Interrogatory responses
Answers to questions 38
Files5
RSR-038_Final.pdf
PDF · 146 KB · 7 pagesText searchable
Download RSR-038_Final.pdfRead the text of RSR-038_Final.pdf
RSR-038 Attachment 1 REDACTED.pdf
PDF · 4.6 MB · 19 pagesText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 1 REDACTED.pdfScanned pages and text of RSR-038 Attachment 1 REDACTED.pdf
RSR-038 Attachment 2 REDACTED.pdf
PDF · 798 KB · 1 pageText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 2 REDACTED.pdfScanned pages and text of RSR-038 Attachment 2 REDACTED.pdf
RSR-038 Attachment 3.pdf
PDF · 502 KB · 1 pageText searchable
Download RSR-038 Attachment 3.pdfRead the text of RSR-038 Attachment 3.pdf
RSR-038 Attachment 4 REDACTED.pdf
PDF · 51 MB · 126 pagesText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 4 REDACTED.pdfScanned pages and text of RSR-038 Attachment 4 REDACTED.pdf
Scanned pages and machine-read text of RSR-038 Attachment 1 REDACTED.pdf

The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 1 of 19 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Selden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 [redacted] April 13, 1988 D01928 Mr. Ronald Corey, Fire Marshall City of Torrington 111 Water Street Torrington, Connecticut 06790 Reference: Letter and Notification, [redacted] o R. Corey, dated May 8, 1986. Dear Mr. Corey: Torrington Area Work Center Notification of Underground Storage Tanks Northeast Utilities Service Company (NUSCO), as agent for the Connecticut Light and Power Company (CL&P), submits an amended Copy No. 2 of Notification Form EPHM-6 for underground storage tanks at CL&P's Torrington Area Work Center. The form submitted to you on May 8, 1986 (Referenced) has been amended to reflect the removal of all of the tanks (A1, B2, C3, D4) at the site. If you have any questions, please call [redacted] NUSCO Generation Facilities Licensing, at [redacted]. Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company [redacted] [redacted] Senior Vice President [redacted] By: C. F. Sears Vice President
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 2 of 19 Mr. Ronald Corey, Fire Marshall DO1928/Page 2 April 13, 1988 Enclosure cc: w/enclosure (Copy 1) Mr. Scott Deshefy Hazardous Material's Management Unit Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106 Mr. Richard Ciasullo Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 3 of 19 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION | PG. 2 of 1 | SITE ID | FOR STATE AGENCY USE ONLY | A. SITE I.D. | B. DATE RCVD BY D E P | C. DATE ENTERED | D. GRID COORDINATES X Y | E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. EPHM-6 NEW 10/85 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SECTION A SECTION B
SECTION C 20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? [X] YES 21. COMMENTS: SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.4. LOCATION OF FACILITY SITE NAME: Torrington Area Work Center NO. AND STREET: 174 Franklin Street NEAREST INTERSECTING STREET: Horwinton Ave. CITY OR TOWN: Torrington STATE: CT 5. LATITUDE: 41° 48' 00" LONGITUDE: 73° 06' 55" 5. BUSINESS NAME AND 6. MAILING ADDRESS NAME: The Connecticut Light + Power Co. (CL4P) NO. AND STREET: P O Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 06141-0270 7. FACILITY OWNER NAME: CL&P NO. AND STREET: Same as Above CITY OR TOWN STATE ZIP CODE 8. TYPE OF OWNER PRIVATE (checked) STATE MUNICIPAL FEDERAL (G.S.A. No.) 9. OPERATOR/CONTACT PERSON [redacted] NO. AND STREET: 174 Franklin Street CITY OR TOWN: Torrington STATE: CT ZIP CODE: 06790 TELEPHONE: 1203 482-4471 10. TANK ID 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. LIFE EXPECTANCY (in years) 12a. TOTAL CAPACITY (Gals.) IN USE ABANDONED IN PLACE 12b. STATUS EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS OIL/PETROLEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No., if known) 15. CONSTRUCTION MATERIALS STEEL FIBERGLASS REINFORCED PLASTIC OTHER (Specify from list A) c. INTERNAL UNLINED b. EXTERNAL UNLINED CATHODIC PROTECTION COATED/WRAPPED CATHODIC PROTECTION OTHER (Specify from list B) 16. PROTECTION 17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION AND PROTECTION (from list A/B) b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (if "YES", enter DATE and attach results; if "NO", enter "NO") Example 5/75 30 5000 X X X H 5 5/75 U NO Example 7/60 - 8000 X 8/78 X X E 7 7/60 U - A1 12/78 15 10,000 X 4/88 X Regular Gasoline X X E 7E 12/78 O 3-15-84 B2 1/64 15 4,000 X 3/88 X Diesel Fuel X X E 7E 1/64 O 3-15-84 C3 1/64 15 4,000 X 3/88 X Unleaded Gasoline X X E 7E 1/64 O 3-15-84 D4 1/60 15 500 X 3/88 X Waste Oil X X E 7E 1/60 U NO
22c. NAME (type or print) [redacted] 22d. OFFICIAL TITLE | Vice President / Senior Vice President COPY 1: SEND TO DEP: 165 CAPITOL AVE. HARTFORD, CT 0610622a. SIGNATURE X [redacted] 22b. DATE SIGNED 13 April 1988 
The scanned page Machine-read text
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 4 of 19 CONN LIGHT & POWER CO. NORTHEAST UTILITIES WORK ORDER SKETCH SHEET
SKETCH INDICATE NORTH AND NAME STREETS Not To Scale B2 A1 21' 140' 159' 177' 44' 275' 255' D4 C3 GARAGE TRANSMISSION TORRINGTON SERVICE BUILDING HARWINTON SCHIBI ST. AVE. OP418? REV. 10-82 DEST. SAME AS ATT. REC. DRAWN BY | TELEPHONE EXT.DISTRICT / REGION TOWN DATE MAP NO. WORK ORDER NO. ACTV. SHEET OF TORRINGTON / WESTERN TORRINGTON 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 5 of 19 REDACTED TO: File FROM: John Szymanski [signature] April 14, 1988 SUBJECT: Torrington AWC Tank removals were conducted at the Torrington AWC during the months of March and April 1988. o During March 1988: One (1) 4000 gallon unleaded gasoline tank and One (1) 500 gallon oil tank were removed; no problems o On March 30, 1988: Notified that (1) 4000 gallon diesel tank was removed with heavy rusting and several apparent holes the size of dimes. o On March 30, 1988: Examined site and took three (3) samples from excavation hole and one (1) sample from diesel tank to have material analyzed and identified by LAB per request by DEP Field Inspector, Richard Ciasullo. o On March 31, 1988: Samples dropped off for analyzing and identification at Souther-Newlands Laboratory. o On April 4, 1988: Souther Newland Laboratory called EPD office to report on lab findings. - Sample from diesel tank identified as diesel fuel - The three (3) samples from the excavation hole all had the same characteristic profiles, but it didn't match that of gasoline or diesel fuel and that it would take two to three weeks to identify samples from the excavation hole. o On Aril 4, 1988: Notified R. Robinson of the DEP Clean Water Group of the test results and asked for permission to continue tank installation construction after film cleaned off top of water and remainder of gray colored gravel removed from hole. Mr. Robinson gave approval to continue construction if I inspected site and assured this was done. o On April 6, 1988: NUSCO construction removed film from water and lowered water table by sucking out 3200 gallons of contaminated water which was hauled off site as contaminated waste water. Removed the remainder of gray contaminated gravel from excavation hole. o On April 6, 1988 after water table lowered gasoline film and strong fumes entered the excavation hole. The fire marshal was notified, who requested DEP to inspect the hole. Concern was generated regarding 10,000 gallon unleaded gasoline tank in the same vicinity where gas fumes and film were found. Construction stopped. o On April 7, 1988: DEP Field Inspector Richard Ciasullo and
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 6 of 19 Torrington Fire Marshal Ron Corey arrived on site and gave us two alternatives: 1. Test tank full of product and be ready to remove it immediately if tank leaks; 2. Remove 10,000 gallon unleaded tank. o April 7, 1988: Discussions were held between Area Superintendent Walt Wadman, Ken Busick, Frank Melluzzo, Bud Meyer, John Betz, Jack Farrel and John Szymanski to discuss options and make decision as to disposition of 10,000 gallon gasoline tank. Final consensus was to remove tank based on presence of gasoline odor and fumes in area, water level in tank raised when emptied of product, bottom ash found in vicinity of tank, tank had been unprotected for 10 years, the older unprotected tank 4000 diesel came out of ground looking like swiss cheese. o April 7, 1988: Removed 10,000 gallon unleaded gasoline tank, some heavy rusting and pitting visible on tank but there was no apparent holes. Backfill around tank was improper per today's installation standards (very large boulders, large gravel and some sand) there were no hold down straps on tank, and bottom ash in close proximity to tank. Wet lines were heavily rusted in one large area.
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 7 of 19 REDACTED Distribution: [redacted]Claims and Insurance [redacted]s. and Test Department [redacted]Regional Operations - WMECO [redacted]struction [redacted]HP [redacted]rans. SS and Mtce. [redacted] Trans. Bldg. Eng. Design [redacted]nsportation [redacted] EPD [redacted]ores [redacted] EPD [redacted]cilities Management [redacted] Legal [redacted] Nuclear Prod. [redacted]en. Fac. Lic. Dept. bsl cc: [redacted]
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 8 of 19 TORRINGTON AUG / CT Bemis / Laura Lionts leak lokator hunter ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] TEST RESULTS DATE OF TEST | 07-6-85 CONTRACT NUMBER
TEST RESULTS SUMMARYCUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER NAME ADDRESS 178 Franklin Drive CITY Torrington STATE Conn LEAK LOKATOR USE ONLY CONCL. CODE
OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTSNO. SYSTEM PRODUCT TANK SIZE GALLONS DIA/MATL WATER INCHES LEAK LOKATOR RESULTS LEVEL INCHES ALR GPH CONCLUSION RECOMMENDATIONS TEST TANK SYS II No Lead Tank #I 4000 64/37 1 1/2" 106" .039 Tight II No Lead Tank #II 4000 64/37 1 1/2" 95" .038 Tight VII Regular Lead 10000 96/3T 1 1/2" 113" .038 Tight
NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTSNO. SYSTEM PRODUCT TYPE OF PUMP REMOTE TYPE OF PUMP SUCTION # APPLIED MINUTES APPLIED PRODUCT LOSS CC'S PRODUCT LOSS GPH CONCLUSION/RESULT II No Lead Tank I > ✓ DL Pressure test test X II No Lead Tank II > ✓ 170 Pressure test test X III Regular Leaded > Pump ✓ Side [illegible] [illegible] X X Tight NO. SYSTEM PRODUCT TEST NO. TEST LEVEL (INCHES) CLOCK START DURATION HRS.-MIN. LEAK RATE CC/DIV LEAK RATE CC/MIN TEMP COMP Δ°F TEMP COMP CC/MIN ABSOLUTE LEAK RATE CC/MIN ABSOLUTE LEAK RATE GPH CHECK TEST Y or N I No Lead Tank I 1 106" 9:45 31 min .39 +25.95 +.161 +33.80 -1.85 -.039 N II No Lead Tank II 1 95" 7:52 31 min .47 +2.82 +.636 +6.37 -2.44 -.038 N III Regular Leaded 1 142" 11:46 20 min .35 +21.47 +.655 23.88 -2.41 -.038 N 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 9 of 19 REDACTED ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] Bemis | TORRINGTON AWG / CT Laura [illegible] leak lokator TEST RESULTS DATE OF TEST | 03-6-8? CONTRACT NUMBER CUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER
TEST RESULTS SUMMARYADDRESS 178 Franklin Drive NAME CITY Torrington STATE Con
OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTSNO. SYSTEM PRODUCT TANK SIZE GALLONS DIA/MATL WATER INCHES LEAK LOKATOR RESULTS LEVEL INCHES ALR GPH CONCLUSION RECOMMENDATIONS LEAK LOKATOR USE ONLY CONCL. CODE TEST TANK SYS I NO LEAD TANK I 4500 64.37 1 1/2" 166" -.029 Tight II NO LEAD TANK II 4500 64.37 1 1/2" 95" -.038 Tight III REGULAR LEADED 10000 96 x T 1 1/2" 115" -.026 Tight
NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTSNO. SYSTEM PRODUCT TYPE OF PUMP REMOTE SUCTION # APPLIED MINUTES APPLIED PRODUCT LOSS CC'S PRODUCT LOSS GPH CONCLUSION/RESULT I NO LEAD TANK I ✓ DO DO [illegible] test X II NO LEAD TANK II ✓ test X III REGULAR LEADED ✓ ✓ 110 Due X III REGULAR LEADED ✓ Pump ✓ [illegible] [illegible] [illegible] [illegible] Tight
* LEVEL – INCHES FROM TANK BOTTOM TO TEST LEVEL ALR – ABSOLUTE LEAK RATE (MEASURED LEAK RATE – TEMPERATURE COMPENSATION) IN GALLONS PER HOUR CONCLUSION – NFPA 329 CRITERION OF ± 0.05 GPH IS USED TO CERTIFY TIGHTNESS CERTIFICATION This is to certify that the above described tank systems were tested, using the HUNTER ENVIRONMENTAL SERVICES, INC. LEAK LOKATOR according to all standard operating procedures. Those indicated as tight meet the criterion established by the National Fire Protection Association Pamphlet 329 for Precision Testing.NO. SYSTEM PRODUCT TEST NO. TEST LEVEL (INCHES) TIME CLOCK START TIME DURATION HRS.-MIN. LEAK RATE CC/DIV LEAK RATE CC/MIN TEMPERATURE COMPENSATION Δ°F TEMPERATURE COMPENSATION CC/MIN ABSOLUTE LEAK RATE CC/MIN ABSOLUTE LEAK RATE GPH CHECK TEST Y or N I NO LEAD TANK I 1 166" 9:45 31 min .39 +25.95 +.141 +27.82 -1.85 -.029 N II NO LEAD TANK II 1 95" 9:52 35 min 4.17 12.08 +.036 16.37 -2.44 -.038 N III REGULAR LEADED 1 114" 9:46 30 min -.37 +21.17 +.255 23.66 -2.41 -.038 N TESTS CONDUCTED BY CERTIFIED BY TEST VAN NO. [illegible] SIGNATURE [illegible] TANK TESTING SPECIALIST [illegible] NAME [illegible] DATE [illegible] TANK TESTING SPECIALIST [illegible] TITLE [illegible] 
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 10 of 19 TANK AND LOCATION DATA DATE: 03-6-85
SCHEMATIC: Building PUMP NO LEAD II 4000gal 64" NO LEAD II 4000gal 64" NO LEAD PUMP VENT Regular PUMPS VENT Regular LEADED 10000gal 96" BuildingCUSTOMER: Northeast Utilities CITY: Torrington I.D. # STATE: Conn WEATHER TIME TEMPERATURE COMMENTS BEFORE TEST – AFTER TEST –
VAPOR RECOVERY TYPE VENT CONFIGURATION P-V VENT VALVE TYPEPRODUCT/TANK NO. NO LEAD I NO LEAD II Regular BEFORE DELIVERY LEVEL Fill Gauge Fill Gauge Fill Gauge Fill Gauge Fill Gauge LEVEL Full GALLONS WATER 1½" 1½" 1½" TOP OF RISER 97 96 101 132 GRADE 160 163 162 137 DROP TUBE AL AL AL CAPACITY, GALLONS 4000 4000 10000 DIAMETER, INCHES 64 64 64 MATERIAL STEEL STEEL STEEL PUMP TYPE Gasboy [illegible] Bennett TYPE OF COVER TAN TAN TAN AGE OF TANK UK UK UK SIPHON NO NO NO TANK OPENINGS 1-4" 1-2" 1-4" 1-2" 1-4" EXTRACTORS NO NO NO
ADDITIONAL CHARGES: (pumpovers, overtime, etc.) [illegible] [illegible] *Data obtained from ☐ Station ☐ LL Charts ☐ Other ______REPLACEMENT PARTS: PART # DESCRIPTION QUANTITY PRICE #701 [illegible] 1 [illegible] #124 [illegible] 1 [illegible] # 6" Quick Tite 2-gauge (wire) 1 [illegible]
Scanned pages and machine-read text of RSR-038 Attachment 2 REDACTED.pdf

The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 2 REDACTED Page 1 of 1 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION
STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 556-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SITE I.D.2. PG. of 1 1
SECTION A/B3. FOR STATE AGENCY USE ONLY A. SITE I.D. B. DATE RCVD BY D.E.P. C. DATE ENTERED D. GRID COORDINATES X ___ Y ___ E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO
[redacted] SECTION C4. LOCATION OF FACILITY SITE NAME: East Hampton Service Center NO. AND STREET: 22 East High Street NEAREST INTERSECTING STREET: Route 2 CITY OR TOWN: East Hampton STATE: CT 5. LATITUDE: 41° 34' 56" LONGITUDE: 72° 30' 14" 6. BUSINESS NAME AND MAILING ADDRESS NAME: The Connecticut Light & Power Company NO. AND STREET: P.O. Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 061410270 7. FACILITY OWNER NAME: The Connecticut Light & Power Company NO. AND STREET: P.O. Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 061410270 8. TYPE OF OWNER X PRIVATE STATE MUNICIPAL FEDERAL (G.S.A. No. ___) 9. OPERATOR/CONTACT PERSON [redacted] NO. AND STREET: 22 East High Street CITY OR TOWN: East Hampton STATE: CT ZIP CODE: 06424
20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? X YES 21. COMMENTS: 16b coal tar epoxy. Tanks B2, D4, E5 & F6 budgeted for cathodic protection in 1986. A1 is also for [illegible] [illegible] SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.10. TANK ID. 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. TANK LIFE EXPECTANCY (# of years) 12a. TOTAL CAPACITY (Gals.) 12b. STATUS: IN USE ABANDONED IN PLACE EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS: OIL/PETRO-LEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS: CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No. if known) 15. CONSTRUCTION MATERIALS: STEEL FIBERGLASS REINFORCED PLASTIC OTHER (Specify from list A) 16. PROTECTION a. INTERNAL: LINED UNLINED; b. EXTERNAL: CATHODIC PROTECTION COATED/WRAPPED CATHODIC PROTECTION OTHER (Specify from list B) 17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION PROTECTION (See list B) b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (If "YES," enter DATE and attach results. If "NO," enter "NO") Example 5/75 30 5000 X X X X H 5 5/75 U NO Example 7/60 - 8000 X 8/78 X X X E 7 7/60 U — A1 /72 15 275 X X X X X H 7 /72 H 092584 B2 /72 15 10000 X X X X 7 /72 O 092684 (10-14-86 / 092684 struck through) C3 '30 30 10000 X 0 11/84 X X 8 /80 O 092684 D4 '72 15 275 X X X X 7 /72 U 092584 E5 ,72 15 550 X X X X 7 /72 U 092884 P6 ,72 15 550 X X X X 7 /72 U 092884
COPY 422a. SIGNATURE X [redacted] 22b. DATE SIGNED 5/5/86 22c. NAME (Type or Print) [redacted] 22d. OFFICIAL TITLE (of owner or authorized representative) Senior Vice President
Text of RSR-038 Attachment 3.pdf
Extracted from the file · 1 page · 146 characters
Scanned pages and machine-read text of RSR-038 Attachment 4 REDACTED.pdf
Page 82 of 126
Full-size scan of page 82 (opens in a new tab)In the PDF: page 82 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 82 of 126 21 ED2125 REV. 11-84 TELEPHONE MEMORANDUM
TELEPHONE CONVERSATION PARTICIPANTSPROJECT ROUTING Madison AWC : UST Release [redacted] CALL DATE TIME AM / PM INCOMING / OUTGOING 12-4-91 3:15 AM / X PM [ ] INCOMING / [X] OUTGOING
Called Mark DeCaprio, Conn. DEP Spill Group to update him on the status of the Madison Release project. I informed Mark, that the helium Testing Conducted on Monday 12-2-91 indicated that there is no leakage sources in the two (2) 5000gal Gastanks (USTs) at the site. I told him that we (NU) were investigating the possibility of either surface spillage or spillage during tank filling processes. Mark was informed regarding: (1) additional Monitoring Wells being installed Friday Dec. 6, 1991 – He requested a verbal report on Friday and he may request split Spoon Sampl[e] based on info recieved from Drill filling decriptions. (2) V-droot System being installed Next Wk. (Week of 12-9-91). (3) Tank Calibration work to generate tank charts Dec. 16th or 17th. (4) Tank Testing Dec. 17th or Dec. 18th – Mark requested to review inventory records when he comes to site to look at Tank Testing (Precis[ion] Hydrostatic Test by Outside Vendor).NAME COMPANY NAME Mark DeCaprio Oil & Chemical Spills Group Conn. DEP [redacted] [redacted] CALL REPORTER'S NAME: [redacted] NU Environmental Programs Dept. DATE 12-4-91 cc: Chronological File SUMMARY Page 83 of 126
Full-size scan of page 83 (opens in a new tab)In the PDF: page 83 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 83 of 126 22 GEL CORRESPONDENCE SIGNOFF AND DISTRIBUTION FORM PLEASE HELP EXPEDITE - REVIEW PROMPTLY AND HAND CARRY TO NEXT PERSON FOR ASSISTANCE CALL EXTENSIONS 5296 OR 3056
SIGNOFF/DISTRIBUTION Signoff indicates your written concurrence for your discipline with statements and commitments made in the attached documents.FACILITY: Madison CODE: BGN LETTER NO: D05094 TITLE/SUBJECT: Amended UST Notification AGENCY: CDP SPECIAL INSTRUCTIONS: LETTER DATE: 12-10-91
COMMITMENT / ACTION TRACKING INFORMATION Full/Partial Response To: COTRAP # C_____ or FORCOM # F_____ DUE DATE: _____ Number of Calendar days in Advance (+) or Late (-) of Due Date_____ Commitment Number | GEL Lead | Discipline Lead | Response Date | DESCRIPTION REV. 5 7-91DS A PERSON SO DISCIPLINE LOC. EXT INIT. DATE COMMENTS R.P. Klattenberg X Enviro. Svcs. B3F3 4628 ✓ Sat 12-5 R.C. Nichols Enviro. Audit B3F3 4645 W.C. Renfro Enviro. Prog. B3F3 4620 T.J. Butwill Civil Hydraulics N206 5403 D.R. Wade FH Programs Engng N226 5460 W.J. Kornacki FH Improv. Engng N226 3792 R.N. Smart FH Eng. & Const. N207 5362 XX X RHPershon X Legal E217 3175 Dsp 12/4/91 Land Planning SBS N.J. Lanzalotta Prod. Opns. Svcs. W239 5657 Project Engineer Facility Mgr./Supt. XX C.A. Edge Fac. Opns. & Engng SBS 6750 P.C. Robotham Transportation 3333 6677 J. Barresi Supt. - CT&M 3333 6662 W.V. Reichelt Sys. Supt. - Fossil W239 5467 R.G. Chevalier Sys. Supt. - Hydro W239 5064 X X Szymanski X Originator/Lead B3F3 4614 ✓ CKS 10-4-91 X X Chatlic Smith X GEL Lead W218 5340 X Supvsr - NL W218 R. Osella X Supvsr - GEL W218 5448 12-9-91 NRC ☐ Yes ☐ No OTHER DISTRIBUTION GEL CLERK INSTRUCTIONS X X Facilities File GEL Clerk W218 X ORIGINAL AND ___ COPIES X X T. Beltz Test Build. NOTARY REQUIRED X X S. Martin Madison X ATTACHMENTS (X in "A" Column) FEE CHECK FEDERAL EXPRESS REGISTERED MAIL TELECOPY Page 84 of 126
Full-size scan of page 84 (opens in a new tab)In the PDF: page 84 (opens in a new tab)
The scanned page Machine-read text
* DEC-* 5-91 THU 13:03 | GEN. FACIL. LICENSING | FAX NO. 2036665890 | P. 02 The Connecticut Light and Power Company REDACTED | d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 84 of 126 GEL CORRESPONDENCE SIGNOFF AND DISTRIBUTION FORM PLEASE HELP EXPEDITE - REVIEW PROMPTLY AND HAND CARRY TO NEXT PERSON FOR ASSISTANCE CALL EXTENSIONS 5296 OR 3056
SIGNOFF/DISTRIBUTION Signoff indicates your written concurrence for your discipline with statements and commitments made in the attached documents.FACILITY: Madison CODE: BGN LETTER NO: DO5094 TITLE/SUBJECT: Amended UST Notification AGENCY: CDP SPECIAL INSTRUCTIONS: LETTER DATE:
NRC ☐ Yes ☐ NoDS A PERSON SO DISCIPLINE LOC. EXT INIT. DATE COMMENTS R.P. Klattenberg X Enviro. Svcs. B3F3 4628 RPK 12-5-91 R.C. Nichols Enviro. Audit B3F3 4645 W.C. Renfro Enviro. Prog. B3F3 4620 T.J. Butwill Civil Hydraulics N206 5403 D.R. Wade FH Programs Engng N226 5460 W.J. Kornacki FH Improv. Engng N226 3792 R.N. Smart FH Eng. & Const. N207 5362 RHPershan X Legal E217 3725 PRP 12/4/91 Land Planning SBS N.J. Lanzalotta Prod. Opns. Svcs. W239 5657 Project Engineer Facility Mgr./Supt. X X C.A. Edge Fac. Opns. & Engng SBS 6750 P.C. Robotham Transportation 3333 6677 J. Barresi Supt. - CT&M 3333 6662 W.V. Reichelt Sys. Supt. - Fossil W239 5467 R.G. Chevalier Sys. Supt. - Hydro W239 5064 X JTszymanski X Originator/Lead B3F3 4614 [signature] 12-5-91 X Chaillic Smith X GEL Lead W218 5340 CLS 12-5-91 X Supvsr - NL W218 R. Osella X Supvsr - GEL W218 5448
COMMITMENT / ACTION TRACKING INFORMATION Full/Partial Response To: COTRAP # C_______ or PORCOM # F_______ DUE DATE:_______ Number of Calendar days in Advance (+) or Late (-) of Due Date_______ Commitment Number | GEL Lead | Discipline Lead | Response Date | DESCRIPTION REV. 5 7-91OTHER DISTRIBUTION GEL CLERK INSTRUCTIONS X X Facilities File GEL Clerk W218 X ORIGINAL AND ___ COPIES X X T. Betz Test Build. NOTARY REQUIRED X X S. Martin Madison X ATTACHMENTS (X in "A" Column) FEE CHECK FEDERAL EXPRESS REGISTERED MAIL TELECOPY Page 85 of 126
Full-size scan of page 85 (opens in a new tab)In the PDF: page 85 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 85 of 126 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Selden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 [redacted] December 10, 1991 D05094 UST Coordinator Department of Environmental Protection 165 Capitol Avenue Hartford, CT 06106 Reference: Letter and Notification (D03879), [redacted] dated October 16, 1990. Dear Sir or Madam: Madison Service Center Amended UST Notification Northeast Utilities Service Company (NUSCO), as agent for The Connecticut Light and Power Company (CL&P), submits an amended Underground Storage Facility Notification for CL&P's Madison Service Center. This notification supersedes the notification submitted on October 16, 1990 (referenced). The following changes have been made: o Removal of Tank A1, 550-gallon hydraulic fluid UST o Removal of Tank B2, 550-gallon motor oil UST o Removal of Tank F6, 550-gallon waste oil UST If you have any questions, please call Ms. Cynthia Karlic-Smith, NUSCO Generation and Environmental Licensing, at 665-3740. Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company FOR: [redacted] Vice President BY: [redacted] Vice President cc w/Copy No. 2: Mr. Arthur W. Cunningham Town Hall 8 Meeting House Lane Madison, CT 06443Page 86 of 126
Full-size scan of page 86 (opens in a new tab)In the PDF: page 86 (opens in a new tab)
The scanned page Machine-read text
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 86 of 126 UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. FACILITY NOTIFICATION 1a. FIRST NOTIFICATION OR SUBSEQUENT NOTIFICATION | (If checked, enter No.) SITE I.D. 3. FOR STATE AGENCY USE ONLY A. SITE I.D.
SECTION A/BB. DATE RCVD BY D.E.P. C. DATE ENTERED D. GRID COORDINATES X Y E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO
SECTION C (TANK TABLE)4. LOCATION OF FACILITY SITE NAME: MADISON REGIONAL SERVICE CTR NO. AND STREET: 135 NEW RD NEAREST INTERSECTING STREET: DUCK HOLE RD CITY OR TOWN: MADISON STATE: CT S. LATITUDE LONGITUDE TELEPHONE 5. BUSINESS NAME AND 6. MAILING ADDRESS NAME NO. AND STREET CITY OR TOWN STATE ZIP CODE TELEPHONE 7. FACILITY OWNER NAME: THE CONNECTICUT LIGHT + POWER CO. NO. AND STREET: P.O. Box 270 CITY OR TOWN: HARTFORD STATE: CT ZIP CODE: 06141-0270 [redacted] 8. TYPE OF OWNER PRIVATE STATE MUNICIPAL FEDERAL (G.S.A. No. ____) 9. OPERATOR/CONTACT PERSON NAME NO. AND STREET CITY OR TOWN STATE ZIP CODE TELEPHONE [redacted]
20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? ☐ YES 21. COMMENTS: All tanks - 16b + 17a - Impressed current system G7 - 16b - Tank is vaulted 22. CERTIFICATION: [certification text, not fully legible at this resolution] | 22a. SIGNATURE [redacted] | 22b. DATE SIGNED 12-10-91 | 22d. OFFICIAL TITLE (of owner or authorized representative): Vice President COPY 1: SEND TO DEP: 165 CAPITOL AVE. HARTFORD, CT 0610610. TANK ID. 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. LIFE EXPECTANCY (# of years) 12a. TOTAL CAPACITY (Gals.) 12b. STATUS: IN USE ABANDONED IN PLACE EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS: OIL/PETRO-LEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS: CHEMICAL NAME OF PRINCIPAL SUBSTANCE (Enter C.A.S. No., if known) 15. CONSTRUCTION MATERIALS: a. STEEL FIBERGLASS REINFORCED PLASTIC OTHER (Specify) b. INTERNAL: LINED UNLINED 16. PROTECTION: a. INTERNAL: CATHODIC PROTECTION COATED/WRAPPED CATHODIC PROTECTION OTHER (Specify) b. EXTERNAL 17. INTEGRAL PIPING SYSTEM: a. CONSTRUCTION PROTECTION b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (If "YES", enter DATE and attach results. If "NO", enter "NO") Example 5/75 30 5000 X X Heating fuel #2 X X H 3 H 5/75 U NO Example 7/60 - 8000 X 8/78 X 1, 1, 1 - Trichloroethane CAS #79016 X X E 7 W 7/60 U — A1 /73 - 550 X 11/91 X HYDRAULIC FLUID B2 /73 - 550 X 11/91 X MOTOR OIL C3 /73 30 5000 X X UNLEADED GASOLINE X X X E A 8 W C 10/89 I,O 8-15-90 D4 /73 30 5000 X X UNLEADED GASOLINE X X X E A 8 W C 10/89 I,O 7-24-90 E5 /73 - 10000 X 8/89 X UNLEADED GASOLINE F6 /73 - 550 X 11/91 X WASTE OIL G7 /73 30 170 X X HYDRAULIC FLUID X X X E F 8 W C /73 R NO H8 /73 - 1500 X /89 X DIESEL Page 87 of 126
Full-size scan of page 87 (opens in a new tab)In the PDF: page 87 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 87 of 126 23 GEL CORRESPONDENCE SIGNOFF AND DISTRIBUTION FORM PLEASE HELP EXPEDITE - REVIEW PROMPTLY AND HAND CARRY TO NEXT PERSON FOR ASSISTANCE CALL EXTENSIONS 5296 OR 3056
SIGNOFF/DISTRIBUTION Signoff indicates your written concurrence for your discipline with statements and commitments made in the attached documents.FACILITY: Madison CODE: BGN LETTER NO: DD5094/ TITLE/SUBJECT: Amended UST Notification AGENCY: CDP SPECIAL INSTRUCTIONS: LETTER DATE: 12-10-91
OTHER DISTRIBUTIONDS A PERSON SO DISCIPLINE LOC. EXT INIT. DATE COMMENTS R.P. Klattenberg X Enviro. Svcs. B3F3 4628 ✓ Sept 12-5 R.C. Nichols Enviro. Audit B3F3 4645 W.C. Renfro Enviro. Prog. B3F3 4620 T.J. Butwill Civil Hydraulics N206 5403 D.R. Wade FH Programs Engng N226 5460 W.J. Kornacki FH Improv. Engng N226 3792 R.N. Smart FH Eng. & Const. N207 5362 X X [illegible] X Legal E217 3/25 PdP 12/4/91 Land Planning SBS N.J. Lanzalotta Prod. Opns. Svcs. W239 5657 Project Engineer Facility Mgr./Supt. X X C.A. Edge Fac. Opns. & Engng SBS 6750 P.C. Robotham Transportation 3333 6677 J. Barresi Supt. - CT&M 3333 6662 W.V. Reichelt Sys. Supt. - Fossil W239 5467 R.G. Chevalier Sys. Supt. - Hydro W239 5064 X [illegible] X Originator/Lead B3F3 4614 ✓ X [illegible] X GEL Lead W218 5440 [illegible] 12-4-91 NRC ☐ Yes ☐ No X Supvsr - NL W218 R. Osella X Supvsr - GEL W218 5448 [illegible] 12-9-91
COMMITMENT / ACTION TRACKING INFORMATION Pull/Partial Response To: COTRAP # C_____ or FORCOM # F_____ DUE DATE: _____ Number of Calendar days in Advance (+) or Late (-) of Due Date_____ Commitment Number | GEL Lead | Discipline Lead | Response Date | DESCRIPTION REV. 5 7-91X X Facilities File GEL Clerk W218 X GEL CLERK INSTRUCTIONS J. Betz Test Build. ORIGINAL AND ___ COPIES S. Martin madison X NOTARY REQUIRED ATTACHMENTS (X in "A" Column) FEE CHECK FEDERAL EXPRESS REGISTERED MAIL TELECOPY Page 88 of 126
Full-size scan of page 88 (opens in a new tab)In the PDF: page 88 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 88 of 126 DEC- 5-91 THU 13:03 | GEN. FACIL. LICENSING | . | FAX NO. 2036655896 | P. U2 GEL CORRESPONDENCE SIGNOFF AND DISTRIBUTION FORM PLEASE HELP EXPEDITE - REVIEW PROMPTLY AND HAND CARRY TO NEXT PERSON FOR ASSISTANCE CALL EXTENSIONS 5296 OR 3056
SIGNOFF/DISTRIBUTION Signoff indicates your written concurrence for your discipline with statements and commitments made in the attached documents.FACILITY: Madison CODE: BGN LETTER NO: D05094 TITLE/SUBJECT: Amended UST Notification AGENCY: CDP SPECIAL INSTRUCTIONS: LETTER DATE:
COMMITMENT / ACTION TRACKING INFORMATION Full/Partial Response To: COTRAP # C____ or FORCOM # F____ | DUE DATE:____ Number of Calendar days in Advance (+) or Late (-) of Due Date____ Commitment Number | GEL Lead | Discipline Lead | Response Date | DESCRIPTION REV. 5 7-91DS A PERSON SO DISCIPLINE LOC. EXT INIT. DATE COMMENTS R.P. Klattenberg X Enviro. Svcs. B3F3 4628 RPK 12-5-91 R.C. Nichols Enviro. Audit B3F3 4645 W.C. Renfro Enviro. Prog. B3F3 4620 T.J. Butwill Civil Hydraulics N206 5403 D.R. Wade FH Programs Engng N226 5460 W.J. Kornacki FH Improv. Engng N226 3792 R.N. Smart FH Eng. & Const. N207 5362 RHPershan X Legal E217 3723? [illegible] 12/4/91 Land Planning SBS N.J. Lanzalotta Prod. Opns. Svcs. W239 5657 Project Engineer Facility Mgr./Supt. X X C.A. Edge Fac. Opns. & Engng SBS 6750 P.C. Robotham Transportation 3333 6677 J. Barresi Supt. - CT&M 3333 6662 W.V. Reichelt Sys. Supt. - Fossil W239 5467 R.G. Chevalier Sys. Supt. - Hydro W239 5064 X J Szymanski X Originator/Lead B3F3 4614 [illegible] 12-7-91 X Chatlic Smith X GEL Lead W218 5946 CKS 12-5-91 NRC ☐ Yes ☐ No X Supvsr - NL W218 R. Osella X Supvsr - GEL W218 5448 OTHER DISTRIBUTION GEL CLERK INSTRUCTIONS X X Facilities File GEL Clerk W218 X ORIGINAL AND ___ COPIES X X J. Betz Test Build. NOTARY REQUIRED X X S. Martin Madison X ATTACHMENTS (X in "A" Column) FEE CHECK FEDERAL EXPRESS REGISTERED MAIL TELECOPY Page 89 of 126
Full-size scan of page 89 (opens in a new tab)In the PDF: page 89 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 89 of 126 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Selden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 ([redacted]) December 10, 1991 D05094 UST Coordinator Department of Environmental Protection 165 Capitol Avenue Hartford, CT 06106 Reference: Letter and Notification (D03879), [redacted] o F. Wacht, dated October 16, 1990. Dear Sir or Madam: Madison Service Center Amended UST Notification Northeast Utilities Service Company (NUSCO), as agent for The Connecticut Light and Power Company (CL&P), submits an amended Underground Storage Facility Notification for CL&P's Madison Service Center. This notification supersedes the notification submitted on October 16, 1990 (referenced). The following changes have been made: o Removal of Tank A1, 550-gallon hydraulic fluid UST o Removal of Tank B2, 550-gallon motor oil UST o Removal of Tank F6, 550-gallon waste oil UST If you have any questions, please call Ms. Cynthia Karlic-Smith, NUSCO Generation and Environmental Licensing, at 665-3740. Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company FOR: [redacted] Vice President BY: [redacted] Vice President cc w/Copy No. 2: Mr. Arthur W. Cunningham Town Hall 8 Meeting House Lane Madison, CT 06443Page 90 of 126
Full-size scan of page 90 (opens in a new tab)In the PDF: page 90 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 90 of 126 REDACTED FACILITY NOTIFICATION UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. SITE I.D. A. SITE I.D. POR STATE AGENCY USE ONLY B. DATE RCVD BY D.E.P C. DATE ENTERED D. GRID COORDINATES X ___ Y E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO 1a. FIRST NOTIFICATION OR SUBSEQUENT NOTIFICATION (If checked, enter No.) SECTION A SECTION B
SECTION C4. LOCATION OF FACILITY SITE NAME: MADISON REGIONAL SERVICE CTR NO. AND STREET: 135 NEW RD NEAREST INTERSECTING STREET: DUCK HOLE RD CITY OR TOWN: MADISON STATE: CT 5. LATITUDE LONGITUDE TELEPHONE 6. BUSINESS NAME AND MAILING ADDRESS NAME NO. AND STREET CITY OR TOWN STATE ZIP CODE TELEPHONE 7. FACILITY OWNER NAME: THE CONNECTICUT LIGHT + POWER CO. NO. AND STREET: P.O. Box 270 CITY OR TOWN: HARTFORD STATE: CT ZIP CODE: 06141-0270 [redacted] 8. TYPE OF OWNER PRIVATE STATE MUNICIPAL FEDERAL (G.S.A. No. ___) 9. OPERATOR/CONTACT PERSON NAME NO. AND STREET CITY OR TOWN STATE ZIP CODE TELEPHONE
20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? ☐ YES 21. COMMENTS: All tanks - 16b + 17a - Impressed current system G7 - 16b - Tank is vaulted 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted. 22a. SIGNATURE [redacted] 22b. DATE SIGNED 12-10-97 22d. OFFICIAL TITLE (of owner or authorized representative) Vice President COPY 1: SEND TO DEP: 165 CAPITOL AVE. HARTFORD, CT 0610610. TANK ID 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. LIFE EXPECTANCY (# of years) 12a. TOTAL CAPACITY (Gals.) 12b. STATUS: IN USE ABANDONED IN PLACE EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS: OIL/PETRO-LEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS: CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No., if known) 15. CONSTRUCTION MATERIALS a. INTERNAL: STEEL, FIBERGLASS REINFORCED PLASTIC, OTHER, LINED, UNLINED b. EXTERNAL: CATHODIC PROTECTION, COATED/WRAPPED, CATHODIC PROTECTION, OTHER 16. PROTECTION 17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION MATERIAL, b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (If "YES", enter DATE and attach results. If "NO", enter "NO") Example 5/75 30 5000 X X X H 3 H 5/75 U NO Example 7/60 - 8000 X 8/78 X X E 7 W 7/60 U — A1 /73 - 550 X 11/91 X HYDRAULIC FLUID B2 /73 - 550 X 11/91 X MOTOR OIL C3 /73 30 5000 X X UNLEADED GASOLINE X X X E A B W C 10/89 I,O 8-15-90 D4 /73 30 6000 X X UNLEADED GASOLINE X X X E A B W C 10/89 I,O 7-24-90 E5 /73 - 10000 X 8/89 X UNLEADED GASOLINE F6 /73 - 550 X 11/91 X WASTE OIL G7 /73 30 170 X X HYDRAULIC FLUID X X X E F 8 W C /73 R NO H8 /73 - 1500 X /89 X DIESEL Page 91 of 126
Full-size scan of page 91 (opens in a new tab)In the PDF: page 91 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 91 of 126 24 [redacted] ED2125 REV. 11-84 TELEPHONE MEMORANDUM PROJECT
TELEPHONE CONVERSATION PARTICIPANTSMadison AWC: Notice of Site Conditions ROUTING NAME INITIALS CALL DATE TIME AM PM ☐ INCOMING ☒ OUTGOING 01/08/92
cc: Chronological File SUMMARY I called Elsie P. to explain the history of the recent problems at the Madison site including presence of free product, efforts to identify the source of the gasoline, helium test results and UST failure of the tank tightness tests on Jan 7. She was very interested in the current situation with the groundwater treatment system and infiltration galley. I described the installation of the air stripper and tests performed to ensure that gasoline was not leaving the treatment system back to groundwater. She felt that NU was doing "everything we should have done." She requested a copy of all test results, notifications and followup reports.NAME COMPANY NAME Elsie Pettlon DEP, Water Management [redacted] [redacted] NU EPD [redacted] CALL REPORTER'S NAME DATE
As listed on the current system
Question(s) Answered 38 (The Connecticut Light and Power Company) Date Filed: 10/20/2026