Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 59

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy6 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files6

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
1 page match
Words on different pages
  1. Page 5 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 5 of 19 GALLERIA MALL • Constructed 1984–1985; opened 1986 • ~2 million ft² super-regional mall; largest in the Southeast at time of construction • Located ~10 miles south of Birmingham, Alabama (Hoover) • Major commercial facility with an electrical demand of approximately 20 MVA • Supplied by four 200-A underground distribution loops at 34.5 kV https://hooversun.com/news/what-s-next-for-the-riverchase-galleria/ 5
  2. Page 6 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 6 of 19 EPR Cable Removed (17 yr; 2001) EPR Cable Removed (25 yr; 2010) Galleria Mall TR-XLPE Cable Removed (40 yr; 2025 TR-XLPE Cable Removed (17yr;2001)
  3. Page 7 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 7 of 19 TEAM REMOVES CABLES FROM THE GALLERIA MALL LOOP 7
  4. Page 8 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 8 of 19 SIMILAR 35 KV CABLE DESIGNS Cable Component TR-XLPE EPR No. 1/0 Copper Conductor (strand fill*) No. 1/0 Copper Conductor (strand fill*) XLPE Semi-Conductive Conductor Shield EPR Semi-Conductive Conductor Shield 345 mils TR-XLPE Insulation 345 mils EPR Insulation Insulation Shield Strippable XLPE Insulation Shield EPR Semi-Conductive Insulation Shield Concentric Neutral 16 x #14 Copper Concentric Neutral 16 x #14 Copper Concentric Neutral Jacket 80 mils Semi-Conductive PE Jacket 80 mils PE Insulating Jacket Conductor Conductor Shield Insulation *TR-XLPE Cable used a viscous fill material within and over the conductor strands with a semi-con tape layer over the filled conductor. EPR Cable used a soft rubber strand fill material. 8
  5. Page 9 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 9 of 19 TEST PROGRAM ▪ TR-XLPE and EPR 35kV cables with 40 years of field service ▪ 300 circuit feet from each cable removed for stress testing was done by NEETRAC an independent 3rd party testing organization ➢ HVTT (Ambient) ➢ Impulse (90 °C) ➢ DF 60Hz versus Temp Performed by NEETRAC ➢ Treeing analysis ➢ VLF tan d ➢ TR additive analysis Performed by Dow ➢ Moisture Analysis 9
  6. Page 10 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 10 of 19 ST A B L E TR E E RE T A R D A N T AD D IT IV E DIS T R IB U T IO N IN TR-XLPE 3.00 2.50 Intensity 2.00 1.50 1.00 0.50 0.00 0 1000 2000 Cable A Intensity 3000 4000 5000 Distance (micrometer) Cable B Intensity 6000 7000 8000 Cable C Intensity ▪ Normalized absorbance of a peak assigned to the TR additive relative to one assigned to PE ▪ The spectra were collected in 11 evenly spaced steps (about every 800 µm) along each slice from the insulation shield to the conductor shield 10
  7. Page 11 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 11 of 19 WATER TREE ANALYSIS – ONLY SMALL NUMBER PRESENT AFTER 40 YRS TR-XLPE EPR Volume Analyzed: 0.6 in3 Area Analyzed: 23.7 in2 Vented Trees 10-12 mils: 1 21-30 mils: 1 10-12 mils: 0 21-30 mils: 0 Bowtie Tress 6-10 mils: 3 11-20 mils: 1 6-10 mils: 1 11-20 mils: 1 TR-XLPE Small Bow-Tie Tree Phase A EPR Vented Tree Phase B Small Bow-Tie Tree Phase A ▪ No indication that water treeing became any more severe even as the cables reached the end of the projected life ▪ Maintained breakdown strength characteristics several times greater than the nominal stress level Pelissou, S., et al, “A Review of Possible Methods for Defining Tree Retardant Crosslinked Polyethylene (TRXLPE)”, IEEE Electrical Insulation Magazine, v.24, n.5 (2008). 11
  8. Page 12 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 12 of 19 BREAKDOWN STRENGTH WELL ABOVE OPERATING STRESS AFTER 40 YRS Nominal operating stress 12
  9. Page 13 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 13 of 19 HOT IMPULSE BREAKDOWN AT ELEVATED TEMP AFTER 40 YRS TR-XLPE EPR 13
  10. Page 14 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued October 16, 2026 RSR-059 Attachment 3 Page 14 of 19 DISSIPATION FACTOR OF TR-XLPE REMAINS WELL BELOW 0.5% 3.0 TRXLPE - 17y TRXLPE - 40y 2.5 EPR - 17y Tan Delta, % EPR - 40y 2.0 1.5 1.0 0.5 0.0 0 30 60 90 Conductor Temperature, °C 120 Dielectric losses in TR-XLPE remain minimal with temperature and age 14

Text of RSR-059 Attachment 4.pdf

Extracted from the file · 1 page · 426 characters

Text of RSR-059 Attachment 4.xlsx

Sheet names, column headings and text cells; numbers left out

As listed on the current system

Question(s) Answered 59 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 11/06/2026