Interrogatory responses
Answers to questions 38
Files5
RSR-038_Final.pdf
PDF · 146 KB · 7 pagesText searchable
Download RSR-038_Final.pdfRead the text of RSR-038_Final.pdf
RSR-038 Attachment 1 REDACTED.pdf
PDF · 4.6 MB · 19 pagesText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 1 REDACTED.pdfScanned pages and text of RSR-038 Attachment 1 REDACTED.pdf
RSR-038 Attachment 2 REDACTED.pdf
PDF · 798 KB · 1 pageText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 2 REDACTED.pdfScanned pages and text of RSR-038 Attachment 2 REDACTED.pdf
RSR-038 Attachment 3.pdf
PDF · 502 KB · 1 pageText searchable
Download RSR-038 Attachment 3.pdfRead the text of RSR-038 Attachment 3.pdf
RSR-038 Attachment 4 REDACTED.pdf
PDF · 51 MB · 126 pagesText read by machine from a scan; may contain errors, especially in numbers
Download RSR-038 Attachment 4 REDACTED.pdfScanned pages and text of RSR-038 Attachment 4 REDACTED.pdf
Scanned pages and machine-read text of RSR-038 Attachment 1 REDACTED.pdf

The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 1 of 19 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Selden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 [redacted] April 13, 1988 D01928 Mr. Ronald Corey, Fire Marshall City of Torrington 111 Water Street Torrington, Connecticut 06790 Reference: Letter and Notification, [redacted] o R. Corey, dated May 8, 1986. Dear Mr. Corey: Torrington Area Work Center Notification of Underground Storage Tanks Northeast Utilities Service Company (NUSCO), as agent for the Connecticut Light and Power Company (CL&P), submits an amended Copy No. 2 of Notification Form EPHM-6 for underground storage tanks at CL&P's Torrington Area Work Center. The form submitted to you on May 8, 1986 (Referenced) has been amended to reflect the removal of all of the tanks (A1, B2, C3, D4) at the site. If you have any questions, please call [redacted] NUSCO Generation Facilities Licensing, at [redacted]. Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company [redacted] [redacted] Senior Vice President [redacted] By: C. F. Sears Vice President
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 2 of 19 Mr. Ronald Corey, Fire Marshall DO1928/Page 2 April 13, 1988 Enclosure cc: w/enclosure (Copy 1) Mr. Scott Deshefy Hazardous Material's Management Unit Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106 Mr. Richard Ciasullo Department of Environmental Protection 165 Capitol Avenue Hartford, Connecticut 06106
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 3 of 19 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION | PG. 2 of 1 | SITE ID | FOR STATE AGENCY USE ONLY | A. SITE I.D. | B. DATE RCVD BY D E P | C. DATE ENTERED | D. GRID COORDINATES X Y | E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. EPHM-6 NEW 10/85 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SECTION A SECTION B
SECTION C 20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? [X] YES 21. COMMENTS: SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.4. LOCATION OF FACILITY SITE NAME: Torrington Area Work Center NO. AND STREET: 174 Franklin Street NEAREST INTERSECTING STREET: Horwinton Ave. CITY OR TOWN: Torrington STATE: CT 5. LATITUDE: 41° 48' 00" LONGITUDE: 73° 06' 55" 5. BUSINESS NAME AND 6. MAILING ADDRESS NAME: The Connecticut Light + Power Co. (CL4P) NO. AND STREET: P O Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 06141-0270 7. FACILITY OWNER NAME: CL&P NO. AND STREET: Same as Above CITY OR TOWN STATE ZIP CODE 8. TYPE OF OWNER PRIVATE (checked) STATE MUNICIPAL FEDERAL (G.S.A. No.) 9. OPERATOR/CONTACT PERSON [redacted] NO. AND STREET: 174 Franklin Street CITY OR TOWN: Torrington STATE: CT ZIP CODE: 06790 TELEPHONE: 1203 482-4471 10. TANK ID 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. LIFE EXPECTANCY (in years) 12a. TOTAL CAPACITY (Gals.) IN USE ABANDONED IN PLACE 12b. STATUS EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS OIL/PETROLEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No., if known) 15. CONSTRUCTION MATERIALS STEEL FIBERGLASS REINFORCED PLASTIC OTHER (Specify from list A) c. INTERNAL UNLINED b. EXTERNAL UNLINED CATHODIC PROTECTION COATED/WRAPPED CATHODIC PROTECTION OTHER (Specify from list B) 16. PROTECTION 17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION AND PROTECTION (from list A/B) b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (if "YES", enter DATE and attach results; if "NO", enter "NO") Example 5/75 30 5000 X X X H 5 5/75 U NO Example 7/60 - 8000 X 8/78 X X E 7 7/60 U - A1 12/78 15 10,000 X 4/88 X Regular Gasoline X X E 7E 12/78 O 3-15-84 B2 1/64 15 4,000 X 3/88 X Diesel Fuel X X E 7E 1/64 O 3-15-84 C3 1/64 15 4,000 X 3/88 X Unleaded Gasoline X X E 7E 1/64 O 3-15-84 D4 1/60 15 500 X 3/88 X Waste Oil X X E 7E 1/60 U NO
22c. NAME (type or print) [redacted] 22d. OFFICIAL TITLE | Vice President / Senior Vice President COPY 1: SEND TO DEP: 165 CAPITOL AVE. HARTFORD, CT 0610622a. SIGNATURE X [redacted] 22b. DATE SIGNED 13 April 1988 
The scanned page Machine-read text
REDACTED The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 4 of 19 CONN LIGHT & POWER CO. NORTHEAST UTILITIES WORK ORDER SKETCH SHEET
SKETCH INDICATE NORTH AND NAME STREETS Not To Scale B2 A1 21' 140' 159' 177' 44' 275' 255' D4 C3 GARAGE TRANSMISSION TORRINGTON SERVICE BUILDING HARWINTON SCHIBI ST. AVE. OP418? REV. 10-82 DEST. SAME AS ATT. REC. DRAWN BY | TELEPHONE EXT.DISTRICT / REGION TOWN DATE MAP NO. WORK ORDER NO. ACTV. SHEET OF TORRINGTON / WESTERN TORRINGTON 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 5 of 19 REDACTED TO: File FROM: John Szymanski [signature] April 14, 1988 SUBJECT: Torrington AWC Tank removals were conducted at the Torrington AWC during the months of March and April 1988. o During March 1988: One (1) 4000 gallon unleaded gasoline tank and One (1) 500 gallon oil tank were removed; no problems o On March 30, 1988: Notified that (1) 4000 gallon diesel tank was removed with heavy rusting and several apparent holes the size of dimes. o On March 30, 1988: Examined site and took three (3) samples from excavation hole and one (1) sample from diesel tank to have material analyzed and identified by LAB per request by DEP Field Inspector, Richard Ciasullo. o On March 31, 1988: Samples dropped off for analyzing and identification at Souther-Newlands Laboratory. o On April 4, 1988: Souther Newland Laboratory called EPD office to report on lab findings. - Sample from diesel tank identified as diesel fuel - The three (3) samples from the excavation hole all had the same characteristic profiles, but it didn't match that of gasoline or diesel fuel and that it would take two to three weeks to identify samples from the excavation hole. o On Aril 4, 1988: Notified R. Robinson of the DEP Clean Water Group of the test results and asked for permission to continue tank installation construction after film cleaned off top of water and remainder of gray colored gravel removed from hole. Mr. Robinson gave approval to continue construction if I inspected site and assured this was done. o On April 6, 1988: NUSCO construction removed film from water and lowered water table by sucking out 3200 gallons of contaminated water which was hauled off site as contaminated waste water. Removed the remainder of gray contaminated gravel from excavation hole. o On April 6, 1988 after water table lowered gasoline film and strong fumes entered the excavation hole. The fire marshal was notified, who requested DEP to inspect the hole. Concern was generated regarding 10,000 gallon unleaded gasoline tank in the same vicinity where gas fumes and film were found. Construction stopped. o On April 7, 1988: DEP Field Inspector Richard Ciasullo and
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 6 of 19 Torrington Fire Marshal Ron Corey arrived on site and gave us two alternatives: 1. Test tank full of product and be ready to remove it immediately if tank leaks; 2. Remove 10,000 gallon unleaded tank. o April 7, 1988: Discussions were held between Area Superintendent Walt Wadman, Ken Busick, Frank Melluzzo, Bud Meyer, John Betz, Jack Farrel and John Szymanski to discuss options and make decision as to disposition of 10,000 gallon gasoline tank. Final consensus was to remove tank based on presence of gasoline odor and fumes in area, water level in tank raised when emptied of product, bottom ash found in vicinity of tank, tank had been unprotected for 10 years, the older unprotected tank 4000 diesel came out of ground looking like swiss cheese. o April 7, 1988: Removed 10,000 gallon unleaded gasoline tank, some heavy rusting and pitting visible on tank but there was no apparent holes. Backfill around tank was improper per today's installation standards (very large boulders, large gravel and some sand) there were no hold down straps on tank, and bottom ash in close proximity to tank. Wet lines were heavily rusted in one large area.
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 7 of 19 REDACTED Distribution: [redacted]Claims and Insurance [redacted]s. and Test Department [redacted]Regional Operations - WMECO [redacted]struction [redacted]HP [redacted]rans. SS and Mtce. [redacted] Trans. Bldg. Eng. Design [redacted]nsportation [redacted] EPD [redacted]ores [redacted] EPD [redacted]cilities Management [redacted] Legal [redacted] Nuclear Prod. [redacted]en. Fac. Lic. Dept. bsl cc: [redacted]
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 8 of 19 TORRINGTON AUG / CT Bemis / Laura Lionts leak lokator hunter ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] TEST RESULTS DATE OF TEST | 07-6-85 CONTRACT NUMBER
TEST RESULTS SUMMARYCUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER NAME ADDRESS 178 Franklin Drive CITY Torrington STATE Conn LEAK LOKATOR USE ONLY CONCL. CODE
OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTSNO. SYSTEM PRODUCT TANK SIZE GALLONS DIA/MATL WATER INCHES LEAK LOKATOR RESULTS LEVEL INCHES ALR GPH CONCLUSION RECOMMENDATIONS TEST TANK SYS II No Lead Tank #I 4000 64/37 1 1/2" 106" .039 Tight II No Lead Tank #II 4000 64/37 1 1/2" 95" .038 Tight VII Regular Lead 10000 96/3T 1 1/2" 113" .038 Tight
NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTSNO. SYSTEM PRODUCT TYPE OF PUMP REMOTE TYPE OF PUMP SUCTION # APPLIED MINUTES APPLIED PRODUCT LOSS CC'S PRODUCT LOSS GPH CONCLUSION/RESULT II No Lead Tank I > ✓ DL Pressure test test X II No Lead Tank II > ✓ 170 Pressure test test X III Regular Leaded > Pump ✓ Side [illegible] [illegible] X X Tight NO. SYSTEM PRODUCT TEST NO. TEST LEVEL (INCHES) CLOCK START DURATION HRS.-MIN. LEAK RATE CC/DIV LEAK RATE CC/MIN TEMP COMP Δ°F TEMP COMP CC/MIN ABSOLUTE LEAK RATE CC/MIN ABSOLUTE LEAK RATE GPH CHECK TEST Y or N I No Lead Tank I 1 106" 9:45 31 min .39 +25.95 +.161 +33.80 -1.85 -.039 N II No Lead Tank II 1 95" 7:52 31 min .47 +2.82 +.636 +6.37 -2.44 -.038 N III Regular Leaded 1 142" 11:46 20 min .35 +21.47 +.655 23.88 -2.41 -.038 N 
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 9 of 19 REDACTED ENVIRONMENTAL SERVICES, INC. 18 GREAT VALLEY PARKWAY, SUITE 6 MALVERN, PA 19355 [phone removed] [phone removed] Bemis | TORRINGTON AWG / CT Laura [illegible] leak lokator TEST RESULTS DATE OF TEST | 03-6-8? CONTRACT NUMBER CUSTOMER Northeast Utilities LOCATION – IDENTIFICATION NUMBER
TEST RESULTS SUMMARYADDRESS 178 Franklin Drive NAME CITY Torrington STATE Con
OTHER INFORMATION FINAL REPORT PRODUCT LINES – HYDROSTATIC PRESSURE TEST RESULTSNO. SYSTEM PRODUCT TANK SIZE GALLONS DIA/MATL WATER INCHES LEAK LOKATOR RESULTS LEVEL INCHES ALR GPH CONCLUSION RECOMMENDATIONS LEAK LOKATOR USE ONLY CONCL. CODE TEST TANK SYS I NO LEAD TANK I 4500 64.37 1 1/2" 166" -.029 Tight II NO LEAD TANK II 4500 64.37 1 1/2" 95" -.038 Tight III REGULAR LEADED 10000 96 x T 1 1/2" 115" -.026 Tight
NOTE: On suction systems, NEVER put more than 15 psi on any pump system. OTHER CONTRACTORS, OFFICIALS, CUSTOMER REPRESENTATIVES PRESENT DETAIL OF TEST RESULTSNO. SYSTEM PRODUCT TYPE OF PUMP REMOTE SUCTION # APPLIED MINUTES APPLIED PRODUCT LOSS CC'S PRODUCT LOSS GPH CONCLUSION/RESULT I NO LEAD TANK I ✓ DO DO [illegible] test X II NO LEAD TANK II ✓ test X III REGULAR LEADED ✓ ✓ 110 Due X III REGULAR LEADED ✓ Pump ✓ [illegible] [illegible] [illegible] [illegible] Tight
* LEVEL – INCHES FROM TANK BOTTOM TO TEST LEVEL ALR – ABSOLUTE LEAK RATE (MEASURED LEAK RATE – TEMPERATURE COMPENSATION) IN GALLONS PER HOUR CONCLUSION – NFPA 329 CRITERION OF ± 0.05 GPH IS USED TO CERTIFY TIGHTNESS CERTIFICATION This is to certify that the above described tank systems were tested, using the HUNTER ENVIRONMENTAL SERVICES, INC. LEAK LOKATOR according to all standard operating procedures. Those indicated as tight meet the criterion established by the National Fire Protection Association Pamphlet 329 for Precision Testing.NO. SYSTEM PRODUCT TEST NO. TEST LEVEL (INCHES) TIME CLOCK START TIME DURATION HRS.-MIN. LEAK RATE CC/DIV LEAK RATE CC/MIN TEMPERATURE COMPENSATION Δ°F TEMPERATURE COMPENSATION CC/MIN ABSOLUTE LEAK RATE CC/MIN ABSOLUTE LEAK RATE GPH CHECK TEST Y or N I NO LEAD TANK I 1 166" 9:45 31 min .39 +25.95 +.141 +27.82 -1.85 -.029 N II NO LEAD TANK II 1 95" 9:52 35 min 4.17 12.08 +.036 16.37 -2.44 -.038 N III REGULAR LEADED 1 114" 9:46 30 min -.37 +21.17 +.255 23.66 -2.41 -.038 N TESTS CONDUCTED BY CERTIFIED BY TEST VAN NO. [illegible] SIGNATURE [illegible] TANK TESTING SPECIALIST [illegible] NAME [illegible] DATE [illegible] TANK TESTING SPECIALIST [illegible] TITLE [illegible] 
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 1 REDACTED Page 10 of 19 TANK AND LOCATION DATA DATE: 03-6-85
SCHEMATIC: Building PUMP NO LEAD II 4000gal 64" NO LEAD II 4000gal 64" NO LEAD PUMP VENT Regular PUMPS VENT Regular LEADED 10000gal 96" BuildingCUSTOMER: Northeast Utilities CITY: Torrington I.D. # STATE: Conn WEATHER TIME TEMPERATURE COMMENTS BEFORE TEST – AFTER TEST –
VAPOR RECOVERY TYPE VENT CONFIGURATION P-V VENT VALVE TYPEPRODUCT/TANK NO. NO LEAD I NO LEAD II Regular BEFORE DELIVERY LEVEL Fill Gauge Fill Gauge Fill Gauge Fill Gauge Fill Gauge LEVEL Full GALLONS WATER 1½" 1½" 1½" TOP OF RISER 97 96 101 132 GRADE 160 163 162 137 DROP TUBE AL AL AL CAPACITY, GALLONS 4000 4000 10000 DIAMETER, INCHES 64 64 64 MATERIAL STEEL STEEL STEEL PUMP TYPE Gasboy [illegible] Bennett TYPE OF COVER TAN TAN TAN AGE OF TANK UK UK UK SIPHON NO NO NO TANK OPENINGS 1-4" 1-2" 1-4" 1-2" 1-4" EXTRACTORS NO NO NO
ADDITIONAL CHARGES: (pumpovers, overtime, etc.) [illegible] [illegible] *Data obtained from ☐ Station ☐ LL Charts ☐ Other ______REPLACEMENT PARTS: PART # DESCRIPTION QUANTITY PRICE #701 [illegible] 1 [illegible] #124 [illegible] 1 [illegible] # 6" Quick Tite 2-gauge (wire) 1 [illegible]
Scanned pages and machine-read text of RSR-038 Attachment 2 REDACTED.pdf

The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 2 REDACTED Page 1 of 1 REDACTED UNDERGROUND STORAGE FACILITY NOTIFICATION
STATE OF CONNECTICUT Department of Environmental Protection UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 556-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. 1a. FIRST NOTIFICATION OR b. SUBSEQUENT NOTIFICATION (If checked, enter No.) SITE I.D.2. PG. of 1 1
SECTION A/B3. FOR STATE AGENCY USE ONLY A. SITE I.D. B. DATE RCVD BY D.E.P. C. DATE ENTERED D. GRID COORDINATES X ___ Y ___ E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO
[redacted] SECTION C4. LOCATION OF FACILITY SITE NAME: East Hampton Service Center NO. AND STREET: 22 East High Street NEAREST INTERSECTING STREET: Route 2 CITY OR TOWN: East Hampton STATE: CT 5. LATITUDE: 41° 34' 56" LONGITUDE: 72° 30' 14" 6. BUSINESS NAME AND MAILING ADDRESS NAME: The Connecticut Light & Power Company NO. AND STREET: P.O. Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 061410270 7. FACILITY OWNER NAME: The Connecticut Light & Power Company NO. AND STREET: P.O. Box 270 CITY OR TOWN: Hartford STATE: CT ZIP CODE: 061410270 8. TYPE OF OWNER X PRIVATE STATE MUNICIPAL FEDERAL (G.S.A. No. ___) 9. OPERATOR/CONTACT PERSON [redacted] NO. AND STREET: 22 East High Street CITY OR TOWN: East Hampton STATE: CT ZIP CODE: 06424
20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? X YES 21. COMMENTS: 16b coal tar epoxy. Tanks B2, D4, E5 & F6 budgeted for cathodic protection in 1986. A1 is also for [illegible] [illegible] SECTION D 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted.10. TANK ID. 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. TANK LIFE EXPECTANCY (# of years) 12a. TOTAL CAPACITY (Gals.) 12b. STATUS: IN USE ABANDONED IN PLACE EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS: OIL/PETRO-LEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS: CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No. if known) 15. CONSTRUCTION MATERIALS: STEEL FIBERGLASS REINFORCED PLASTIC OTHER (Specify from list A) 16. PROTECTION a. INTERNAL: LINED UNLINED; b. EXTERNAL: CATHODIC PROTECTION COATED/WRAPPED CATHODIC PROTECTION OTHER (Specify from list B) 17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION PROTECTION (See list B) b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (If "YES," enter DATE and attach results. If "NO," enter "NO") Example 5/75 30 5000 X X X X H 5 5/75 U NO Example 7/60 - 8000 X 8/78 X X X E 7 7/60 U — A1 /72 15 275 X X X X X H 7 /72 H 092584 B2 /72 15 10000 X X X X 7 /72 O 092684 (10-14-86 / 092684 struck through) C3 '30 30 10000 X 0 11/84 X X 8 /80 O 092684 D4 '72 15 275 X X X X 7 /72 U 092584 E5 ,72 15 550 X X X X 7 /72 U 092884 P6 ,72 15 550 X X X X 7 /72 U 092884
COPY 422a. SIGNATURE X [redacted] 22b. DATE SIGNED 5/5/86 22c. NAME (Type or Print) [redacted] 22d. OFFICIAL TITLE (of owner or authorized representative) Senior Vice President
Text of RSR-038 Attachment 3.pdf
Extracted from the file · 1 page · 146 characters
Scanned pages and machine-read text of RSR-038 Attachment 4 REDACTED.pdf
Page 89 of 126
Full-size scan of page 89 (opens in a new tab)In the PDF: page 89 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 89 of 126 NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY General Offices • Selden Street, Berlin, Connecticut P.O. BOX 270 HARTFORD, CONNECTICUT 06141-0270 ([redacted]) December 10, 1991 D05094 UST Coordinator Department of Environmental Protection 165 Capitol Avenue Hartford, CT 06106 Reference: Letter and Notification (D03879), [redacted] o F. Wacht, dated October 16, 1990. Dear Sir or Madam: Madison Service Center Amended UST Notification Northeast Utilities Service Company (NUSCO), as agent for The Connecticut Light and Power Company (CL&P), submits an amended Underground Storage Facility Notification for CL&P's Madison Service Center. This notification supersedes the notification submitted on October 16, 1990 (referenced). The following changes have been made: o Removal of Tank A1, 550-gallon hydraulic fluid UST o Removal of Tank B2, 550-gallon motor oil UST o Removal of Tank F6, 550-gallon waste oil UST If you have any questions, please call Ms. Cynthia Karlic-Smith, NUSCO Generation and Environmental Licensing, at 665-3740. Very truly yours, NORTHEAST UTILITIES SERVICE COMPANY As Agent for The Connecticut Light and Power Company FOR: [redacted] Vice President BY: [redacted] Vice President cc w/Copy No. 2: Mr. Arthur W. Cunningham Town Hall 8 Meeting House Lane Madison, CT 06443Page 90 of 126
Full-size scan of page 90 (opens in a new tab)In the PDF: page 90 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 90 of 126 REDACTED FACILITY NOTIFICATION UNDERGROUND STORAGE FACILITIES PROGRAM HAZARDOUS MATERIALS MANAGEMENT UNIT 165 Capitol Avenue, Hartford, CT 06106 TEL. 566-4630 PLEASE TYPE. ALL THREE COPIES MUST BE LEGIBLE! Refer to INSTRUCTIONS FOR FILING NOTIFICATION before completing form. SITE I.D. A. SITE I.D. POR STATE AGENCY USE ONLY B. DATE RCVD BY D.E.P C. DATE ENTERED D. GRID COORDINATES X ___ Y E. DOES FACILITY MEET NEW REQUIREMENTS? YES NO 1a. FIRST NOTIFICATION OR SUBSEQUENT NOTIFICATION (If checked, enter No.) SECTION A SECTION B
SECTION C4. LOCATION OF FACILITY SITE NAME: MADISON REGIONAL SERVICE CTR NO. AND STREET: 135 NEW RD NEAREST INTERSECTING STREET: DUCK HOLE RD CITY OR TOWN: MADISON STATE: CT 5. LATITUDE LONGITUDE TELEPHONE 6. BUSINESS NAME AND MAILING ADDRESS NAME NO. AND STREET CITY OR TOWN STATE ZIP CODE TELEPHONE 7. FACILITY OWNER NAME: THE CONNECTICUT LIGHT + POWER CO. NO. AND STREET: P.O. Box 270 CITY OR TOWN: HARTFORD STATE: CT ZIP CODE: 06141-0270 [redacted] 8. TYPE OF OWNER PRIVATE STATE MUNICIPAL FEDERAL (G.S.A. No. ___) 9. OPERATOR/CONTACT PERSON NAME NO. AND STREET CITY OR TOWN STATE ZIP CODE TELEPHONE
20. HAVE YOU ATTACHED SKETCH OF TANKS AND LOCATION? ☐ YES 21. COMMENTS: All tanks - 16b + 17a - Impressed current system G7 - 16b - Tank is vaulted 22. CERTIFICATION: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate and complete. Penalties: any owner who knowingly fails to notify shall be subject to a civil penalty not to exceed $10,000 for each tank for which notification is not given or for which false information is submitted. 22a. SIGNATURE [redacted] 22b. DATE SIGNED 12-10-97 22d. OFFICIAL TITLE (of owner or authorized representative) Vice President COPY 1: SEND TO DEP: 165 CAPITOL AVE. HARTFORD, CT 0610610. TANK ID 11a. DATE OF INSTALLATION (Mo./Yr.) 11b. LIFE EXPECTANCY (# of years) 12a. TOTAL CAPACITY (Gals.) 12b. STATUS: IN USE ABANDONED IN PLACE EST. QUANTITY LEFT STORED (if any) (Gals.) REMOVED DATE TANK LAST USED (Mo./Yr.) 13. TYPE OF CONTENTS: OIL/PETRO-LEUM PRODUCT CHEMICAL LIQUID 14. CONTENTS: CHEMICAL NAME OF PRINCIPAL SUBSTANCE (not trade name.) (Enter C.A.S. No., if known) 15. CONSTRUCTION MATERIALS a. INTERNAL: STEEL, FIBERGLASS REINFORCED PLASTIC, OTHER, LINED, UNLINED b. EXTERNAL: CATHODIC PROTECTION, COATED/WRAPPED, CATHODIC PROTECTION, OTHER 16. PROTECTION 17. INTEGRAL PIPING SYSTEM a. CONSTRUCTION MATERIAL, b. DATE OF INSTALLATION OR REPLACEMENT (Mo./Yr.) 18. MONITORING SYSTEM (Specify type from list B) 19. FAILURE DETERMINATION CONDUCTED? (If "YES", enter DATE and attach results. If "NO", enter "NO") Example 5/75 30 5000 X X X H 3 H 5/75 U NO Example 7/60 - 8000 X 8/78 X X E 7 W 7/60 U — A1 /73 - 550 X 11/91 X HYDRAULIC FLUID B2 /73 - 550 X 11/91 X MOTOR OIL C3 /73 30 5000 X X UNLEADED GASOLINE X X X E A B W C 10/89 I,O 8-15-90 D4 /73 30 6000 X X UNLEADED GASOLINE X X X E A B W C 10/89 I,O 7-24-90 E5 /73 - 10000 X 8/89 X UNLEADED GASOLINE F6 /73 - 550 X 11/91 X WASTE OIL G7 /73 30 170 X X HYDRAULIC FLUID X X X E F 8 W C /73 R NO H8 /73 - 1500 X /89 X DIESEL Page 91 of 126
Full-size scan of page 91 (opens in a new tab)In the PDF: page 91 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 91 of 126 24 [redacted] ED2125 REV. 11-84 TELEPHONE MEMORANDUM PROJECT
TELEPHONE CONVERSATION PARTICIPANTSMadison AWC: Notice of Site Conditions ROUTING NAME INITIALS CALL DATE TIME AM PM ☐ INCOMING ☒ OUTGOING 01/08/92
cc: Chronological File SUMMARY I called Elsie P. to explain the history of the recent problems at the Madison site including presence of free product, efforts to identify the source of the gasoline, helium test results and UST failure of the tank tightness tests on Jan 7. She was very interested in the current situation with the groundwater treatment system and infiltration galley. I described the installation of the air stripper and tests performed to ensure that gasoline was not leaving the treatment system back to groundwater. She felt that NU was doing "everything we should have done." She requested a copy of all test results, notifications and followup reports.NAME COMPANY NAME Elsie Pettlon DEP, Water Management [redacted] [redacted] NU EPD [redacted] CALL REPORTER'S NAME DATE Page 92 of 126
Full-size scan of page 92 (opens in a new tab)In the PDF: page 92 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company [redacted] d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 92 of 126 25 NU ED2125 REV. 11-84 TELEPHONE MEMORANDUM PROJECT
01/08/92 TELEPHONE CONVERSATION PARTICIPANTSMadison AWC: Notice of tank failures ROUTING CALL DATE TIME AM PM INCOMING OUTGOING NAME INITIALS
[redacted] [redacted] DATE 1/8/92 SUMMARY I called M. DeCaprio to report that the two (2) - 5,000 gal unleaded gasoline USTs at the Madison site failed system tightness tests on Jan 7. Test Results were Tank 1 0.139 gal/hr (system), .007 gal/hr (tank top); Tank 2 0.121 gal/hr (system), .038 gal/hr (tank top). He appreciated the notification and indicated that the report would not be treated as a new release. We also discussed 1. Tank 2 was pumped out after the test and Tank 1 was being pumped out today 2 NU has decided to remove both tanks and replace them with above ground tanks ASAP 3 NU will retest both tanks with helium on Friday 1/10. I explained the history of helium testing @ NU and at the Madison site. the test will help determine the long term value of this equipment 4 He agreed that E. Patton at DEP should be notified at the status of the site Mark indicated he will try to visit the site during the helum testing.NAME COMPANY NAME Mark DeCaprio DEP, Oil & Chemical Spills 566-4633 EPD Page 93 of 126
Full-size scan of page 93 (opens in a new tab)In the PDF: page 93 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 93 of 126 [illegible] NORTHEAST UTILITIES THE CONNECTICUT LIGHT AND POWER COMPANY WESTERN MASSACHUSETTS ELECTRIC COMPANY HOLYOKE WATER POWER COMPANY NORTHEAST UTILITIES SERVICE COMPANY NORTHEAST NUCLEAR ENERGY COMPANY M E M O Jan. 9, 1992 TO: John Betz Sean Martin Cindy Karlic Smith John Szymanski FROM: [redacted] Regional Buildings Supervisor - Eastern [illegible] SUBJECT: Madison Tank Test Reports Attached are the copies of the tank test reports for the two (2) - 5,000 gallon tanks at this site that failed the tank tests on Jan. 7, 1992. These tanks are being removed on Jan. 13, 1992. If there are any questions regarding this matter, please call me. [redacted] cc Madison E.C. file OS70 REV. 3-83Page 94 of 126
Full-size scan of page 94 (opens in a new tab)In the PDF: page 94 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 94 of 126 Tank Auditor (tm) Copyright Leak Detection Systems, 1986,87,88,89,90; all rights reserved. Tank testing system version 2.16, released 09/19/90 est run #1 ate & time - 01/07/92 15:41:13 ompany name - NORTHEAST UTILITIES INC. ank ID - TANK #1 ank Location - 135 NEW ROAD, MADDISON CT. roduct in tank - UNLEADED GASOLINE ustomer contact - JOHN SLATER Phone number - [phone removed] treet/building address - 49 RANDOLPH RD. City, state, zip, etc - MIDDLETOWN CT. ustomer P.O # - VERBAL ank capacity (gallons) - 5000 ank diameter (inches) - 96 ill diameter (inches) - 4 ill to tank top (inches) - 33 bserved API - 66.80 bserved temperature (F) - 72.00 orrected API - 66.80 oef of expansion (F) or O - 0.0006800 re tanks inter-connected - NO ll valves closed - YES s vent restricted - NO teel or fiberglass tank - STEEL pproximate age - 19 YEARS OLD apor recovery system - COAXIAL D/T ater table (if known) - 144" nches of water in tank - 1/2" uction, Turbine or No pump -SUCTION WITH GILBARCO DISPENCER eather and temperature - CLOUDY AND COOLER 36 est conducted by - HERIBERTO ORTIZ TEL-ENTERPRISES TA/#98 est witnessed by - [redacted]ORTHEAST UTILITIES INC. omments - Test Results roduct elevation in tank (in inches) - 148.00 est run on 01/07/92 at 16:02:23. he level data for this analysis starts at 16:21:53 and ends at 17:07:27. he temperature data for this analysis starts at 16:21:53 and ends at 17:07:27. he voltage change for a calibration volume of 25 mL was 0.491 volts irect readings taken at the endpoints of the selected analysis period how an auditor probe change of 0.495 mV in 45 minutes and 34 seconds. his is a gross level change of 25 mL in 45 minutes and 34 seconds. aking all the data into consideration by performing a least square egression of level on time gives an auditor probe slope of -0.630 V/hour. hus, the gross product volume is dropping 32.1 mL/hour. he coefficient of correlation for the level data is -95.3%.Page 95 of 126
Full-size scan of page 95 (opens in a new tab)In the PDF: page 95 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 95 of 126 id the coefficient of expansion, [illegible] 1 increase in volume of 493.9 mL/hour. e coefficient of correlation for the temperature data is 94.7%. btracting the computed temperature volume change from the gross oduct volume change yields a temperature corrected volume change : 526.0 mL/hour, or 0.13898 gal/hour. _/ System complies with N.F.P.A. #329 criteria (+/- 0.05 GPH) √/ System does not comply with N.F.P.A. #329 criteria (+/- 0.05 GPH): /_/ Piping leak indicated /_/ Tank leak indicated _/ Test inconclusive: /_/ Air or Vapor trap indicated /_/ Temperature instability /_/ Improper installation est conducted by HERIBERTO ORTIZ TEL-ENTERPRISES TA/#98; signature: [handwritten signature] est witnessed by [redacted]R NORTHEAST UTILITIES INC.; signature: perator's comments for this test: ANK TEST SYSTEM:FULL SYSTEM TEST AT 148" dditional comments: TANK #1 (NU ID# 643AW)Page 96 of 126
Full-size scan of page 96 (opens in a new tab)In the PDF: page 96 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 96 of 126 Tank Auditor (tm) Copyright Leak Detection Systems, 1986,87,88,89,90; all rights reserved. Tank testing system version 2.16, released 09/19/90 test run #2 Date & time - 01/07/92 15:41:13 Company name - NORTHEAST UTILITIES INC. Tank ID - TANK #1 Tank Location - 135 NEW ROAD, MADISON CT. Product in tank - UNLEADED GASOLINE Customer contact - JOHN SLATER Phone number - [phone removed] Street/building address - 49 RANDOLPH RD. City, state, zip, etc - MIDDLETOWN CT. Customer P.O # - VERBAL Tank capacity (gallons) - 5000 Tank diameter (inches) - 96 Fill diameter (inches) - 4 Fill to tank top (inches) - 33 Observed API - 66.80 Observed temperature (F) - 72.00 Corrected API - 66.80 Coef of expansion (F) or O - 0.0006800 Are tanks inter-connected - NO All valves closed - YES Is vent restricted - NO Steel or fiberglass tank - STEEL Approximate age - 19 YEARS OLD Vapor recovery system - COAXIAL D/T Water table (if known) - 144" Inches of water in tank - 1/2" Suction, Turbine or No pump -SUCTION WITH GILBARCO DISPENCER Weather and temperature - CLOUDY AND COOLER 36 Test conducted by - HERIBERTO ORTIZ TEL-ENTERPRISES TA/#98 Test witnessed by - [redacted]R NORTHEAST UTILITIES INC. Comments - Test Results product elevation in tank (in inches) - 150.00 test run on 01/07/92 at 17:26:57. The level data for this analysis starts at 17:26:57 and ends at 17:47:07. The temperature data for this analysis starts at 17:26:57 and ends at 17:47:07. The voltage change for a calibration volume of 50 mL was 0.324 volts Direct readings taken at the endpoints of the selected analysis period show an auditor probe change of 1.008 mV in 20 minutes and 10 seconds. This is a gross level change of 155 mL in 20 minutes and 10 seconds. Taking all the data into consideration by performing a least square regression of level on time gives an auditor probe slope of -2.967 V/hour. Thus, the gross product volume is dropping 457.2 mL/hour. The coefficient of correlation for the level data is -99.9%. Using the calculated temperature slope of 0.024279 degrees C / hour and the coefficient of expansion, the effect of temperature is an increase in volume of 562.4 mL/hour. [illegible]Page 97 of 126
Full-size scan of page 97 (opens in a new tab)In the PDF: page 97 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED | d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 97 of 126 roduct volume change yields a temperature corrected volume change f 1019.6 mL/hour, or 0.26939 gal/hour. _/ System complies with N.F.P.A. #329 criteria (+/- 0.05 GPH) √/ System does not comply with N.F.P.A. #329 criteria (+/- 0.05 GPH): /_/ Piping leak indicated /_/ Tank leak indicated _/ Test inconclusive: /_/ Air or Vapor trap indicated /_/ Temperature instability /_/ Improper installation est conducted by HERIBERTO ORTIZ TEL-ENTERPRISES TA/#98; signature: est witnessed b [redacted] NORTHEAST UTILITIES INC.; signature: perator's comments for this test: ANK TEST SYSTEM:FULL SYSTEM TEST <RETEST> @ 160" dditional comments: Tank #1 (NU #643AW Madison Service Center 135 New Rd. Madison, Ct.Page 98 of 126
Full-size scan of page 98 (opens in a new tab)In the PDF: page 98 (opens in a new tab)
The scanned page Machine-read text
The Connecticut Light and Power Company REDACTED d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 29, 2026 RSR-038 Attachment 4 REDACTED Page 98 of 126 Tank Auditor (tm) Copyright Leak Detection Systems, 1986,87,88,89,90; all rights reserved. Tank testing system version 2.16, released 09/19/90 test run #3 Date & time - 01/07/92 15:41:13 Company name - NORTHEAST UTILITIES INC. Tank ID - TANK #1 Tank Location - 135 NEW ROAD, MADDISON CT. Product in tank - UNLEADED GASOLINE Customer contact - [redacted] Phone number - [redacted] Street/building address - 49 RANDOLPH RD. City, state, zip, etc - MIDDLETOWN CT. Customer P.O # - VERBAL Tank capacity (gallons) - 5000 Tank diameter (inches) - 96 Fill diameter (inches) - 4 Fill to tank top (inches) - 33 Observed API - 66.80 Observed temperature (F) - 72.00 Corrected API - 66.80 Coef of expansion (F) or 0 - 0.0006800 Are tanks inter-connected - NO All valves closed - YES Is vent restricted - NO Steel or fiberglass tank - STEEL Approximate age - 19 YEARS OLD Vapor recovery system - COAXIAL D/T Water table (if known) - 144" Inches of water in tank - 1/2" Suction, Turbine or No pump -SUCTION WITH GILBARCO DISPENCER Weather and temperature - CLOUDY AND COOLER 36 Test conducted by - HERIBERTO ORTIZ TEL-ENTERPRISES TA/#98 Test witnessed by - JOHN SLATER NORTHEAST UTILITIES INC. Comments - Test Results product elevation in tank (in inches) - 101.50 test run on 01/07/92 at 18:02:32. The level data for this analysis starts at 18:35:28 and ends at 19:20:44. The temperature data for this analysis starts at 18:35:28 and ends at 19:20:44. The voltage change for a calibration volume of 50 mL was 0.396 volts
As listed on the current system
Question(s) Answered 38 (The Connecticut Light and Power Company) Date Filed: 10/20/2026