Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 32

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy210 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files210

Search terms highlighted
Eversource rate increase is on 9 pages across 3 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-032 Attachment 176_Part2.pdf

Extracted from the file · 754 pages · 1,598,897 characters

Text of RSR-032 Attachment 176_Part1.pdf

Extracted from the file · 110 pages · 439,601 characters

Text of RSR-032 Attachment 175_Part7.pdf

Extracted from the file · 275 pages · 622,526 characters

Text of RSR-032 Attachment 175_Part6.pdf

Extracted from the file · 350 pages · 828,421 characters

Text of RSR-032 Attachment 175_Part5.pdf

Extracted from the file · 350 pages · 841,526 characters

Text of RSR-032 Attachment 175_Part4.pdf

Extracted from the file · 350 pages · 529,828 characters

Text of RSR-032 Attachment 175_Part3.pdf

Extracted from the file · 350 pages · 417,827 characters

Text of RSR-032 Attachment 175_Part2.pdf

Extracted from the file · 350 pages · 717,402 characters

Text of RSR-032 Attachment 175_Part1.pdf

Extracted from the file · 350 pages · 426,888 characters

Text of RSR-032 Attachment 174.pdf

Extracted from the file · 2 pages · 3,788 characters

Text of RSR-032 Attachment 173.pdf

Extracted from the file · 9 pages · 19,276 characters

Text of RSR-032 Attachment 172.pdf

Extracted from the file · 2 pages · 5,216 characters

Text of RSR-032 Attachment 171.pdf

Extracted from the file · 2 pages · 7,025 characters

Text of RSR-032 Attachment 170.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 169.pdf

Extracted from the file · 14 pages · 2,105 characters

Text of RSR-032 Attachment 168.pdf

Extracted from the file · 178 pages · 303,260 characters

Text of RSR-032 Attachment 167_Part2.pdf

Extracted from the file · 844 pages · 1,367,165 characters

Text of RSR-032 Attachment 167_Part1.pdf

Extracted from the file · 284 pages · 480,797 characters

Text of RSR-032 Attachment 166.pdf

Extracted from the file · 4 pages · 5,984 characters

Text of RSR-032 Attachment 165_Part 4.pdf

Extracted from the file · 84 pages · 130,960 characters

Text of RSR-032 Attachment 165_Part 3.pdf

Extracted from the file · 482 pages · 674,897 characters

Text of RSR-032 Attachment 165_Part 2.pdf

Extracted from the file · 509 pages · 549,394 characters

Text of RSR-032 Attachment 165_Part 1.pdf

Extracted from the file · 500 pages · 578,799 characters

Text of RSR-032 Attachment 164.pdf

Extracted from the file · 42 pages, 16 without text · 66,266 characters

Text of RSR-032 Attachment 163.pdf

Extracted from the file · 575 pages · 624,136 characters

Text of RSR-032 Attachment 162.pdf

Extracted from the file · 17 pages · 19,879 characters

Text of RSR-032 Attachment 161 _Part2.pdf

Extracted from the file · 609 pages · 625,572 characters

Text of RSR-032 Attachment 161 _Part1.pdf

Extracted from the file · 131 pages · 171,359 characters

Text of RSR-032 Attachment 160.pdf

Extracted from the file · 56 pages · 84,793 characters

Text of RSR-032 Attachment 159.pdf

Extracted from the file · 97 pages · 159,126 characters

Text of RSR-032 Attachment 158.pdf

Extracted from the file · 54 pages · 96,528 characters

Text of RSR-032 Attachment 157.pdf

Extracted from the file · 261 pages · 326,004 characters

Text of RSR-032 Attachment 156.pdf

Extracted from the file · 74 pages · 99,158 characters

Text of RSR-032 Attachment 155.pdf

Extracted from the file · 40 pages · 40,141 characters

Text of RSR-032 Attachment 154.pdf

Extracted from the file · 37 pages · 59,275 characters

Text of RSR-032 Attachment 153.pdf

Extracted from the file · 61 pages · 86,468 characters

Text of RSR-032 Attachment 152.pdf

Extracted from the file · 126 pages · 258,689 characters

Text of RSR-032 Attachment 151.pdf

Extracted from the file · 340 pages · 405,994 characters

Text of RSR-032 Attachment 150.pdf

Extracted from the file · 33 pages · 27,344 characters

Text of RSR-032 Attachment 149.pdf

Extracted from the file · 47 pages · 51,678 characters

Text of RSR-032 Attachment 148.pdf

Extracted from the file · 52 pages · 65,933 characters

Text of RSR-032 Attachment 147.pdf

Extracted from the file · 136 pages · 187,807 characters

Text of RSR-032 Attachment 146.pdf

Extracted from the file · 211 pages · 257,714 characters

Text of RSR-032 Attachment 145.pdf

Extracted from the file · 58 pages · 84,698 characters

Text of RSR-032 Attachment 144.pdf

Extracted from the file · 31 pages · 57,751 characters

Text of RSR-032 Attachment 143.pdf

Extracted from the file · 30 pages · 51,258 characters

Text of RSR-032 Attachment 142.pdf

Extracted from the file · 33 pages · 29,732 characters

Text of RSR-032 Attachment 141.pdf

Extracted from the file · 578 pages · 899,265 characters

Text of RSR-032 Attachment 140.pdf

Extracted from the file · 26 pages · 45,518 characters

Text of RSR-032 Attachment 139.pdf

Extracted from the file · 29 pages · 58,671 characters

Text of RSR-032 Attachment 138.pdf

Extracted from the file · 24 pages · 44,766 characters

Text of RSR-032 Attachment 137.pdf

Extracted from the file · 54 pages · 85,922 characters

Text of RSR-032 Attachment 136.pdf

Extracted from the file · 618 pages · 1,036,591 characters

Text of RSR-032 Attachment 135.pdf

Extracted from the file · 52 pages · 107,952 characters

Text of RSR-032 Attachment 134.pdf

Extracted from the file · 57 pages · 119,843 characters

Text of RSR-032 Attachment 133.pdf

Extracted from the file · 82 pages · 196,725 characters

Text of RSR-032 Attachment 132.pdf

Extracted from the file · 137 pages · 251,594 characters

Text of RSR-032 Attachment 131.pdf

Extracted from the file · 7 pages · 1,043 characters

Text of RSR-032 Attachment 130.pdf

Extracted from the file · 847 pages · 1,478,588 characters

Text of RSR-032 Attachment 129.pdf

Extracted from the file · 124 pages · 255,121 characters

Text of RSR-032 Attachment 128.pdf

Extracted from the file · 104 pages · 208,223 characters

Text of RSR-032 Attachment 127.pdf

Extracted from the file · 125 pages · 243,340 characters

Text of RSR-032 Attachment 126.pdf

Extracted from the file · 128 pages · 264,919 characters

Text of RSR-032 Attachment 125.pdf

Extracted from the file · 824 pages · 1,180,085 characters

Text of RSR-032 Attachment 124.pdf

Extracted from the file · 28 pages · 47,835 characters

Text of RSR-032 Attachment 123.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 122.pdf

Extracted from the file · 29 pages · 4,370 characters

Text of RSR-032 Attachment 121.pdf

Extracted from the file · 50 pages · 7,541 characters

Text of RSR-032 Attachment 120.PDF

Extracted from the file · 2 pages · 3,192 characters

Text of RSR-032 Attachment 119_Part3.pdf

Extracted from the file · 105 pages · 238,387 characters

Text of RSR-032 Attachment 119_Part2.pdf

Extracted from the file · 169 pages · 372,755 characters

Text of RSR-032 Attachment 119_Part1.pdf

Extracted from the file · 51 pages · 61,331 characters

Text of RSR-032 Attachment 118_Part6.pdf

Extracted from the file · 54 pages · 47,246 characters

Text of RSR-032 Attachment 118_Part5.pdf

Extracted from the file · 254 pages · 39,246 characters

Text of RSR-032 Attachment 118_Part4.pdf

Extracted from the file · 378 pages · 97,273 characters

Text of RSR-032 Attachment 118_Part3.pdf

Extracted from the file · 218 pages · 519,182 characters

Text of RSR-032 Attachment 118_Part2.pdf

Extracted from the file · 334 pages · 879,939 characters

Text of RSR-032 Attachment 118_Part1.pdf

Extracted from the file · 164 pages · 353,286 characters

Text of RSR-032 Attachment 117.pdf

Extracted from the file · 55 pages · 49,861 characters

Text of RSR-032 Attachment 116.pdf

Extracted from the file · 2 pages · 5,651 characters

Text of RSR-032 Attachment 115.pdf

Extracted from the file · 135 pages · 191,165 characters

Text of RSR-032 Attachment 114.pdf

Extracted from the file · 123 pages · 185,862 characters

Text of RSR-032 Attachment 113.pdf

Extracted from the file · 4 pages · 596 characters

Text of RSR-032 Attachment 112.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 111.pdf

Extracted from the file · 42 pages · 123,247 characters

Text of RSR-032 Attachment 110.pdf

Extracted from the file · 38 pages · 8,159 characters

Text of RSR-032 Attachment 109.pdf

Extracted from the file · 1 page · 149 characters

Text of RSR-032 Attachment 108.pdf

Extracted from the file · 23 pages · 27,882 characters

Text of RSR-032 Attachment 107.pdf

Extracted from the file · 1 page · 243 characters

Text of RSR-032 Attachment 106.pdf

Extracted from the file · 1 page · 321 characters

Text of RSR-032 Attachment 105.pdf

Extracted from the file · 493 pages · 1,262,208 characters

Text of RSR-032 Attachment 104.pdf

Extracted from the file · 628 pages · 1,570,354 characters

Text of RSR-032 Attachment 103.pdf

Extracted from the file · 40 pages · 129,345 characters

Text of RSR-032 Attachment 102.pdf

Extracted from the file · 2 pages · 298 characters

Text of RSR-032 Attachment 101.pdf

Extracted from the file · 186 pages · 437,630 characters

Text of RSR-032 Attachment 100.pdf

Extracted from the file · 244 pages · 509,938 characters

Text of RSR-032 Attachment 99.pdf

Extracted from the file · 193 pages · 412,257 characters

Text of RSR-032 Attachment 98.pdf

Extracted from the file · 2,201 pages · 3,529,384 characters

Text of RSR-032 Attachment 97.pdf

Extracted from the file · 2 pages · 2,870 characters

Text of RSR-032 Attachment 96.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 95.pdf

Extracted from the file · 27 pages · 8,963 characters

Text of RSR-032 Attachment 94.pdf

Extracted from the file · 3 pages · 5,367 characters

Text of RSR-032 Attachment 93.pdf

Extracted from the file · 3 pages · 5,315 characters

Text of RSR-032 Attachment 92.pdf

Extracted from the file · 3 pages · 5,225 characters

Text of RSR-032 Attachment 91.pdf

Extracted from the file · 2 pages · 2,709 characters

Text of RSR-032 Attachment 90.pdf

Extracted from the file · 2 pages · 2,630 characters

Text of RSR-032 Attachment 89.pdf

Extracted from the file · 2 pages · 2,615 characters

Text of RSR-032 Attachment 88.pdf

Extracted from the file · 2 pages · 2,771 characters

Text of RSR-032 Attachment 87.pdf

Extracted from the file · 2 pages · 2,948 characters

Text of RSR-032 Attachment 86.pdf

Extracted from the file · 2 pages · 2,772 characters

Text of RSR-032 Attachment 85.pdf

Extracted from the file · 2 pages · 2,764 characters

Text of RSR-032 Attachment 84.pdf

Extracted from the file · 2 pages · 2,999 characters

Text of RSR-032 Attachment 83.pdf

Extracted from the file · 2 pages · 2,995 characters

Text of RSR-032 Attachment 82.pdf

Extracted from the file · 2 pages · 2,968 characters

Text of RSR-032 Attachment 81.pdf

Extracted from the file · 2 pages · 2,973 characters

Text of RSR-032 Attachment 80.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 79.pdf

Extracted from the file · 2 pages · 2,694 characters

Text of RSR-032 Attachment 78.pdf

Extracted from the file · 3 pages · 3,876 characters

Text of RSR-032 Attachment 77.pdf

Extracted from the file · 3 pages · 3,646 characters

Text of RSR-032 Attachment 76.pdf

Extracted from the file · 3 pages · 3,805 characters

Text of RSR-032 Attachment 75.pdf

Extracted from the file · 9 pages · 13,840 characters

Text of RSR-032 Attachment 74.pdf

Extracted from the file · 3 pages · 3,990 characters

Text of RSR-032 Attachment 73.pdf

Extracted from the file · 3 pages · 4,170 characters

Text of RSR-032 Attachment 72.pdf

Extracted from the file · 3 pages · 3,957 characters

Text of RSR-032 Attachment 71.pdf

Extracted from the file · 3 pages · 3,642 characters

Text of RSR-032 Attachment 70.pdf

Extracted from the file · 2 pages · 2,078 characters

Text of RSR-032 Attachment 69.pdf

Extracted from the file · 3 pages · 4,357 characters

Text of RSR-032 Attachment 68.pdf

Extracted from the file · 3 pages · 3,165 characters

Text of RSR-032 Attachment 67.pdf

Extracted from the file · 4 pages · 3,715 characters

Text of RSR-032 Attachment 66.pdf

Extracted from the file · 3 pages · 3,168 characters

Text of RSR-032 Attachment 65.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 64.pdf

Extracted from the file · 2 pages · 2,099 characters

Text of RSR-032 Attachment 63.pdf

Extracted from the file · 2 pages · 2,062 characters

Text of RSR-032 Attachment 62.pdf

Extracted from the file · 7 pages · 5,200 characters

Text of RSR-032 Attachment 61.pdf

Extracted from the file · 5 pages · 10,643 characters

Text of RSR-032 Attachment 60.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 59.pdf

Extracted from the file · 2 pages · 4,147 characters

Text of RSR-032 Attachment 58.pdf

Extracted from the file · 1 page · 2,448 characters

Text of RSR-032 Attachment 57.pdf

Extracted from the file · 2 pages · 296 characters

Text of RSR-032 Attachment 56.pdf

Extracted from the file · 10 pages · 1,491 characters

Text of RSR-032 Attachment 55_Part10.pdf

Extracted from the file · 286 pages · 344,076 characters

Text of RSR-032 Attachment 55_Part9.pdf

Extracted from the file · 500 pages · 957,292 characters

Text of RSR-032 Attachment 55_Part8.pdf

Extracted from the file · 500 pages · 874,750 characters

Text of RSR-032 Attachment 55_Part7.pdf

Extracted from the file · 500 pages · 470,022 characters

Text of RSR-032 Attachment 55_Part6.pdf

Extracted from the file · 500 pages · 494,317 characters

Text of RSR-032 Attachment 55_Part5.pdf

Extracted from the file · 500 pages · 461,760 characters

Text of RSR-032 Attachment 55_Part4.pdf

Extracted from the file · 500 pages · 492,694 characters

Text of RSR-032 Attachment 55_Part3.pdf

Extracted from the file · 500 pages · 580,603 characters

Text of RSR-032 Attachment 55_Part2.pdf

Extracted from the file · 500 pages · 483,371 characters

Text of RSR-032 Attachment 55_Part1.pdf

Extracted from the file · 500 pages · 881,595 characters

Text of RSR-032 Attachment 54.pdf

Extracted from the file · 121 pages · 447,477 characters

Text of RSR-032 Attachment 53.pdf

Extracted from the file · 204 pages · 625,248 characters

Text of RSR-032 Attachment 52.pdf

Extracted from the file · 130 pages · 298,641 characters

Text of RSR-032 Attachment 51.pdf

Extracted from the file · 57 pages · 123,610 characters

Text of RSR-032 Attachment 50.pdf

Extracted from the file · 6 pages · 8,050 characters

Text of RSR-032 Attachment 49.pdf

Extracted from the file · 83 pages · 194,182 characters

Text of RSR-032 Attachment 48.pdf

Extracted from the file · 3 pages · 8,556 characters

Text of RSR-032 Attachment 47.pdf

Extracted from the file · 10 pages · 14,266 characters

Text of RSR-032 Attachment 46.pdf

Extracted from the file · 7 pages · 10,783 characters

Text of RSR-032 Attachment 45.pdf

Extracted from the file · 373 pages · 490,688 characters

Text of RSR-032 Attachment 44.pdf

Extracted from the file · 38 pages · 6,799 characters

Text of RSR-032 Attachment 43.pdf

Extracted from the file · 49 pages · 83,514 characters

Text of RSR-032 Attachment 42.pdf

Extracted from the file · 25 pages, 14 without text · 13,836 characters

Text of RSR-032 Attachment 41.pdf

Extracted from the file · 3 pages · 5,506 characters

Text of RSR-032 Attachment 40.pdf

Extracted from the file · 1 page · 1,448 characters

Text of RSR-032 Attachment 39.pdf

Extracted from the file · 14 pages · 17,145 characters

Text of RSR-032 Attachment 38.pdf

Extracted from the file · 12 pages · 14,555 characters

Text of RSR-032 Attachment 37.pdf

Extracted from the file · 12 pages · 14,398 characters

Text of RSR-032 Attachment 36.pdf

Extracted from the file · 12 pages · 15,426 characters

Text of RSR-032 Attachment 35.pdf

Extracted from the file · 38 pages · 61,388 characters

Text of RSR-032 Attachment 34.pdf

Extracted from the file · 13 pages · 12,161 characters

Text of RSR-032 Attachment 33.pdf

Extracted from the file · 11 pages · 7,928 characters

Text of RSR-032 Attachment 32.pdf

Extracted from the file · 3 pages · 444 characters

Text of RSR-032 Attachment 31.pdf

Extracted from the file · 26 pages · 3,891 characters

Text of RSR-032 Attachment 30.pdf

Extracted from the file · 18 pages · 2,691 characters

Text of RSR-032 Attachment 29.pdf

Extracted from the file · 9 pages · 10,238 characters

Text of RSR-032 Attachment 28.pdf

Extracted from the file · 127 pages · 218,825 characters

Text of RSR-032 Attachment 27.pdf

Extracted from the file · 12 pages · 12,858 characters

Text of RSR-032 Attachment 26.pdf

Extracted from the file · 12 pages · 14,742 characters

Text of RSR-032 Attachment 25.pdf

Extracted from the file · 14 pages · 16,968 characters

Text of RSR-032 Attachment 24.pdf

Extracted from the file · 13 pages · 16,061 characters

Text of RSR-032 Attachment 23.pdf

Extracted from the file · 19 pages · 8,357 characters

Text of RSR-032 Attachment 22.pdf

Extracted from the file · 1,282 pages · 3,304,505 characters

Text of RSR-032 Attachment 21.pdf

Extracted from the file · 1,005 pages · 2,609,640 characters

Text of RSR-032 Attachment 20_Part2.pdf

Extracted from the file · 109 pages · 16,568 characters

Text of RSR-032 Attachment 20_Part1.pdf

Extracted from the file · 150 pages · 190,904 characters

Text of RSR-032 Attachment 19.pdf

Extracted from the file · 23 pages · 39,103 characters

Text of RSR-032 Attachment 18.pdf

Extracted from the file · 8 pages · 12,671 characters

Text of RSR-032 Attachment 17_Part3.pdf

Extracted from the file · 282 pages · 740,441 characters

Text of RSR-032 Attachment 17_Part2.pdf

Extracted from the file · 500 pages · 1,293,274 characters

Text of RSR-032 Attachment 17_Part1.pdf

Extracted from the file · 500 pages · 1,270,790 characters

Text of RSR-032 Attachment 16.pdf

Extracted from the file · 46 pages · 130,280 characters

Text of RSR-032 Attachment 15.pdf

Extracted from the file · 17 pages · 25,967 characters

Text of RSR-032 Attachment 14.pdf

Extracted from the file · 10 pages · 15,944 characters

Text of RSR-032 Attachment 13.pdf

Extracted from the file · 17 pages · 29,849 characters

Text of RSR-032 Attachment 12.pdf

Extracted from the file · 12 pages · 20,731 characters

Text of RSR-032 Attachment 11.pdf

Extracted from the file · 15 pages · 23,899 characters

Text of RSR-032 Attachment 10.pdf

Extracted from the file · 145 pages · 332,684 characters

Text of RSR-032 Attachment 9.pdf

Extracted from the file · 897 pages · 1,943,866 characters

Text of RSR-032 Attachment 8.pdf

Extracted from the file · 203 pages · 512,054 characters

Text of RSR-032 Attachment 7.pdf

Extracted from the file · 12 pages · 13,977 characters

Text of RSR-032 Attachment 6.pdf

Extracted from the file · 335 pages · 685,056 characters

Text of RSR-032 Attachment 5.pdf

Extracted from the file · 65 pages · 194,221 characters

Words on different pages
  1. Page 6 of 570

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 4 Page 6 of 570 2023 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2023 2. Background 2.1 Site Description The 3.43-acre Site is bounded by a wooded lot, a church, and residential properties to the north, Maple Street to the east, the Hockanum River and West Main Street to the south, and residential properties with frontage on West Street (Route 527) to the west. The Site is currently used as an electrical substation, Eversource’s Substation 14W. The substation is enclosed by a perimeter fence that limits access to authorized personnel only. The Inner Substation Area includes the active electrical substation infrastructure including high voltage power lines, towers, transformers, and electrical control houses. Subsurface electrical power supply ducts and substation grounding grid are located beneath a crushed gravel cover inside the Inner Substation Area. Access to the Inner Substation Area is restricted by a high security fence equipped with barbed wire. Eversource requires notification and specialized training prior to entry to the Inner Substation Area and appropriate escort by qualified personnel. The remainder of the parcel outside the Inner Substation Area is referred to as the Outer Substation Area (Fig. 2). The Outer Substation Area includes a grassed area surrounding the eastern and northern sides of the Site. A series of electrical duct banks extend from the switch gear beyond the northeastern Inner Substation Area into the Outer Substation Area that feed distribution poles along the site boundary with Maple Street. A fenced area with a high-pressure gas regulator/ control house is located on the western portion of the Outer Substation Area. The Hockanum River is in the Outer Substation Area and abuts the Inner Substation Area to the south. Wooded and overgrown areas are located on the northern portion of the Site adjacent to the St. Joseph’s Church paved parking lot and along the southern portion of the Site between the Hockanum River and West Main Street. The Site is zoned “NR-10”, which is a designation provided to historic district neighborhood parcels. Surrounding land use within a 500-foot radius includes mixed residential, commercial, and industrial land use, schools, and a church. 2.2 Site History 2.2.1 Operational History The Site was formerly a MGP that operated from 1863 until the mid-1930s when gas production ceased. The original MGP consisted of a distillation works and a gas holder, with coal gas produced by the retort process. By 1877, a second gas holder was erected, as well as a 1.5-story brick building to house gas production. In 1890, three gas engines were installed and the coal-gas made on-Site was consumed by electrical generators for arc lighting. In the GEI Consultants, Inc. 2
  2. Page 7 of 570

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 4 Page 7 of 570 2023 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2023 mid-1890s, the MGP was converted to make carbureted water-gas. A third gas holder was erected at the MGP in 1922. Gas production ceased prior to the mid-1930s. The footprint of the former MGP structures is shown in Fig. 2. The former MGP was acquired by CL&P in 1935 and later converted to be used as an electrical substation and natural gas regulator station, as it remains today. The operations of the gas regulator station are being decommissioned in 2023 and 2024. 2.2.2 Previous Environmental Reports and Site Status Several investigations were conducted at the Site during the 1990s as identified below: • MGP Site Investigation, March 1992, NUSCO • MGP Off-Site Investigation Phase I Interim Report, May 1993, NUSCO • MGP Off-Site Investigation, April 1994, NUSCO • Human Health Risk Assessment, December 1994, NUSCO • Field Summary Report, April 1995, NUSCO • Analysis of Remedial Alternatives, October 1996, RETEC On September 2, 2015, Eversource entered the Site into the VRP, pursuant to Connecticut General Statutes (CGS) 22a-133x, by submitting an Environmental Condition Assessment Form (ECAF) and fee to the CT DEEP. Acknowledgment of the ECAF and fee was provided in a letter from CT DEEP dated September 24, 2015. Since CT DEEP did not indicate that the Commissioner’s review and approval of the investigation was required within 30 days of the date of their letter, the Site was automatically delegated to a Licensed Environmental Professional (LEP). A data summary of the investigations listed above is provided in the ECAF and the “Site Status and Condition Report” prepared by GEI, both of which are dated August 31, 2015, and submitted to CT DEEP on September 2, 2015. A Water-Supply Well Receptor Survey was also performed as part of the ECAF; no wells were identified within a 500-foot radius of the Site. Eversource retained Tighe & Bond as the LEP firm in December 2015. Tighe & Bond conducted various Site investigation activities and submitted Annual Reports to CT DEEP from December 2016 and December 2021. Sample locations associated with investigations performed by Tighe & Bond are shown in Fig. 3. CT DEEP Significant Environmental Hazard Forms were also submitted as required. In 2020, an Off-Site Soil Vapor Assessment was completed and submitted to the church pastor. In 2021, Exponent Ecological and GEI Consultants, Inc. 3
  3. Page 8 of 570

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 4 Page 8 of 570 2023 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2023 Biological Sciences (Exponent) completed a Screening Level Ecological Risk Assessment (SLERA) that was submitted to CT DEEP. These activities have been summarized in prior annual reports. In early 2022, Eversource once again retained GEI to plan and implement a Supplemental Phase II/III Environmental Site Assessment (ESA) Work Plan for the Site. On March 30, 2022, GEI provided a letter to CT DEEP indicating a change in the LEP of Record for the Site. GEI has recently assigned a new LEP of Record for this Site, Mr. Jeffrey Holden (LEP#423). Activities performed during 2023 are further discussed in Section 3. 2.3 Previously Identified Data Gaps and Status Several data gaps were identified in 2022 based on GEI’s understanding of the Site and prior investigation efforts. The Supplemental Phase II/III ESA Work Plan, the contents of which were summarized in the 2022 Annual Report submittal to CT DEEP, identified proposed activities to address these data gaps. The identified data gaps are summarized below, along with a brief summary of the status of each (in bold): • Characterization of the nature and extent of the groundwater plume within the intermediate groundwater zone is needed to the west/northwest of MW-42M, which exceeds the Surface Water Protection Criteria (SWPC) for extractable total petroleum hydrocarbons (ETPH) and the Groundwater Protection Criteria (GWPC) for benzene and ETPH. Additional wells were installed in 2022 and subject to quarterly monitoring in 2023 to delineate the affected groundwater area (see Section 3). • Additional groundwater data at St. Joseph’s Church and proposed additional downgradient wells are needed to evaluate seasonal changes to constituents of concern (COCs) in groundwater downgradient of the Site. Additional wells were installed in 2022 and subject to quarterly monitoring in 2023 to delineate the affected groundwater area (see Section 3). • Additional groundwater data at the northwestern and western portions of the Outer Substation Area is needed to evaluate seasonal changes to COCs in groundwater at monitoring wells MW-03DR and MW-39S. Wells RW-03M, MW-03DR, and MW-37S need to be gauged to evaluate if measurable volumes of tar have accumulated at these locations. Additional monitoring of these wells was performed in 2023 (see Section 3). • Volatile organic compounds (VOCs) and petroleum-impacted groundwater in well MW-35S is within 15 feet of the ground surface of the electrical control house slab, thus warranting a soil vapor assessment beneath the control house. Soil vapor testing was performed in the control house in March 2022. The detected concentrations of VOCs and ETPH were below both the RES VC GEI Consultants, Inc. 4
  4. Page 9 of 570

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 4 Page 9 of 570 2023 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2023 and I/C VC for soil vapor and therefore meet the CT DEEP RSR Section 22a-133k-3(c)(1)(A) Alternative Demonstration of Compliance with Volatilization Criteria for Groundwater for Soil Vapor Below a Building. A summary memo was included as Appendix B to the 2022 Annual Report. • Additional delineation of shallow soils (0 to 2 feet below ground surface) was needed around previous soil sample locations SB-76 and SB-78 to determine the extent of soil with benzo(a)pyrene concentrations exceeding the SEH Condition Notification Threshold Concentration. The SEH Conditions have been delineated as further discussed in Section 2.4. An annual SEH Status Update Form was submitted in 2023 (see Section 3.3). • The SLERA completed by Exponent in 2021 indicated a potential for Site-related COCs in the Hockanum River portion of the Site to present adverse ecological effects to benthic invertebrates, fish, and semi-aquatic wildlife. The SLERA recommended further evaluation in a Baseline Ecological Risk Assessment (BERA). GEI recommended the performance of a refined SLERA in lieu of a BERA and additional data collection would be required in support of this. Additional data collection was performed in 2022 and a refined SLERA was submitted to CT DEEP on May 31, 2023 (see Section 3.5). Following completion of the proposed investigation activities for the Supplemental Phase II/III ESA, the existing data gaps will be re-evaluated. The results of the data gap analysis will determine if the nature and extent of impacts associated with the former MGP site has been defined. Any additional information required to select and design a remedy for the Site and to demonstrate compliance with the CT DEEP Remediation Standard Regulations (RSRs) for soil, groundwater, and non-aqueous phase liquid (NAPL) impacts. 2.4 Significant Environmental Hazard (SEH) Reporting Background During sampling for the Phase III Environmental Site Assessment (ESA) in 2018, a sample was detected above CT DEEP’s Significant Environmental Hazard (SEH) Condition Notification Threshold Concentration of 30 mg/kg for benzo(a)pyrene (BaP). The sample was collected from surface soils at SS-102 located in the Inner Substation Area and was determined to be associated with historical fill. The exceedance was reported to CT DEEP in a SEH Notification Form (SEH ID:13641) on February 26, 2018. In response, CT DEEP issued an SEH Acknowledgment Letter on March 16, 2018, which stated that an immediate action to limit short-term risk was not required because the area was secured by permanent fencing. The letter required that the site investigation, remediation, and annual inspection reporting be continued in accordance with the plan provided in the SEH Notification Form. GEI Consultants, Inc. 5
  5. Page 10 of 570

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 4 Page 10 of 570 2023 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2023 Annual SEH Status Update Forms have been submitted to the CT DEEP since 2020 to provide an update on any SEH sampling, mitigation measures, and/or abatement activities. Additional locations exceeding the SEH Condition Threshold Concentration for BaP have been identified at the following locations and reported to the CT DEEP: • In 2018, during the Phase III ESA, BaP washes detected above the SEH Condition Notification Threshold Concentration in surficial soils at HA-01A, HA02, and HA-03 located around SS-102 and in the one-to-two-foot interval at HA18 located in the Outer Substation Area. • In 2020, on-going Phase III ESA sampling identified BaP above the SEH Condition Notification Threshold Concentration within historical fill in soil borings SB-76 and SB-78 located within the Inner Substation Area. • In 2021, pre-characterization sampling to support the installation of a utility conduit duct bank found an SEH exceedance for BaP at OSS-4 in the Outer Substation Area. After excavation of the duct bank trench through the OSS-4 sample area, four sidewall samples including OSS-4NW, OSS-4NE, OSS-4SE and OSS-4SW, were collected from the trench. BaP results from these samples indicated the SEH condition was abated. The soils from the OSS-4 area were removed and disposed of offsite along with the other soils generated from the project under the same waste profile. In March 2022, additional delineation sampling around SB-76 and SB-78 was performed. The additional sampling defined the limits of the SEH condition at boring SB-78 and approximately 18 tons of soil was excavated in May 2022, as summarized in the 2022 SEH Status Update Form submitted to the CT DEEP on May 25, 2022. The March 2022 delineation sampling around boring SB-76 did not completely define the limits of the SEH condition in this area of the Site. Additional delineation sampling was completed in December 2022 and preliminary results were discussed in the 2022 Annual Report. Section 3.3 below discusses the SEH-related activities performed in 2023. GEI Consultants, Inc. 6
  6. Page 11 of 570

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 4 Page 11 of 570 2023 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2023 3. 2023 Site Activities This section summarizes key project-related activities performed from January 2023 through mid-December 2023, including the following: • Quarterly NAPL gauging and recovery. • Quarterly groundwater monitoring. • Additional SEH-related abatement and reporting. • Investigation derived waste transport and disposal activities. • Preparation and submittal of a refined SLERA. • Ongoing data gap assessment. • Management of soil generated during gas main abandonment activities. Each of these is discussed in further detail in the following subsections. 3.1 Quarterly NAPL Gauging & Recovery GEI’s 2022 Work Plan included NAPL gauging of certain monitoring wells where NAPL was previously detected. This monitoring effort was continued through 2023 to understand NAPL thickness and recovery trends and to periodically remove NAPL from the existing well network if present and recoverable. Initially, a comprehensive well gauging event was performed in January 2023 and one of its objectives was to obtain an updated assessment regarding the presence of NAPL in the monitoring well network. Wells that were initially identified to contain NAPL included MW-2D, MW-3D, MW-10D, and MW-24S, all of which contained a tar-like dense non-aqueous phase liquid (DNAPL). However, during the April 2023 monitoring event, monitoring well MW-32S was observed to contain light nonaqueous phase liquid (LNAPL) and the well was therefore included in the subsequent NAPL gauging and recovery program. Table 1 summarizes the NAPL gauging and recovery data from 2023. As indicated, LNAPL was observed in monitoring well MW-32S during two out of the three of the events where it was gauged (April, July, and October 2023; the well was not accessible during the January 2023 monitoring event). LNAPL thicknesses measured in MW-32S ranged from not detected to 2.15 feet. Approximately 2 gallons of LNAPL was recovered from the well in 2023. LNAPL was not detected in any other monitoring wells at the Site. GEI Consultants, Inc. 7
  7. Page 12 of 570

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 4 Page 12 of 570 2023 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2023 DNAPL was detected in the four wells listed above at thickness ranging from trace (< 0.01 feet) to 1.14 feet in MW-24S (October 2023). Recoverable DNAPL was removed from the wells during each event totaling approximately 3 gallons of DNAPL during 2023. Recovered NAPL was contained on-Site in 55-gallon drums pending off-Site transport and disposal. IDW management is discussed below in Section 3.4. All NAPL detections during 2023 were from wells located within the Site property and no NAPL was detected in off-Site wells with the exception of monitoring well MW-20S immediately adjacent to the northern property boundary where trace amounts of NAPL were observed in purge water during the January 2023 monitoring event. We note that no measurable NAPL was detected during the gauging portion of the work. 3.2 Groundwater Monitoring The 2022 Work Plan called for four rounds of quarterly groundwater monitoring at the Site following installation of the new wells. All four quarterly events were performed in 2023. The monitoring events included groundwater sample collection from up to sixteen wells including MW-3DR, MW-13M, MW-14M, MW-29S, MW-39S, MW-40S, MW-41S, MW-42S, MW-42M, MW-43S, MW-43M, MW-44S, MW-44M. MW-45S, MW-45M, and MW-46M. The groundwater monitoring program was primarily focused on the collection of groundwater analytical data from wells at the downgradient property boundary and downgradient properties. Note that all sixteen wells were not sampled every quarter due to factors including inaccessibility (MW-42S and MW-42M) or because four quarters of sampling was not scoped for certain wells in the Work Plan (MW-03DR and MW-39S). Where appropriate, Eversource coordinated with the associated private property owners in accordance with the access agreements previously executed in October 2022. Groundwater samples were collected from each monitoring well utilizing low-flow/lowstress sampling techniques with submersible bladder pumps. During purging, aquifer parameters including temperature, pH, specific conductance, turbidity, dissolved oxygen, and oxidation reduction potential were monitored using a water quality monitor equipped with a flow through cell. A separate turbidity meter was used to collect turbidity measurements. Aquifer parameters, purging rates, and water levels were generally measured and recorded at five-minute intervals. Prior to sampling, depth to water was measured so that the mid-point of the saturated screen could be determined. Monitoring well sampling logs will be included in a comprehensive Phase III report to be submitted in the future. All groundwater samples were analyzed for VOCs via EPA Method 8260, polycyclic aromatic hydrocarbons (PAHs) via EPA Method 8270D, ETPH via CT ETPH methodologies, total 15 RSR-listed metals via EPA Method 6000/7000 series, and total cyanide. Samples were placed in the appropriate containers and all containers were labeled including sample identifications, sampler initials, date, time and preservative. Samples were GEI Consultants, Inc. 8
  8. Page 13 of 570

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 4 Page 13 of 570 2023 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2023 then transported in iced coolers under chain of custody protocol to Phoenix Environmental Laboratory of Manchester, Connecticut for analysis. Water level measurements are summarized in Table 1, and the groundwater analytical results are summarized in Table 2. The groundwater sampling results are discussed in the following subsections. 3.2.1 Well Gauging During the January and April 2023 monitoring events, GEI completed a comprehensive well gauging round where all Site wells were gauged for depth to water and the presence of NAPL (NAPL gauging results discussed above, and the July and October 2023 events included wells potentially containing NAPL only). Groundwater depths were measured from the previously surveyed top of the PVC well riser pipe for each monitoring well using an electronic water level meter capable of measuring the depth to water to within 0.01 feet. Groundwater elevations were then calculated based on top of PVC well riser elevations previously surveyed to develop updated groundwater contours and approximate flow direction. As indicated on the attached Figs. 4A through 4D, groundwater in the shallow, intermediate, and deep overburden, and shallow bedrock flow in a northwesterly direction, similar to that previously documented. The shallow wells and surface water gauging data also suggest the Hockanum River is a “losing stream” adjacent to the Site, as indicated by prior investigations. 3.2.2 Groundwater Analytical Results The 2023 groundwater analytical results were evaluated against the following criteria established in the RSRs: GWPC; SWPC; RES GWVC; and the I/C GWVC. The detected groundwater analytical results are provided in Table 2 and the analytical laboratory report is included in Appendix C. VOCs were detected in five out of the 16 (maximum) wells sampled during the four quarterly events including MW-3DR, MW14M, MW-29S, MW-41S, and MW-42M. Detected VOC concentrations were below the stated RSR criteria with the exception of benzene and Isopropylbenzene detected in wells MW-14M, MW-29S, MW-41S (benzene only), and MW 42M. Note that tetrachloroethene (PCE) was detected in monitoring well MW-46M at concentrations ranging from 1.4 to 3.0 µg/L, below the GWPC. MW-46M is located downgradient from the former MGP site. PCE is not associated with former MGP operations and is not considered a Site-related constituent. Several PAHs were detected in 12 of the 16 wells sampled as indicated in Table 2. PAH concentrations exceeded the GWPC and/or SWPC in wells including MW-3DR, MW-13M, MW-14M, MW-29S, MW-39S, MW-41S, MW-42S, MW-42M, MW-44S, MW-44M, MW 45S, and MW-45M. ETPH was also detected in five of the 15 wells at concentrations GEI Consultants, Inc. 9
  9. Page 14 of 570

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 4 Page 14 of 570 2023 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2023 ranging from 0.13 (MW-29S) to 2.2 mg/L (MW-14M). ETPH exceed the GWPC criteria in wells MW-14M, MW-29S, MW-39S, MW-41S, and MW-42M. Certain metals were also detected above the applicable groundwater criteria including copper, lead, vanadium, zinc at MW-39S and nickel at MW-43M. As indicated on Table 2, these and other metals were detected in other monitoring wells at concentrations below the applicable groundwater criteria. Cyanide was detected in monitoring well MW-29S at 0.19 mg/L, below the GWPC. Cyanide was not detected in any of the other wells sampled. The groundwater analytical data collected in 2023 does not indicate significant seasonal variation. Locations along the downgradient portion of the well network indicate compliance with the SWPC upgradient of any groundwater discharge location and therefore, no further delineation of groundwater zones are warranted. While downgradient concentrations slightly exceed the GWPC for one or more constituents, the exceedances are marginal and the trends are reducing along the groundwater flow path, so additional downgradient delineation is not currently anticipated (see Section 3.6). 3.3 Significant Environmental Hazard (SEH) Activities As mentioned in Section 2.3, BaP was detected in soil above the SEH Condition Notification Threshold Concentration of 30 mg/kg at sample location SB-76 (0 to 2 feet). Additional delineation sampling was performed in December 2022 to further delineate this SEH exceedance. Specifically, soil samples were collected from the 0- to 1-foot and 1- to 2-foot depth intervals at an adjacent location SB-76A1 and submitted under chain-of-custody to Phoenix Laboratories for analysis of PAHs by EPA Method 8270D. The 2022 Annual Report indicated that the preliminary results for these samples were below SEH criteria. This was confirmed after receipt of final results and data quality review in 2023 such that the area around SB-76 is delineated as a result of the December 2022 sampling. The SEH sampling activities and data are further discussed in the 2023 CT DEEP SEH Status Update Form submitted to the CT DEEP on May 19, 2023, a copy of which is included as Appendix A. The remaining SEH conditions at the Site are protected within the outer or inner substation fence and will be abated as part of the Site wide remedy. 3.4 Investigation Derived Waste As part of the quarterly NAPL gauging and recovery, groundwater sampling work and previous investigation work, waste streams were collected in appropriately labeled 55-gallon drums and stored in a designated drum storage area on-Site. Waste streams included NAPL, groundwater sampling purge water, and spent personal protective equipment (PPE) and disposable sampling supplies. The waste generated as part of the 2022 Investigation work was appropriately profiled and transported off-Site for disposal on February 8, 2023 to Red Technologies, LLC facility located in Portland, Connecticut. All drums were transported to the Clean Earth disposal facility located in Plainville, Connecticut for disposal. A total of GEI Consultants, Inc. 10
  10. Page 15 of 570

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-032 Attachment 4 Page 15 of 570 2023 Annual Report Rockville Former MGP Site 13 Maple Street, Vernon, Rockville, CT 06066 December 2023 seven soil drums, six groundwater drums, and one spent PPE drum were transported off-Site for disposal. Copies of the shipping documentation are included in Appendix D. Drums used for collection of NAPL, sampling purge water, and spent PPE as part of the 2023 monitoring work continue to be used for waste collection and will be disposed of in 2024. 3.5 Revised SLERA As indicated in Section 2.3, one of the previously identified data gaps was the need to revise the 2021 SLERA to further evaluate the potential for Site-related impacts to the Hockanum River portion of the Site. To this end, additional surface water and sediment sampling was performed in 2022 in accordance with the Supplemental Phase II/III ESA Work Plan. The resulting data were evaluated in the Refined Screening Level Ecological Risk Assessment (RSLERA), which was prepared by GEI and submitted to CT DEEP on May 31, 2023. The RSLERA concluded surface water conditions adjacent to the Site did not exceed environmental screening criteria such that no further evaluation of surface water was warranted. For sediment, the RSLERA concluded that sediment conditions adjacent to the Site were not statistically different relative to upstream conditions. Based on these conclusions, no further investigation, evaluation, or action with respect to ecological receptors is warranted pending CT DEEP review of the RSLERA. 3.6 Data Gap Assessment In May 2023, GEI performed a Data Gap Assessment to provide an evaluation of the previously identified data gaps following completion of the additional investigation activities outlined in the 2022 Work Plan. The assessment concluded that no additional investigations beyond the work described in the 2022 Work Plan and summarized in the 2022 Annual Report and this 2023 Annual Report were necessary to address the identified data gaps. GEI is continuing to evaluate the Site for other potential data gaps and a comprehensive evaluation of historical data is currently being completed. Additionally, GEI and Eversource are assessing groundwater reclassification for groundwater west and northwest of the Site (downgradient). Initial steps related to groundwater reclassification will be to consult with CT DEEP personnel to evaluate the likelihood of reclassification approval given the Site and area conditions, and available data. 3.7 Regulator Station Abandonment In September 2023, Yankee Gas Services Company dba Eversource Energy abandoned a natural gas main located at the northeast corner of the Site within the Outer Substation Area (Fig. 2). The gas regulator station associated with this gas main is being decommissioned in 2024. Soils were excavated as part of the utility abandonment work and temporarily stockpiled on and covered by polyethylene sheeting adjacent to the work area. GEI sampled GEI Consultants, Inc. 11

Text of RSR-032 Attachment 3.pdf

Extracted from the file · 8 pages · 15,762 characters

Text of RSR-032 Attachment 2.pdf

Extracted from the file · 26 pages · 3,865 characters

Text of RSR-032 Attachment 1.pdf

Extracted from the file · 18 pages · 2,673 characters

As listed on the current system

Question(s) Answered 32 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/30/2026

This filing on the current system (opens in a new tab)