Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 38

Files5

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages

Scanned pages and machine-read text of RSR-038 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 1 of 19 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Selden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 [redacted] April 13, 1988 D01928 Mr. Ronald Corey, Fire Marshall City of Torrington 111 Water Street Torrington, Connecticut 06790 Reference: Letter and Notification, [redacted] o R. Corey, dated May 8, 1986. Dear Mr. Corey: Torrington Area Work Center Notification of Underground Storage Tanks Northeast Utilities Service Company (NUSCO), as agent for the Connecticut Light and Power Company (CL&P), submits an amended Copy No. 2 of Notification Form EPHM-6 for underground storage tanks at CL&P's Torrington Area Work Center. The form submitted to you on May 8, 1986 (Referenced) has been amended to reflect the removal of all of the tanks (A1, B2, C3, D4) at the site. If you have any questions, please call [redacted] NUSCO Generation Facilities Licensing, at [redacted]. Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company [redacted] [redacted] Senior Vice President [redacted] By: C. F. Sears Vice President
  2. Scan of page 2 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 2 of 19 Mr. Ronald Corey, Fire Marshall DO1928/Page 2 April 13, 1988 Enclosure cc: w/enclosure (Copy 1) Mr. Scott Deshefy Hazardous Material's Management Unit Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106 Mr. Richard Ciasullo Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106
  3. Scan of page 3 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 3 of 19 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION | PG. 2 of 1 | SITE ID | FOR STATE AGENCY USE ONLY | A. SITE I.D. | B. DATE RCVD BY D E P | C. DATE ENTERED | D. GRID COORDINATES X Y | E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. EPHM-6 NEW 10/85 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SECTION A SECTION B
    4. LOCATION OF FACILITYSITE NAME: Torrington Area Work CenterNO. AND STREET: 174 Franklin StreetNEAREST INTERSECTING STREET: Horwinton Ave.CITY OR TOWN: TorringtonSTATE: CT5. LATITUDE: 41° 48' 00"LONGITUDE: 73° 06' 55"
    5. BUSINESS NAME AND 6. MAILING ADDRESSNAME: The Connecticut Light + Power Co. (CL4P)NO. AND STREET: P O Box 270CITY OR TOWN: HartfordSTATE: CTZIP CODE: 06141-0270
    7. FACILITY OWNERNAME: CL&PNO. AND STREET: Same as AboveCITY OR TOWNSTATEZIP CODE
    8. TYPE OF OWNERPRIVATE (checked)STATEMUNICIPALFEDERAL (G.S.A. No.)
    9. OPERATOR/CONTACT PERSON[redacted]NO. AND STREET: 174 Franklin StreetCITY OR TOWN: TorringtonSTATE: CTZIP CODE: 06790TELEPHONE: 1203 482-4471
    10. TANK ID11a. DATE OF INSTALLATION (Mo./Yr.)11b. LIFE EXPECTANCY (in years)12a. TOTAL CAPACITY (Gals.)IN USEABANDONED IN PLACE12b. STATUS EST. QUANTITY LEFT STORED (if any) (Gals.)REMOVEDDATE TANK LAST USED (Mo./Yr.)13. TYPE OF CONTENTS OIL/PETROLEUM PRODUCTCHEMICAL LIQUID14. CONTENTS CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No., if known)15. CONSTRUCTION MATERIALS STEELFIBERGLASS REINFORCED PLASTICOTHER (Specify from list A)c. INTERNAL UNLINEDb. EXTERNAL UNLINEDCATHODIC PROTECTIONCOATED/WRAPPEDCATHODIC PROTECTIONOTHER (Specify from list B)16. PROTECTION17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION AND PROTECTION (from list A/B)b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.)18. MONITORING SYSTEM (Specify type from list B)19. FAILURE DETERMINATION CONDUCTED? (if "YES", enter DATE and attach results; if "NO", enter "NO")
    Example5/75305000XXXH55/75UNO
    Example7/60-8000X8/78XXE77/60U-
    A112/781510,000X4/88XRegular GasolineXXE7E12/78O3-15-84
    B21/64154,000X3/88XDiesel FuelXXE7E1/64O3-15-84
    C31/64154,000X3/88XUnleaded GasolineXXE7E1/64O3-15-84
    D41/6015500X3/88XWaste OilXXE7E1/60UNO
    SECTION C 20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? [X] YES 21. COMMENTS: SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.
    22a. SIGNATUREX [redacted]
    22b. DATE SIGNED13 April 1988
    22c. NAME (type or print) [redacted] 22d. OFFICIAL TITLE | Vice President / Senior Vice President COPY 1: SEND TO DEP: 165 CAPITOL AVE. HARTFORD, CT 06106
  4. Scan of page 4 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 4 of 19 CONN LIGHT & POWER CO. NORTHEAST UTILITIES WORK ORDER SKETCH SHEET
    DISTRICT / REGIONTOWNDATEMAP NO.WORK ORDER NO.ACTV.SHEETOF
    TORRINGTON / WESTERNTORRINGTON
    SKETCH INDICATE NORTH AND NAME STREETS Not To Scale B2 A1 21' 140' 159' 177' 44' 275' 255' D4 C3 GARAGE TRANSMISSION TORRINGTON SERVICE BUILDING HARWINTON SCHIBI ST. AVE. OP418? REV. 10-82 DEST. SAME AS ATT. REC. DRAWN BY | TELEPHONE EXT.
  5. Scan of page 5 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 5 of 19 REDACTED TO: File FROM: John Szymanski [signature] April 14, 1988 SUBJECT: Torrington AWC Tank removals were conducted at the Torrington AWC during the months of March and April 1988. o During March 1988: One (1) 4000 gallon unleaded gasoline tank and One (1) 500 gallon oil tank were removed; no problems o On March 30, 1988: Notified that (1) 4000 gallon diesel tank was removed with heavy rusting and several apparent holes the size of dimes. o On March 30, 1988: Examined site and took three (3) samples from excavation hole and one (1) sample from diesel tank to have material analyzed and identified by LAB per request by DEP Field Inspector, Richard Ciasullo. o On March 31, 1988: Samples dropped off for analyzing and identification at Souther-Newlands Laboratory. o On April 4, 1988: Souther Newland Laboratory called EPD office to report on lab findings. - Sample from diesel tank identified as diesel fuel - The three (3) samples from the excavation hole all had the same characteristic profiles, but it didn't match that of gasoline or diesel fuel and that it would take two to three weeks to identify samples from the excavation hole. o On Aril 4, 1988: Notified R. Robinson of the DEP Clean Water Group of the test results and asked for permission to continue tank installation construction after film cleaned off top of water and remainder of gray colored gravel removed from hole. Mr. Robinson gave approval to continue construction if I inspected site and assured this was done. o On April 6, 1988: NUSCO construction removed film from water and lowered water table by sucking out 3200 gallons of contaminated water which was hauled off site as contaminated waste water. Removed the remainder of gray contaminated gravel from excavation hole. o On April 6, 1988 after water table lowered gasoline film and strong fumes entered the excavation hole. The fire marshal was notified, who requested DEP to inspect the hole. Concern was generated regarding 10,000 gallon unleaded gasoline tank in the same vicinity where gas fumes and film were found. Construction stopped. o On April 7, 1988: DEP Field Inspector Richard Ciasullo and
  6. Scan of page 6 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 6 of 19 Torrington Fire Marshal Ron Corey arrived on site and gave us two alternatives: 1. Test tank full of product and be ready to remove it immediately if tank leaks; 2. Remove 10,000 gallon unleaded tank. o April 7, 1988: Discussions were held between Area Superintendent Walt Wadman, Ken Busick, Frank Melluzzo, Bud Meyer, John Betz, Jack Farrel and John Szymanski to discuss options and make decision as to disposition of 10,000 gallon gasoline tank. Final consensus was to remove tank based on presence of gasoline odor and fumes in area, water level in tank raised when emptied of product, bottom ash found in vicinity of tank, tank had been unprotected for 10 years, the older unprotected tank 4000 diesel came out of ground looking like swiss cheese. o April 7, 1988: Removed 10,000 gallon unleaded gasoline tank, some heavy rusting and pitting visible on tank but there was no apparent holes. Backfill around tank was improper per today's installation standards (very large boulders, large gravel and some sand) there were no hold down straps on tank, and bottom ash in close proximity to tank. Wet lines were heavily rusted in one large area.
  7. Scan of page 7 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 7 of 19 REDACTED Distribution: [redacted]Claims and Insurance [redacted]s. and Test Department [redacted]Regional Operations - WMECO [redacted]struction [redacted]HP [redacted]rans. SS and Mtce. [redacted] Trans. Bldg. Eng. Design [redacted]nsportation [redacted] EPD [redacted]ores [redacted] EPD [redacted]cilities Management [redacted] Legal [redacted] Nuclear Prod. [redacted]en. Fac. Lic. Dept. bsl cc: [redacted]
  8. Scan of page 8 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 8 of 19 TORRINGTON AUG / CT Bemis / Laura Lionts leak lokator hunter ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] TEST RESULTS DATE OF TEST | 07-6-85 CONTRACT NUMBER
    CUSTOMERNortheast Utilities
    LOCATION – IDENTIFICATION NUMBERNAME
    ADDRESS178 Franklin DriveCITYTorringtonSTATEConn
    LEAK LOKATOR USE ONLYCONCL. CODE
    TEST RESULTS SUMMARY
    NO.SYSTEM PRODUCTTANK SIZE GALLONSDIA/MATLWATER INCHESLEAK LOKATOR RESULTS LEVEL INCHESALR GPHCONCLUSIONRECOMMENDATIONSTESTTANKSYS
    IINo Lead Tank #I400064/371 1/2"106".039Tight
    IINo Lead Tank #II400064/371 1/2"95".038Tight
    VIIRegular Lead1000096/3T1 1/2"113".038Tight
    OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTS
    NO.SYSTEM PRODUCTTYPE OF PUMP REMOTETYPE OF PUMP SUCTION# APPLIEDMINUTES APPLIEDPRODUCT LOSS CC'SPRODUCT LOSS GPHCONCLUSION/RESULT
    IINo Lead Tank I>✓DLPressure testtestX
    IINo Lead Tank II>✓170Pressure testtestX
    IIIRegular Leaded> Pump✓ Side[illegible][illegible]XXTight
    NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTS
    NO.SYSTEM PRODUCTTEST NO.TEST LEVEL (INCHES)CLOCK STARTDURATION HRS.-MIN.LEAK RATE CC/DIVLEAK RATE CC/MINTEMP COMP Δ°FTEMP COMP CC/MINABSOLUTE LEAK RATE CC/MINABSOLUTE LEAK RATE GPHCHECK TEST Y or N
    INo Lead Tank I1106"9:4531 min.39+25.95+.161+33.80-1.85-.039N
    IINo Lead Tank II195"7:5231 min.47+2.82+.636+6.37-2.44-.038N
    IIIRegular Leaded1142"11:4620 min.35+21.47+.65523.88-2.41-.038N
  9. Scan of page 9 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 9 of 19 REDACTED ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] Bemis | TORRINGTON AWG / CT Laura [illegible] leak lokator TEST RESULTS DATE OF TEST | 03-6-8? CONTRACT NUMBER CUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER
    ADDRESS 178 Franklin DriveNAME
    CITY TorringtonSTATE Con
    TEST RESULTS SUMMARY
    NO.SYSTEM PRODUCTTANK SIZE GALLONSDIA/MATLWATER INCHESLEAK LOKATOR RESULTS LEVEL INCHESALR GPHCONCLUSIONRECOMMENDATIONSLEAK LOKATOR USE ONLY CONCL. CODE TEST TANK SYS
    INO LEAD TANK I450064.371 1/2"166"-.029Tight
    IINO LEAD TANK II450064.371 1/2"95"-.038Tight
    IIIREGULAR LEADED1000096 x T1 1/2"115"-.026Tight
    OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTS
    NO.SYSTEM PRODUCTTYPE OF PUMP REMOTESUCTION# APPLIEDMINUTES APPLIEDPRODUCT LOSS CC'SPRODUCT LOSS GPHCONCLUSION/RESULT
    INO LEAD TANK I✓DODO[illegible]testX
    IINO LEAD TANK II✓testX
    IIIREGULAR LEADED✓✓110DueX
    IIIREGULAR LEADED✓ Pump✓[illegible][illegible][illegible][illegible]Tight
    NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTS
    NO.SYSTEM PRODUCTTEST NO.TEST LEVEL (INCHES)TIME CLOCK STARTTIME DURATION HRS.-MIN.LEAK RATE CC/DIVLEAK RATE CC/MINTEMPERATURE COMPENSATION Δ°FTEMPERATURE COMPENSATION CC/MINABSOLUTE LEAK RATE CC/MINABSOLUTE LEAK RATE GPHCHECK TEST Y or N
    INO LEAD TANK I1166"9:4531 min.39+25.95+.141+27.82-1.85-.029N
    IINO LEAD TANK II195"9:5235 min4.1712.08+.03616.37-2.44-.038N
    IIIREGULAR LEADED1114"9:4630 min-.37+21.17+.25523.66-2.41-.038N
    * LEVEL – INCHES FROM TANK BOTTOM TO TEST LEVEL ALR – ABSOLUTE LEAK RATE (MEASURED LEAK RATE – TEMPERATURE COMPENSATION) IN GALLONS PER HOUR CONCLUSION – NFPA 329 CRITERION OF ± 0.05 GPH IS USED TO CERTIFY TIGHTNESS CERTIFICATION This is to certify that the above described tank systems were tested, using the HUNTER ENVIRONMENTAL SERVICES, INC. LEAK LOKATOR according to all standard operating procedures. Those indicated as tight meet the criterion established by the National Fire Protection Association Pamphlet 329 for Precision Testing.
    TESTS CONDUCTED BYCERTIFIED BY
    TEST VAN NO. [illegible]SIGNATURE [illegible]
    TANK TESTING SPECIALIST [illegible]NAME [illegible]DATE [illegible]
    TANK TESTING SPECIALIST [illegible]TITLE [illegible]
  10. Scan of page 10 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 10 of 19 TANK AND LOCATION DATA DATE: 03-6-85
    CUSTOMER: Northeast UtilitiesCITY: Torrington
    I.D. #STATE: Conn
    WEATHERTIMETEMPERATURECOMMENTS
    BEFORE TEST –
    AFTER TEST –
    SCHEMATIC: Building PUMP NO LEAD II 4000gal 64" NO LEAD II 4000gal 64" NO LEAD PUMP VENT Regular PUMPS VENT Regular LEADED 10000gal 96" Building
    PRODUCT/TANK NO.NO LEAD INO LEAD IIRegular
    BEFORE DELIVERY LEVELFillGaugeFillGaugeFillGaugeFillGaugeFillGauge
    LEVELFull
    GALLONS
    WATER1½"1½"1½"
    TOP OF RISER9796101132
    GRADE160163162137
    DROP TUBEALALAL
    CAPACITY, GALLONS4000400010000
    DIAMETER, INCHES646464
    MATERIALSTEELSTEELSTEEL
    PUMP TYPEGasboy[illegible]Bennett
    TYPE OF COVERTANTANTAN
    AGE OF TANKUKUKUK
    SIPHONNONONO
    TANK OPENINGS1-4" 1-2"1-4" 1-2"1-4"
    EXTRACTORSNONONO
    VAPOR RECOVERY TYPE VENT CONFIGURATION P-V VENT VALVE TYPE
    REPLACEMENT PARTS: PART #DESCRIPTIONQUANTITYPRICE
    #701[illegible]1[illegible]
    #124[illegible]1[illegible]
    #6" Quick Tite 2-gauge (wire)1[illegible]
    ADDITIONAL CHARGES: (pumpovers, overtime, etc.) [illegible] [illegible] *Data obtained from ☐ Station ☐ LL Charts ☐ Other ______

Scanned pages and machine-read text of RSR-038 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of RSR-038 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 2 REDACTED Page 1 of 1 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION
    2. PG.of
    11
    STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 556-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SITE I.D.
    3. FOR STATE AGENCY USE ONLYA. SITE I.D.
    B. DATE RCVD BY D.E.P.C. DATE ENTERED
    D. GRID COORDINATES X ___ Y ___E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO
    SECTION A/B
    4. LOCATION OF FACILITYSITE NAME: East Hampton Service CenterNO. AND STREET: 22 East High StreetNEAREST INTERSECTING STREET: Route 2CITY OR TOWN: East HamptonSTATE: CT5. LATITUDE: 41° 34' 56"LONGITUDE: 72° 30' 14"
    6. BUSINESS NAME AND MAILING ADDRESSNAME: The Connecticut Light & Power CompanyNO. AND STREET: P.O. Box 270CITY OR TOWN: HartfordSTATE: CTZIP CODE: 061410270
    7. FACILITY OWNERNAME: The Connecticut Light & Power CompanyNO. AND STREET: P.O. Box 270CITY OR TOWN: HartfordSTATE: CTZIP CODE: 061410270
    8. TYPE OF OWNERX PRIVATESTATEMUNICIPALFEDERAL (G.S.A. No. ___)
    9. OPERATOR/CONTACT PERSON[redacted]NO. AND STREET: 22 East High StreetCITY OR TOWN: East HamptonSTATE: CTZIP CODE: 06424
    [redacted] SECTION C
    10. TANK ID.11a. DATE OF INSTALLATION (Mo./Yr.)11b. TANK LIFE EXPECTANCY (# of years)12a. TOTAL CAPACITY (Gals.)12b. STATUS: IN USEABANDONED IN PLACEEST. QUANTITY LEFT STORED (if any) (Gals.)REMOVEDDATE TANK LAST USED (Mo./Yr.)13. TYPE OF CONTENTS: OIL/PETRO-LEUM PRODUCTCHEMICAL LIQUID14. CONTENTS: CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No. if known)15. CONSTRUCTION MATERIALS: STEELFIBERGLASS REINFORCED PLASTICOTHER (Specify from list A)16. PROTECTION a. INTERNAL: LINEDUNLINED; b. EXTERNAL: CATHODIC PROTECTIONCOATED/WRAPPEDCATHODIC PROTECTIONOTHER (Specify from list B)17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION PROTECTION (See list B)b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.)18. MONITORING SYSTEM (Specify type from list B)19. FAILURE DETERMINATION CONDUCTED? (If "YES," enter DATE and attach results. If "NO," enter "NO")
    Example5/75305000XXXXH55/75UNO
    Example7/60-8000X8/78XXXE77/60U—
    A1/7215275XXXXXH7/72H092584
    B2/721510000XXXX7/72O092684 (10-14-86 / 092684 struck through)
    C3'303010000X011/84XX8/80O092684
    D4'7215275XXXX7/72U092584
    E5,7215550XXXX7/72U092884
    P6,7215550XXXX7/72U092884
    20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? X YES 21. COMMENTS: 16b coal tar epoxy. Tanks B2, D4, E5 & F6 budgeted for cathodic protection in 1986. A1 is also for [illegible] [illegible] SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.
    22a. SIGNATUREX [redacted]22b. DATE SIGNED5/5/86
    22c. NAME (Type or Print)[redacted]
    22d. OFFICIAL TITLE (of owner or authorized representative)Senior Vice President
    COPY 4

Text of RSR-038 Attachment 3.pdf

Extracted from the file · 1 page · 146 characters

Scanned pages and machine-read text of RSR-038 Attachment 4 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 117 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED | d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 117 of 126 GEL CORRESPONDENCE SIGNOFF AND DISTRIBUTION FORM PLEASE HELP EXPEDITE - REVIEW PROMPTLY AND HAND CARRY TO NEXT PERSON FOR ASSISTANCE CALL EXTENSION 5487/FAX 5896
    FACILITY: Madison Service CenterCODE(unit): BGNLETTER NO: D 08179
    TITLE/SUBJECT: Supplemental Application for Reimbursement from the Fund - Site No. 168AGENCY: CDP
    SPECIAL INSTRUCTIONS:LETTER DATE: 11/28/94
    DISTRIBUTION/SIGNOFF Signoff indicates your written concurrence for your discipline with statements and commitments made in the attached documents.
    DSAPERSONSODISCIPLINELOC.EXTINIT.DATECOMMENTS
    P.M. JacobsonEnv. Programs Mgr.NU East4642
    M. KeserAqua.Ser.Br. Mgr.NUEL4238
    P. BrindamourAqua. ServicesNU East
    T.J. ButwillF/H Eng. (Civil)N2065403
    XR.P. KlahenbergXERMNU East4628RPK11/21/94Nice job
    XD. GilbaneXLegalE2173431[illegible]11/22/94[illegible]
    Land PlanningNU East
    J.P. DonohuePOS Env. Comp. Mgr.W239
    Hydro ProductionW239
    J.W. McLaughlinHydro Prod., NHManch.
    R. PickeringEnv. & Results, NHManch.
    XW. HaynackXERMNU East4613[illegible]11/21/94As noted
    XD. FlemingTolland
    Facility Mgr./Supt.
    Fac. Opns. & EngngNU East
    Trans. CT&M3333
    W.H. SmagulaDir. - Fossil Prod.W2395467
    W.J. NadeauDir. - Hydro Prod.W2395064
    D.R. BrownPSNH ProductionManch.
    Lead Discipline
    Project Engineer
    XL. SheridanXGEL LeadW218 N223743LMS11/23/94
    Supvsr - NLW218NRC ☐ Yes ☐ No
    L.E. BireleyXGEL ManagerW218 N225448[illegible]11/28/94
    OTHER DISTRIBUTIONGEL CLERK INSTRUCTIONS
    XXFacilities FileXORIGINAL AND ____ COPIES
    XC.A. EdgeNU EastFEE CHECK
    FEDERAL EXPRESS
    REGISTERED MAIL
    TELECOPY
    COMMITMENT / ACTION TRACKING INFORMATION Response To: COTRAP # C____________ or FORCOM # F____________ DUE DATE: __________ Number of Calendar days in Advance (+) or Late (-) of Due Date____________
    Commitment NumberGEL LeadLead DisciplineResponse DateDESCRIPTION
    REV. 9 11-93
  2. Scan of page 118 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 118 of 126 Northeast Utilities System 107 Selden Street, Berlin, CT 06037 Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 [redacted] November 28, 1994 D08179 UST Petroleum Clean-Up Fund Review Board Bureau of Waste Management Department of Environmental Protection 79 Elm Street Hartford, CT 06102 Dear Sir or Madam: Madison Service Center Supplemental Application for Reimbursement from the Fund - Site No. 168 Northeast Utilities Service Company (NUSCO), on behalf of The Connecticut Light and Power Company (CL&P), hereby submits a supplemental application for reimbursement from the UST Petroleum Clean-Up Fund for the referenced site. This supplemental application covers the period beginning May, 1993 and ending June 30, 1994. The total amount requested for the referenced period is $49,283.32. Fuss & O'Neill, Inc. prepared this application in cooperation with our operations, environmental and laboratory personnel. Attached documentation includes the following: • Application Forms (sheets 1 and 2 only of full application) • Summary of Total Costs and Supporting Data for Contracted Services • Supporting Data for Costs Incurred by NUSCO Environmental Programs Personnel • Supporting Data for Costs Incurred by Production Operations Services Laboratory • Environmental Assessment and Progress Reports (April, May, June, 1994) We trust that the application forms, supporting cost and environmental data provides sufficient detail for review by DEP staff. Both NUSCO and Fuss & O'Neill, Inc. are prepared to answer any questions that may arise during your review. Please call Mr. [redacted] NUSCO Environmental Programs, at [redacted] initiate disc[redacted] Very truly yours, THE CONNECTICUT LIGHT AND POWER COMPANY [redacted] Attachment OS3422 REV. 1-94
  3. Scan of page 119 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 119 of 126 32 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION [redacted] 0'4/96 UST Owned Memo Re: 170. 8475 Dear Owner/Operator: Madison Regional Service Center Thank you for completing the Underground Storage Tank (UST) Questionnaire. The information represented on your questionnaire, however, does not match the information on your most recent notification form (Form EPHM-6). It is a State and Federal requirement that Forms EPHM-6 be submitted to the Department (UST Program) with each change of status of UST Operation/Ownership. For your convenience, we have enclosed an Underground Storage Facility Notification Form form. Please submit a copy of this letter with the completed form and return it to this office with up-to-date information about your UST facilities. If you have removed or abandoned motor fuel or waste oil tanks prior to December 1988, and closure reports and/or soil sampling were not conducted at that time, please send in any empirical verification of cleanup or degree of contamination which you may have. If you have removed or abandoned motor fuel or waste oil tanks after December 1988, please submit a concise closure report, including copies of sampling results and verification of clean-up, as required by state and federal law. Should you have any questions, please call me at [phone removed]. Thank your for your cooperation. Sincerely, Kelly A. McShea Kelly A. McShea UST Enforcement Program re: 1st AI installed 1/73 550 gal. hydrolic fluid (Printed on Recycled Paper) 79 Elm Street • Hartford, CT 06106 An Equal Opportunity Employer
  4. Scan of page 120 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 120 of 126 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION 170- 8475 THE CONNECTICUT LIGHT & POWER COMPANY O P.O. BOX 270 HARTFORD CT 06141 Madison Regional Service Center Dear UST owner/operator: 135 New Rd. The following questionnaire should be completed as part of a joint state and federal compliance monitoring project. Please answer as accurately as possible all of the following which pertains to your particular UST site. Please be advised that the information herein provided will be compared with those data currently maintained as part of the Connecticut DEP/ Federal Environmental Protection Agency data management system. Please make as many copies of this form as needed. 1) If you own ONLY heating fuel tanks for on-site consumptive use, please check here and return this letter. 2) How many UST(s) are in service at this site in total (including heating fuel tanks for on-site consumptive use)? How many are heating fuel tanks? Heating fuel tanks used for on-site consumption only are exempt from the rest of this survey. Use one row vertically for each tank /container that is part of the facility being reported. 3) What are the tank I.D.'s ? | | | | (as previously registered with CT DEP and EPA)
    4) What was the date of installation for each of your tanks?
    5) What do these tanks contain? C=hazardous materials
    G=gasoline, D=diesel fuel, W=waste oil
    6) What is the total capacity of these tanks (in gallons)?
    7) What type of UST(s) do you have?
    F= fiberglass, S=Steel, C= steel clad and cathodic protection O=other (please explain) 8) Which of the following leak detection options are being used? | | | | a) inventory control (gauging / weekly reconciliation with water paste test) and annual failure determination b) double walled UST-interstitial monitoring c) automatic tank gauging (eg. Veeder root system) d) approved installation and monthly monitoring of ground water wells e) approved installation and monthly monitoring of "vapor sniffing" wells f) Manual tank gauging as defined in 22a-449(d)-104(e)2 for UST systems ≤ 2000 gallons 9) Do you have pressurized piping or suction | | | | piping? P = pressurized; S = suction
  5. Scan of page 121 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 121 of 126 GEL CORRESPONDENCE SIGNOFF AND DISTRIBUTION FORM PLEASE HELP EXPEDITE - REVIEW PROMPTLY AND HAND CARRY TO NEXT PERSON FOR ASSISTANCE CALL EXTENSION 5487/FAX 5896
    FACILITY: Madison Service CenterCODE(unit): BGNLETTER NO: D 08179
    TITLE/SUBJECT: Supplemental Application for Reimbursement from the Fund - Site No. 168AGENCY: CDP
    SPECIAL INSTRUCTIONS:LETTER DATE: 11/28/94
    DISTRIBUTION/SIGNOFF Signoff indicates your written concurrence for your discipline with statements and commitments made in the attached documents.
    DSAPERSONSODISCIPLINELOC.EXTINIT.DATECOMMENTS
    P.M. JacobsonEnv. Programs Mgr.NU East4642
    M. KeserAqua.Ser.Br. Mgr.NUEL4238
    P. BrindamourAqua. ServicesNU East
    T.J. ButwillF/H Eng. (Civil)N2065403
    XR.P.KlattenbergXERMNU East4628RPK11/21/94Nice job
    XD. GilbaneXLegalE2173431GMK11/22/94see go a sheet for
    Land PlanningNU East
    J.P. DonohuePOS Env. Comp. Mgr.W239
    Hydro ProductionW239
    J.W. McLaughlinHydro Prod., NHManch.
    R. PickeringEnv. & Results, NHManch.
    XW. HaynackXERMNU East4613WH11/21/94As noted
    XD. FlemingTolland
    Facility Mgr./Supt.
    Fac. Opns. & EngngNU East
    Trans. CT&M3333
    W.H. SmagulaDir. - Fossil Prod.W2395467
    W.J. NadeauDir. - Hydro Prod.W2395064
    D.R. BrownPSNH ProductionManch.
    Lead Discipline
    Project Engineer
    XL. SheridanXGEL LeadW218 N2263743LMS11/23/94
    Supvsr - NLW218NRC ☐ Yes ☐ No
    L.E. BireleyXGEL ManagerW218 N2265448LEB11/28/94
    OTHER DISTRIBUTIONGEL CLERK INSTRUCTIONS
    XXFacilities FileXORIGINAL AND ___ COPIES
    XC.A. EdgeNU EastFEE CHECK
    FEDERAL EXPRESS
    REGISTERED MAIL
    TELECOPY
    COMMITMENT / ACTION TRACKING INFORMATION Response To: COTRAP # C____ or FORCOM # F____ DUE DATE:____ Number of Calendar days in Advance (+) or Late (-) of Due Date____
    Commitment NumberGEL LeadLead DisciplineResponse DateDESCRIPTION
    REV. 9 11-93
  6. Scan of page 122 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 122 of 126 Northeast Utilities System 107 Selden Street, Berlin, CT 06037 Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 [redacted] November 28, 1994 D08179 UST Petroleum Clean-Up Fund Review Board Bureau of Waste Management Department of Environmental Protection 79 Elm Street Hartford, CT 06102 Dear Sir or Madam: Madison Service Center Supplemental Application for Reimbursement from the Fund - Site No. 168 Northeast Utilities Service Company (NUSCO), on behalf of The Connecticut Light and Power Company (CL&P), hereby submits a supplemental application for reimbursement from the UST Petroleum Clean-Up Fund for the referenced site. This supplemental application covers the period beginning May, 1993 and ending June 30, 1994. The total amount requested for the referenced period is $49,283.32. Fuss & O'Neill, Inc. prepared this application in cooperation with our operations, environmental and laboratory personnel. Attached documentation includes the following: • Application Forms (sheets 1 and 2 only of full application) • Summary of Total Costs and Supporting Data for Contracted Services • Supporting Data for Costs Incurred by NUSCO Environmental Programs Personnel • Supporting Data for Costs Incurred by Production Operations Services Laboratory • Environmental Assessment and Progress Reports (April, May, June, 1994) We trust that the application forms, supporting cost and environmental data provides sufficient detail for review by DEP staff. Both NUSCO and Fuss & O'Neill, Inc. are prepared to answer any questions that may arise during your review. Please call Mr. [redacted] NUSCO Environmental Programs, at [redacted] to initiate discussions on any issue. Very truly yours, THE CONNECTICUT LIGHT AND POWER COMPANY [redacted] Vice President Attachment OS3422 REV. 1-94
  7. Scan of page 123 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 123 of 126 Reference Number: D13590 | OUTGOING DOCUMENT SIGN-OFF | OUT Letter Date: RESPONSE TO COMMITMENT: This document is being distributed for your review and comments. If you have any questions, please contact [redacted] SUBJECT: Amended UST Notification - Madison Facility: Madison Service Center Agency: CT Department Of Environmental Protection A response is due at the Agency by: 12/22/98
    copyPersonDepartmentLocationExt.InitDateComments
    X[redacted]orrosion & est[redacted][redacted][redacted][redacted][redacted]
    X[redacted]acilities anagement[redacted][redacted][redacted][redacted][redacted]
    [redacted]egal[redacted][redacted][redacted][redacted][redacted]
    X[redacted]ldg. Admin.[redacted][redacted][redacted][redacted][redacted]
    [redacted]nv. Services[redacted][redacted][redacted][redacted][redacted]
    X[redacted]nv. Services[redacted][redacted][redacted][redacted][redacted]
    Facility File: BGN Related Documents:
  8. Scan of page 124 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 124 of 126 OUTGOING DOCUMENT DISTRIBUTION ONLY FOR YOUR INFORMATION ONLY -- NO ACTION REQUIRED From: [redacted] REFERENCE NO.: D13590 SUBJECT: Amended UST Notification - Madison Facility: Madison Service Center Agency: CT Department Of Environmental Protection
    Full CopyPersonDepartmentLocation/Mail Stop
    X[redacted]Regional Ops.Tolland
  9. Scan of page 125 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 125 of 126 Northeast Utilities System 107 Selden Street, Berlin, CT 06037 Northeast Utilities Service Company P.O. Box 270 Hartford, CT 06141-0270 [redacted] [redacted] Vice President - Environmental, Safety and Ethics December 21, 1998 D13590 UST Coordinator Department of Environmental Protection 79 Elm Street P.O. Box 5066 Hartford, CT 06106-5127 Dear Sir or Madam: Madison Regional Service Center Amended UST Notification The Connecticut Light and Power Company herein submits an amended underground storage facility notification form for the removal of three underground storage tanks at the Madison Regional Service Center. If you have any questions or require additional information, call Mr. [redacted] Northeast Utilities Service Company Environmental Services, at [redacted] Very truly yours, THE CONNECTICUT LIGHT AND POWER COMPANY [redacted] cc: Copy #2: Mr. Sheldon Inkster, Fire Marshall Madison Town Hall 8 Campus Drive Madison, CT 06443 OS4025 REV. 2-98
  10. Scan of page 126 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 126 of 126 UNDERGROUND STORAGE FACILITY NOTIFICATION | PG 1 of 1 | 2. STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM Bureau of Waste Management 79 ELM STREET Hartford, CT 06106-5127 TEL [phone removed] PLEASE TYPE OR PRINT. ALL THREE COPIES MUST BE LEGIBLE Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form TPHM 5 Rev 5/94 FOR STATE AGENCY USE ONLY | A DATE ENTERED | B FEE BILLED | C FEE RECEIVED 1a FIRST NOTIFICATION
    b SUBSEQUENT NOTIFICATION (if checked, enter no.)SITE ID 8475
    GEO COORDINATES X YD DOES FACILITY MEET NEW REQUIREMENTS? YES NO
    SECTION A
    4. OF FACILITY LOCATIONSITE NAME Madison Regional Service CenterNO AND STREET 135 New RoadNEAREST INTERSECTING STREETCITY OR TOWN MadisonSTATE CT5 LATITUDELONGITUDE
    6. MAILING ADDRESS BUSINESS NAME ANDNAMENO. AND STREETCITY OR TOWNSTATEZIP CODETELEPHONE
    7. FACILITY OWNERNAME The Connecticut Light & Power CompanyNO AND STREET P. O. Box 270CITY OR TOWN HartfordSTATE CTZIP CODE 06141TELEPHONE
    8. TYPE OF OWNERX PRIVATESTATEMUNICIPALFEDERAL (G.S.A. NO. )
    9. PERSON OPERATOR/CONTACTNAME Barry LockeNO AND STREET 48 Tolland Stage RoadCITY OR TOWN TollandSTATE CTZIP CODE 06084TELEPHONE [phone removed]
    SECTION B / SECTION C
    10 TANK ID11a DATE OF INSTALLATION (Mo/Yr.)11b12a TOTAL CAPACITY (Gals.)12b STATUS IN USEABANDONED IN PLACEEST QUANTITY LEFT STORED (if any) (Gals.)REMOVEDDATE TANK LAST USED (Mo/Yr.)13 TYPE OF CONTENTS14 CONTENTS CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name) (Use C.A.S. No., if known)15 CONSTRUCTION MATERIALS16 PROTECTION a INTERNAL b EXTERNAL17 INTEGRAL PIPING SYSTEM18 MONITORING SYSTEM (Specify type from list B)19 FAILURE DETERMINATION CONDUCTED? (If "YES", enter "DATE" and attach results) (If "NO", enter "NO")
    Example5/75305000XXHeating fuel #2XXH3H5/75UNO
    Example7/60–8000X8/78XI,I,-Trichloroethane CAS #79016XXE7W7/60U–
    11/73550X11/93
    21/73550X11/93
    61/73550X11/93
    SECTION D 20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? YES 21. COMMENTS: 22 CERTIFICATION: [text partly illegible] [redacted] 2b DATE SIGNED 2d. OFFICIAL TITLE (of owner or authorized representative) Vice President COPY 1: SEND TO DEP, 79 ELM ST. HARTFORD, CT 06106

As listed on the current system

Question(s) Answered 38 (The Connecticut Light and Power Company) Date Filed: 10/20/2026

This filing on the current system (opens in a new tab)