Interrogatory responses
Answers to questions 38
Files5
RSR-038_Final.pdf
PDF · 146 KB · 7 pagesText searchable
Download RSR-038_Final.pdfRead the text of RSR-038_Final.pdf
RSR-038 Attachment 1 REDACTED.pdf
PDF · 4.6 MB · 19 pagesText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 1 REDACTED.pdfScanned pages and text of RSR-038 Attachment 1 REDACTED.pdf
RSR-038 Attachment 2 REDACTED.pdf
PDF · 798 KB · 1 pageText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 2 REDACTED.pdfScanned pages and text of RSR-038 Attachment 2 REDACTED.pdf
RSR-038 Attachment 3.pdf
PDF · 502 KB · 1 pageText searchable
Download RSR-038 Attachment 3.pdfRead the text of RSR-038 Attachment 3.pdf
RSR-038 Attachment 4 REDACTED.pdf
PDF · 51 MB · 126 pagesText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 4 REDACTED.pdfScanned pages and text of RSR-038 Attachment 4 REDACTED.pdf
Scanned pages and machine-read text of RSR-038 Attachment 1 REDACTED.pdf

The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 1 of 19 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Selden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 [redacted] April 13, 1988 D01928 Mr. Ronald Corey, Fire Marshall City of Torrington 111 Water Street Torrington, Connecticut 06790 Reference: Letter and Notification, [redacted] o R. Corey, dated May 8, 1986. Dear Mr. Corey: Torrington Area Work Center Notification of Underground Storage Tanks Northeast Utilities Service Company (NUSCO), as agent for the Connecticut Light and Power Company (CL&P), submits an amended Copy No. 2 of Notification Form EPHM-6 for underground storage tanks at CL&P's Torrington Area Work Center. The form submitted to you on May 8, 1986 (Referenced) has been amended to reflect the removal of all of the tanks (A1, B2, C3, D4) at the site. If you have any questions, please call [redacted] NUSCO Generation Facilities Licensing, at [redacted]. Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company [redacted] [redacted] Senior Vice President [redacted] By: C. F. Sears Vice President
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 2 of 19 Mr. Ronald Corey, Fire Marshall DO1928/Page 2 April 13, 1988 Enclosure cc: w/enclosure (Copy 1) Mr. Scott Deshefy Hazardous Material's Management Unit Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106 Mr. Richard Ciasullo Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 3 of 19 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION | PG. 2 of 1 | SITE ID | FOR STATE AGENCY USE ONLY | A. SITE I.D. | B. DATE RCVD BY D E P | C. DATE ENTERED | D. GRID COORDINATES X Y | E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. EPHM-6 NEW 10/85 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SECTION A SECTION B
SECTION C 20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? [X] YES 21. COMMENTS: SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.4. LOCATION OF FACILITY SITE NAME: Torrington Area Work Center NO. AND STREET: 174 Franklin Street NEAREST INTERSECTING STREET: Horwinton Ave. CITY OR TOWN: Torrington STATE: CT 5. LATITUDE: 41° 48' 00" LONGITUDE: 73° 06' 55" 5. BUSINESS NAME AND 6. MAILING ADDRESS NAME: The Connecticut Light + Power Co. (CL4P) NO. AND STREET: P O Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 06141-0270 7. FACILITY OWNER NAME: CL&P NO. AND STREET: Same as Above CITY OR TOWN STATE ZIP CODE 8. TYPE OF OWNER PRIVATE (checked) STATE MUNICIPAL FEDERAL (G.S.A. No.) 9. OPERATOR/CONTACT PERSON [redacted] NO. AND STREET: 174 Franklin Street CITY OR TOWN: Torrington STATE: CT ZIP CODE: 06790 TELEPHONE: 1203 482-4471 10. TANK ID 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. LIFE EXPECTANCY (in years) 12a. TOTAL CAPACITY (Gals.) IN USE ABANDONED IN PLACE 12b. STATUS EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS OIL/PETROLEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No., if known) 15. CONSTRUCTION MATERIALS STEEL FIBERGLASS REINFORCED PLASTIC OTHER (Specify from list A) c. INTERNAL UNLINED b. EXTERNAL UNLINED CATHODIC PROTECTION COATED/WRAPPED CATHODIC PROTECTION OTHER (Specify from list B) 16. PROTECTION 17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION AND PROTECTION (from list A/B) b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (if "YES", enter DATE and attach results; if "NO", enter "NO") Example 5/75 30 5000 X X X H 5 5/75 U NO Example 7/60 - 8000 X 8/78 X X E 7 7/60 U - A1 12/78 15 10,000 X 4/88 X Regular Gasoline X X E 7E 12/78 O 3-15-84 B2 1/64 15 4,000 X 3/88 X Diesel Fuel X X E 7E 1/64 O 3-15-84 C3 1/64 15 4,000 X 3/88 X Unleaded Gasoline X X E 7E 1/64 O 3-15-84 D4 1/60 15 500 X 3/88 X Waste Oil X X E 7E 1/60 U NO
22c. NAME (type or print) [redacted] 22d. OFFICIAL TITLE | Vice President / Senior Vice President COPY 1: SEND TO DEP: 165 CAPITOL AVE. HARTFORD, CT 0610622a. SIGNATURE X [redacted] 22b. DATE SIGNED 13 April 1988 
The scanned page Machine-read text
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 4 of 19 CONN LIGHT & POWER CO. NORTHEAST UTILITIES WORK ORDER SKETCH SHEET
SKETCH INDICATE NORTH AND NAME STREETS Not To Scale B2 A1 21' 140' 159' 177' 44' 275' 255' D4 C3 GARAGE TRANSMISSION TORRINGTON SERVICE BUILDING HARWINTON SCHIBI ST. AVE. OP418? REV. 10-82 DEST. SAME AS ATT. REC. DRAWN BY | TELEPHONE EXT.DISTRICT / REGION TOWN DATE MAP NO. WORK ORDER NO. ACTV. SHEET OF TORRINGTON / WESTERN TORRINGTON 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 5 of 19 REDACTED TO: File FROM: John Szymanski [signature] April 14, 1988 SUBJECT: Torrington AWC Tank removals were conducted at the Torrington AWC during the months of March and April 1988. o During March 1988: One (1) 4000 gallon unleaded gasoline tank and One (1) 500 gallon oil tank were removed; no problems o On March 30, 1988: Notified that (1) 4000 gallon diesel tank was removed with heavy rusting and several apparent holes the size of dimes. o On March 30, 1988: Examined site and took three (3) samples from excavation hole and one (1) sample from diesel tank to have material analyzed and identified by LAB per request by DEP Field Inspector, Richard Ciasullo. o On March 31, 1988: Samples dropped off for analyzing and identification at Souther-Newlands Laboratory. o On April 4, 1988: Souther Newland Laboratory called EPD office to report on lab findings. - Sample from diesel tank identified as diesel fuel - The three (3) samples from the excavation hole all had the same characteristic profiles, but it didn't match that of gasoline or diesel fuel and that it would take two to three weeks to identify samples from the excavation hole. o On Aril 4, 1988: Notified R. Robinson of the DEP Clean Water Group of the test results and asked for permission to continue tank installation construction after film cleaned off top of water and remainder of gray colored gravel removed from hole. Mr. Robinson gave approval to continue construction if I inspected site and assured this was done. o On April 6, 1988: NUSCO construction removed film from water and lowered water table by sucking out 3200 gallons of contaminated water which was hauled off site as contaminated waste water. Removed the remainder of gray contaminated gravel from excavation hole. o On April 6, 1988 after water table lowered gasoline film and strong fumes entered the excavation hole. The fire marshal was notified, who requested DEP to inspect the hole. Concern was generated regarding 10,000 gallon unleaded gasoline tank in the same vicinity where gas fumes and film were found. Construction stopped. o On April 7, 1988: DEP Field Inspector Richard Ciasullo and
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 6 of 19 Torrington Fire Marshal Ron Corey arrived on site and gave us two alternatives: 1. Test tank full of product and be ready to remove it immediately if tank leaks; 2. Remove 10,000 gallon unleaded tank. o April 7, 1988: Discussions were held between Area Superintendent Walt Wadman, Ken Busick, Frank Melluzzo, Bud Meyer, John Betz, Jack Farrel and John Szymanski to discuss options and make decision as to disposition of 10,000 gallon gasoline tank. Final consensus was to remove tank based on presence of gasoline odor and fumes in area, water level in tank raised when emptied of product, bottom ash found in vicinity of tank, tank had been unprotected for 10 years, the older unprotected tank 4000 diesel came out of ground looking like swiss cheese. o April 7, 1988: Removed 10,000 gallon unleaded gasoline tank, some heavy rusting and pitting visible on tank but there was no apparent holes. Backfill around tank was improper per today's installation standards (very large boulders, large gravel and some sand) there were no hold down straps on tank, and bottom ash in close proximity to tank. Wet lines were heavily rusted in one large area.
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 7 of 19 REDACTED Distribution: [redacted]Claims and Insurance [redacted]s. and Test Department [redacted]Regional Operations - WMECO [redacted]struction [redacted]HP [redacted]rans. SS and Mtce. [redacted] Trans. Bldg. Eng. Design [redacted]nsportation [redacted] EPD [redacted]ores [redacted] EPD [redacted]cilities Management [redacted] Legal [redacted] Nuclear Prod. [redacted]en. Fac. Lic. Dept. bsl cc: [redacted]
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 8 of 19 TORRINGTON AUG / CT Bemis / Laura Lionts leak lokator hunter ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] TEST RESULTS DATE OF TEST | 07-6-85 CONTRACT NUMBER
TEST RESULTS SUMMARYCUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER NAME ADDRESS 178 Franklin Drive CITY Torrington STATE Conn LEAK LOKATOR USE ONLY CONCL. CODE
OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTSNO. SYSTEM PRODUCT TANK SIZE GALLONS DIA/MATL WATER INCHES LEAK LOKATOR RESULTS LEVEL INCHES ALR GPH CONCLUSION RECOMMENDATIONS TEST TANK SYS II No Lead Tank #I 4000 64/37 1 1/2" 106" .039 Tight II No Lead Tank #II 4000 64/37 1 1/2" 95" .038 Tight VII Regular Lead 10000 96/3T 1 1/2" 113" .038 Tight
NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTSNO. SYSTEM PRODUCT TYPE OF PUMP REMOTE TYPE OF PUMP SUCTION # APPLIED MINUTES APPLIED PRODUCT LOSS CC'S PRODUCT LOSS GPH CONCLUSION/RESULT II No Lead Tank I > ✓ DL Pressure test test X II No Lead Tank II > ✓ 170 Pressure test test X III Regular Leaded > Pump ✓ Side [illegible] [illegible] X X Tight NO. SYSTEM PRODUCT TEST NO. TEST LEVEL (INCHES) CLOCK START DURATION HRS.-MIN. LEAK RATE CC/DIV LEAK RATE CC/MIN TEMP COMP Δ°F TEMP COMP CC/MIN ABSOLUTE LEAK RATE CC/MIN ABSOLUTE LEAK RATE GPH CHECK TEST Y or N I No Lead Tank I 1 106" 9:45 31 min .39 +25.95 +.161 +33.80 -1.85 -.039 N II No Lead Tank II 1 95" 7:52 31 min .47 +2.82 +.636 +6.37 -2.44 -.038 N III Regular Leaded 1 142" 11:46 20 min .35 +21.47 +.655 23.88 -2.41 -.038 N 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 9 of 19 REDACTED ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] Bemis | TORRINGTON AWG / CT Laura [illegible] leak lokator TEST RESULTS DATE OF TEST | 03-6-8? CONTRACT NUMBER CUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER
TEST RESULTS SUMMARYADDRESS 178 Franklin Drive NAME CITY Torrington STATE Con
OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTSNO. SYSTEM PRODUCT TANK SIZE GALLONS DIA/MATL WATER INCHES LEAK LOKATOR RESULTS LEVEL INCHES ALR GPH CONCLUSION RECOMMENDATIONS LEAK LOKATOR USE ONLY CONCL. CODE TEST TANK SYS I NO LEAD TANK I 4500 64.37 1 1/2" 166" -.029 Tight II NO LEAD TANK II 4500 64.37 1 1/2" 95" -.038 Tight III REGULAR LEADED 10000 96 x T 1 1/2" 115" -.026 Tight
NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTSNO. SYSTEM PRODUCT TYPE OF PUMP REMOTE SUCTION # APPLIED MINUTES APPLIED PRODUCT LOSS CC'S PRODUCT LOSS GPH CONCLUSION/RESULT I NO LEAD TANK I ✓ DO DO [illegible] test X II NO LEAD TANK II ✓ test X III REGULAR LEADED ✓ ✓ 110 Due X III REGULAR LEADED ✓ Pump ✓ [illegible] [illegible] [illegible] [illegible] Tight
* LEVEL – INCHES FROM TANK BOTTOM TO TEST LEVEL ALR – ABSOLUTE LEAK RATE (MEASURED LEAK RATE – TEMPERATURE COMPENSATION) IN GALLONS PER HOUR CONCLUSION – NFPA 329 CRITERION OF ± 0.05 GPH IS USED TO CERTIFY TIGHTNESS CERTIFICATION This is to certify that the above described tank systems were tested, using the HUNTER ENVIRONMENTAL SERVICES, INC. LEAK LOKATOR according to all standard operating procedures. Those indicated as tight meet the criterion established by the National Fire Protection Association Pamphlet 329 for Precision Testing.NO. SYSTEM PRODUCT TEST NO. TEST LEVEL (INCHES) TIME CLOCK START TIME DURATION HRS.-MIN. LEAK RATE CC/DIV LEAK RATE CC/MIN TEMPERATURE COMPENSATION Δ°F TEMPERATURE COMPENSATION CC/MIN ABSOLUTE LEAK RATE CC/MIN ABSOLUTE LEAK RATE GPH CHECK TEST Y or N I NO LEAD TANK I 1 166" 9:45 31 min .39 +25.95 +.141 +27.82 -1.85 -.029 N II NO LEAD TANK II 1 95" 9:52 35 min 4.17 12.08 +.036 16.37 -2.44 -.038 N III REGULAR LEADED 1 114" 9:46 30 min -.37 +21.17 +.255 23.66 -2.41 -.038 N TESTS CONDUCTED BY CERTIFIED BY TEST VAN NO. [illegible] SIGNATURE [illegible] TANK TESTING SPECIALIST [illegible] NAME [illegible] DATE [illegible] TANK TESTING SPECIALIST [illegible] TITLE [illegible] 
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 10 of 19 TANK AND LOCATION DATA DATE: 03-6-85
SCHEMATIC: Building PUMP NO LEAD II 4000gal 64" NO LEAD II 4000gal 64" NO LEAD PUMP VENT Regular PUMPS VENT Regular LEADED 10000gal 96" BuildingCUSTOMER: Northeast Utilities CITY: Torrington I.D. # STATE: Conn WEATHER TIME TEMPERATURE COMMENTS BEFORE TEST – AFTER TEST –
VAPOR RECOVERY TYPE VENT CONFIGURATION P-V VENT VALVE TYPEPRODUCT/TANK NO. NO LEAD I NO LEAD II Regular BEFORE DELIVERY LEVEL Fill Gauge Fill Gauge Fill Gauge Fill Gauge Fill Gauge LEVEL Full GALLONS WATER 1½" 1½" 1½" TOP OF RISER 97 96 101 132 GRADE 160 163 162 137 DROP TUBE AL AL AL CAPACITY, GALLONS 4000 4000 10000 DIAMETER, INCHES 64 64 64 MATERIAL STEEL STEEL STEEL PUMP TYPE Gasboy [illegible] Bennett TYPE OF COVER TAN TAN TAN AGE OF TANK UK UK UK SIPHON NO NO NO TANK OPENINGS 1-4" 1-2" 1-4" 1-2" 1-4" EXTRACTORS NO NO NO
ADDITIONAL CHARGES: (pumpovers, overtime, etc.) [illegible] [illegible] *Data obtained from ☐ Station ☐ LL Charts ☐ Other ______REPLACEMENT PARTS: PART # DESCRIPTION QUANTITY PRICE #701 [illegible] 1 [illegible] #124 [illegible] 1 [illegible] # 6" Quick Tite 2-gauge (wire) 1 [illegible]
Scanned pages and machine-read text of RSR-038 Attachment 2 REDACTED.pdf

The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 2 REDACTED Page 1 of 1 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION
STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 556-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SITE I.D.2. PG. of 1 1
SECTION A/B3. FOR STATE AGENCY USE ONLY A. SITE I.D. B. DATE RCVD BY D.E.P. C. DATE ENTERED D. GRID COORDINATES X ___ Y ___ E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO
[redacted] SECTION C4. LOCATION OF FACILITY SITE NAME: East Hampton Service Center NO. AND STREET: 22 East High Street NEAREST INTERSECTING STREET: Route 2 CITY OR TOWN: East Hampton STATE: CT 5. LATITUDE: 41° 34' 56" LONGITUDE: 72° 30' 14" 6. BUSINESS NAME AND MAILING ADDRESS NAME: The Connecticut Light & Power Company NO. AND STREET: P.O. Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 061410270 7. FACILITY OWNER NAME: The Connecticut Light & Power Company NO. AND STREET: P.O. Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 061410270 8. TYPE OF OWNER X PRIVATE STATE MUNICIPAL FEDERAL (G.S.A. No. ___) 9. OPERATOR/CONTACT PERSON [redacted] NO. AND STREET: 22 East High Street CITY OR TOWN: East Hampton STATE: CT ZIP CODE: 06424
20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? X YES 21. COMMENTS: 16b coal tar epoxy. Tanks B2, D4, E5 & F6 budgeted for cathodic protection in 1986. A1 is also for [illegible] [illegible] SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.10. TANK ID. 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. TANK LIFE EXPECTANCY (# of years) 12a. TOTAL CAPACITY (Gals.) 12b. STATUS: IN USE ABANDONED IN PLACE EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS: OIL/PETRO-LEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS: CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No. if known) 15. CONSTRUCTION MATERIALS: STEEL FIBERGLASS REINFORCED PLASTIC OTHER (Specify from list A) 16. PROTECTION a. INTERNAL: LINED UNLINED; b. EXTERNAL: CATHODIC PROTECTION COATED/WRAPPED CATHODIC PROTECTION OTHER (Specify from list B) 17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION PROTECTION (See list B) b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (If "YES," enter DATE and attach results. If "NO," enter "NO") Example 5/75 30 5000 X X X X H 5 5/75 U NO Example 7/60 - 8000 X 8/78 X X X E 7 7/60 U — A1 /72 15 275 X X X X X H 7 /72 H 092584 B2 /72 15 10000 X X X X 7 /72 O 092684 (10-14-86 / 092684 struck through) C3 '30 30 10000 X 0 11/84 X X 8 /80 O 092684 D4 '72 15 275 X X X X 7 /72 U 092584 E5 ,72 15 550 X X X X 7 /72 U 092884 P6 ,72 15 550 X X X X 7 /72 U 092884
COPY 422a. SIGNATURE X [redacted] 22b. DATE SIGNED 5/5/86 22c. NAME (Type or Print) [redacted] 22d. OFFICIAL TITLE (of owner or authorized representative) Senior Vice President
Text of RSR-038 Attachment 3.pdf
Extracted from the file · 1 page · 146 characters
Scanned pages and machine-read text of RSR-038 Attachment 4 REDACTED.pdf
Page 116 of 126
Full-size scan of page 116 (opens in a new tab)In the PDF: page 116 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 116 of 126
The Board, at its meeting, also voted to reject the following amounts due to incompleteness:63 7.1 High Ridge Citgo, 1070 High Ridge Rd., Stamford $311.86 13% 108 1 Mobil #06-E22, 205 Sound Beach Ave., Greenwich $1757.51 6% 152 1.1 Mobil #06-037, 519 Farmington Ave., Hartford $4131.70 20% 163 1 Mobil #06-122, 995 South Main St., Cheshire $4094.18 5%
The Board, at its meeting, also voted to reject the following amounts due to ineligibility.Site No. Site Name and Address Amount 63 5.1 High Ridge Citgo, 1070 High Ridge Rd., Stamford $282.71 153 1 Mobil Service Station #06-HAO, I95 Westbound, Darien $2264.47 22.1 1.1 Hartford Citgo, 888 New Britain Ave., Hartford $8983.77 118 1.1 Shell Service Station, 436 Slater Rd., New Britain $4532.00 134 1.1 Amoco Station #382, 927 East Main St., Meriden $76,576.21 155 1.2 Mobil Service Station #06-GPO, Newtown Rd., Danbury $3619.40 168 1.1 C,L & P, 135 New St., Madison $34,250.20
The following amounts were withdrawn by the applicants:Site No. Site Name and Address Amount 139 1.1 Classic Carriage, 351 Boston Post Rd., Old Saybrook $10,575.44 149 1.1 Johnson Glass & Auto Service, 176 Howe Ave., Shelton $8322.48 134 1.1 Amoco Station #382, 927 East Main St., Meriden $19,636.34 152 1.1 Mobil Station #06-037, 519 Farmington Ave., Hartford $579.92 161 1.1 Mobil Station #06-ELA, 142 Willard Ave., Newington $9473.94 170 1.1 Mobil Station #06-HGO, 1705 Park St., Bridgeport $9469.81
Sincerely, [signature] John Mitchell Chairman Underground Storage Tank Petroleum Clean-up Fund BoardSite No. Site Name and Address Amount 5 6 Tire Country of Enfield, 623 Hazard Ave., Enfield $13,539.84 34 11 Monroe Petrol Plus, 40-44 Main St., Monroe $131,870.41 108 1 Mobil #06-E22, 205 Sound Beach Ave., Old Greenwich $12,276.68 163 1 Mobil Station #06-122, 995 South Main St., Cheshire $31,645.10 166 1 Mobil Station #06-QBA, 1164 Boston Post Rd., Guilford $218,487.37 169 1 Rite-Way #2, 2 Scott Rd., Waterbury $67,196.21 171 1 Mobil Station #06-HMO, 818 Federal Rd., Brookfield $102,209.48 170 1.1 Mobil Station #06-HGO, 1705 Park St., Bridgeport $7540.69 Page 117 of 126
Full-size scan of page 117 (opens in a new tab)In the PDF: page 117 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED | d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 117 of 126 GEL CORRESPONDENCE SIGNOFF AND DISTRIBUTION FORM PLEASE HELP EXPEDITE - REVIEW PROMPTLY AND HAND CARRY TO NEXT PERSON FOR ASSISTANCE CALL EXTENSION 5487/FAX 5896
DISTRIBUTION/SIGNOFF Signoff indicates your written concurrence for your discipline with statements and commitments made in the attached documents.FACILITY: Madison Service Center CODE(unit): BGN LETTER NO: D 08179 TITLE/SUBJECT: Supplemental Application for Reimbursement from the Fund - Site No. 168 AGENCY: CDP SPECIAL INSTRUCTIONS: LETTER DATE: 11/28/94
COMMITMENT / ACTION TRACKING INFORMATION Response To: COTRAP # C____________ or FORCOM # F____________ DUE DATE: __________ Number of Calendar days in Advance (+) or Late (-) of Due Date____________DS A PERSON SO DISCIPLINE LOC. EXT INIT. DATE COMMENTS P.M. Jacobson Env. Programs Mgr. NU East 4642 M. Keser Aqua.Ser.Br. Mgr. NUEL 4238 P. Brindamour Aqua. Services NU East T.J. Butwill F/H Eng. (Civil) N206 5403 X R.P. Klahenberg X ERM NU East 4628 RPK 11/21/94 Nice job X D. Gilbane X Legal E217 3431 [illegible] 11/22/94 [illegible] Land Planning NU East J.P. Donohue POS Env. Comp. Mgr. W239 Hydro Production W239 J.W. McLaughlin Hydro Prod., NH Manch. R. Pickering Env. & Results, NH Manch. X W. Haynack X ERM NU East 4613 [illegible] 11/21/94 As noted X D. Fleming Tolland Facility Mgr./Supt. Fac. Opns. & Engng NU East Trans. CT&M 3333 W.H. Smagula Dir. - Fossil Prod. W239 5467 W.J. Nadeau Dir. - Hydro Prod. W239 5064 D.R. Brown PSNH Production Manch. Lead Discipline Project Engineer X L. Sheridan X GEL Lead W218 N22 3743 LMS 11/23/94 Supvsr - NL W218 NRC ☐ Yes ☐ No L.E. Bireley X GEL Manager W218 N22 5448 [illegible] 11/28/94 OTHER DISTRIBUTION GEL CLERK INSTRUCTIONS X X Facilities File X ORIGINAL AND ____ COPIES X C.A. Edge NU East FEE CHECK FEDERAL EXPRESS REGISTERED MAIL TELECOPY
REV. 9 11-93Commitment Number GEL Lead Lead Discipline Response Date DESCRIPTION Page 118 of 126
Full-size scan of page 118 (opens in a new tab)In the PDF: page 118 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 118 of 126 Northeast Utilities System 107 Selden Street, Berlin, CT 06037 Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 [redacted] November 28, 1994 D08179 UST Petroleum Clean-Up Fund Review Board Bureau of Waste Management Department of Environmental Protection 79 Elm Street Hartford, CT 06102 Dear Sir or Madam: Madison Service Center Supplemental Application for Reimbursement from the Fund - Site No. 168 Northeast Utilities Service Company (NUSCO), on behalf of The Connecticut Light and Power Company (CL&P), hereby submits a supplemental application for reimbursement from the UST Petroleum Clean-Up Fund for the referenced site. This supplemental application covers the period beginning May, 1993 and ending June 30, 1994. The total amount requested for the referenced period is $49,283.32. Fuss & O'Neill, Inc. prepared this application in cooperation with our operations, environmental and laboratory personnel. Attached documentation includes the following: • Application Forms (sheets 1 and 2 only of full application) • Summary of Total Costs and Supporting Data for Contracted Services • Supporting Data for Costs Incurred by NUSCO Environmental Programs Personnel • Supporting Data for Costs Incurred by Production Operations Services Laboratory • Environmental Assessment and Progress Reports (April, May, June, 1994) We trust that the application forms, supporting cost and environmental data provides sufficient detail for review by DEP staff. Both NUSCO and Fuss & O'Neill, Inc. are prepared to answer any questions that may arise during your review. Please call Mr. [redacted] NUSCO Environmental Programs, at [redacted] initiate disc[redacted] Very truly yours, THE CONNECTICUT LIGHT AND POWER COMPANY [redacted] Attachment OS3422 REV. 1-94Page 119 of 126
Full-size scan of page 119 (opens in a new tab)In the PDF: page 119 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 119 of 126 32 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION [redacted] 0'4/96 UST Owned Memo Re: 170. 8475 Dear Owner/Operator: Madison Regional Service Center Thank you for completing the Underground Storage Tank (UST) Questionnaire. The information represented on your questionnaire, however, does not match the information on your most recent notification form (Form EPHM-6). It is a State and Federal requirement that Forms EPHM-6 be submitted to the Department (UST Program) with each change of status of UST Operation/Ownership. For your convenience, we have enclosed an Underground Storage Facility Notification Form form. Please submit a copy of this letter with the completed form and return it to this office with up-to-date information about your UST facilities. If you have removed or abandoned motor fuel or waste oil tanks prior to December 1988, and closure reports and/or soil sampling were not conducted at that time, please send in any empirical verification of cleanup or degree of contamination which you may have. If you have removed or abandoned motor fuel or waste oil tanks after December 1988, please submit a concise closure report, including copies of sampling results and verification of clean-up, as required by state and federal law. Should you have any questions, please call me at [phone removed]. Thank your for your cooperation. Sincerely, Kelly A. McShea Kelly A. McShea UST Enforcement Program re: 1st AI installed 1/73 550 gal. hydrolic fluid (Printed on Recycled Paper) 79 Elm Street • Hartford, CT 06106 An Equal Opportunity EmployerPage 120 of 126
Full-size scan of page 120 (opens in a new tab)In the PDF: page 120 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 120 of 126 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION 170- 8475 THE CONNECTICUT LIGHT & POWER COMPANY O P.O. BOX 270 HARTFORD CT 06141 Madison Regional Service Center Dear UST owner/operator: 135 New Rd. The following questionnaire should be completed as part of a joint state and federal compliance monitoring project. Please answer as accurately as possible all of the following which pertains to your particular UST site. Please be advised that the information herein provided will be compared with those data currently maintained as part of the Connecticut DEP/ Federal Environmental Protection Agency data management system. Please make as many copies of this form as needed. 1) If you own ONLY heating fuel tanks for on-site consumptive use, please check here and return this letter. 2) How many UST(s) are in service at this site in total (including heating fuel tanks for on-site consumptive use)? How many are heating fuel tanks? Heating fuel tanks used for on-site consumption only are exempt from the rest of this survey. Use one row vertically for each tank /container that is part of the facility being reported. 3) What are the tank I.D.'s ? | | | | (as previously registered with CT DEP and EPA)
G=gasoline, D=diesel fuel, W=waste oil4) What was the date of installation for each of your tanks? 5) What do these tanks contain? C=hazardous materials
F= fiberglass, S=Steel, C= steel clad and cathodic protection O=other (please explain) 8) Which of the following leak detection options are being used? | | | | a) inventory control (gauging / weekly reconciliation with water paste test) and annual failure determination b) double walled UST-interstitial monitoring c) automatic tank gauging (eg. Veeder root system) d) approved installation and monthly monitoring of ground water wells e) approved installation and monthly monitoring of "vapor sniffing" wells f) Manual tank gauging as defined in 22a-449(d)-104(e)2 for UST systems ≤ 2000 gallons 9) Do you have pressurized piping or suction | | | | piping? P = pressurized; S = suction6) What is the total capacity of these tanks (in gallons)? 7) What type of UST(s) do you have? Page 121 of 126
Full-size scan of page 121 (opens in a new tab)In the PDF: page 121 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 121 of 126 GEL CORRESPONDENCE SIGNOFF AND DISTRIBUTION FORM PLEASE HELP EXPEDITE - REVIEW PROMPTLY AND HAND CARRY TO NEXT PERSON FOR ASSISTANCE CALL EXTENSION 5487/FAX 5896
DISTRIBUTION/SIGNOFF Signoff indicates your written concurrence for your discipline with statements and commitments made in the attached documents.FACILITY: Madison Service Center CODE(unit): BGN LETTER NO: D 08179 TITLE/SUBJECT: Supplemental Application for Reimbursement from the Fund - Site No. 168 AGENCY: CDP SPECIAL INSTRUCTIONS: LETTER DATE: 11/28/94
COMMITMENT / ACTION TRACKING INFORMATION Response To: COTRAP # C____ or FORCOM # F____ DUE DATE:____ Number of Calendar days in Advance (+) or Late (-) of Due Date____DS A PERSON SO DISCIPLINE LOC. EXT INIT. DATE COMMENTS P.M. Jacobson Env. Programs Mgr. NU East 4642 M. Keser Aqua.Ser.Br. Mgr. NUEL 4238 P. Brindamour Aqua. Services NU East T.J. Butwill F/H Eng. (Civil) N206 5403 X R.P.Klattenberg X ERM NU East 4628 RPK 11/21/94 Nice job X D. Gilbane X Legal E217 3431 GMK 11/22/94 see go a sheet for Land Planning NU East J.P. Donohue POS Env. Comp. Mgr. W239 Hydro Production W239 J.W. McLaughlin Hydro Prod., NH Manch. R. Pickering Env. & Results, NH Manch. X W. Haynack X ERM NU East 4613 WH 11/21/94 As noted X D. Fleming Tolland Facility Mgr./Supt. Fac. Opns. & Engng NU East Trans. CT&M 3333 W.H. Smagula Dir. - Fossil Prod. W239 5467 W.J. Nadeau Dir. - Hydro Prod. W239 5064 D.R. Brown PSNH Production Manch. Lead Discipline Project Engineer X L. Sheridan X GEL Lead W218 N226 3743 LMS 11/23/94 Supvsr - NL W218 NRC ☐ Yes ☐ No L.E. Bireley X GEL Manager W218 N226 5448 LEB 11/28/94 OTHER DISTRIBUTION GEL CLERK INSTRUCTIONS X X Facilities File X ORIGINAL AND ___ COPIES X C.A. Edge NU East FEE CHECK FEDERAL EXPRESS REGISTERED MAIL TELECOPY
REV. 9 11-93Commitment Number GEL Lead Lead Discipline Response Date DESCRIPTION Page 122 of 126
Full-size scan of page 122 (opens in a new tab)In the PDF: page 122 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 122 of 126 Northeast Utilities System 107 Selden Street, Berlin, CT 06037 Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 [redacted] November 28, 1994 D08179 UST Petroleum Clean-Up Fund Review Board Bureau of Waste Management Department of Environmental Protection 79 Elm Street Hartford, CT 06102 Dear Sir or Madam: Madison Service Center Supplemental Application for Reimbursement from the Fund - Site No. 168 Northeast Utilities Service Company (NUSCO), on behalf of The Connecticut Light and Power Company (CL&P), hereby submits a supplemental application for reimbursement from the UST Petroleum Clean-Up Fund for the referenced site. This supplemental application covers the period beginning May, 1993 and ending June 30, 1994. The total amount requested for the referenced period is $49,283.32. Fuss & O'Neill, Inc. prepared this application in cooperation with our operations, environmental and laboratory personnel. Attached documentation includes the following: • Application Forms (sheets 1 and 2 only of full application) • Summary of Total Costs and Supporting Data for Contracted Services • Supporting Data for Costs Incurred by NUSCO Environmental Programs Personnel • Supporting Data for Costs Incurred by Production Operations Services Laboratory • Environmental Assessment and Progress Reports (April, May, June, 1994) We trust that the application forms, supporting cost and environmental data provides sufficient detail for review by DEP staff. Both NUSCO and Fuss & O'Neill, Inc. are prepared to answer any questions that may arise during your review. Please call Mr. [redacted] NUSCO Environmental Programs, at [redacted] to initiate discussions on any issue. Very truly yours, THE CONNECTICUT LIGHT AND POWER COMPANY [redacted] Vice President Attachment OS3422 REV. 1-94Page 123 of 126
Full-size scan of page 123 (opens in a new tab)In the PDF: page 123 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 123 of 126 Reference Number: D13590 | OUTGOING DOCUMENT SIGN-OFF | OUT Letter Date: RESPONSE TO COMMITMENT: This document is being distributed for your review and comments. If you have any questions, please contact [redacted] SUBJECT: Amended UST Notification - Madison Facility: Madison Service Center Agency: CT Department Of Environmental Protection A response is due at the Agency by: 12/22/98
Facility File: BGN Related Documents:copy Person Department Location Ext. Init Date Comments X [redacted] orrosion & est [redacted] [redacted] [redacted] [redacted] [redacted] X [redacted] acilities anagement [redacted] [redacted] [redacted] [redacted] [redacted] [redacted] egal [redacted] [redacted] [redacted] [redacted] [redacted] X [redacted] ldg. Admin. [redacted] [redacted] [redacted] [redacted] [redacted] [redacted] nv. Services [redacted] [redacted] [redacted] [redacted] [redacted] X [redacted] nv. Services [redacted] [redacted] [redacted] [redacted] [redacted] Page 124 of 126
Full-size scan of page 124 (opens in a new tab)In the PDF: page 124 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 124 of 126 OUTGOING DOCUMENT DISTRIBUTION ONLY FOR YOUR INFORMATION ONLY -- NO ACTION REQUIRED From: [redacted] REFERENCE NO.: D13590 SUBJECT: Amended UST Notification - Madison Facility: Madison Service Center Agency: CT Department Of Environmental ProtectionFull Copy Person Department Location/Mail Stop X [redacted] Regional Ops. Tolland Page 125 of 126
Full-size scan of page 125 (opens in a new tab)In the PDF: page 125 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 125 of 126 Northeast Utilities System 107 Selden Street, Berlin, CT 06037 Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 [redacted] [redacted] Vice President - Environmental, Safety and Ethics December 21, 1998 D13590 UST Coordinator Department of Environmental Protection 79 Elm Street P.O. Box 5066 Hartford, CT 06106-5127 Dear Sir or Madam: Madison Regional Service Center Amended UST Notification The Connecticut Light and Power Company herein submits an amended underground storage facility notification form for the removal of three underground storage tanks at the Madison Regional Service Center. If you have any questions or require additional information, call Mr. [redacted] Northeast Utilities Service Company Environmental Services, at [redacted] Very truly yours, THE CONNECTICUT LIGHT AND POWER COMPANY [redacted] cc: Copy #2: Mr. Sheldon Inkster, Fire Marshall Madison Town Hall 8 Campus Drive Madison, CT 06443 OS4025 REV. 2-98
As listed on the current system
Question(s) Answered 38 (The Connecticut Light and Power Company) Date Filed: 10/20/2026