Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 59

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
1 page match
Words on different pages
  1. Page 10 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 10 of 19 ST A B L E TR E E RE T A R D A N T AD D IT IV E DIS T R IB U T IO N IN TR-XLPE 3.00 2.50 Intensity 2.00 1.50 1.00 0.50 0.00 0 1000 2000 Cable A Intensity 3000 4000 5000 Distance (micrometer) Cable B Intensity 6000 7000 8000 Cable C Intensity ▪ Normalized absorbance of a peak assigned to the TR additive relative to one assigned to PE ▪ The spectra were collected in 11 evenly spaced steps (about every 800 µm) along each slice from the insulation shield to the conductor shield 10
  2. Page 11 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 11 of 19 WATER TREE ANALYSIS – ONLY SMALL NUMBER PRESENT AFTER 40 YRS TR-XLPE EPR Volume Analyzed: 0.6 in3 Area Analyzed: 23.7 in2 Vented Trees 10-12 mils: 1 21-30 mils: 1 10-12 mils: 0 21-30 mils: 0 Bowtie Tress 6-10 mils: 3 11-20 mils: 1 6-10 mils: 1 11-20 mils: 1 TR-XLPE Small Bow-Tie Tree Phase A EPR Vented Tree Phase B Small Bow-Tie Tree Phase A ▪ No indication that water treeing became any more severe even as the cables reached the end of the projected life ▪ Maintained breakdown strength characteristics several times greater than the nominal stress level Pelissou, S., et al, “A Review of Possible Methods for Defining Tree Retardant Crosslinked Polyethylene (TRXLPE)”, IEEE Electrical Insulation Magazine, v.24, n.5 (2008). 11
  3. Page 12 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 12 of 19 BREAKDOWN STRENGTH WELL ABOVE OPERATING STRESS AFTER 40 YRS Nominal operating stress 12
  4. Page 13 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 13 of 19 HOT IMPULSE BREAKDOWN AT ELEVATED TEMP AFTER 40 YRS TR-XLPE EPR 13
  5. Page 14 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 14 of 19 DISSIPATION FACTOR OF TR-XLPE REMAINS WELL BELOW 0.5% 3.0 TRXLPE - 17y TRXLPE - 40y 2.5 EPR - 17y Tan Delta, % EPR - 40y 2.0 1.5 1.0 0.5 0.0 0 30 60 90 Conductor Temperature, °C 120 Dielectric losses in TR-XLPE remain minimal with temperature and age 14
  6. Page 15 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 15 of 19 VLF TAN D (CDFI) – CABLE DIAGNOSTIC ASSESSMENT ▪ CDFI-based VLF tan δ evaluation (0.1 Hz) ▪ Test stress levels: 0.5, 1.0, 1.5U₀ ▪ Action guidance informed by multi-diagnostic data ▪ Asset decision support (replace / monitor / no action) Insulation Material TR-XLPE EPR Phase VLF tan δ at 0.5 U₀ VLF tan δ at 1.0 U₀ VLF tan δ at 1.5 U₀ Std. Dev. @ 1.0 U₀ Tip-Up (TU) A 0.2355 0.2116 0.1953 0.0037 −0.04 B 0.3655 0.3400 0.3268 0.0000 −0.03 C 0.4989 0.4716 0.4526 0.0037 −0.05 A 7.0200 7.1000 7.1979 0.0000 0.18 B 7.8672 7.9884 8.1226 0.0037 0.26 C 8.0300 8.1400 8.2600 0.0000 0.23 “Tip-Up” is the change in tan δ at 1.5Uo compared to 0.5Uo. CDFI Action Guidance: ✅ TR-XLPE: No action required — low tan δ, negative tip-up possible ✅ EPR: No action required — higher tan δ, positive tip-up expected 15
  7. Page 16 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 16 of 19 KE Y TA K E A W A Y S — 40 YE A R S O F PR O V E N FIE L D PE R F O R M A N C E 🧪Material Insights – 1st-gen TR-XLPE: 1985 vintage EPR: Maintains low dielectric losses ➢ Uniform additive distribution ➢ Comparative water-treeing behavior ➢ Moderate increase dielectric losses with age ➢ Similar breakdown strength ➢ Comparative water-treeing behavior ➢ 📅Field Aging Behavior after 40-years in service Diagnostic indicators show slow, stable aging ➢ Retention of breakdown strength several times higher than operating stress. ➢ ✅ Reliability Confirmed 1985 vintage TR-XLPE and EPR exceed life expectancy of 40 years ➢ No immediate reliability concerns identified ➢ ➡️Looking Forward for TR-XLPE Modern TR-XLPE (Gen-3) delivers significantly improved aging performance ➢ Enables higher-stress and wet-design MV/HV applications ➢ 16
  8. Page 17 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 17 of 19 Thank you!
  9. Page 18 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 18 of 19 PA U L BR IG A N D I - BIO Dr. Paul Brigandi is the Application Technology Leader for Dow Packaging & Specialty Plastics Wire & Cable business in North America based in Collegeville, PA. Paul has experience across the cable industry in power transmission and distribution as well as telecommunication markets focused on research and development of new material solutions. His technical expertise includes formulation and processing of polyolefins, elastomers, and polymer composites. Paul is active in several industry organizations including serving on the IWCS symposium committee, Insulated Conductors Committee, Communications Cable and Connectivity Association, and Fiber Broadband Association technical committees. Paul earned a Ph.D. in Polymer Science and Engineering from Lehigh University and a B.S. in Chemical Engineering from the University of Delaware. He is also an active Adjunct Professor at Lehigh University in the Material Science & Engineering department. 18
  10. Page 19 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 19 of 19 MOISTURE ANALYSIS FOR TRXLPE AND EPR INSULATION 1600 Moisture (ppm) 1400 1200 1000 800 600 400 200 0 Phase I Phase II Phase III Phase I TR-XLPE Outer_avg (ppm) Phase II Phase III EPR Middle_avg (ppm) Inner_avg (ppm) Moisture levels remain well controlled in TR-XLPE across outer-to-inner insulation 19

Text of RSR-059 Attachment 4.pdf

Extracted from the file · 1 page · 426 characters

Text of RSR-059 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 59 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026

This filing on the current system (opens in a new tab)