Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 38

Files5

Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Words on different pages

Scanned pages and machine-read text of RSR-038 Attachment 1 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 1 of 19 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Selden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 [redacted] April 13, 1988 D01928 Mr. Ronald Corey, Fire Marshall City of Torrington 111 Water Street Torrington, Connecticut 06790 Reference: Letter and Notification, [redacted] o R. Corey, dated May 8, 1986. Dear Mr. Corey: Torrington Area Work Center Notification of Underground Storage Tanks Northeast Utilities Service Company (NUSCO), as agent for the Connecticut Light and Power Company (CL&P), submits an amended Copy No. 2 of Notification Form EPHM-6 for underground storage tanks at CL&P's Torrington Area Work Center. The form submitted to you on May 8, 1986 (Referenced) has been amended to reflect the removal of all of the tanks (A1, B2, C3, D4) at the site. If you have any questions, please call [redacted] NUSCO Generation Facilities Licensing, at [redacted]. Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company [redacted] [redacted] Senior Vice President [redacted] By: C. F. Sears Vice President
  2. Scan of page 2 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 2 of 19 Mr. Ronald Corey, Fire Marshall DO1928/Page 2 April 13, 1988 Enclosure cc: w/enclosure (Copy 1) Mr. Scott Deshefy Hazardous Material's Management Unit Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106 Mr. Richard Ciasullo Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106
  3. Scan of page 3 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 3 of 19 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION | PG. 2 of 1 | SITE ID | FOR STATE AGENCY USE ONLY | A. SITE I.D. | B. DATE RCVD BY D E P | C. DATE ENTERED | D. GRID COORDINATES X Y | E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. EPHM-6 NEW 10/85 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SECTION A SECTION B
    4. LOCATION OF FACILITYSITE NAME: Torrington Area Work CenterNO. AND STREET: 174 Franklin StreetNEAREST INTERSECTING STREET: Horwinton Ave.CITY OR TOWN: TorringtonSTATE: CT5. LATITUDE: 41° 48' 00"LONGITUDE: 73° 06' 55"
    5. BUSINESS NAME AND 6. MAILING ADDRESSNAME: The Connecticut Light + Power Co. (CL4P)NO. AND STREET: P O Box 270CITY OR TOWN: HartfordSTATE: CTZIP CODE: 06141-0270
    7. FACILITY OWNERNAME: CL&PNO. AND STREET: Same as AboveCITY OR TOWNSTATEZIP CODE
    8. TYPE OF OWNERPRIVATE (checked)STATEMUNICIPALFEDERAL (G.S.A. No.)
    9. OPERATOR/CONTACT PERSON[redacted]NO. AND STREET: 174 Franklin StreetCITY OR TOWN: TorringtonSTATE: CTZIP CODE: 06790TELEPHONE: 1203 482-4471
    10. TANK ID11a. DATE OF INSTALLATION (Mo./Yr.)11b. LIFE EXPECTANCY (in years)12a. TOTAL CAPACITY (Gals.)IN USEABANDONED IN PLACE12b. STATUS EST. QUANTITY LEFT STORED (if any) (Gals.)REMOVEDDATE TANK LAST USED (Mo./Yr.)13. TYPE OF CONTENTS OIL/PETROLEUM PRODUCTCHEMICAL LIQUID14. CONTENTS CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No., if known)15. CONSTRUCTION MATERIALS STEELFIBERGLASS REINFORCED PLASTICOTHER (Specify from list A)c. INTERNAL UNLINEDb. EXTERNAL UNLINEDCATHODIC PROTECTIONCOATED/WRAPPEDCATHODIC PROTECTIONOTHER (Specify from list B)16. PROTECTION17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION AND PROTECTION (from list A/B)b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.)18. MONITORING SYSTEM (Specify type from list B)19. FAILURE DETERMINATION CONDUCTED? (if "YES", enter DATE and attach results; if "NO", enter "NO")
    Example5/75305000XXXH55/75UNO
    Example7/60-8000X8/78XXE77/60U-
    A112/781510,000X4/88XRegular GasolineXXE7E12/78O3-15-84
    B21/64154,000X3/88XDiesel FuelXXE7E1/64O3-15-84
    C31/64154,000X3/88XUnleaded GasolineXXE7E1/64O3-15-84
    D41/6015500X3/88XWaste OilXXE7E1/60UNO
    SECTION C 20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? [X] YES 21. COMMENTS: SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.
    22a. SIGNATUREX [redacted]
    22b. DATE SIGNED13 April 1988
    22c. NAME (type or print) [redacted] 22d. OFFICIAL TITLE | Vice President / Senior Vice President COPY 1: SEND TO DEP: 165 CAPITOL AVE. HARTFORD, CT 06106
  4. Scan of page 4 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 4 of 19 CONN LIGHT & POWER CO. NORTHEAST UTILITIES WORK ORDER SKETCH SHEET
    DISTRICT / REGIONTOWNDATEMAP NO.WORK ORDER NO.ACTV.SHEETOF
    TORRINGTON / WESTERNTORRINGTON
    SKETCH INDICATE NORTH AND NAME STREETS Not To Scale B2 A1 21' 140' 159' 177' 44' 275' 255' D4 C3 GARAGE TRANSMISSION TORRINGTON SERVICE BUILDING HARWINTON SCHIBI ST. AVE. OP418? REV. 10-82 DEST. SAME AS ATT. REC. DRAWN BY | TELEPHONE EXT.
  5. Scan of page 5 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 5 of 19 REDACTED TO: File FROM: John Szymanski [signature] April 14, 1988 SUBJECT: Torrington AWC Tank removals were conducted at the Torrington AWC during the months of March and April 1988. o During March 1988: One (1) 4000 gallon unleaded gasoline tank and One (1) 500 gallon oil tank were removed; no problems o On March 30, 1988: Notified that (1) 4000 gallon diesel tank was removed with heavy rusting and several apparent holes the size of dimes. o On March 30, 1988: Examined site and took three (3) samples from excavation hole and one (1) sample from diesel tank to have material analyzed and identified by LAB per request by DEP Field Inspector, Richard Ciasullo. o On March 31, 1988: Samples dropped off for analyzing and identification at Souther-Newlands Laboratory. o On April 4, 1988: Souther Newland Laboratory called EPD office to report on lab findings. - Sample from diesel tank identified as diesel fuel - The three (3) samples from the excavation hole all had the same characteristic profiles, but it didn't match that of gasoline or diesel fuel and that it would take two to three weeks to identify samples from the excavation hole. o On Aril 4, 1988: Notified R. Robinson of the DEP Clean Water Group of the test results and asked for permission to continue tank installation construction after film cleaned off top of water and remainder of gray colored gravel removed from hole. Mr. Robinson gave approval to continue construction if I inspected site and assured this was done. o On April 6, 1988: NUSCO construction removed film from water and lowered water table by sucking out 3200 gallons of contaminated water which was hauled off site as contaminated waste water. Removed the remainder of gray contaminated gravel from excavation hole. o On April 6, 1988 after water table lowered gasoline film and strong fumes entered the excavation hole. The fire marshal was notified, who requested DEP to inspect the hole. Concern was generated regarding 10,000 gallon unleaded gasoline tank in the same vicinity where gas fumes and film were found. Construction stopped. o On April 7, 1988: DEP Field Inspector Richard Ciasullo and
  6. Scan of page 6 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 6 of 19 Torrington Fire Marshal Ron Corey arrived on site and gave us two alternatives: 1. Test tank full of product and be ready to remove it immediately if tank leaks; 2. Remove 10,000 gallon unleaded tank. o April 7, 1988: Discussions were held between Area Superintendent Walt Wadman, Ken Busick, Frank Melluzzo, Bud Meyer, John Betz, Jack Farrel and John Szymanski to discuss options and make decision as to disposition of 10,000 gallon gasoline tank. Final consensus was to remove tank based on presence of gasoline odor and fumes in area, water level in tank raised when emptied of product, bottom ash found in vicinity of tank, tank had been unprotected for 10 years, the older unprotected tank 4000 diesel came out of ground looking like swiss cheese. o April 7, 1988: Removed 10,000 gallon unleaded gasoline tank, some heavy rusting and pitting visible on tank but there was no apparent holes. Backfill around tank was improper per today's installation standards (very large boulders, large gravel and some sand) there were no hold down straps on tank, and bottom ash in close proximity to tank. Wet lines were heavily rusted in one large area.
  7. Scan of page 7 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 7 of 19 REDACTED Distribution: [redacted]Claims and Insurance [redacted]s. and Test Department [redacted]Regional Operations - WMECO [redacted]struction [redacted]HP [redacted]rans. SS and Mtce. [redacted] Trans. Bldg. Eng. Design [redacted]nsportation [redacted] EPD [redacted]ores [redacted] EPD [redacted]cilities Management [redacted] Legal [redacted] Nuclear Prod. [redacted]en. Fac. Lic. Dept. bsl cc: [redacted]
  8. Scan of page 8 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 8 of 19 TORRINGTON AUG / CT Bemis / Laura Lionts leak lokator hunter ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] TEST RESULTS DATE OF TEST | 07-6-85 CONTRACT NUMBER
    CUSTOMERNortheast Utilities
    LOCATION – IDENTIFICATION NUMBERNAME
    ADDRESS178 Franklin DriveCITYTorringtonSTATEConn
    LEAK LOKATOR USE ONLYCONCL. CODE
    TEST RESULTS SUMMARY
    NO.SYSTEM PRODUCTTANK SIZE GALLONSDIA/MATLWATER INCHESLEAK LOKATOR RESULTS LEVEL INCHESALR GPHCONCLUSIONRECOMMENDATIONSTESTTANKSYS
    IINo Lead Tank #I400064/371 1/2"106".039Tight
    IINo Lead Tank #II400064/371 1/2"95".038Tight
    VIIRegular Lead1000096/3T1 1/2"113".038Tight
    OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTS
    NO.SYSTEM PRODUCTTYPE OF PUMP REMOTETYPE OF PUMP SUCTION# APPLIEDMINUTES APPLIEDPRODUCT LOSS CC'SPRODUCT LOSS GPHCONCLUSION/RESULT
    IINo Lead Tank I>✓DLPressure testtestX
    IINo Lead Tank II>✓170Pressure testtestX
    IIIRegular Leaded> Pump✓ Side[illegible][illegible]XXTight
    NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTS
    NO.SYSTEM PRODUCTTEST NO.TEST LEVEL (INCHES)CLOCK STARTDURATION HRS.-MIN.LEAK RATE CC/DIVLEAK RATE CC/MINTEMP COMP Δ°FTEMP COMP CC/MINABSOLUTE LEAK RATE CC/MINABSOLUTE LEAK RATE GPHCHECK TEST Y or N
    INo Lead Tank I1106"9:4531 min.39+25.95+.161+33.80-1.85-.039N
    IINo Lead Tank II195"7:5231 min.47+2.82+.636+6.37-2.44-.038N
    IIIRegular Leaded1142"11:4620 min.35+21.47+.65523.88-2.41-.038N
  9. Scan of page 9 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 9 of 19 REDACTED ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] Bemis | TORRINGTON AWG / CT Laura [illegible] leak lokator TEST RESULTS DATE OF TEST | 03-6-8? CONTRACT NUMBER CUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER
    ADDRESS 178 Franklin DriveNAME
    CITY TorringtonSTATE Con
    TEST RESULTS SUMMARY
    NO.SYSTEM PRODUCTTANK SIZE GALLONSDIA/MATLWATER INCHESLEAK LOKATOR RESULTS LEVEL INCHESALR GPHCONCLUSIONRECOMMENDATIONSLEAK LOKATOR USE ONLY CONCL. CODE TEST TANK SYS
    INO LEAD TANK I450064.371 1/2"166"-.029Tight
    IINO LEAD TANK II450064.371 1/2"95"-.038Tight
    IIIREGULAR LEADED1000096 x T1 1/2"115"-.026Tight
    OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTS
    NO.SYSTEM PRODUCTTYPE OF PUMP REMOTESUCTION# APPLIEDMINUTES APPLIEDPRODUCT LOSS CC'SPRODUCT LOSS GPHCONCLUSION/RESULT
    INO LEAD TANK I✓DODO[illegible]testX
    IINO LEAD TANK II✓testX
    IIIREGULAR LEADED✓✓110DueX
    IIIREGULAR LEADED✓ Pump✓[illegible][illegible][illegible][illegible]Tight
    NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTS
    NO.SYSTEM PRODUCTTEST NO.TEST LEVEL (INCHES)TIME CLOCK STARTTIME DURATION HRS.-MIN.LEAK RATE CC/DIVLEAK RATE CC/MINTEMPERATURE COMPENSATION Δ°FTEMPERATURE COMPENSATION CC/MINABSOLUTE LEAK RATE CC/MINABSOLUTE LEAK RATE GPHCHECK TEST Y or N
    INO LEAD TANK I1166"9:4531 min.39+25.95+.141+27.82-1.85-.029N
    IINO LEAD TANK II195"9:5235 min4.1712.08+.03616.37-2.44-.038N
    IIIREGULAR LEADED1114"9:4630 min-.37+21.17+.25523.66-2.41-.038N
    * LEVEL – INCHES FROM TANK BOTTOM TO TEST LEVEL ALR – ABSOLUTE LEAK RATE (MEASURED LEAK RATE – TEMPERATURE COMPENSATION) IN GALLONS PER HOUR CONCLUSION – NFPA 329 CRITERION OF ± 0.05 GPH IS USED TO CERTIFY TIGHTNESS CERTIFICATION This is to certify that the above described tank systems were tested, using the HUNTER ENVIRONMENTAL SERVICES, INC. LEAK LOKATOR according to all standard operating procedures. Those indicated as tight meet the criterion established by the National Fire Protection Association Pamphlet 329 for Precision Testing.
    TESTS CONDUCTED BYCERTIFIED BY
    TEST VAN NO. [illegible]SIGNATURE [illegible]
    TANK TESTING SPECIALIST [illegible]NAME [illegible]DATE [illegible]
    TANK TESTING SPECIALIST [illegible]TITLE [illegible]
  10. Scan of page 10 of 19 of RSR-038 Attachment 1 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 10 of 19 TANK AND LOCATION DATA DATE: 03-6-85
    CUSTOMER: Northeast UtilitiesCITY: Torrington
    I.D. #STATE: Conn
    WEATHERTIMETEMPERATURECOMMENTS
    BEFORE TEST –
    AFTER TEST –
    SCHEMATIC: Building PUMP NO LEAD II 4000gal 64" NO LEAD II 4000gal 64" NO LEAD PUMP VENT Regular PUMPS VENT Regular LEADED 10000gal 96" Building
    PRODUCT/TANK NO.NO LEAD INO LEAD IIRegular
    BEFORE DELIVERY LEVELFillGaugeFillGaugeFillGaugeFillGaugeFillGauge
    LEVELFull
    GALLONS
    WATER1½"1½"1½"
    TOP OF RISER9796101132
    GRADE160163162137
    DROP TUBEALALAL
    CAPACITY, GALLONS4000400010000
    DIAMETER, INCHES646464
    MATERIALSTEELSTEELSTEEL
    PUMP TYPEGasboy[illegible]Bennett
    TYPE OF COVERTANTANTAN
    AGE OF TANKUKUKUK
    SIPHONNONONO
    TANK OPENINGS1-4" 1-2"1-4" 1-2"1-4"
    EXTRACTORSNONONO
    VAPOR RECOVERY TYPE VENT CONFIGURATION P-V VENT VALVE TYPE
    REPLACEMENT PARTS: PART #DESCRIPTIONQUANTITYPRICE
    #701[illegible]1[illegible]
    #124[illegible]1[illegible]
    #6" Quick Tite 2-gauge (wire)1[illegible]
    ADDITIONAL CHARGES: (pumpovers, overtime, etc.) [illegible] [illegible] *Data obtained from ☐ Station ☐ LL Charts ☐ Other ______

Scanned pages and machine-read text of RSR-038 Attachment 2 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 1 of 1 of RSR-038 Attachment 2 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 2 REDACTED Page 1 of 1 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION
    2. PG.of
    11
    STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 556-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SITE I.D.
    3. FOR STATE AGENCY USE ONLYA. SITE I.D.
    B. DATE RCVD BY D.E.P.C. DATE ENTERED
    D. GRID COORDINATES X ___ Y ___E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO
    SECTION A/B
    4. LOCATION OF FACILITYSITE NAME: East Hampton Service CenterNO. AND STREET: 22 East High StreetNEAREST INTERSECTING STREET: Route 2CITY OR TOWN: East HamptonSTATE: CT5. LATITUDE: 41° 34' 56"LONGITUDE: 72° 30' 14"
    6. BUSINESS NAME AND MAILING ADDRESSNAME: The Connecticut Light & Power CompanyNO. AND STREET: P.O. Box 270CITY OR TOWN: HartfordSTATE: CTZIP CODE: 061410270
    7. FACILITY OWNERNAME: The Connecticut Light & Power CompanyNO. AND STREET: P.O. Box 270CITY OR TOWN: HartfordSTATE: CTZIP CODE: 061410270
    8. TYPE OF OWNERX PRIVATESTATEMUNICIPALFEDERAL (G.S.A. No. ___)
    9. OPERATOR/CONTACT PERSON[redacted]NO. AND STREET: 22 East High StreetCITY OR TOWN: East HamptonSTATE: CTZIP CODE: 06424
    [redacted] SECTION C
    10. TANK ID.11a. DATE OF INSTALLATION (Mo./Yr.)11b. TANK LIFE EXPECTANCY (# of years)12a. TOTAL CAPACITY (Gals.)12b. STATUS: IN USEABANDONED IN PLACEEST. QUANTITY LEFT STORED (if any) (Gals.)REMOVEDDATE TANK LAST USED (Mo./Yr.)13. TYPE OF CONTENTS: OIL/PETRO-LEUM PRODUCTCHEMICAL LIQUID14. CONTENTS: CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No. if known)15. CONSTRUCTION MATERIALS: STEELFIBERGLASS REINFORCED PLASTICOTHER (Specify from list A)16. PROTECTION a. INTERNAL: LINEDUNLINED; b. EXTERNAL: CATHODIC PROTECTIONCOATED/WRAPPEDCATHODIC PROTECTIONOTHER (Specify from list B)17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION PROTECTION (See list B)b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.)18. MONITORING SYSTEM (Specify type from list B)19. FAILURE DETERMINATION CONDUCTED? (If "YES," enter DATE and attach results. If "NO," enter "NO")
    Example5/75305000XXXXH55/75UNO
    Example7/60-8000X8/78XXXE77/60U—
    A1/7215275XXXXXH7/72H092584
    B2/721510000XXXX7/72O092684 (10-14-86 / 092684 struck through)
    C3'303010000X011/84XX8/80O092684
    D4'7215275XXXX7/72U092584
    E5,7215550XXXX7/72U092884
    P6,7215550XXXX7/72U092884
    20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? X YES 21. COMMENTS: 16b coal tar epoxy. Tanks B2, D4, E5 & F6 budgeted for cathodic protection in 1986. A1 is also for [illegible] [illegible] SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.
    22a. SIGNATUREX [redacted]22b. DATE SIGNED5/5/86
    22c. NAME (Type or Print)[redacted]
    22d. OFFICIAL TITLE (of owner or authorized representative)Senior Vice President
    COPY 4

Text of RSR-038 Attachment 3.pdf

Extracted from the file · 1 page · 146 characters

Scanned pages and machine-read text of RSR-038 Attachment 4 REDACTED.pdf

Read by machine
This document is a scan with no text in it. The text shown with each page was read from the image by machine (an AI model), not typed or checked by a person. It may contain errors, especially in numbers, dates and names, and a hard-to-read spot can come out as plausible but wrong text. Check the page image before relying on any figure. Open the original PDF (opens in a new tab)
  1. Scan of page 54 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 54 of 126 :P CHART FOR DATA RECORD: 90081556.A07 OF 5000 GALLON UNLEADED 2 TANK : Address: CL+P 135 NEW ROAD MADISON. CT. : Operator: BER < RATE AVG OF 30 CYCLES TANK TEMP @ START: 76.3 F 0.000662 DEN: 0.738 LFD: 6.0 Manifolding: None <----------------------- @ = 10.0F ------------------> AVG THREE <------------------------t = 0.1 F ------------------> LEAK STD GAL <----------------------- V = 0.1 gal ------------------> RATE DEV [illegible] END OF STRIP CHART DATA COLLECTED ON LEAK COMPUTER SN 88060161
  2. Scan of page 55 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 55 of 126 CATION
    2.PG.OF
    11
    STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 EPHM-6 NEW 10/85 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form.
    3. FOR STATE AGENCY USE ONLYA. SITE I.D.B. DATE RCVD BY D.E.PC. DATE ENTERED
    D. GRID COORDINATES X ___ Y ___E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO
    1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) [X] SITE ID.
    4. LOCATION OF FACILITYSITE NAMENO. AND STREETNEAREST INTERSECTING STREETCITY OR TOWNSTATELATITUDELONGITUDE
    Madison Regional Service Center105 New RdDick Hole RdMadisonCT
    6. BUSINESS NAME AND MAILING ADDRESSNAMENO. AND STREETCITY OR TOWNSTATEZIP CODETELEPHONE
    7. FACILITY OWNERNAME: The Connecticut Light & Power Co.NO. AND STREET: P.O. Box 270CITY OR TOWN: HartfordSTATE: CTZIP CODE: 06141-0270[redacted]
    8. TYPE OF OWNERPRIVATESTATEMUNICIPALFEDERAL (G.S.A. No. ___)
    9. OPERATOR/CONTACT PERSONNAME [redacted]NO. AND STREET: 105 New RdCITY OR TOWN: MadisonSTATE: CTZIP CODE: 06443TELEPHONE [redacted]
    10. TANK ID11a. DATE OF INSTALLATION (Mo./Yr.)11b. LIFE EXPECTANCY (# of years)12a. TOTAL CAPACITY (Gals.)IN USEABANDONED IN PLACE12b. STATUS EST. QUANTITY LEFT STORED (if any) (Gals.)REMOVEDDATE TANK LAST USED (Mo./Yr.)13. TYPE OF CONTENTS OIL/PETRO-LEUM PRODUCTCHEMICAL LIQUID14. CONTENTS CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No., If known)15. CONSTRUCTION MATERIALS STEELFIBERGLASS REINFORCED PLASTICOTHER (Specify from list A)a. INTERNAL LINEDUNLINED16. PROTECTION a. INTERNAL CATHODIC PROTECTIONCOATED/WRAPPEDb. EXTERNAL CATHODIC PROTECTIONOTHER (Specify from list B)17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION AND PROTECTION (See list A&B)b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.)MONITORING SYSTEM (Specify type from list B)DETERMINATION CONDUCTED? (If "YES", enter DATE and attach results. If "NO", enter "NO")
    Example5/75305000XXXXH55/75UNO
    Example7/60-8000X8/78XXXE77/60U-
    A1/7320550XXXXE8/73IONO
    B2/7330550XXXXE8/73IONO
    C3/73205000XXUNLEADED GASOLINEXXEA8C10/89IO9-15-90
    D4/73205000XXUNLEADED GASOLINEXXEA8C10/89IO7-?-90
    E5/73-10000X8/89XUNLEADED GASOLINEXXI
    F6/7320550XXWASTE OILXXE8/73INO
    G7/7320170XXHYDRAULIC OILXXEE8C/73RNO
    H8/73-1500X/89XDIESELNO
    20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? [X] YES 21. COMMENTS: All Tanks - 1&6-1&9 - Impressed Current System G7 Tank - Tank is Vaulted. 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted. 22a. SIGNATURE [redacted] 22b. DATE SIGNED Oct 16, 2010 22d. OFFICIAL TITLE (of owner or authorized representative) Vice President COPY 3: RETAIN FOR YOUR RECORDS
  3. Scan of page 56 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 56 of 126 FACILITY NOTIFICATION 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SITE I.D. UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. FOR STATE AGENCY USE ONLY B. DATE RCVD BY D.E.P | C. DATE ENTERED D. GRID COORDINATES X ___ Y ___ E. DOES FACILITY MEET NEW REQUIREMENTS? ☐ YES ☐ NO SECTION A
    4. LOCATION OF FACILITYSITE NAME: MADISON REGIONAL SERVICE CENTERNO. AND STREET: 135 NEW RDNEAREST INTERSECTING STREET: DUCK HOLE RDCITY OR TOWN: MADISONSTATE: CT5. LATITUDELONGITUDE
    6. BUSINESS NAME AND MAILING ADDRESSNAMENO. AND STREETCITY OR TOWNSTATEZIP CODETELEPHONE
    SECTION B
    7. FACILITY OWNERNAME: THE CONNECTICUT LIGHT & POWER CO.NO. AND STREET: P.O. BOX 270CITY OR TOWN: HARTFORDSTATE: CTZIP CODE: 06141-0270[redacted]
    8. TYPE OF OWNER☐ PRIVATE☐ STATE☐ MUNICIPAL☐ FEDERAL (G.S.A. No. ___)
    9. OPERATOR/CONTACT PERSONNAME: [redacted]NO. AND STREET: 135 NEW RDCITY OR TOWN: MADISONSTATE: CTZIP CODE: 06443
    SECTION C
    10. TANK ID11a. DATE OF INSTALLATION (Mo./Yr.)LIFE EXPECTANCY (# of years)TOTAL CAPACITY (Gals.)STATUS: IN USEABANDONED IN PLACEEST. QUANTITY LEFT STORED (if any.) (Gals.)REMOVEDDATE TANK LAST USED (Mo./Yr.)13. TYPE OF CONTENTS: OIL/PETROLEUM PRODUCTCHEMICAL LIQUID14. CONTENTS - CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No., if known)15. CONSTRUCTION MATERIALS: STEELFIBERGLASS REINFORCED PLASTICOTHER (Specify from list A)16. PROTECTION a. INTERNAL: LINEDUNLINEDCATHODIC PROTECTIONCOATED/WRAPPEDb. EXTERNAL: CATHODIC PROTECTIONOTHER (Specify from list B)17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION (see list A8)b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.)MONITORING SYSTEM (Specify type from list B)18. DETERMINATION CONDUCTED? (If "YES", enter DATE and attach results). (If "NO", enter "NO")
    Example5/75305000XXXH55/75UNO
    Heating fuel #2X (fiberglass)X (unlined)
    Example7/60–8000X8/78XXE77/60U–
    1,1,1 - Trichloroethane CAS #79016X (steel)X (unlined)
    A1/7330550XXXXE8/73IONO
    HYDRAULIC FLUID B2 | /73 | 30 | 550 | X | | | | X | | | X | | X | E | 8 | /73 | IO | NO MOTOR OIL C3 | /73 | 30 | 5000 | X | | | | X | | | X | | X | EA | 8C | 10/89 | IO | 8-15-90 UNLEADED GASOLINE D4 | /73 | 30 | 5000 | X | | | | X | | | X | | X | EA | 8C | 10/89 | IO | 7-24-90 UNLEADED GASOLINE E5 | /73 | – | 10000 | | | | X 8/89 | X | | | | | | | | | | UNLEADED GASOLINE F6 | /73 | 30 | 550 | X | | | | X | | | X | | X | E | 8 | /73 | I | NO WASTE OIL G7 | /73 | 30 | 170 | X | | | | X | | | X | | X | EF | 8C | /73 | R | NO HYDRAULIC OIL H8 | /73 | – | 1500 | | | | X /89 | X | | | | | | | | | | DIESEL SECTION D 20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? ☒ YES 21. COMMENTS: All Tanks - 16b+17a- Impressed Current System G7-16b- Tank is vaulted. 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted. [redacted] 22a. DATE SIGNED: Oct. 16, 1990 22d. OFFICIAL TITLE (of owner or authorized representative): Vice President COPY 1: SEND TO DEP: 165 CAPITOL AVE. HART[redacted]
  4. Scan of page 57 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is below it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 57 of 126 CONN LIGHT & POWER CO. NORTHEAST UTILITIES WORK ORDER SKETCH SHEET SHEET ___ OF___
    DISTRICT / REGIONTOWNDATEMAP NO.WORK ORDER NO.ACTV.
    MADISON / EASTERNMADISON
    SKETCH INDICATE NORTH AND NAME STREETS NOT TO SCALE DUCK HOLE RD. 857' H8 362' GEN. 850' 76' 811' 13' E5 D4 850' 5' 67' GARAGE G7 C3 42' 910' F6 B2 A1 11' 14' New Rd. OP4185 REV. 10-82 DEST. SAME AS ATT. REC. DRAWN BY | TELEPHONE EXT.
  5. Scan of page 58 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 58 of 126 PETRONICS INC. ENVIRONMENTAL MONITORING SERVICE 2019 JOHN FITCH BLVD. • SOUTH WINDSOR, CT 06074 [phone removed] TEST RESULTS Test Number: 900724 Test Date: July 24, 1990 Location: Northeast Utilities New Road Madison, CT
    GradeVolume (gal)Low Level Leak Rate (gal/hour)High Level Leak Rate (gal/hour)TankTank PipingProduct Lines
    Unleaded5,0000.010.01PASSPASSPASS
  6. Scan of page 59 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 59 of 126 RIP CHART FOR DATA RECORD: 90072449.A08 OF 5000 GALLON UNLEADED TANK st Address: CL+P NEW ROAD MADISON, CT. st Operator: BER AK RATE AVG OF 60 CYCLES TANK TEMP @ START: 75.9 F E: 0.000661 DEN: 0.733 LFD: 6.0 Manifolding: None <--------------------- @ = 10.0F -------------------> AVG THREE <----------------------t = 0.1 F ------------------> LEAK STD ME GAL <--------------------- V = 0.1 gal -----------------> RATE DEV [illegible] END OF STRIP CHART DATA COLLECTED ON LEAK COMPUTER SN 88060101
  7. Scan of page 60 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 60 of 126 PETRONICS INC. ENVIRONMENTAL MONITORING SERVICE 2019 JOHN FITCH BLVD. • SOUTH WIN [phone removed] cc: (Sent to:) [redacted] Connecticut Light & Power P.O. Box 5017 Hartford, CT 06102-5017 Attn: Mr. [redacted] RE: Test Number: 900815 Test Date: August 15, 1990 Location: Northeast Utilities 135 New Road Madison, CT August 17, 1990 Dear [redacted] A tank integrity test was performed on the storage tanks at the above location using the LEAK COMPUTER(R) Tank Test System. This test was performed in accordance with the precision test requirements of NFPA-329-87. The criteria for acceptable tank integrity allowed by this test procedure is based upon a leak rate detection limit of +/- 0.05 gallons per hour. The results of the test are given on the attached chart. This chart identifies the tank tested, the size of the tank, the leak rate levels and a pass/fail indicator. The pass/fail indication is shown for the tank; the tank piping (risers, vent lines, etc.); and product lines, if applicable. Also included for your review is a copy of the computer printout of the test data indicating the average leak rate and the confidence level. This information will be stored in a permanent file at our office should future verification be needed to confirm the tank integrity at the time of the test. Sincerely, Brian Reed Field Test Engineer Certification #A/P 011
  8. Scan of page 61 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED | d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 61 of 126 PETRONICS INC. ENVIRONMENTAL MONITORING SERVICE 2019 JOHN FITCH BLVD. • SOUTH WINDSOR, CT 06074 [phone removed] TEST RESULTS Test Number: 900815 Test Date: August 15, 1990 Location: Northeast Utilities 135 New Road Madison, CT
    GradeVolume (gal)Low Level Leak Rate (gal/hour)High Level Leak Rate (gal/hour)TankTank PipingProduct Lines
    UNLEADED TANK #250000.030.02PASSPASSPASS
  9. Scan of page 62 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 62 of 126 ?IP CHART FOR DATA RECORD: 90081556.A07 OF 5000 GALLON UNLEADED 2 TANK st Address: CL+P 135 NEW ROAD MADISON. CT. st Operator: BER ?AK RATE AVG OF 30 CYCLES TANK TEMP @ START: 76.3 F ?: 0.000662 DEN: 0.738 LFD: 6.0 Manifolding: None <------------------- @ = 10.0F ------------------> AVG THREE <--------------------t = 0.1 F -------------------> LEAK STD <-------------------- V = 0.1 gal -----------------> RATE DEV 1E GAL [illegible] END OF STRIP CHART DATA COLLECTED ON LEAK COMPUTER SN 88060101
  10. Scan of page 63 of 126 of RSR-038 Attachment 4 REDACTED.pdf. The machine-read text is beside it.
    The scanned page

    Machine-read text

    The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 63 of 126 15 FHEL CORRESPONDENCE SIGNOFF AND DISTRIBUTION FORM PLEASE HELP EXPEDITE - REVIEW PROMPTLY AND HAND CARRY TO NEXT PERSON FOR ASSISTANCE CALL EXTENSIONS 5296 OR 3056
    FACILITY: Madison Service CenterCODE: BGNLETTER NO: D 03980
    TITLE/SUBJECT: Amended UST NotificationAGENCY: Town
    SPECIAL INSTRUCTIONS:LETTER DATE:
    SIGNOFF/DISTRIBUTION Signoff indicates your written concurrence for your discipline with statements and commitments made in the attached documents.
    DSAPERSONSODISCIPLINELOC.EXTINIT.DATECOMMENTS
    J.H. GastlerGen. Env. Svcs.B3F34638
    R.P. KlattenbergFac. Env. Svcs.B3F34628
    R.C. NicholsEnviro. AuditB3F34645
    W.C. RenfroEnviro. Prog.B3F34620
    T.J. ButwillCivil HydraulicsN2065403
    D.R. WadeFH Programs EngngN2265460
    W.J. KornackiFH Improv. EngngN2263792
    R.N. SmartFH Eng. & Const.N2075362
    XRH PeishanXLegalE2173175RHP10/17
    R. de BrigardLand PlanningSBS6714
    N.J. LanzalottaProd. Opns. Svcs.W2395657
    Project Engineer
    Facility Mgr./Supt.
    C.A. EdgeFac. Opns. & EngngSBS6750
    P.C. RobothamTransportation33336677
    J. BarresiSupt. - CT&M33336662
    W.V. ReicheltSys. Supt. - FossilW2395467
    R.G. ChevalierSys. Supt. - HydroW2395064
    XJH SzymanskiXOriginator/LeadB3F34614Telecopy letter sent spray
    XCL KarlicXFHEL LeadW2183740CLK10-24-90
    R. OsellaXSupvsr - FHELW2185448RO10/24/90
    OTHER DISTRIBUTIONGFL CLERK INSTRUCTIONS
    XXFacilities FileGFL ClerkW218XORIGINAL AND ___ COPIES
    XJ HarringtonSBSNOTARY REQUIRED
    XJ BetzoTRBXATTACHMENTS (X in "A" Column)
    FEE CHECK
    FEDERAL EXPRESS
    REGISTERED MAIL
    TELECOPY
    COMMITMENT / ACTION TRACKING INFORMATION Full/Partial Response To: COTRAP # C_____ or FORCOM # F_____ DUE DATE:_____ Number of Calendar days in Advance (+) or Late (-) of Due Date_____
    Commitment NumberGFL LeadDiscipline LeadResponse DateDESCRIPTION
    ALL CORRESPONDENCE TOCOPY TO NUCLEAR LICENSINGREV. 3 5-25-90
    NPDES PERMITTING AGENCIES:SUPERVISOR FOR FORWARDING TO USNRC

As listed on the current system

Question(s) Answered 38 (The Connecticut Light and Power Company) Date Filed: 10/20/2026

This filing on the current system (opens in a new tab)