Interrogatory responses

Answers to questions 38

Files5

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages

Scanned pages and machine-read text of RSR-038 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 5 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 5 of 19 REDACTED TO: File FROM: John Szymanski [signature] April 14, 1988 SUBJECT: Torrington AWC Tank removals were conducted at the Torrington AWC during the months of March and April 1988. o During March 1988: One (1) 4000 gallon unleaded gasoline tank and One (1) 500 gallon oil tank were removed; no problems o On March 30, 1988: Notified that (1) 4000 gallon diesel tank was removed with heavy rusting and several apparent holes the size of dimes. o On March 30, 1988: Examined site and took three (3) samples from excavation hole and one (1) sample from diesel tank to have material analyzed and identified by LAB per request by DEP Field Inspector, Richard Ciasullo. o On March 31, 1988: Samples dropped off for analyzing and identification at Souther-Newlands Laboratory. o On April 4, 1988: Souther Newland Laboratory called EPD office to report on lab findings. - Sample from diesel tank identified as diesel fuel - The three (3) samples from the excavation hole all had the same characteristic profiles, but it didn't match that of gasoline or diesel fuel and that it would take two to three weeks to identify samples from the excavation hole. o On Aril 4, 1988: Notified R. Robinson of the DEP Clean Water Group of the test results and asked for permission to continue tank installation construction after film cleaned off top of water and remainder of gray colored gravel removed from hole. Mr. Robinson gave approval to continue construction if I inspected site and assured this was done. o On April 6, 1988: NUSCO construction removed film from water and lowered water table by sucking out 3200 gallons of contaminated water which was hauled off site as contaminated waste water. Removed the remainder of gray contaminated gravel from excavation hole. o On April 6, 1988 after water table lowered gasoline film and strong fumes entered the excavation hole. The fire marshal was notified, who requested DEP to inspect the hole. Concern was generated regarding 10,000 gallon unleaded gasoline tank in the same vicinity where gas fumes and film were found. Construction stopped. o On April 7, 1988: DEP Field Inspector Richard Ciasullo and
  2. Scan of page 6 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 6 of 19 Torrington Fire Marshal Ron Corey arrived on site and gave us two alternatives: 1. Test tank full of product and be ready to remove it immediately if tank leaks; 2. Remove 10,000 gallon unleaded tank. o April 7, 1988: Discussions were held between Area Superintendent Walt Wadman, Ken Busick, Frank Melluzzo, Bud Meyer, John Betz, Jack Farrel and John Szymanski to discuss options and make decision as to disposition of 10,000 gallon gasoline tank. Final consensus was to remove tank based on presence of gasoline odor and fumes in area, water level in tank raised when emptied of product, bottom ash found in vicinity of tank, tank had been unprotected for 10 years, the older unprotected tank 4000 diesel came out of ground looking like swiss cheese. o April 7, 1988: Removed 10,000 gallon unleaded gasoline tank, some heavy rusting and pitting visible on tank but there was no apparent holes. Backfill around tank was improper per today's installation standards (very large boulders, large gravel and some sand) there were no hold down straps on tank, and bottom ash in close proximity to tank. Wet lines were heavily rusted in one large area.
  3. Scan of page 7 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 7 of 19 REDACTED Distribution: [redacted]Claims and Insurance [redacted]s. and Test Department [redacted]Regional Operations - WMECO [redacted]struction [redacted]HP [redacted]rans. SS and Mtce. [redacted] Trans. Bldg. Eng. Design [redacted]nsportation [redacted] EPD [redacted]ores [redacted] EPD [redacted]cilities Management [redacted] Legal [redacted] Nuclear Prod. [redacted]en. Fac. Lic. Dept. bsl cc: [redacted]
  4. Scan of page 8 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 8 of 19 TORRINGTON AUG / CT Bemis / Laura Lionts leak lokator hunter ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] TEST RESULTS DATE OF TEST | 07-6-85 CONTRACT NUMBER
    CUSTOMERNortheast Utilities
    LOCATION – IDENTIFICATION NUMBERNAME
    ADDRESS178 Franklin DriveCITYTorringtonSTATEConn
    LEAK LOKATOR USE ONLYCONCL. CODE
    TEST RESULTS SUMMARY
    NO.SYSTEM PRODUCTTANK SIZE GALLONSDIA/MATLWATER INCHESLEAK LOKATOR RESULTS LEVEL INCHESALR GPHCONCLUSIONRECOMMENDATIONSTESTTANKSYS
    IINo Lead Tank #I400064/371 1/2"106".039Tight
    IINo Lead Tank #II400064/371 1/2"95".038Tight
    VIIRegular Lead1000096/3T1 1/2"113".038Tight
    OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTS
    NO.SYSTEM PRODUCTTYPE OF PUMP REMOTETYPE OF PUMP SUCTION# APPLIEDMINUTES APPLIEDPRODUCT LOSS CC'SPRODUCT LOSS GPHCONCLUSION/RESULT
    IINo Lead Tank I>✓DLPressure testtestX
    IINo Lead Tank II>✓170Pressure testtestX
    IIIRegular Leaded> Pump✓ Side[illegible][illegible]XXTight
    NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTS
    NO.SYSTEM PRODUCTTEST NO.TEST LEVEL (INCHES)CLOCK STARTDURATION HRS.-MIN.LEAK RATE CC/DIVLEAK RATE CC/MINTEMP COMP Δ°FTEMP COMP CC/MINABSOLUTE LEAK RATE CC/MINABSOLUTE LEAK RATE GPHCHECK TEST Y or N
    INo Lead Tank I1106"9:4531 min.39+25.95+.161+33.80-1.85-.039N
    IINo Lead Tank II195"7:5231 min.47+2.82+.636+6.37-2.44-.038N
    IIIRegular Leaded1142"11:4620 min.35+21.47+.65523.88-2.41-.038N
  5. Scan of page 9 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 9 of 19 REDACTED ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] Bemis | TORRINGTON AWG / CT Laura [illegible] leak lokator TEST RESULTS DATE OF TEST | 03-6-8? CONTRACT NUMBER CUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER
    ADDRESS 178 Franklin DriveNAME
    CITY TorringtonSTATE Con
    TEST RESULTS SUMMARY
    NO.SYSTEM PRODUCTTANK SIZE GALLONSDIA/MATLWATER INCHESLEAK LOKATOR RESULTS LEVEL INCHESALR GPHCONCLUSIONRECOMMENDATIONSLEAK LOKATOR USE ONLY CONCL. CODE TEST TANK SYS
    INO LEAD TANK I450064.371 1/2"166"-.029Tight
    IINO LEAD TANK II450064.371 1/2"95"-.038Tight
    IIIREGULAR LEADED1000096 x T1 1/2"115"-.026Tight
    OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTS
    NO.SYSTEM PRODUCTTYPE OF PUMP REMOTESUCTION# APPLIEDMINUTES APPLIEDPRODUCT LOSS CC'SPRODUCT LOSS GPHCONCLUSION/RESULT
    INO LEAD TANK I✓DODO[illegible]testX
    IINO LEAD TANK II✓testX
    IIIREGULAR LEADED✓✓110DueX
    IIIREGULAR LEADED✓ Pump✓[illegible][illegible][illegible][illegible]Tight
    NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTS
    NO.SYSTEM PRODUCTTEST NO.TEST LEVEL (INCHES)TIME CLOCK STARTTIME DURATION HRS.-MIN.LEAK RATE CC/DIVLEAK RATE CC/MINTEMPERATURE COMPENSATION Δ°FTEMPERATURE COMPENSATION CC/MINABSOLUTE LEAK RATE CC/MINABSOLUTE LEAK RATE GPHCHECK TEST Y or N
    INO LEAD TANK I1166"9:4531 min.39+25.95+.141+27.82-1.85-.029N
    IINO LEAD TANK II195"9:5235 min4.1712.08+.03616.37-2.44-.038N
    IIIREGULAR LEADED1114"9:4630 min-.37+21.17+.25523.66-2.41-.038N
    * LEVEL – INCHES FROM TANK BOTTOM TO TEST LEVEL ALR – ABSOLUTE LEAK RATE (MEASURED LEAK RATE – TEMPERATURE COMPENSATION) IN GALLONS PER HOUR CONCLUSION – NFPA 329 CRITERION OF ± 0.05 GPH IS USED TO CERTIFY TIGHTNESS CERTIFICATION This is to certify that the above described tank systems were tested, using the HUNTER ENVIRONMENTAL SERVICES, INC. LEAK LOKATOR according to all standard operating procedures. Those indicated as tight meet the criterion established by the National Fire Protection Association Pamphlet 329 for Precision Testing.
    TESTS CONDUCTED BYCERTIFIED BY
    TEST VAN NO. [illegible]SIGNATURE [illegible]
    TANK TESTING SPECIALIST [illegible]NAME [illegible]DATE [illegible]
    TANK TESTING SPECIALIST [illegible]TITLE [illegible]
  6. Scan of page 10 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 10 of 19 TANK AND LOCATION DATA DATE: 03-6-85
    CUSTOMER: Northeast UtilitiesCITY: Torrington
    I.D. #STATE: Conn
    WEATHERTIMETEMPERATURECOMMENTS
    BEFORE TEST –
    AFTER TEST –
    SCHEMATIC: Building PUMP NO LEAD II 4000gal 64" NO LEAD II 4000gal 64" NO LEAD PUMP VENT Regular PUMPS VENT Regular LEADED 10000gal 96" Building
    PRODUCT/TANK NO.NO LEAD INO LEAD IIRegular
    BEFORE DELIVERY LEVELFillGaugeFillGaugeFillGaugeFillGaugeFillGauge
    LEVELFull
    GALLONS
    WATER1½"1½"1½"
    TOP OF RISER9796101132
    GRADE160163162137
    DROP TUBEALALAL
    CAPACITY, GALLONS4000400010000
    DIAMETER, INCHES646464
    MATERIALSTEELSTEELSTEEL
    PUMP TYPEGasboy[illegible]Bennett
    TYPE OF COVERTANTANTAN
    AGE OF TANKUKUKUK
    SIPHONNONONO
    TANK OPENINGS1-4" 1-2"1-4" 1-2"1-4"
    EXTRACTORSNONONO
    VAPOR RECOVERY TYPE VENT CONFIGURATION P-V VENT VALVE TYPE
    REPLACEMENT PARTS: PART #DESCRIPTIONQUANTITYPRICE
    #701[illegible]1[illegible]
    #124[illegible]1[illegible]
    #6" Quick Tite 2-gauge (wire)1[illegible]
    ADDITIONAL CHARGES: (pumpovers, overtime, etc.) [illegible] [illegible] *Data obtained from ☐ Station ☐ LL Charts ☐ Other ______
  7. Scan of page 11 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 11 of 19 PUMP METER CALIBRATION
    DATE:3-06-85
    CUSTOMER:Northeast Utilities
    LOCATION:175 Franklin Drive
    Torrington ct
    PRODUCT IDRegular leaded side-2 1 Pump 2 nozzles
    PUMP INFO/SERIAL NO.#3 side 2 12C0015718 Serial #
    INITIAL TEST READING +-6cubic inches
    CORRECT TO +-1cubic inches
    PRODUCT IDRegular leaded side-1 1 Pump 2 nozzles
    PUMP INFO/SERIAL NO.#3 side 1 12C0015718 Serial #
    INITIAL TEST READING +-2 1/2cubic inches
    CORRECT TO +cubic inches
    PRODUCT IDEconomy u/L
    PUMP INFO/SERIAL NO.#1 (394428) Serial #
    INITIAL TEST READING +-2cubic inches
    CORRECT TO +cubic inches
    PRODUCT ID
    PUMP INFO/SERIAL NO.
    INITIAL TEST READING +cubic inches
    CORRECT TO +cubic inches
    LL VAN #6TEAM MANAGEREdsin Ortiz
    RJT - 2/85
  8. Scan of page 12 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 12 of 19 CONN LIGHT & POWER CO. NORTHEAST UTILITIES WORK ORDER SKETCH SHEET SHEET ___ OF___
    DISTRICT / REGIONTOWNDATEMAP NO.WORK ORDER NO.ACTV.
    TORRINGTON / WESTERNTORRINGTON
    SKETCH INDICATE NORTH AND NAME STREETS NOT TO SCALE water B2 A1 21' 140' TORRINGTON SERVICE BUILDING 159' 177' 44' 275' 255' GARAGE TRANSMISSION D4 C3 HARWINTON SCHIBI ST. AVE. OP4185 REV. 10-82 DEST. SAME AS ATT. REC. DRAWN BY | TELEPHONE EXT.
  9. Scan of page 13 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 13 of 19 TORRINGTON AWC/CT Bernie | Laura Zlonts leak lokator Hunter ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] TEST RESULTS DATE OF TEST | CC-6-85 CONTRACT NUMBER CUSTOMER Northeast Utilities
    LOCATION - IDENTIFICATION NUMBERNAME
    ADDRESS 178 Franklin DriveCITY TorringtonSTATE Conn
    TEST RESULTS SUMMARY
    NO.SYSTEM PRODUCTTANK SIZE GALLONSTANK SIZE DIA/MATLWATER INCHESLEVEL INCHESALR GPHCONCLUSIONRECOMMENDATIONSLEAK LOKATOR USE ONLY TEST TANK SYS
    INO LEAD TANK I4000641 1/2"116".029Tight
    IINO LEAD TANK II4000641 1/2"95".038Tight
    IIIRegular LEADED10000961 1/2"113".038Tight
    OTHER INFORMATION FINAL REPORT PRODUCT LINES - HYDROSTATIC PRESSURE TEST RESULTS
    NO.SYSTEM PRODUCTTYPE OF PUMP REMOTETYPE OF PUMP SUCTION# APPLIEDMINUTES APPLIEDPRODUCT LOSS CC'SPRODUCT LOSS GPHCONCLUSION/RESULT
    INO LEAD TANK I✓DirDiravetestX
    IINO LEAD TANK II✓1 1/2PressuretestX
    IIIREGULAR LEADED✓ Pump✓ Side line pressure testGasolineleakingand tightTight
    IIIREGULAR LEADED✓ side to E-16310 minxxTight
    NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTS
    NO.SYSTEM PRODUCTTEST NO.TEST LEVEL (INCHES)TIME CLOCK STARTTIME DURATION HRS.-MIN.LEAK RATE CC/DIVLEAK RATE CC/MINTEMPERATURE COMPENSATION Δ°FTEMPERATURE COMPENSATION CC/MINABSOLUTE LEAK RATE CC/MINABSOLUTE LEAK RATE GPHCHECK TEST Y/N
    INO LEAD TANK I1116"9:0521 min4.79+25.95+1.161+23.20-1.85-.034N
    IINO LEAD TANK II195"9:5235 min4.17+2.08-1.636+6.37-2.44-.038N
    IIIREGULAR LEADED1114"11:1530 min1.25+26.17+1.6523.88-2.11-.036N
  10. Scan of page 14 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 14 of 19 Page 2 TANK AND LOCATION DATA DATE: 03-6-85
    CUSTOMER: Northeast UtilitiesCITY: Torrington
    I.D. #STATE: Conn
    WEATHERTIMETEMPERATURECOMMENTS
    BEFORE TEST –
    AFTER TEST –
    SCHEMATIC: Building PUMP NO LEAD II 4000 gal 6" NO LEAD I 10000 gal 6" NO LEAD PUMP Vent Regular PUMPS Vent Regular LEADED 10000 gal 96" Building
    PRODUCT/TANK NO.NO LEAD INO LEAD IIRegular
    BEFORE DELIVERY LEVELFillGaugeFillGaugeFillGaugeFillGaugeFillGauge
    GALLONS
    WATER1½"1½"1½"
    TOP OF RISER071??101132
    GRADE100103102137
    DROP TUBEALALAL
    CAPACITY, GALLONS4000400010000
    DIAMETER, INCHES646464
    MATERIALSTEELSTEELSTEEL
    PUMP TYPEGas BoyCentralBennett
    TYPE OF COVERTANTANTAN
    AGE OF TANKURURUK
    SIPHONNONONO
    TANK OPENINGS1-4" 1-2"1-4" 1-2"1-4"
    EXTRACTORSNONO
    VAPOR RECOVERY
    TYPE
    VENT CONFIGURATION
    P-V VENT VALVE TYPE
    REPLACEMENT PARTS: PART #DESCRIPTIONQUANTITYPRICE
    #7011 inch Fill Pox14.75
    #124Tank oil ...1
    #6" Gauge Hat ...1
    ADDITIONAL CHARGES: (pumpovers, overtime, etc.)[illegible]
    *Data obtained from □ Station □ LL Charts □ Other

Scanned pages and machine-read text of RSR-038 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of RSR-038 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 2 REDACTED Page 1 of 1 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION
    2. PG.of
    11
    STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 556-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SITE I.D.
    3. FOR STATE AGENCY USE ONLYA. SITE I.D.
    B. DATE RCVD BY D.E.P.C. DATE ENTERED
    D. GRID COORDINATES X ___ Y ___E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO
    SECTION A/B
    4. LOCATION OF FACILITYSITE NAME: East Hampton Service CenterNO. AND STREET: 22 East High StreetNEAREST INTERSECTING STREET: Route 2CITY OR TOWN: East HamptonSTATE: CT5. LATITUDE: 41° 34' 56"LONGITUDE: 72° 30' 14"
    6. BUSINESS NAME AND MAILING ADDRESSNAME: The Connecticut Light & Power CompanyNO. AND STREET: P.O. Box 270CITY OR TOWN: HartfordSTATE: CTZIP CODE: 061410270
    7. FACILITY OWNERNAME: The Connecticut Light & Power CompanyNO. AND STREET: P.O. Box 270CITY OR TOWN: HartfordSTATE: CTZIP CODE: 061410270
    8. TYPE OF OWNERX PRIVATESTATEMUNICIPALFEDERAL (G.S.A. No. ___)
    9. OPERATOR/CONTACT PERSON[redacted]NO. AND STREET: 22 East High StreetCITY OR TOWN: East HamptonSTATE: CTZIP CODE: 06424
    [redacted] SECTION C
    10. TANK ID.11a. DATE OF INSTALLATION (Mo./Yr.)11b. TANK LIFE EXPECTANCY (# of years)12a. TOTAL CAPACITY (Gals.)12b. STATUS: IN USEABANDONED IN PLACEEST. QUANTITY LEFT STORED (if any) (Gals.)REMOVEDDATE TANK LAST USED (Mo./Yr.)13. TYPE OF CONTENTS: OIL/PETRO-LEUM PRODUCTCHEMICAL LIQUID14. CONTENTS: CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No. if known)15. CONSTRUCTION MATERIALS: STEELFIBERGLASS REINFORCED PLASTICOTHER (Specify from list A)16. PROTECTION a. INTERNAL: LINEDUNLINED; b. EXTERNAL: CATHODIC PROTECTIONCOATED/WRAPPEDCATHODIC PROTECTIONOTHER (Specify from list B)17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION PROTECTION (See list B)b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.)18. MONITORING SYSTEM (Specify type from list B)19. FAILURE DETERMINATION CONDUCTED? (If "YES," enter DATE and attach results. If "NO," enter "NO")
    Example5/75305000XXXXH55/75UNO
    Example7/60-8000X8/78XXXE77/60U—
    A1/7215275XXXXXH7/72H092584
    B2/721510000XXXX7/72O092684 (10-14-86 / 092684 struck through)
    C3'303010000X011/84XX8/80O092684
    D4'7215275XXXX7/72U092584
    E5,7215550XXXX7/72U092884
    P6,7215550XXXX7/72U092884
    20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? X YES 21. COMMENTS: 16b coal tar epoxy. Tanks B2, D4, E5 & F6 budgeted for cathodic protection in 1986. A1 is also for [illegible] [illegible] SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.
    22a. SIGNATUREX [redacted]22b. DATE SIGNED5/5/86
    22c. NAME (Type or Print)[redacted]
    22d. OFFICIAL TITLE (of owner or authorized representative)Senior Vice President
    COPY 4
Words on different pages

Scanned pages of RSR-038 Attachment 4 REDACTED.pdf

Read by machine from a scan · 126 pages · may contain errors, especially in numbers

As listed on the current system

Question(s) Answered 38 (The Connecticut Light and Power Company) Date Filed: 10/20/2026

This filing on the current system (opens in a new tab)