Interrogatory responses
Answers to questions 38
Files5
RSR-038_Final.pdf
PDF · 146 KB · 7 pagesText searchable
Download RSR-038_Final.pdfRead the text of RSR-038_Final.pdf
RSR-038 Attachment 1 REDACTED.pdf
PDF · 4.6 MB · 19 pagesText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 1 REDACTED.pdfScanned pages and text of RSR-038 Attachment 1 REDACTED.pdf
RSR-038 Attachment 2 REDACTED.pdf
PDF · 798 KB · 1 pageText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 2 REDACTED.pdfScanned pages and text of RSR-038 Attachment 2 REDACTED.pdf
RSR-038 Attachment 3.pdf
PDF · 502 KB · 1 pageText searchable
Download RSR-038 Attachment 3.pdfRead the text of RSR-038 Attachment 3.pdf
RSR-038 Attachment 4 REDACTED.pdf
PDF · 51 MB · 126 pagesText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 4 REDACTED.pdfScanned pages and text of RSR-038 Attachment 4 REDACTED.pdf
Scanned pages and machine-read text of RSR-038 Attachment 1 REDACTED.pdf

The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 1 of 19 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Selden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 [redacted] April 13, 1988 D01928 Mr. Ronald Corey, Fire Marshall City of Torrington 111 Water Street Torrington, Connecticut 06790 Reference: Letter and Notification, [redacted] o R. Corey, dated May 8, 1986. Dear Mr. Corey: Torrington Area Work Center Notification of Underground Storage Tanks Northeast Utilities Service Company (NUSCO), as agent for the Connecticut Light and Power Company (CL&P), submits an amended Copy No. 2 of Notification Form EPHM-6 for underground storage tanks at CL&P's Torrington Area Work Center. The form submitted to you on May 8, 1986 (Referenced) has been amended to reflect the removal of all of the tanks (A1, B2, C3, D4) at the site. If you have any questions, please call [redacted] NUSCO Generation Facilities Licensing, at [redacted]. Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company [redacted] [redacted] Senior Vice President [redacted] By: C. F. Sears Vice President
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 2 of 19 Mr. Ronald Corey, Fire Marshall DO1928/Page 2 April 13, 1988 Enclosure cc: w/enclosure (Copy 1) Mr. Scott Deshefy Hazardous Material's Management Unit Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106 Mr. Richard Ciasullo Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 3 of 19 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION | PG. 2 of 1 | SITE ID | FOR STATE AGENCY USE ONLY | A. SITE I.D. | B. DATE RCVD BY D E P | C. DATE ENTERED | D. GRID COORDINATES X Y | E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. EPHM-6 NEW 10/85 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SECTION A SECTION B
SECTION C 20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? [X] YES 21. COMMENTS: SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.4. LOCATION OF FACILITY SITE NAME: Torrington Area Work Center NO. AND STREET: 174 Franklin Street NEAREST INTERSECTING STREET: Horwinton Ave. CITY OR TOWN: Torrington STATE: CT 5. LATITUDE: 41° 48' 00" LONGITUDE: 73° 06' 55" 5. BUSINESS NAME AND 6. MAILING ADDRESS NAME: The Connecticut Light + Power Co. (CL4P) NO. AND STREET: P O Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 06141-0270 7. FACILITY OWNER NAME: CL&P NO. AND STREET: Same as Above CITY OR TOWN STATE ZIP CODE 8. TYPE OF OWNER PRIVATE (checked) STATE MUNICIPAL FEDERAL (G.S.A. No.) 9. OPERATOR/CONTACT PERSON [redacted] NO. AND STREET: 174 Franklin Street CITY OR TOWN: Torrington STATE: CT ZIP CODE: 06790 TELEPHONE: 1203 482-4471 10. TANK ID 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. LIFE EXPECTANCY (in years) 12a. TOTAL CAPACITY (Gals.) IN USE ABANDONED IN PLACE 12b. STATUS EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS OIL/PETROLEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No., if known) 15. CONSTRUCTION MATERIALS STEEL FIBERGLASS REINFORCED PLASTIC OTHER (Specify from list A) c. INTERNAL UNLINED b. EXTERNAL UNLINED CATHODIC PROTECTION COATED/WRAPPED CATHODIC PROTECTION OTHER (Specify from list B) 16. PROTECTION 17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION AND PROTECTION (from list A/B) b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (if "YES", enter DATE and attach results; if "NO", enter "NO") Example 5/75 30 5000 X X X H 5 5/75 U NO Example 7/60 - 8000 X 8/78 X X E 7 7/60 U - A1 12/78 15 10,000 X 4/88 X Regular Gasoline X X E 7E 12/78 O 3-15-84 B2 1/64 15 4,000 X 3/88 X Diesel Fuel X X E 7E 1/64 O 3-15-84 C3 1/64 15 4,000 X 3/88 X Unleaded Gasoline X X E 7E 1/64 O 3-15-84 D4 1/60 15 500 X 3/88 X Waste Oil X X E 7E 1/60 U NO
22c. NAME (type or print) [redacted] 22d. OFFICIAL TITLE | Vice President / Senior Vice President COPY 1: SEND TO DEP: 165 CAPITOL AVE. HARTFORD, CT 0610622a. SIGNATURE X [redacted] 22b. DATE SIGNED 13 April 1988 
The scanned page Machine-read text
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 4 of 19 CONN LIGHT & POWER CO. NORTHEAST UTILITIES WORK ORDER SKETCH SHEET
SKETCH INDICATE NORTH AND NAME STREETS Not To Scale B2 A1 21' 140' 159' 177' 44' 275' 255' D4 C3 GARAGE TRANSMISSION TORRINGTON SERVICE BUILDING HARWINTON SCHIBI ST. AVE. OP418? REV. 10-82 DEST. SAME AS ATT. REC. DRAWN BY | TELEPHONE EXT.DISTRICT / REGION TOWN DATE MAP NO. WORK ORDER NO. ACTV. SHEET OF TORRINGTON / WESTERN TORRINGTON 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 5 of 19 REDACTED TO: File FROM: John Szymanski [signature] April 14, 1988 SUBJECT: Torrington AWC Tank removals were conducted at the Torrington AWC during the months of March and April 1988. o During March 1988: One (1) 4000 gallon unleaded gasoline tank and One (1) 500 gallon oil tank were removed; no problems o On March 30, 1988: Notified that (1) 4000 gallon diesel tank was removed with heavy rusting and several apparent holes the size of dimes. o On March 30, 1988: Examined site and took three (3) samples from excavation hole and one (1) sample from diesel tank to have material analyzed and identified by LAB per request by DEP Field Inspector, Richard Ciasullo. o On March 31, 1988: Samples dropped off for analyzing and identification at Souther-Newlands Laboratory. o On April 4, 1988: Souther Newland Laboratory called EPD office to report on lab findings. - Sample from diesel tank identified as diesel fuel - The three (3) samples from the excavation hole all had the same characteristic profiles, but it didn't match that of gasoline or diesel fuel and that it would take two to three weeks to identify samples from the excavation hole. o On Aril 4, 1988: Notified R. Robinson of the DEP Clean Water Group of the test results and asked for permission to continue tank installation construction after film cleaned off top of water and remainder of gray colored gravel removed from hole. Mr. Robinson gave approval to continue construction if I inspected site and assured this was done. o On April 6, 1988: NUSCO construction removed film from water and lowered water table by sucking out 3200 gallons of contaminated water which was hauled off site as contaminated waste water. Removed the remainder of gray contaminated gravel from excavation hole. o On April 6, 1988 after water table lowered gasoline film and strong fumes entered the excavation hole. The fire marshal was notified, who requested DEP to inspect the hole. Concern was generated regarding 10,000 gallon unleaded gasoline tank in the same vicinity where gas fumes and film were found. Construction stopped. o On April 7, 1988: DEP Field Inspector Richard Ciasullo and
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 6 of 19 Torrington Fire Marshal Ron Corey arrived on site and gave us two alternatives: 1. Test tank full of product and be ready to remove it immediately if tank leaks; 2. Remove 10,000 gallon unleaded tank. o April 7, 1988: Discussions were held between Area Superintendent Walt Wadman, Ken Busick, Frank Melluzzo, Bud Meyer, John Betz, Jack Farrel and John Szymanski to discuss options and make decision as to disposition of 10,000 gallon gasoline tank. Final consensus was to remove tank based on presence of gasoline odor and fumes in area, water level in tank raised when emptied of product, bottom ash found in vicinity of tank, tank had been unprotected for 10 years, the older unprotected tank 4000 diesel came out of ground looking like swiss cheese. o April 7, 1988: Removed 10,000 gallon unleaded gasoline tank, some heavy rusting and pitting visible on tank but there was no apparent holes. Backfill around tank was improper per today's installation standards (very large boulders, large gravel and some sand) there were no hold down straps on tank, and bottom ash in close proximity to tank. Wet lines were heavily rusted in one large area.
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 7 of 19 REDACTED Distribution: [redacted]Claims and Insurance [redacted]s. and Test Department [redacted]Regional Operations - WMECO [redacted]struction [redacted]HP [redacted]rans. SS and Mtce. [redacted] Trans. Bldg. Eng. Design [redacted]nsportation [redacted] EPD [redacted]ores [redacted] EPD [redacted]cilities Management [redacted] Legal [redacted] Nuclear Prod. [redacted]en. Fac. Lic. Dept. bsl cc: [redacted]
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 8 of 19 TORRINGTON AUG / CT Bemis / Laura Lionts leak lokator hunter ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] TEST RESULTS DATE OF TEST | 07-6-85 CONTRACT NUMBER
TEST RESULTS SUMMARYCUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER NAME ADDRESS 178 Franklin Drive CITY Torrington STATE Conn LEAK LOKATOR USE ONLY CONCL. CODE
OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTSNO. SYSTEM PRODUCT TANK SIZE GALLONS DIA/MATL WATER INCHES LEAK LOKATOR RESULTS LEVEL INCHES ALR GPH CONCLUSION RECOMMENDATIONS TEST TANK SYS II No Lead Tank #I 4000 64/37 1 1/2" 106" .039 Tight II No Lead Tank #II 4000 64/37 1 1/2" 95" .038 Tight VII Regular Lead 10000 96/3T 1 1/2" 113" .038 Tight
NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTSNO. SYSTEM PRODUCT TYPE OF PUMP REMOTE TYPE OF PUMP SUCTION # APPLIED MINUTES APPLIED PRODUCT LOSS CC'S PRODUCT LOSS GPH CONCLUSION/RESULT II No Lead Tank I > ✓ DL Pressure test test X II No Lead Tank II > ✓ 170 Pressure test test X III Regular Leaded > Pump ✓ Side [illegible] [illegible] X X Tight NO. SYSTEM PRODUCT TEST NO. TEST LEVEL (INCHES) CLOCK START DURATION HRS.-MIN. LEAK RATE CC/DIV LEAK RATE CC/MIN TEMP COMP Δ°F TEMP COMP CC/MIN ABSOLUTE LEAK RATE CC/MIN ABSOLUTE LEAK RATE GPH CHECK TEST Y or N I No Lead Tank I 1 106" 9:45 31 min .39 +25.95 +.161 +33.80 -1.85 -.039 N II No Lead Tank II 1 95" 7:52 31 min .47 +2.82 +.636 +6.37 -2.44 -.038 N III Regular Leaded 1 142" 11:46 20 min .35 +21.47 +.655 23.88 -2.41 -.038 N 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 9 of 19 REDACTED ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] Bemis | TORRINGTON AWG / CT Laura [illegible] leak lokator TEST RESULTS DATE OF TEST | 03-6-8? CONTRACT NUMBER CUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER
TEST RESULTS SUMMARYADDRESS 178 Franklin Drive NAME CITY Torrington STATE Con
OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTSNO. SYSTEM PRODUCT TANK SIZE GALLONS DIA/MATL WATER INCHES LEAK LOKATOR RESULTS LEVEL INCHES ALR GPH CONCLUSION RECOMMENDATIONS LEAK LOKATOR USE ONLY CONCL. CODE TEST TANK SYS I NO LEAD TANK I 4500 64.37 1 1/2" 166" -.029 Tight II NO LEAD TANK II 4500 64.37 1 1/2" 95" -.038 Tight III REGULAR LEADED 10000 96 x T 1 1/2" 115" -.026 Tight
NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTSNO. SYSTEM PRODUCT TYPE OF PUMP REMOTE SUCTION # APPLIED MINUTES APPLIED PRODUCT LOSS CC'S PRODUCT LOSS GPH CONCLUSION/RESULT I NO LEAD TANK I ✓ DO DO [illegible] test X II NO LEAD TANK II ✓ test X III REGULAR LEADED ✓ ✓ 110 Due X III REGULAR LEADED ✓ Pump ✓ [illegible] [illegible] [illegible] [illegible] Tight
* LEVEL – INCHES FROM TANK BOTTOM TO TEST LEVEL ALR – ABSOLUTE LEAK RATE (MEASURED LEAK RATE – TEMPERATURE COMPENSATION) IN GALLONS PER HOUR CONCLUSION – NFPA 329 CRITERION OF ± 0.05 GPH IS USED TO CERTIFY TIGHTNESS CERTIFICATION This is to certify that the above described tank systems were tested, using the HUNTER ENVIRONMENTAL SERVICES, INC. LEAK LOKATOR according to all standard operating procedures. Those indicated as tight meet the criterion established by the National Fire Protection Association Pamphlet 329 for Precision Testing.NO. SYSTEM PRODUCT TEST NO. TEST LEVEL (INCHES) TIME CLOCK START TIME DURATION HRS.-MIN. LEAK RATE CC/DIV LEAK RATE CC/MIN TEMPERATURE COMPENSATION Δ°F TEMPERATURE COMPENSATION CC/MIN ABSOLUTE LEAK RATE CC/MIN ABSOLUTE LEAK RATE GPH CHECK TEST Y or N I NO LEAD TANK I 1 166" 9:45 31 min .39 +25.95 +.141 +27.82 -1.85 -.029 N II NO LEAD TANK II 1 95" 9:52 35 min 4.17 12.08 +.036 16.37 -2.44 -.038 N III REGULAR LEADED 1 114" 9:46 30 min -.37 +21.17 +.255 23.66 -2.41 -.038 N TESTS CONDUCTED BY CERTIFIED BY TEST VAN NO. [illegible] SIGNATURE [illegible] TANK TESTING SPECIALIST [illegible] NAME [illegible] DATE [illegible] TANK TESTING SPECIALIST [illegible] TITLE [illegible] 
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 10 of 19 TANK AND LOCATION DATA DATE: 03-6-85
SCHEMATIC: Building PUMP NO LEAD II 4000gal 64" NO LEAD II 4000gal 64" NO LEAD PUMP VENT Regular PUMPS VENT Regular LEADED 10000gal 96" BuildingCUSTOMER: Northeast Utilities CITY: Torrington I.D. # STATE: Conn WEATHER TIME TEMPERATURE COMMENTS BEFORE TEST – AFTER TEST –
VAPOR RECOVERY TYPE VENT CONFIGURATION P-V VENT VALVE TYPEPRODUCT/TANK NO. NO LEAD I NO LEAD II Regular BEFORE DELIVERY LEVEL Fill Gauge Fill Gauge Fill Gauge Fill Gauge Fill Gauge LEVEL Full GALLONS WATER 1½" 1½" 1½" TOP OF RISER 97 96 101 132 GRADE 160 163 162 137 DROP TUBE AL AL AL CAPACITY, GALLONS 4000 4000 10000 DIAMETER, INCHES 64 64 64 MATERIAL STEEL STEEL STEEL PUMP TYPE Gasboy [illegible] Bennett TYPE OF COVER TAN TAN TAN AGE OF TANK UK UK UK SIPHON NO NO NO TANK OPENINGS 1-4" 1-2" 1-4" 1-2" 1-4" EXTRACTORS NO NO NO
ADDITIONAL CHARGES: (pumpovers, overtime, etc.) [illegible] [illegible] *Data obtained from ☐ Station ☐ LL Charts ☐ Other ______REPLACEMENT PARTS: PART # DESCRIPTION QUANTITY PRICE #701 [illegible] 1 [illegible] #124 [illegible] 1 [illegible] # 6" Quick Tite 2-gauge (wire) 1 [illegible]
Scanned pages and machine-read text of RSR-038 Attachment 2 REDACTED.pdf

The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 2 REDACTED Page 1 of 1 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION
STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 556-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SITE I.D.2. PG. of 1 1
SECTION A/B3. FOR STATE AGENCY USE ONLY A. SITE I.D. B. DATE RCVD BY D.E.P. C. DATE ENTERED D. GRID COORDINATES X ___ Y ___ E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO
[redacted] SECTION C4. LOCATION OF FACILITY SITE NAME: East Hampton Service Center NO. AND STREET: 22 East High Street NEAREST INTERSECTING STREET: Route 2 CITY OR TOWN: East Hampton STATE: CT 5. LATITUDE: 41° 34' 56" LONGITUDE: 72° 30' 14" 6. BUSINESS NAME AND MAILING ADDRESS NAME: The Connecticut Light & Power Company NO. AND STREET: P.O. Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 061410270 7. FACILITY OWNER NAME: The Connecticut Light & Power Company NO. AND STREET: P.O. Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 061410270 8. TYPE OF OWNER X PRIVATE STATE MUNICIPAL FEDERAL (G.S.A. No. ___) 9. OPERATOR/CONTACT PERSON [redacted] NO. AND STREET: 22 East High Street CITY OR TOWN: East Hampton STATE: CT ZIP CODE: 06424
20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? X YES 21. COMMENTS: 16b coal tar epoxy. Tanks B2, D4, E5 & F6 budgeted for cathodic protection in 1986. A1 is also for [illegible] [illegible] SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.10. TANK ID. 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. TANK LIFE EXPECTANCY (# of years) 12a. TOTAL CAPACITY (Gals.) 12b. STATUS: IN USE ABANDONED IN PLACE EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS: OIL/PETRO-LEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS: CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No. if known) 15. CONSTRUCTION MATERIALS: STEEL FIBERGLASS REINFORCED PLASTIC OTHER (Specify from list A) 16. PROTECTION a. INTERNAL: LINED UNLINED; b. EXTERNAL: CATHODIC PROTECTION COATED/WRAPPED CATHODIC PROTECTION OTHER (Specify from list B) 17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION PROTECTION (See list B) b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (If "YES," enter DATE and attach results. If "NO," enter "NO") Example 5/75 30 5000 X X X X H 5 5/75 U NO Example 7/60 - 8000 X 8/78 X X X E 7 7/60 U — A1 /72 15 275 X X X X X H 7 /72 H 092584 B2 /72 15 10000 X X X X 7 /72 O 092684 (10-14-86 / 092684 struck through) C3 '30 30 10000 X 0 11/84 X X 8 /80 O 092684 D4 '72 15 275 X X X X 7 /72 U 092584 E5 ,72 15 550 X X X X 7 /72 U 092884 P6 ,72 15 550 X X X X 7 /72 U 092884
COPY 422a. SIGNATURE X [redacted] 22b. DATE SIGNED 5/5/86 22c. NAME (Type or Print) [redacted] 22d. OFFICIAL TITLE (of owner or authorized representative) Senior Vice President
Text of RSR-038 Attachment 3.pdf
Extracted from the file · 1 page · 146 characters
Scanned pages and machine-read text of RSR-038 Attachment 4 REDACTED.pdf
Page 37 of 126
Full-size scan of page 37 (opens in a new tab)In the PDF: page 37 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 37 of 126 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Selden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 [redacted] August 29, 1989 D02987 Mr. John Aceto Oil and Chemical Spill Section Department of Environmental Protection 122 Washington Street Hartford, CT 06106 Dear Mr. Aceto: Madison Area Work Center Results of Tightness Test Northeast Utilities Service Company (NUSCO), on behalf of The Connecticut Light and Power Company (CL&P), submits the results of the tightness test performed on August 18, 1989 on a 10,000-gallon unleaded gasoline underground storage tank (UST) at CL&P's Madison Area Work Center (AWC). On August 10, 1989, you were verbally notified that the results of a soil gas survey at the AWC showed levels of hydrocarbons in the ground. All three fueling USTs at the site have passed the tightness test (Results attached). These results were verbally reported to you on August 21, 1989. CL&P has concluded that the hydrocarbon levels are the result of historic spills. Pursuant to 40CFR280.52(a)(3), CL&P is performing a site check around the 10,000-gallon UST. Monitoring wells were installed on August 22, 1989. They will be developed and sampled by the week ending September 8, 1989. The results will be sent to DEP's UST Programs Department. If you have any questions, please call [redacted], NUSCO Generation Facilities Licensing.[redacted] Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company [redacted] [redacted] Senior Vice President [redacted] By: C. F. Sears Vice PresidentPage 38 of 126
Full-size scan of page 38 (opens in a new tab)In the PDF: page 38 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 38 of 126 Mr. John Aceta DO2987/Page 2 August 29, 1989 Enclosure cc: w/Enclosure Mr. G. Scott Deshefy, Coordinator UST Programs Department of Environmental Protection 122 Washington Street Hartford, CT 06106 Mr. Arthur W. Cunningham, Fire Marshal Town Hall 8 Meeting House Lane Madison, Ct 06443Page 39 of 126
Full-size scan of page 39 (opens in a new tab)In the PDF: page 39 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 39 of 126 SEP 25 1989 II FHEL CORRESPONDENCE SIGNOFF AND DISTRIBUTION FORM PLEASE HELP EXPEDITE - REVIEW PROMPTLY AND HAND CARRY TO NEXT PERSON FOR ASSISTANCE CALL EXTENSIONS 5296, 3715 OR 5974.
SIGNOFF/DISTRIBUTION Signoff indicates your written concurrence for your discipline with statements and commitments made in the attached documents.FACILITY: Madison Area Work Center CODE: BGN LETTER NO: D [redacted] 03028 TITLE/SUBJECT: UST Release 20-Day Letter AGENCY: CDP SPECIAL INSTRUCTIONS: Must go Sept. 18, 1989 LETTER DATE: Sept. 18, 1989
COMMITMENT / ACTION TRACKING INFORMATION Full/Partial Response To: COTRAP # C____ or FORCOM # F____ | DUE DATE: N/A Number of Calendar days in Advance (+) or Late (-) of Due Date____DS A PERSON SO DISCIPLINE LOC. EXT INIT. DATE COMMENTS X X C.L. Karlic X Originator/Lead W218 3740 CALL 9-13-89 J.H. Gastler Gen. Env. Svcs. B3F3 4638 X X R.P. Klattenberg X Fac. Env. Svcs. B3F3 4628 Telecopy Letter Only Sent 9-13 R.C. Nichols Enviro. Audit B3F3 4645 T.J. Butwill Civil Hydraulics N206 5403 D.R. Wade FH Programs Engng N226 5460 W.J. Kornacki FH Improv. Engng N226 3792 X X J.C. Stalbaum X Legal E217 5087 JCS 9/15/89 OK per Chantal conv. R. de Brigard Land Planning SBS 6714 N.J. Lanzalotta Prod. Opns. Svcs. W239 5657 X X W. Haynack X EPD B3F3 4613 Telecopy Letter Only Sent 9-13 X X J. Slater X Fac Mgmt SBS Sent Sept. Copy vacation Project Engineer Facility Mgr./Supt. C.A. Edge Fac. Opns. & Engng SBS 6750 P.C. Robotham Transportation 3333 6677 J. Barresi Supt. - CT&M 3333 6662 W.V. Reichelt Sys. Supt. - Fossil W239 5467 R.G. Chevalier Sys. Supt. - Hydro W239 5064 C.L. Karlic X FHEL Lead W218 3740 CLK 9-18-89 as amended R. Osella X Supvsr - FHEL W218 5448 9/18/89 OTHER DISTRIBUTION GFL CLERK INSTRUCTIONS X X Facilities File GFL Clerk W218 X ORIGINAL AND ___ COPIES X X P. Wilson NOTARY REQUIRED X ATTACHMENTS (X in "A" Column) FEE CHECK FEDERAL EXPRESS REGISTERED MAIL TELECOPY Commitment Number GFL Lead Discipline Lead Response Date DESCRIPTION ALL CORRESPONDENCE TO COPY TO NUCLEAR LICENSING REV. 2 1-03-89 NPDES PERMITTING AGENCIES: SUPERVISOR FOR FORWARDING TO USNRC Page 40 of 126
Full-size scan of page 40 (opens in a new tab)In the PDF: page 40 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 40 of 126 STATE OF CONNECTICUT partment of Environmental Protection OUND STORAGE FACILITIES PROGRAM RDOUS MATERIALS MANAGEMENT UNIT 5 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 E. ALL THREE COPIES MUST BE LEGIBLE! FOR FILING NOTIFICATION before completing form. EPHM- 6 NEW 10/85
FEDERAL (G.S.A. No. ______ )3. FOR STATE AGENCY USE ONLY A. SITE I.D. B. DATE RCVD BY D.E.P C. DATE ENTERED D. GRID COORDINATES X ___ Y ___ E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO New Rd NEAREST INTERSECTING STREET Duck Hole Rd CITY OR TOWN Madison STATE CT 5.LATITUDE 47 ° 17 ' 31 " LONGITUDE 7? 34 36" xy 2 70 CITY OR TOWN Hartford STATE CT ZIP CODE 06141-0270 TELEPHONE [redacted] CITY OR TOWN STATE ZIP CODE
22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted. 22a. SIGNATURE [redacted] | 22b. DATE SIGNED [illegible] | 22d. OFFICIAL TITLE (of owner or authorized representative) Vice President PY 3: RETAIN FOR YOUR RECORDSew Rd CITY OR TOWN Madison STATE CT ZIP CODE 06443 TELEPHONE 203245-5366 14. CONTENTS- CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No.,If known) 15. CONSTRUCTION MATERIALS (STEEL FIBERGLASS REINFORCED PLASTIC OTHER (Specify from list A)) 16.PROTECTION a.INTERNAL (LINED UNLINED CATHODIC PROTECTION COATED/WRAPPED) b. EXTERNAL (CATHODIC PROTECTION OTHER (Specify from list B)) 17. INTEGRAL PIPING SYSTEM a. (CONSTRUCTION AND PROTECTION (See list A&B)) b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (If "YES", enter DATE and attach results). (If "NO", enter "NO") Heating fuel #2 X X H 5 5/75 U NO 1,1,1 - Trichloroethane CAS #79016 X X E 7 7/60 U — Hydraulic Fluid X X X E 8 /73 IO NO Motor Oil X X X E 8 /73 IO NO Unleaded Gasoline X X X EA 8 /73 IO 8-18-89 Diesel Fuel X X X EA 8 /73 IO 8-18-89 Unleaded Gasoline X X X EA 8 /73 IO 8-18-89 Waste Oil X X X E 8 /73 I NO Hydraulic Oil X X X EF 8 /72 R NO Diesel X X X E 7,10 C /13 I NO Page 41 of 126
Full-size scan of page 41 (opens in a new tab)In the PDF: page 41 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 41 of 126 FETRONICS INC. ENVIRONMENTAL MONITORING SERVICE 2019 JOHN FITCH BLVD. • SOUTH WINDSOR, CT 06074 [phone removed] TEST RESULTS Test Number: 900724 Test Date: July 24, 1990 Location: Northeast Utilities New Road Madison, CTGrade Volume (gal) Low Level Leak Rate (gal/hour) High Level Leak Rate (gal/hour) Tank Tank Piping Product Lines Unleaded 5,000 0.01 0.01 PASS PASS PASS Page 42 of 126
Full-size scan of page 42 (opens in a new tab)In the PDF: page 42 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 42 of 126 P CHART FOR DATA RECORD: 90072449.A08 OF 5000 GALLON UNLEADED TANK Address: CL+P NEW ROAD MADISON, CT. Operator: BER RATE AVG OF 60 CYCLES TANK TEMP @ START: 75.9 F 0.000661 DEN: 0.733 LFD: 6.0 Manifolding: None <---------------------- @ = 10.0F --------------------> AVG THREE <-------------------------t = 0.1 F --------------------> LEAK STD GAL <---------------------- V = 0.1 gal -----------------> RATE DEV [illegible] END OF STRIP CHART DATA COLLECTED ON LEAK COMPUTER SN 88060101Page 43 of 126
Full-size scan of page 43 (opens in a new tab)In the PDF: page 43 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 43 of 126 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Seiden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 [phone removed] September 18, 1989 D03028 Mr. G. Scott Deshefy, Coordinator UST Programs Department of Environmental Protection 122 Washington Street Hartford, CT 06106 References: 1. Letter [redacted] to J. Aceto, dated August 29, 1989. 2. Letter and Notification, [redacted] to G. S. Deshefy, dated April 11, 1988. Dear Mr. Deshefy: Madison Regional Service Center Initial Abatement Measures--20-Day Notification UST Facility Release Northeast Utilities Service Company (NUSCO), as agent for The Connecticut Light and Power Company (CL&P), and in accordance with 40 CFR 280.62, submits information on the initial abatement measures taken due to a release from an unleaded gasoline underground storage tank (UST) at CL&P's Madison Regional Service Center. A soil gas survey performed at the site revealed high hydrocarbon concentrations around the 10,000-gallon unleaded gasoline UST, designated as E5 on the referenced notification. The UST passed the tightness test that was performed on August 18, 1989. This information has been relayed to Mr. John Aceto, Oil and Chemical Spills Group (Reference 1). The aquifer at the site is GA. Two monitoring wells (MW) were installed on August 22, 1989. No free product was detected in either well. Groundwater samples showed a Benzene-Toluene-Xylene (BTX) concentration of 11,527 ppb in MW-1 and 10 ppb in MW-2. The Ethylbenzene concentration was 862 ppb in MW-1 and < 1 ppb in MW-2. No chlorinated compounds were detected in the samples (see Attachment 1). Based on soil gas survey results and data acquired from the installation of the monitoring wells, a decision was made to excavate along the tank vent line to look for evidence of leakage. The excavation performed on August 29, 1989, yielded evidence of leakage from the vent line. Excavation along the end of the tank showed contamination around and under the tank. Mr. John Aceto was notified of the findings and of the decision to remove the tank. On August 31, 1989, the tank and surrounding contaminated soil were removed. Excavation of the tank revealed areas of gasoline-contaminated soil around the fill, suction, and vent lines. OS3422 REV. 4-88Page 44 of 126
Full-size scan of page 44 (opens in a new tab)In the PDF: page 44 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 44 of 126 Mr. G. Scott Deshefy D03028/Page 2 September 18, 1989 The excavation area was inspected the same day by Mr. Mike McCann, DEP Oil and Chemical Spills Group. The excavated soil has been sampled and is being a analyzed to determine its proper disposal. NUSCO plans on installing an additional 4 or 5 wells at the site. All wells will then be sampled and analyzed. Based on these results, NUSCO will propose a remediation plan. Enclosed for your files is an amended UST notification form to reflect the removal of Tank E5. This supersedes our submittal of April 11, 1988 (Reference 2). Also enclosed is evidence of financial responsibility as required by 40 CFR 280.106(a). CL&P has chosen to meet the requirements through the use of the financial test. If you have any questions, please call [redacted] NUSCO Generation Facilities Licensing, at [redacted] Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company [redacted] Senior Vice President [redacted] Vice President Enclosures cc/enc: Ms. Elsie Patton Water Compliance Unit Department of Environmental Protection 122 Washington Street Hartford, CT 06106 Mr. John Aceto Oil and Chemical Spills Section Department of Environmental Protection 122 Washington Street Hartford, CT 06106 With Copy No. 2 of UST Notification Mr. Arthur W. Cunningham, Fire Marshal Town Hall 8 Meeting House Lane Madison, CT 06443Page 45 of 126
Full-size scan of page 45 (opens in a new tab)In the PDF: page 45 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 45 of 126 ENVIRONMENTAL SCIENCE CORPORATION LABORATORY REPORT LAB. REPORT NO. C-11783 362 INDUSTRIAL PARK ROAD MIDDLETOWN, CT 06457 [phone removed], FAX [phone removed] State Certification No. PH-0476 CLIENT [redacted] Northeast Utilities 100 Corporate Place Rocky Hill, CT 06067
Madison Service Center - 24 HOUR PRIORITYDATE RECEIVED 08/28/89 PURCHASE ORDER NO. 001569 CLIENT I.D. NEU CLIENT PROJECT NO.
-----------------------------------------|----------------|---------------- ** EPA METHOD 8010SAMPLE ID: WELL #1 WELL #2 LOCATION: MADISON SERV. CT MADISON SERV. CT TYPE: WATER WATER DATE: 08/28/89 08/28/89 ** TEST ** (ALL UNITS ARE PPB)
< - Below Minimum Detectable LevelBenzyl Chloride < 100 < 1 Bis(2-Chloroethoxy)Methane < 100 < 1 Bis(2-Chloroisopropyl)Ether < 100 < 1 Bromobenzene < 100 < 1 Bromodichloromethane < 100 < 1 Bromoform < 100 < 1 Bromomethane < 100 < 1 Carbon Tetrachloride < 100 < 1 Chloroacetaldehyde < 100 < 1 Chloral < 100 < 1 Chlorobenzene < 100 < 1 Chloroethane < 100 < 1 Chloroform < 100 < 1 1-Chlorohexane < 100 < 1 2-Chloroethyl Vinyl Ether < 100 < 1 Chloromethane < 100 < 1 Chloromethyl Methyl Ether < 100 < 1 Chlorotoluene < 100 < 1 Dibromochloromethane < 100 < 1 Dibromomethane < 100 < 1 1,2-Dichlorobenzene < 100 < 1 1,3-Dichlorobenzene < 100 < 1 1,4-Dichlorobenzene < 100 < 1 Dichlorodifluoromethane < 100 < 1 1,2-Dichloroethane < 100 < 1 08/31/89 - 1 - [redacted] DATE REPORTED LABORATORY DIRECTOR Page 46 of 126
Full-size scan of page 46 (opens in a new tab)In the PDF: page 46 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 46 of 126 ENVIRONMENTAL SCIENCE CORPORATION 362 INDUSTRIAL PARK ROAD MIDDLETOWN, CT 06457 [phone removed], FAX [phone removed] LABORATORY REPORT LAB. REPORT NO. C-11783 State Certification No. PH-0476 CLIENT Mr. [redacted] Northeast Utilities 100 Corporate Place Rocky Hill, CT 06067 DATE RECEIVED 08/28/89 PURCHASE ORDER NO. 001569 CLIENT I.D. NEU CLIENT PROJECT NO. Madison Service Center - 24 HOUR PRIORITY
** TEST ** (ALL UNITS ARE PPB) EPA METHOD 8010 (continued)SAMPLE ID: WELL #1 WELL #2 LOCATION: MADISON SERV. CT MADISON SERV. CT TYPE: WATER WATER DATE: 08/28/89 08/28/89
< - Below Minimum Detectable Level1,1-Dichloroethane < 100 < 1 1,1-Dichloroethylene < 100 < 1 Trans-1,2-Dichloroethylene < 100 < 1 Dichloromethane < 100 < 1 1,2-Dichloropropane < 100 < 1 1,3-Dichloropropylene < 100 < 1 1,1,2,2-Tetrachloroethane < 100 < 1 1,1,1,2-Tetrachloroethane < 100 < 1 Tetrachloroethylene < 100 < 1 1,1,1-Trichloroethane < 100 < 1 1,1,2-Trichloroethane < 100 < 1 Trichloroethylene < 100 < 1 Trichlorofluoromethane < 100 < 1 Trichloropropane < 100 < 1 Vinyl Chloride < 100 < 1 Trans-1,3-Dichloropropylene < 100 < 1 08/31/89 - 2 - [redacted] DATE REPORTED LABORATORY DIRECTOR
As listed on the current system
Question(s) Answered 38 (The Connecticut Light and Power Company) Date Filed: 10/20/2026