17 251.91 251.54 251.69 252.13 252.16 251.91 245.11 245.62 244.90 246.82 245.72 254.03 251.88 260.52 255.11 268.98 257.07 250.82 243.97 244.28 244.16 260.80 263.85 263.81 261.76 248.56 246.69 255.75 255.63 259.42 258.04 259.08 258.98 257.57 251.20 251.10 250.80 250.90 252.53 252.45 252.45 245.40 245.40 245.36 244.86 246.01 251.16 252.16 260.52 255.30 269.20 257.59 250.99 244.53 244.45 244.32 261.00 264.11 235.81 183.76 238.56 234.69 235.75 190.63 239.42 238.04 204.08 179.98 162.57 238.70 229.60 239.80 231.40 232.53 216.95 184.45 230.40 217.40 173.36 232.86 234.01 174.16 233.16 231.52 230.30 235.20 231.59 231.99 234.53 175.45 162.32 232.00 232.11 33 83 15 17 25 70 25 25 60 84 100 17.5 24 16 22 18.2 30.5-40.5 73 19.58 33 76.21 17 17 82 24 34 30 39 31 24 15 74 87 34 37 23-33 73-83 5-15 7-17 15-25 60-70 15-25 15-25 50-60 74-84 90-100 7.5-17.5 19-24 6-16 17-22 15-25 19.32 23.35 18.95 - 238.01 237.17 238.12 - 81.53 33.50 31.76 - - 0.50 - 21.55 21.65 - 235.78 235.42 - 80.10 31.43 - - 1.75 - 23.30 23.39 - 233.68 - 80.05 31.48 - - 0.50 - Grassed Area- Outer Substation West Main Street Parcel St. Joseph Church Parking Lot Outer Substation Area St. Joseph Church Parking Lot USPS ROW Grassed Area- Outer Substation Front of St. Joseph Convent GEI Consultants, Inc. 17 Maple Street Maple Street ROW 63-73 10-20 23-33 67-77 7-17 7-17 72-82 14-24 24-34 20-30 29-39 21-31 14-24 5-15 64-74 77-87 24-34 27-37 1 of 2 Project 2200138 December 2024 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2024 Annual Report\Table\Table 1 - Monitoring Well Gauging Summary Table_SCC2024
  8. Page 18 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 18 of 65 Table 1. Well Gauging and NAPL Summary 2024 Annual Report Rockville Former MGP Site Date: 4/8/2024 8/1/2024 11/14/2024 Monitoring Well Construction Details Well ID Location Top of Well Ground Casing or Measuring Point Elevation (ft. Elevation MSL) (ft. NAVD 88) Midpoint Elevation of Screen Completion Depth (ft. below grade) Screen Interval (ft. below grade) Depth to water (ft.) 231.24 174.31 237.58 238.00 235.00 233.49 237.39 236.01 236.66 142.05 185.05 157.41 237.21 236.91 230.19 229.46 228.20 210.21 229.60 215.70 228.54 208.59 229.47 209.45 210.30 18 75 12 17 20 19 15 17 15 28 85 105 9 9 20 20 20 38 20 34 20 40 20 40 39 8-18 65-75 2-12 7-17 10-20 9-19 5-15 7-17 5-15 18-28 75-85 95-105 4-9 4-9 10-20 10-20 10-20 28-38 10-20 24-34 10-20 30-40 10-20 30-40 29-39 11.09 23.14 - 238.41 237.63 - 88.51 - 0.25 - - 13.23 - 236.27 - 19.68 - Trace - - 15.38 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 242.89 242.73 240.73 236.93 236.36 - - - 4.52 4.64 4.28 4.46 4.55 Groundwater DNAPL LNAPL and River Total Thickness Thickness Elevation Depth (ft.) (ft.) (ft.) (ft. NAVD88) Depth to water (ft.) Groundwater Groundwater DNAPL Depth to DNAPL LNAPL LNAPL and River Total and River Total water Thickness Thickness Thickness Thickness Elevation Depth (ft.) Elevation Depth (ft.) (ft.) (ft.) (ft.) (ft.) (ft.) (ft. NAVD88) (ft. NAVD88) Monitoring Well Locations MW-29S MW-29D MW-30S MW-31S MW-32S MW-33S MW-34S MW-35S MW-36S MW-37S MW-37D MW-37BR MW-38S MW-39S MW-40S MW-41S MW-42S MW-42M MW-43S MW-43M MW-44S MW-44M MW-45S MW-45M MW-46M St. Joseph Church Front Lawn Rear of Substation West Street ROW Inner Substation Outer Substation Area Rear of Substation Front of school Front of St. Joseph Church NE of Windsor Ave and West St intersection SW of West St and Union St intersection Walgreens Parking Lot 40 West Café Parking lot 43 West Street 244.09 244.00 244.46 246.16 249.50 247.19 247.09 247.68 246.36 260.21 260.77 260.05 243.31 243.76 245.19 244.46 243.20 243.21 244.60 244.70 243.01 243.33 244.20 244.14 243.88 244.24 244.31 244.58 250.00 250.00 247.49 247.39 248.01 246.66 265.05 265.05 257.41 243.71 243.41 243.54 243.59 244.47 244.45 244.30 - 234.12 - 19.80 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 243.18 242.84 241.12 237.26 236.61 - - - - - - - - Hockanum River Piezometers and Gauging Locations RG-1 (River Gauge) PZ-1 PZ-1 River Level 245.12 244.54 244.54 PZ-1A 246.79 PZ-1A River Level 246.79 PZ-2A 244.90 PZ-2A River Level 244.90 PZ-3A Hockanum River 244.12 - 1 to 2 ft. below 2 ft. below river river bottom bottom 1 to 2 ft. below 2 ft. below river river bottom bottom - 2 ft. below river bottom 1 to 2 ft. below river bottom PZ-3A River Level 244.90 SG-01 247.70 SG-02 247.48 SG-03 245.40 SG-04 241.72 SG-05 241.16 Notes: NA -Not Applicable * - Data Unavailable "S" denotes a water table monitoring well (Shallow Groundwater Zone) "M" denotes an intermediate monitoring well (Intermediate Groundwater Zone) "D" denotes a deep monitoring well (Intermediate Groundwater Zone) red text- indicates a well was destroyed or unusable. Denotes product observed in the well : measured or observed during development or pumping. Elevation for measuring point was surveyed by Kratzer Jones Associates in 2016 and 2017. Elevations in NAVD 88. MSL- mean sea level-Elevations obtained from Eversource survey information: Rockville Manufactured Gas Plant Site Investigation Report dated March 1992 PZ-18 GEI Consultants, Inc. 4.81 4.75 4.67 4.79 4.8 2 of 2 Project 2200138 December 2024 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2024 Annual Report\Table\Table 1 - Monitoring Well Gauging Summary Table_SCC2024
  9. Page 19 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 19 of 65 Table 2. Conceptual Site Model Summary 2024 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 1 Coal and oil used to generate manufactured gas. By- products VOCs generated could include (BTEX), Surface soils tar residues, coal ash, Former Retorts/ SVOCs, Subsurface coke, complexed cyanide Generating Room Metals, Total soils compounds during the Cyanide, Groundwater production of gas. ETPH Materials could have been used as fill in the building foundation. TB-34 TB-47 SB-07 SB-43 SB-44 SB-46 SB-47 SB-48 MW-35S SB-76 SB-77 MW-9S/ MW-9D MW-9S/ MW-9D MW-35S Subsurface Soil samples from MW-09 contained VOC (ethylbenzene), SVOCs above GB PMC, metals detected. Pesticides detected (GB PMC exempt) Fill observed (ash, brick) and tar sheen and odors on auger cuttings. ETPH above RES and I/C DEC and GB PMC in SB-07, SB-47, and MW35S ETPH above RES DEC in SB-43 and SB-46 PAHs above RES and I/C DEC and GB PMC in SB-07, SB-43, SB-46, SB47, MW35S, SB-77 and SB-78. Benzo(a) pyrene above SEH Condition Threshold Concentration in SB-76. Fill observed (ash, brick, coal) in SB-07 Staining with petroleum odors (10-11.5 ft.) Tar impacts in SB-07: 16 to 25ft, 33-33.5ft., 39-40 ft. Tar impacts in SB-43 and SB-47 at 11-15ft. Tar impacts in SB-44 at 12-15ft and 24.5-26ft. Tar impacts in SB-46 10-37ft. Tar impacts MW-35S 8-20 ft. Petroleum odors in SB-77 4-6 ft. Fill observed in SB-76 0-4 ft. Fill observed in SB-77 0-2 ft. MW-9S: VOCs (xylenes), PAHs, metals, cyanide above SWPC MW-9D: PAHs and metals above SWPC Shallow: MW-9S: ETPH, VOCs (1,2,4trimethylbenzene and naphthalene), PAHs, cyanide above SWPC. ETPH detected above Res VC and I/C VC. MW-35S: ETPH , MA VPH, MA EPH and PAHs above SWPC. ETPH and MA VPH above Res VC. VOC (naphthalene) detected above the SWPC. Deep: MW-9D: VOC,ETPH and cyanide not detected. Naphthalene and metals detected below the SWPC. Phase I ESA (2017) Phase II Surface water Remedial evaluation Investigation (Hockanum pending the completion (1992) River) of the Phase III upgradient of Phase III ESA investigation. the AOC (2016-2020) Phase II/III ESA (2022) A soil vapor sample (SV-CH-1) taken from beneath the control house was below RES VC and I/C VC for VOCs and ETPH (Phase II/III ESA) 2 Manufactured gas was VOCs passed through lime used (BTEX), to scrub impurities Surface soils Former Purifying SVOCs, (sulphur/cyanide) from the Subsurface House Metals, Total gas (Purifier waste). soils Materials could have been Groundwater Cyanide, ETPH used as fill in the building foundation. TBX1 TB-3 TB-4 TB-5 TB-20 TB-21 TB-22 TP-01 TP-02 TP-03 SB-31 SB-52 Soil samples from MWShallow: ETPH and PAHs above RES and I/C DEC and GB PMC in SB-31 and SB09 contained VOC MW-9S: ETPH, VOCs (1,2,4Phase I ESA 52 DEC does not apply due to samples greater than 15'. PAHs above MW-9S: VOCs (ethylbenzene), SVOCs trimethylbenzene and naphthalene), PAHs, (2017) RES and I/C DEC and GB PMC, ETPH above RES DEC in TP-03. PAHs (xylenes), PAHs, Surface water above GB PMC, metals Remedial evaluation cyanide above SWPC. ETPH detected Phase II detected above RES and I/C DEC and GB PMC. Cyanide detected in all metals, cyanide above (Hockanum detected. Pesticides pending the completion above Res VC and I/C VC. Investigation MW-9S/ MW-9D MW-9S/MW-9D but SB-31. SWPC River) detected (GB PMC of the Phase III upgradient of (1992) exempt) investigation. Deep: the AOC Phase III ESA Fill observed (bricks, metal pieces, metal conduit, cast iron pipe, ash) MW-9D: PAHs and Fill observed (brick) and MW-9D: VOC,ETPH and cyanide not (2016-2020) metals above SWPC sheen and strong odors detected. Naphthalene and metals detected Tar impacts in SB-31 and SB-52 15-31ft on auger cuttings. below the SWPC. Surface soil: PAHs detected. 3 Former Gas Holder #1 [Gasometer3 22,000 ft Capacity] VOCs (BTEX), SVOCs, Total Cyanide, ETPH GEI Consultants, Inc. Residual tar droplets TB-18 (Refusal collected inside the bottom 13.6') of the holder which is likely Surface soils TB-19 (Refusal 14') subgrade based upon its Subsurface TB-6 (Refusal age (pre-1900 and boring soils 15.5') refusal). Groundwater TB-7 (Refusal Possible leaks or spills 16.5') from the holder to the TB-45 CSS-4 soils. SB-04 SB-05 SB-06 SB-29 SB-30 SB-31 SB-85 TP-04 TP-05 MW-10S MW-10M MW-10D MW-9S MW-9D MW-10S MW-10M MW-10D MW-10BR MW-10SR MW-24S MW-32S MW-9S: VOCs Shallow: (xylenes), PAHs, MW-10SR: Not sampled due to visual metals, cyanide above observations of tar globules/ staining during SWPC development. Tar present in subsequent ETPH above RES DEC in SB-29 and SB-30. ETPH and VOCs above gauging. Tar present in MW-24S and MWRES & I/C DEC and/or GB PMC in SB-05, SB-06, SB-31, and TP-05. MW-9D: PAHs and 32S during development. MW-24S DEC does not apply to SB-05 due to sample depth greater than 15'. PAHs metals above SWPC contained in subsequent gauging. above RES and I/C DEC and/or GB PMC in SB-29, SB-30, and SB-31 Phase I ESA (2017) Soil samples from MWPhase II 10 contained VOCs, MW-10S: VOCs and Surface water Investigation Intermediate: Fill observed (ash, slag, and/or metal) in SB-06, SB-29, SB-30, SB-31, TPRemedial evaluation cyanide detected, PAHs SVOCs, pesticides (1992) (Hockanum MW-10M: ETPH, VOCs (naphthalene) 04, TP-05 pending the completion above GB PMC but Human Health and metals above River) detected and PAHs above SWPC of the Phase III below the water table. SWPC. upgradient of Risk Heavily tar impacted soils within the Gas Holder #1 (5.75 to 14 feet). investigation. Assessment the AOC TCLP benzene in impacted above characteristic hazardous waste level in Deep: Strong sheen and odor MW-10M: VOCs (1994) SB-85. MW-10D: Not sampled due to visual observed on auger (xylenes) detected, Phase III ESA observations of tar globules/ staining during cuttings. Fill observed PAHs and metals above (2016-2020) Outside holder tar impacts observed in SB-04, SB-05 19.5- 39 feet, 44.5 development TB-18 and TB-19. SWPC ft. to 50 feet, 71 to 74 ft. and SB-31 from 11 to 31 ft and 47 to 49 ft Bedrock: MW-10D: SVOCs and MW-10BR: ETPH, PAHs , VOCs, and metal (zinc) above metals detected. SWPC Page 1 of 9 Project 2200138 December 2024 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2024 Annual Report\Table\Table 2 - CSM
  10. Page 20 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 20 of 65 Table 2. Conceptual Site Model Summary 2024 Annual Report Rockville Former MGP Site AOC # AOC Description COCs Possible Release Mechanisms and Migration Pathways Potentially Affected Media Previous Investigation Soil Locations Phase II/III Soil Locations Previous Investigation Groundwater Locations Phase III Investigation Groundwater Locations Previous COCs in Soil Phase II/III COCs in Soil Previous COCs in Groundwater Phase III COCs in Groundwater COCs in Surface Water Investigation Status Remediation Status Rockville Former MGP Site (On-Site) 4 5 6 Former Gas Holder #2 [Gasometer3 22,000 ft Capacity] Former Gas Holder #3 [Gasometer110,000 ft3 Capacity) Former Coal Shed VOCs (BTEX), SVOCs, Total Cyanide, ETPH VOCs (BTEX), SVOCs, Total Cyanide, ETPH PAHs, Metals GEI Consultants, Inc. Residual tar droplets collected inside the bottom TBX-4 of the holder which is likely Surface soils TB-16 (Refusal 18') subgrade based upon its Subsurface TB-17 age (pre-1900) and boring soils TB-8 refusal. Groundwater TB-9 Possible leaks or spills TB-42 from the holder to the soils. Residual tar droplets collected inside the bottom of the holder which is likely Surface soils a shallow subgrade based Subsurface upon its age (post 1900). soils Possible leaks or spills Groundwater from the holder to the soils. Coal stockpiled for MGP could be present in the soils. Surface soils Subsurface soils SB-02 SB-03 SB-04 SB-05 SB-28 SB-29 SB-73 SB-74 SB-75 SB-83 SB-84 TP-05 TP-06 SS-3A CSS-3 TB-13 (Refusal 8') TB-14 (Refusal 6.5') TP-07 Soils not investigated SS-102 SS-103 SEH Invest. HA-01 HA-02 HA-03 HA-04 HA-05 HA-06 HA-07 HA-08 HA-09 MW-10S MW-10M MW-10D MW-10S MW-10S2 MW-10M MW-10D MW-10BR MW-24S Groundwater not investigated. Water MW-7S/MW-7D encountered inside the holder foundation. PAHs, ETPH and VOCs above RES & I/C DEC and GB PMC in SB-03 and SB-05. PAHs and ETPH above GB PMC in SB-02. PAHs above RES and I/C DEC and/or GB PMC in SB-28, SB-29, and SB73. SB-73 is in compliance with GB PMC through SPLP testing. Elevated Shallow: Surface soil: PAHs PAHs detected in SB- 75 likely intersects the apparent seasonal high MW-10SR: Not sampled due to visual MW-10S: VOCs and detected. water table. cyanide detected, PAHs observations of tar globules/ staining during Phase I ESA Arsenic above RES and I/C DEC and benzene above GB PMC in SB-28. development and metals above (2017) Soil samples from MWETPH above RES DEC in SB-29 SWPC. Phase II 10 contained VOCs, Total and SPLP benzene above GB PMC and 10X GWPC in SB-83 1 to 3 Surface water Investigation Deep: ft. SVOCs, pesticides Remedial evaluation MW-10M: VOCs (1992) (Hockanum MW-10M: ETPH, VOCs (naphthalene) above GB PMC but pending the completion (xylenes) detected, Human Health River) detected and PAHs above SWPC Fill observed (ash, brick, coal) in SB-05, SB-28, and SB-29, TCLP below the water table of the Phase III PAHs and metals above upgradient of Risk MW-10D: Not sampled due to visual benzene in impacted above characteristic hazardous waste level in SBinvestigation. Assessment SWPC the AOC observations of tar globules/ staining during 84. Strong sheen and odor (1994) development. observed on auger Phase III ESA MW-10D: SVOCs and Fill (wood, glass, metal) observed in TP-05. cuttings (TB-16 and TB(2016-2020) metal (zinc) above Bedrock: 17). Fill (bricks) SWPC MW-10BR: ETPH, PAHs ,VOCs, and Tar impacts: SB-02: 18 to 39 ft. observed in TB- 16. metals detected. SB-03: 10.5 to 15 ft. SB-04: 2.5-37 ft. 44.5-50 ft. SB-05: 19.5 to 39 ft., 71-74 ft. SB-28: 24-36.5 ft. TP-05: 5.75 -6.0 ft. Surface soils: PAHs and metals detected Fill observed Surface soils: PAHs, cyanide and metals detected No visual impacts in soils. Groundwater investigations not completed in AOC. Investigation completed. Phase I ESA Soil remediation is not required. (2017) Phase II Shallow : Groundwater impacts Surface water Investigation MW-7S: ETPH and PAHs detected above are likely associated (1992) (Hockanum the SWPC. VOCs and metals detected. Human Health with AOC-3 and AOC River) 4 (Holder #1 and upgradient of Risk Deep: Holder #2). Assessment the AOC MW-7D: PAHs, VOCs and metals detected Groundwater impacts (1994) Phase III ESA are addressed under (2016-2018) site- wide groundwater AOC- 15. Groundwater investigations not completed in AOC. Delineation SEH soils for benzo (a) pyrene Surface water Phase I ESA was completed in 2018. (Hockanum Groundwater investigations not completed (2017) River) in AOC. Phase III ESA Remedial evaluation upgradient of (2017-2018) pending the completion the AOC of the Phase III investigation. PAHs, ETPH, and lead above the RES and I/C DEC and GB PMC in SS102. PCBs detected. Benzo (a) pyrene detected above the SEH Condition Notification Threshold Concentration. Groundwater Groundwater not not investigated investigated No investigations (within active (within active completed in the AOC. transformer transformer yard) yard) PAHs, ETPH, and arsenic above the RES and I/C DEC and/or GB PMC in SS-103. Cyanide detected. PAHs above the RES and I/C DEC in HA-01 through HA-09. SEH Threshold Notification Concentration for benzo(a)pyrene delineated HA01, HA-2 and HA-03 above the threshold. Fill observed (coal, ash) in shallow soils below the trap-rock gravel cover to 2 feet below grade. Page 2 of 9 Project 2200138 December 2024 B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\DOCUMENTS\2024 Annual Report\Table\Table 2 - CSM

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)