Interrogatory responses
Answers to questions 47, 48
Filed by Connecticut Light and Power Company dba Eversource2 files
Part of docket 26-05-10Files2
RSR-047_Final.pdf
PDF · 89 KB · 2 pagesText searchable
Download RSR-047_Final.pdfRead the text of RSR-047_Final.pdf
RSR-048_Final.pdf
PDF · 124 KB · 2 pagesText searchable
Download RSR-048_Final.pdfRead the text of RSR-048_Final.pdf
Words on different pages
Every word of Eversource rate increase is in the text below, but not all on one page. Pages with any of them are listed and highlighted. Clear highlighting
Page 1
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-048 Page 1 of 2 Date Filed: November 03, 2026 Witness: Brendan J. O’Brien and Garrett J. Murray Request from: Public Utilities Regulatory Authority Question: (EXPENSES) Exhibit CLP-REVREQ-2, Schedule WP C-3.17. Explain whether the Company anticipates any cost savings from the TSP plan, and whether these savings are reflected in the Rate Year. Provide details on how those cost savings, if any, will be realized and in what projected dollar amounts. Response: Please refer to the Company’s response to RSR-047 i. Prior Referenced Response: i RSR-047 Question: (EXPENSES) Exhibit CLP-REVREQ-2, Schedule WP C-3.16. Explain whether the Company anticipates any cost savings from the Targeted System Performance (TSP) plan, and whether these savings are reflected in the Rate Year. Provide details on how those cost savings, if any, will be realized and in what projected dollar amounts. RSR-047 Response: The Company anticipates that Targeted System Performance ("TSP") plan investments will deliver significant reliability, resiliency, and operational benefits by improving system performance, expanding capacity to support future growth, addressing aging infrastructure, and reducing the frequency and duration of customer outages. While certain investments may provide near-term operational efficiencies, the majority of the benefits associated with the TSP plan are expected to be realized over multiple years as projects are completed, system improvements are fully integrated into the electric grid, and the impact of the investments are manifested over time. For substation-related investments, project schedules often involve extensive engineering, permitting, and long leadtime material procurement. As a result, many of the anticipated reliability and capacity benefits will not be fully realized during the Rate Year. These investments are primarily intended to support long-term system performance, reliability, and economic development needs rather than generate immediate operating expense reductions. However, planning for the orderly, economic expansion of the system potentially reduces costs that might be incurred responding to unplanned outages or emergency events due to lack of capacity. Similarly, the primary objective of the Company's resiliency investments is to harden vulnerable portions of the system to improve performance and reduce the impacts of severe weather events. Although the Company does not anticipate material, quantifiable operating expense reductions in the Rate Year associated with these investments, its analysis indicates that the proposed resiliency plan is expected to reduce the customers interrupted and customer minutes ofPage 2
The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set PURA-12 Date Issued October 13, 2026 RSR-048 Page 2 of 2 interruption during an average of approximately 40 storm-related outage events annually. This reduction in outage exposure is estimated to lower storm response and restoration costs by approximately $450,000 per year. In addition, the Company estimates annual customer reliability benefits, measured using Value of Lost Load ("VOLL"), of approximately $37 million. These benefits represent avoided customer interruption impacts and improved service reliability due to resiliency plan investments, rather than direct reductions in Company operating expenses. For distribution system investments, including feeder and infrastructure replacement projects, the Company expects long-term operational benefits through improved asset condition, reduced equipment failures, and enhanced operational flexibility. As aging infrastructure is proactively replaced and system conditions improve, the Company anticipates a reduction in emergent events, unplanned corrective maintenance activities, and associated operating costs. However, the timing and magnitude of these benefits depend on several factors, including asset condition, weather impacts, and actual system performance. The full value of these investments is expected to be realized over multiple years as the cumulative effects of increased proactive infrastructure replacement and system improvements are achieved.
As listed on the current system
Question(s) Answered 47, 48 (Connecticut Light and Power Company dba Eversource) Date Filed: 11/03/2026