Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 33

Files7

[Sheet: EOE-024, Attachment 1] 1 2 | Description | Attachment | Page Number | Event Note 3 | 2019 - 2024 Remediation Framework MSA | 4 | 1 | 2019 - 2024 Remediation MSA 4 | 2025 - 2028 Remediation Framework MSA | 4 | 7 | 2025 - 2028 Remediation MSA 5 | Berlin Settling Basin Remediation Project | 4 | 10 | Project Specific RFP 6 | Westside 7A Substation Control House Demolition | 4 | 16 | Project Specific RFP 7 | Willimantic MGP Site Remediation | 4 | 20 | Project Specific RFP 8 | Overflow Contaminated Material Disposal | 4 | 21 | Project Specific RFP 9 | Future Overflow Contaminated Material Disposal | 4 | 22 | Project Specific RFP 10 | Naugatuck and Seymour Control House Remediation and Demo | 4 | 23 | Project Specific RFP 11 | Building Demolition and Remediation Services - Canton Substation | 4 | 25 | Project Specific RFP 12 | Shelton MGP Remediation | 4 | 26 | Project Specific RFP 13 | Cheshire Soil Transportation and Disposal | 4 | 28 | Project Specific RFP

Text of RSR-033 Attachment 3.pdf

Extracted from the file

Text of RSR-033 Attachment 2 REDACTED.pdf

Extracted from the file · 60 pages, 21 without text · 78,965 characters

Text of RSR-033 Attachment 4 REDACTED.pdf

Extracted from the file · 28 pages, 23 without text · 4,232 characters

As listed on the current system

Question(s) Answered 33 (The Connecticut Light and Power Company) Date Filed: 10/16/2026

This filing on the current system (opens in a new tab)