Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

1 page match
  1. Page 31 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 31 of 65 SW/SD-07 k an oc SG-04 H ive um R r MW-42M SG-05 MW-42S MW-44S/44M MW-45S/45M MW-43S SW/SD-07 MW-31S T STREE WEST MW-46M SW/SD-06 MW-29S MW-40S MW-26BR MW-26S SW/SD-05 SV-03 SV-05 MW-46M IA-03 IA-05 MW-26D IA-04 SV-04 SW/SD-06 MW-13M MW-29D R446-B IA-06 (1st Floor) R452-B R452-C SV-01 OA-01 R446-A R452-A R452-D MW-43M MW-41S R446-D SV-02 IA-01 IA-02 R446-C R437-C R438-C R437-A R437-B R438-D R437-D MW-14S MW-14D 0 100 MW-14I MW-14M DOWNGRADIENT OFF-SITE SAMPLE LOCATIONS 200 R426-B SW-04 SED-04 MW-38S SB-40 SB-39 HA-12 SB-54 TB-X2 SS5-C STR E ET MAIN WES T MW-11D SS-108 MW-11S SW/SD-01 SB-58 SED-06B SW/SD-B02 SED-01 MW-6D SED-02 SW/SD-B01 SED-07 SB-10 SB-33 SB-81 TB-24 SB-32 SW-02 Dynamo Room SS-101 SB-77 Control House SB-47 MW-35S Control SB-76C Retorts / House Generating SB-76 Room SB-50 TB-22 SB-76D HA-09 HA-02 HA-07A TB-47 SB-07 MW-9D TP-01 TB-21 TB-40 SB-31 HA-01A TB-45 SB-65 HA-18 SB-49 SED-08 TB-X1 TB-50 TB-18 TP-05 MW-37D SB-03 MW-37S SB-02 TP-06 SB-83 R415-A R414-C R414-B PHASE II/III SITE INVESTIGATION R416-B R416-C NESTED WELL PAIR R416-A R5002 MW-1S Gas Holder #3 110,000 (Ft3) TB-14 TB-13 INTERMEDIATE WELL SOIL VAPOR POINT R414-A STAFF GAUGE SB-63 TB-X5 SS1-D BACKGROUND SEDIMENT SAMPLE MW-27S MW-20S MW-1D TP-07 CSS-3 ADDITIONAL SEH DELINEATION SOIL TB-62 SS1-A SEH DELINEATION SOIL SAMPLE TB-113 SB-20 PREVIOUS SITE INVESTIGATION MW-7D SB-28 TB-11 LEGEND: SEDIMENT SAMPLE SS3-A SB-01 MW-7S TB-12 ABANDONED MONITORING WELL SS2-A SS2-B TB-116 R415-B TB-115 TB-61 TB-60 TB-51 R415-C R5001 SB-62 MW-37BR CSS-2 Gas Holder #2 22,000 (Ft3) SB-84 TB-117 CSS-1 SB-74 TB-42 SB-04 Gas Holder #1 22,000 (Ft3) TB-19 SB-75 TB-59 TB-58 TB-53 HA-06 MW-32S SB-73 TB-20 MW-9S SB-06 SB-85 Purifying TB-17 MW-24S TP-02 Storage TB-16 SB-08 House SB-29 SB-82 TP-04 Meter Engine SB-09A CSS-5 Room & Pump CSS-4 MW-10BR Room MW-10D SB-30 TP-03 TB-X4 SB-05 TB-6 TB-7 SB-52 TB-8 TB-2 SB-51 TB-5 MW-10M TB-3 TB-9 TB-4 MW-10S MW-10SR SB-24 TB-X6 TB-52 SS3-C HA-03 MW-21S TB-126 SB-12 HA-05 Coal Shed HA-01 SS-102 MW-13M TB-127 MW-25S HA-04 SS-103 TB-119 TB-118 SS3-B Shed TB-126 SS1-B TB-49A SB-21 HA-08 HA-07 SB-76B SB-76A SB-76A1 TB-43 TB-39S SB-44 SS1-C TB-56 MW-13D MW-13S TB-120 TB-55 SB-22 Transformer House SB-46 SB-48 MW-6S SS-100 MW-34S SS-107 SED-05 HA-17 SED-06A SED-09 SB-78A TB-28 SB-80 TB-38 MW-3D RW-03M MW-3DR SS3-D SB-45 TB-34 SB-43 Unknown MW-2SR SED-A SED-06C SG-01 SB-78 SB-78D SB-78B SB-34 MW-2BR SS-106 SS-106 TB-46 TB-37 MW-18D MW-3S TB-54 MW-3BR MW-33S SB-78C MW-2D/2S HA-16 (OBSTRUCTION) SB-79 SS-108 SED-06 SG-02 SW-01 MW-8SR HA-15 SB-35 SW/SD-02 Tower SS-104 HA-10 SB-23 TB-130 STREET SED-03 MW-4S TB-32 SB-57 SS5-A SS3-E MW-4D TB-36 MW-4SR HA-09A SB-13 SB-59 TB-121 MW-19S UNION MW-36S SW-03 SED-B HA-14 TB-63 HA-11 SS-105 SW/SD-03 MW-12S TB-55A SS-105 SED-C TB-64 SB-25 MW-17S MW-08S (DESTROYED) SB-67 SB-61 SG-03 MW-12D TB-X3 TB-35 TB-34 SB-42 SB-53 SB-55 MW-12SR SB-38 MW-5S MW-5D SS5-E HA-13 SB-56 SS5-B SB-11 TB-123 SB-41 SB-36 SW/SD-04 Store House SB-26 SB-37 MW-16S MW-39S MW-30S TB-33 SS5-D R426-D SB-66 SW/SD-05 SB-27 R426-A R426-C SB-60 SCALE: 1" = 200' R438-A R438-B SB-64 MONITORING WELL SOIL BORING TB-97 TB-101 TB-99 MAPLE STREET TB-203 TB-224 TB-103 TB-207 TB-200 TB-104 TB-210 TB-105 TB-106 TB-111B TB-111A TB-202 SURFACE SOIL TB-111C TEST PIT TB-211 R453 TB-206 SB-28 MW-28S R454 R505-B R505-C R455 R505-A Unknown R506-B R506-A TB-221 R505-D TB-219 TB-215 TB-217 R506-D R506-C R504-C SEDIMENT SAMPLE R456 R504-A R503-C R504-B R503-A R503-B INDOOR AIR SAMPLE R503-D R504-D R502-C R501-C MW-15D MW-15S SURFACE WATER OUTDOOR AMBIENT AIR SAMPLE R502-A SUB-SLAB AIR SAMPLE R502-B R502-D STREAM R501-A R501-B FENCE LINE R501-D SITE TB-216 HISTORIC STRUCTURE APPROXIMATE PARCELS MW-23S SOURCES: 1. DATA PROVIDED BY TIGHE & BOND. 2. NEARMAP IMAGERY DATED 10/12/2024. B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\005_GIS\2024AR\3_2200138_2024AR_PREV.mxd 0 30 SCALE, FEET 60 2024 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut Consultants Project 2200138 PHASE II/III ESA AND PREVIOUS INVESTIGATION LOCATIONS December 2024 Fig. 3
  2. Page 32 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 32 of 65 236.61 SG-5 23 6 237.26 SG-4 MW-45M 234 MW-45S 236.71 MW-44M R iv er MW-44S 232.36 num MW-42M Ho cka 237.34 MW-39S 233.59 MW-42S 236.63 MW-31S 235.18 MW-26S 237.31 MW-30S 237.07 MW-38S MW-5D 238 239.49 MW-36S 235.85 MW-4S 239.55 MW-2SR MW-3BR 235.82 MW-33S MW-10BR 235.87 MW-24S MW-7D MW-7S 235.15 MW-10D MW-10M MW-35S 239.45 MW-9S 239.09 MW-10SR 237.90 235.15 MW-37S MW-13S 234.35 MW-21S 234.56 234.87 MW-20S NM MW-1S MW-1D MAPLE ST LEGEND: MW-28S 235.10 SHALLOW MONITORING WELL STREAM GAUGE MONITORING WELL 236 242 MW-6D 240 T MW-9D WES T M AIN S 233.98 MW-32S MW-37D MW-18D MW-13D MW-3D RW-3M MW-13M 238 242.84 SG-2 SG-1 243.18 MW-37BR MW-2D MW-2BR 238.70 MW-6S 235.47 MW-25S 23 4 234.42 MW-19S ST MW-11D MW-3DR MW-14M ST 238.54 MW-12SR MW-43M UNION 235.84 MW-4SR 239.35 MW-34S 240 242 235.29 MW-3S ST MW-29S 233.90 MW-46M MW-29D MW-14D MW-4D MW-12D WEST 234.07 MW-14S 235.28 MW-17S 241.12 SG-3 239.97 MW-11S MW-26D 233.32 MW-43S GRANT 235.78 MW-16S 237.86 MW-5S 233.61 MW-41S 232.99 MW-40S MW-26BR MW-23S 235.90 236 234.99 0 150 SCALE, FEET 300 GROUNDWATER CONTOUR (FT, NAVD88) GROUNDWATER ELEVATION (FT, NAVD88) MEASURED 4/1/2023 INFERRED DIRECTION OF GROUNDWATER FLOW 2024 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut SHALLOW GROUNDWATER CONTOUR PLAN Consultants Project 2200138 December 2024 Fig. 4A HERIOT, PAULA B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\00_CAD\Figures\2024AR\4A_2200138_2024AR_GWS.dwg - 12/11/2024
  3. Page 33 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 33 of 65 SG-5 3 23 SG-4 MW-44S MW-45M 233.31 23 4 MW-45S R iv er 23 3 num 235 Ho cka 233.71 MW-42M MW-26BR MW-26S MW-26D MW-38S MW-39S 6 23 MW-10BR MW-10D MW-10M 235.68 MW-10SR MW-1S MW-1D MW-7D MW-20S MW-7S MW-28S MAPLE LEGEND: ST INTERMEDIATE MONITORING WELL USED TO GENERATE GROUNDWATER CONTOURS T M AIN S T MW-24S ST MW-37BR MW-37D MW-32S MW-37S ST SG-1 MW-21S MW-25S 235 SG-2 MW-2BR MW-35S MW-6S MW-9D MW-9S MW-6D MW-13M 234.27 RW-3M 235.33 4 MW-34S MW-2D MW-2SR MW-11D MW-11S 23 MW-36S MW-43M 233.55 MW-14M 233.94 MW-13D MW-13S MW-3BR MW-3DR MW-4D MW-4S MW-4SR MW-33S MW-41S MW-29D MW-40S ST GRANT MW-12D WEST MW-29S UNION MW-30S MW-17S SG-3 MW-43S 237.00 MW-46M MW-14D MW-14S MW-19S MW-18D MW-3D MW-3S MW-16S MW-12SR MW-42S 236 MW-31S MW-5D MW-5S 232.80 MW-44M STREAM GAUGE MONITORING WELL 235 GROUNDWATER CONTOUR (FT, NAVD88) 236 INFERRED GROUNDWATER CONTOUR (FT, NAVD88) WES MW-23S 237.00 GROUNDWATER ELEVATION (FT, NAVD88) MEASURED 4/1/2023 GROUNDWATER FLOW DIRECTION 0 150 SCALE, FEET 300 2024 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut Consultants Project 2200138 INTERMEDIATE GROUNDWATER CONTOUR PLAN December 2024 Fig. 4B HERIOT, PAULA B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\00_CAD\Figures\2024AR\4B_2200138_2024AR_GWI.dwg - 12/11/2024
  4. Page 34 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 34 of 65 SG-5 SG-4 MW-44S MW-44M Ho cka num R iv er MW-45M MW-45S MW-42M 237 8 23 T 5 MW-7S MW-6S MW-28S MW-10D 235.66 MW-10M MW-10SR MAPLE ST MW-7D 235.26 LEGEND: DEEP MONITORING WELL USED TO GENERATE GROUNDWATER CONTOURS STREAM GAUGE MONITORING WELL MW-23S WES MW-6D 237.53 MW-20S MW-1D 235.19 236 SG-1 MW-37BR MW-37S MW-9D 235.79 MW-1S MW-24S MW-10BR MW-32S MW-21S ST MW-3DR 234.88 23 MW-9S MW-13S MW-13M MW-3S RW-3M MW-3BR 235.09 MW-37D MW-11S SG-2 234.29 MW-13D 234.85 MW-3D GRANT MW-35S MW-19S ST 239.96 MW-11D MW-14M MW-33S MW-25S MW-43M UNION MW-34S T M AIN S 4 MW-36S 234 MW-14S MW-17S MW-4S MW-4SR MW-2SR MW-2BR 23 5 236.08 MW-4D SG-3 23 MW-30S MW-5S MW-41S ST MW-29D 233.86 234.08 MW-14D 234.44 MW-18D MW-16S 236 237.59 MW-2D MW-46M MW-26D 234.17 237 239 MW-12SR 238 239.14 MW-12D MW-29S MW-40S MW-26BR MW-26S MW-38S MW-39S WEST MW-43S MW-31S 235.82 MW-5D MW-42S 235 GROUNDWATER CONTOUR (FT, NAVD88) 234.08 GROUNDWATER ELEVATION (FT, NAVD88) MEASURED 4/1/2023 GROUNDWATER FLOW DIRECTION 0 150 SCALE, FEET 300 2024 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut DEEP GROUNDWATER CONTOUR PLAN Consultants Project 2200138 December 2024 Fig. 4C HERIOT, PAULA B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\00_CAD\Figures\2024AR\4C_2200138_2024AR_GWD.dwg - 12/11/2024
  5. Page 35 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 35 of 65 SG-5 SG-4 MW-44S MW-44M Ho cka num R iv er MW-45M MW-45S MW-42M MW-42S WEST MW-43S MW-31S MW-29S 234.14 MW-26BR MW-26S MW-46M MW-40S MW-29D MW-14D MW-14S MW-14M MW-26D MW-41S ST MW-43M 5 23 MW-16S MW-18D 235 MW-35S 234.94 MW-37BR MW-32S 23 8 MW-11D MW-11S SG-2 MW-21S MW-33S MW-25S MW-9D MW-24S 6 23 MW-10BR 235.49 MW-7D MW-7S MW-37S MW-37D MW-20S MW-1S MW-1D MW-28S MAPLE ST MW-10D MW-10M MW-10SR LEGEND: BEDROCK MONITORING WELL USED TO GENERATE GROUNDWATER CONTOURS STREAM GAUGE MONITORING WELL MW-23S WES T M AIN S T SG-1 23 7 MW-9S MW-6D MW-6S ST MW-34S ST MW-2BR 238.85 MW-3BR 236.47 MW-4D MW-4S MW-4SR MW-13D MW-13S MW-13M MW-3S MW-3D RW-3M MW-3DR GRANT 238 MW-36S MW-19S MW-17S SG-3 UNION 237 MW-5D MW-5S MW-12D MW-12SR MW-2D MW-2SR 235 6 23 MW-38S MW-30S MW-39S 235 GROUNDWATER CONTOUR (FT, NAVD88) 236.47 GROUNDWATER ELEVATION (FT, NAVD88) MEASURED 4/1/2023 GROUNDWATER FLOW DIRECTION 0 150 SCALE, FEET 300 2024 Annual Report Rockville Former MGP Site Rockville, Vernon, Connecticut Eversource Energy Berlin, Connecticut BEDROCK GROUNDWATER CONTOUR PLAN Consultants Project 2200138 December 2024 Fig. 4D HERIOT, PAULA B:\Working\EVERSOURCE\2200138 Rockville MGP Supp. Ph II_III ESA\00_CAD\Figures\2024AR\4D_2200138_2024AR_GWBR.dwg - 12/11/2024
  6. Page 36 of 65

    2024 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2024 The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 36 of 65 Appendix A Significant Environmental Hazard Status Update Form: Soil GEI Consultants, Inc.
  7. Page 37 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 37 of 65 Electronic Transmittal Form for DEEP Remediation, LUST, and PCB Secure File Transfer (SFT) DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION REMEDIATION DIVISION, PCB PROGRAM, AND LEAKING UNDERGROUND STORAGE TANK COORDINATION PROGRAM www.ct.gov/deep This Electronic Transmittal Form must be completed and included as the cover sheet of your electronic document when uploading a document to the Connecticut SFT website. Requirements for Transmittals through the SFT website: • • • Documents submitted through the SFT website must include all applicable figures, tables and laboratory data. Files must be formatted as PDF/A and use the appropriate naming convention: o For Remediation Filings: REM_REMID #_SiteAddress_Town_DocumentType_DateofDocument o For LUST Filings: LUST_SiteAddress_Town_AbbreviationForDocumentType_DateofDocument o For PCB Filings: PCB_SiteAddress_Town_AbbreviationForDocumentType_DateofDocument Example: LUST_1MainStreet_Hartford_ESA_01-01-2001 Note: For “AbbreviationForDocumentType” use appropriate abbreviation at Transmittal of Documents If no Rem ID assigned (new filing) or REM ID is unknown leave field blank Part I: Primary Recipient*: Remediation Program (* required) For Remediation documents: For PCB/LUST documents: Primary Program*: Significant Environmental Hazard UST Facility ID: Rem ID*: 13641 Spill Case Number: (if applicable) (if known) Part II: Site Information Site Name*: Rockville Former Manufactured Gas Plant Site Address*: 13 Maple Street City/Town*: Rockville, Vernon State: CT Zip Code: 06066 Secondary Programs (complete as many as applicable for this document): Program: Voluntary Remediation Program: Select Secondary Program Program: Select Secondary Program Program: Select Secondary Program Project ID: 12390 Project ID: Project ID: Project ID: Provide Project ID for each secondary program if it is known. Each program has a unique ID (i.e. Rem ID, Spill Case #, UST Facility ID, etc.) Part III: Document Information (document type required for appropriate program[s] only) Remediation*: SEH Status Update: Soil LUST/PCB*: LUST/PCB Document Type Date of Document*: 5/22/2024 Version: Final Part IV: Submitter Information Name*: Andrew (Drew) P. Blicharz E-mail*: [email removed] Name of business this document is being submitted on behalf of and contact person email: * The Connecticut Light and Power Company dba Eversource Energy DEEP-ETF 1 of 1 Rev.09-11-2023
  8. Page 38 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 38 of 65 Sustainability & Environmental Affairs Department 107 Selden Street, BMN2 Berlin, CT 06037 May 22, 2024 Monica Meschiatti Remediation Division Bureau of Water Protection and Land Reuse Department of Energy and Environmental Protection 79 Elm Street Hartford, CT 06106-5127 Reference: Rockville Former Manufactured Gas Plant Site REM ID: 13641/SEH ID: 1075 Significant Environmental Hazard Status Update Form: Soil Dear Ms. Meschiatti: The Connecticut Light and Power Company dba Eversource Energy (Eversource) submits the enclosed Significant Environmental Hazard (SEH) Status Update Form: Soil for the Rockville Former Manufactured Gas Plant Site located at 13 Maple Street in Rockville, Vernon, Connecticut (the Site). An SEH Notification (SEHN) was submitted to the Connecticut Department of Energy and Environmental Protection (CT DEEP) on February 26, 2018. The SEHN reported that benzo(a)pyrene (BaP) was detected at a concentration that exceeded the SEH Condition Notification Threshold Concentration in shallow surficial soils (upper two feet) in a sample collected from SS-102 (0-6”) during the Phase III Environmental Site Assessment (ESA). Additional SEH conditions in shallow surficial soils were later discovered at the Site during characterization or investigation activities. SEH conditions at OSS-4 and SB-78 were abated. SEH conditions at SB-76 and SB-76A1, HA-18, and an area characterized by HA-01 through HA-03 remain at the Site. The attached SEH Status Update Form: Soil provides an annual update on the mitigation measures for existing SEH conditions in surficial soils, and representative photographs. These SEH conditions in the surficial soils, which are currently within an access-restricted fencing area, are proposed to be abated prior to or as part of the site-wide remedial action plan (RAP) which will be prepared once the Phase III environmental site assessment is completed at the Site. Sincerely, Eversource Energy Service Company ______________________________________ Andrew (Drew) P. Blicharz, LEP, CHMM Senior Environmental Specialist – Remediation Enclosure: Significant Environmental Hazard (SEH) Status Update Form: Soil Cc: Kevin Neary, CT DEEP Jeffrey Holden, LEP, GEI Consultants Sean Connolly, GEI Consultants
  9. Page 39 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 39 of 65 Significant Environmental Hazard Status Update Form: Soil [Connecticut General Statutes (CGS) Section 22a-6u] DEPARTMENT OF ENERGY AND ENVIRONMENTAL PROTECTION BUREAU OF WATER PROTECTION & LAND REUSE REMEDIATION DIVISION 79 ELM STREET www.ct.gov/deep/remediation HARTFORD, CT 06106-5127 Complete and submit this form, accompanied by attachments as requested, to meet the requirement under CGS section 22a-6u(k)(2) to provide a description of any continuing actions being taken to monitor, mitigate, or abate a Significant Environmental Hazard condition in surface soil. Part I – Site Identification Identify the parcel at which a Significant Environmental Hazard (SEH) condition was identified: Name of Site: RemID# DEEP Use Only SEH# Rockville Former MGP Site(REMID 13641/SEHID 1075 Address or Location: 13 Maple Street City/Town: Rockville/Vernon State: CT Zip Code: 06066 Date(s) DEEP was notified: 2/26/18 DEEP Case Manager (if known): MONICA MESCHIATTI Part II – SEH Information A. SEH Condition Reported 30x Industrial/Commercial Direct Expose Criteria (DEC) (for industrial/commercial use, i.e. non-residential) 15x Industrial/Commercial DEC (for metals or PCBs at industrial/commercial properties that are within 300 feet of a current residential use) 15x Residential DEC (for current residential use) B. Has the extent of the SEH condition been fully delineated horizontally and vertically in the top two feet of soil, pursuant to CGS section 22a-6u(d)(3)(A)? Yes No Date report delineating SEH condition submitted: 5/19/23 C. A site map is attached depicting the specific locations and extent of the soil contamination, including contaminant concentrations that exceed SEH notification thresholds. Part III – SEH Mitigation Status Update Describe any steps being taken to delineate, monitor, mitigate, and/or abate the SEH condition and any proposed future actions, pursuant to CGS section 22a-6u(d)(3). A. Report Frequency 1. Annual reports are due on June 1st of each year using this form. This submittal is the annual report. 2. In the event that mitigation measures fail, a supplemental report, using this form, is required within 30 days of discovery of such event and must describe how this condition was addressed in C.4. below. This submittal is a supplemental report. DEEP-REM-SEHN-Soil 1 of 4 Rev. 3/1/19
  10. Page 40 of 65

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 5 Page 40 of 65 B. SEH Mitigation 1. Area that exceeds SEH soil notification thresholds is: Covered by pavement maintained in good condition YES NO Fenced off from the general public YES NO Identified by posted warning signs YES NO 2. Provide any additional details of the mitigation measures taken to prevent exposure to the CHECK IF NONE contaminated soil exceeding the SEH notification threshold. Surficial soil with detections of benzo(a)pyrene (BaP) above the SEH Threshold Concentration including the SS-102, HA-01A, HA-02, HA-03, HA-18, and SB-76 areas remain secured within security fencing that has warning signs posted at the gated entrances to inform authorized visitors. The property is flagged in Eversource's internal GIS which informs Substation Operations personnel to contact Environmental personnel prior to intrusive work at the substation property. C. Inspection and Maintenance of Mitigation Measures 1. List dates of inspection since last annual report (mm/dd/yy): 7/1/23 10/1/23 4/8/24 5/14/24 2. Checklist for inspection of mitigation measures for most recent inspection: Yes No NA Cracking of asphalt or concrete? Yes No NA Changes in surface profile (settling, potholes, roots)? Yes No NA Exposed geotextile membrane or soil erosion? Yes No NA New construction, paving, or landscaping? Yes No NA Opening in fence that could allow access? Yes No NA Warning signs present and legible? Yes No NA Other conditions - describe: 3. Provide current photo documentation of mitigation measures. Date of photos: 5/14/24 PHOTOS ATTACHED 4. Describe any maintenance of mitigation measures that has been completed since the last report. CHECK IF NONE Part IV – SEH Abatement Update A. Abatement Status 1. SEH condition has been abated (complete Part IV.B.) OSS-04 in 2021 and SB-78 in 2022. Reports below. 2. Date abatement plan (to be) submitted: 3. Anticipated date of completion of abatement: DEEP-REM-SEHN-Soil 2 of 4 Rev. 3/1/19

Text of RSR-032 Attachment 4.pdf

Extracted from the file · 570 pages · 1,357,502 characters

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)