Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 11

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy10 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files10

Search terms highlighted
Eversource rate increase is on 13 pages of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of RSR-011 Attachment 2.pdf

Extracted from the file · 11 pages · 40,776 characters

Text of RSR-011 Attachment 2.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RSR-011 Attachment 3.pdf

Extracted from the file · 10 pages · 43,344 characters

Text of RSR-011 Attachment 3.xlsx

Sheet names, column headings and text cells; numbers left out

Text of RSR-011 Attachment 4.pdf

Extracted from the file · 62 pages · 200,627 characters

Words on different pages
  1. Page 16 of 32

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 15, 2026 RSR-011 Attachment 5 Page 16 of 32 Docket No. 25-01-03 Monthly Totals Year-to-Date Totals xvi 39,346,724 30,859,583 36,358,036 65,660,396 23,427,729 51,666,374 27,704,242 24,976,986 39,346,724 70,206,306 106,564,343 172,224,739 195,652,468 247,318,842 275,023,084 300,000,070 300,000,070 300,000,070 300,000,070 300,000,070 300,000,070
  2. Page 17 of 32

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 15, 2026 RSR-011 Attachment 5 Page 17 of 32 Docket No. 25-01-03 xvii APPENDIX B: 2024 Plant Additions Deferred Until the Next Rate Case Jan 2024 Feb 2024 Mar 2024 Apr 2024 May 2024 Jun 2024 Jul 2024 Aug 2024 Sep 2024 Oct 2024 Nov 2024 Dec 2024 2024 DT7C:TRANSFORMERS CL&P 4,672,923 6,958,765 3,959,248 5,587,301 21,178,237 Emergent Equipment Line Annuals 3,716,814 2,302,135 6,736,136 1,799,070 14,554,155 Customer Driven Annuals 3,879,779 4,961,266 1,496,926 4,670,190 2,089,706 17,097,867 101395:DIRECT BURIED CABLE REPLACEMENT PRO 1,423,564 1,689,437 384,653 2,814,180 5,737,804 12,049,639 CS00166:Mansfield 12J Expansion 13,187 20,200 (234,818) 688,309 486,878 CS00189:Triangle 11A - Rpl Bus w/ Swgr 17,350 18,973 9,723 4,774,143 4,820,189 1,211,977 1,438,881 (35,677) 249,674 2,864,855 71,891 223,713 71,610 130,232 497,445 CTMTR24:CT Annual Meter Project for 2024 CS00261:Sandy Hook 37F - Ins 2nd XF CS00486:Mobile Xfmr Reinforcement Project 10,037,700 2,188 7,934 3,104 10,050,927 Lighting Annuals 141,651 1,368,133 1,967,982 1,081,881 4,559,647 CTEDVH24:CT Elec D Fleet Capital Vehicles 507,106 478,204 11,124 2,926,397 3,922,831 RELIABILITY IMPROVE-DR ANNUAL 468,716 154,612 1,452,320 (99,667) 1,975,981 597,915 (10,143,681) 9,415,706 (675,507) (805,567) 1,351,408 2,452,683 (106,485) (1,471,334) 2,226,272 Insurance Claim/Keep Cost CTEDVH22:CT Elec Distrib Vehicle Purchases CD02034:Great Pond, Windsor NS 266,859 (33,461) 19,964 130,874 384,237 CD00563:Rockville/Mansfield System Moderniz (16,941) (214,264) 204,643 (38,038) (64,600) CD02133:Rentschler Field - New Service 219,095 1,147,751 11,378 (271,953) 1,106,272 CS00414:E. Hartford 32G Replace OCB's 0 4,595,636 (2,314) 2,194 4,595,516 CTEDVH23:CT Elec Distrib Vehicle Purchases (368,244) 730,579 738,359 (500,820) 599,874 24703:2024 CL&P-D LOB 138,019 341,516 782,507 1,382,856 2,644,899 CD01915:New Canaan Network Conversion 339,312 (167,520) 103,879 81,568 357,240 CD01132:Triangle 11A Repl Cables for SS wor 234,520 (118,226) 7,735 25,273 149,301 495802:Third Party Make Ready Special Proj 57,939 (102,006) 520,672 79,740 556,346 CD01225:24H6 Smart Switch & Eliminating 25R CT EFO Capital Tools LINE RELOCATIONS-DH ANNUAL 92,611 0 0 2,479,833 65,215 2,545,049 213,337 138,756 310,853 391,175 1,054,121 109,264 328,742 125,810 76,086 732,512
  3. Page 18 of 32

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 15, 2026 RSR-011 Attachment 5 Page 18 of 32 Docket No. 25-01-03 CD00781:Eliminate Baldwin 5kV xviii 687,692 (215,529) 229,612 (77,690) 624,084 CD02195:11F13 WPC Reliability Improvement 911 891,575 911,839 (31,556) 1,772,769 23778:Norwalk Windows & Facade Renovation 0 16,732 (16,732) 1,410,826 1,410,826 CS00463:Compo 23K Replace Relay 0 0 0 92 92 CD01385:Reliability Greenwich Network N-2 (49,062) (74,488) 43,346 (57,475) (137,679) CD02296:Eversource CT Hot Line Clamp Repl. 0 0 0 0 0 CTARAIT:CT Reliab & Analy Insights Trans CD01885:CANTON 5R2 OVERLOAD 364,459 1,911 359 123,774 490,503 0 (33,719) 28,714 (38,542) (43,548) CD02123:1A151 PILC Cable Replacement 54,144 (460) 460 0 54,144 CD01783:1K14 PILC Cable Replacement 0 (2,986) 2,986 0 (0) CS00403:Rocky River 12Y Rplc 2-3Xfmr Relays 0 0 0 0 0 CD01559:11W47 PILC Cable Replacement 0 1,716,131 16,407 10,576 1,743,114 CD02232:47N1 PILC Cable Replacement 1,715,824 (58,361) 2,821 (2,569) 1,657,714 101610:REPAIR & REPL OF CL&P UG STRUCTURES (60,279) 61,433 (31,836) 418,919 388,237 0 0 0 0 0 22CGMR11:2022 CG Equipment CLP Equipment 21730:Windsor SOC Renovation 0 0 0 1,611,333 1,611,333 CD02164:Norwalk 9S27 Normal Overload 54,719 (184,074) 183,081 (245,282) (191,555) CD00080:Naugatuck Network Cable Replacement (917) 665,433 (21,175) 922,973 1,566,314 0 0 0 1,535,089 1,535,089 0 (310) 328 0 18 5,757 200 0 0 5,957 CD02401:11F13 Reliability Improvements CD01931:CDOT #320-0016 Windsor Locks RR CS00401:Gales Ferry 11B Convert to 115kV CD02121:11R50 PILC Cable Replacement 0 0 0 0 0 CD01677:New Circuit 14K8 255,830 (127,383) 150,375 (59,676) 219,146 CD01536:Falls Village 4L07-5L Express Feede 468,840 (110,387) 120,795 (157,412) 321,836 GXCOTRBL:TOOLS/EQUIPMENT TROUBLE SHOOTER ORG 77,155 46,411 181,772 433,857 739,195 CD00891:Extend 24J2 - Creation @ 24J5 and 2 12,425 602,793 257,897 (14,895) 858,220 DSCN23:2023 CT D SS Planned Annual 30,236 125,988 59,390 1,022 216,636 0 (56) 1,607 (1,003) 548 378,956 0 0 394,960 773,916 CD02334:Great Pond, Windsor NS ML2401:2024 Material Logistics LOB CL&P-D CD00916:South End 1G DG1 Sensors 0 0 0 519 519 CS00584:Forestville 12A Rplc MOD 9,755 15,272 83 0 25,110
  4. Page 19 of 32

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 15, 2026 RSR-011 Attachment 5 Page 19 of 32 Docket No. 25-01-03 xix CD02291:37F2 Highland Dr UG Replacement 0 (139,493) 139,493 0 (0) CD01770:Rocky River 12Y8 2020 TDRP 3,455 717 0 0 4,172 DSEQ22:2022 CT D SS Emergent Annual 5,791 29,910 11,312 2,426 49,440 CD02003:Canton 5R2/5R6 ROW Contingency Over 7,311 (93,421) 127,839 0 41,729 CD02169:TRC Circuit Patrol Fixes (54,393) (789,762) 518,679 (217,084) (542,560) CD02275:Western Lateral Contributors to CEM 35,962 122,866 35,600 (106,532) 87,896 ML2410:ML CL&P-D Vehicles 509,610 0 0 573,778 1,083,388 0 (1,086) 1,167 0 82 11,342 (74,131) 84,729 (99,767) (77,827) 0 0 0 1,018,904 1,018,904 CD00810:Williams St 9LSwitchgear/Getaway Ov CD02276:Central Lateral Reconductor CTETFI23:CT Electric Training Facility Impro CD01593:UCONN Medical Center 0 (1,666) 1,467 0 (199) 79,435 24,452 204,642 628 538,102 VOLTAGE CORRECTION-DK ANNUAL 28,009 158,849 144,493 13,061 344,413 CD02012:2N08 PILC Cable Replacement DSCN24:2024 CT D SS Planned Annual 228,945 (80,716) 13,094 37,989 0 (29,633) CD02153:Stone Bridge Commons Cheshire NS 0 0 921,082 17,254 938,336 CD01428:1K06/ 13S10 Contingency Overload 1,986 47,312 24,925 (56,853) 17,371 0 0 0 (871) (871) CD02030:6A7 Overload DSEQ23:2023 CT D SS Emergent Annual 71,074 205,407 15,914 2,443 294,837 CD01759:Noera 13H93 PILC Cable Replacement 0 (9,177) 9,177 0 0 IT23442:2023 LC Modern Desktop - CL&P 0 0 0 0 0 CD02524:4A8 DB Getaway Cable Replacement 0 0 0 866,394 866,394 CD01977:Stevenson Aerial Cable Replacement CD01951:Long Hill Rd Lateral Reliability 0 (4,300) 4,300 (31,770) (31,770) 10,461 (80,021) 83,353 58,827 72,619 217119:Berlin ATC Bldg Env Assessment 0 0 0 0 0 VOCSYS1D:CL&P VOICE RADIO SYSTEM 181 533 95,536 472,399 568,648 CD01926:Amenia Union Rd Reconductoring (434) (121,066) 118,799 (217,131) (219,833) CS00477:Riverside 2R LTC Rebuild 0 0 0 0 0 CTGISMAP:GIS GEOSPATIAL ACCURACY 0 0 0 791,793 791,793 CD01067:Replace Tri-colored Netwk Secondary 0 (2,550) 2,540 0 (10) CD02270:Eastern CEMI-Lateral Reconductoring (2,627) (23,550) 15,864 (18,172) (28,484) CD01615:23Q8 TDRP 628,886 (18,168) 18,233 (39,638) 589,314
  5. Page 20 of 32

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 15, 2026 RSR-011 Attachment 5 Page 20 of 32 Docket No. 25-01-03 CD01364:777 Summer St New Service CD01713:CT Backbone Reliability CD02146:2N05 Contingency Overload xx 3,054 (32,039) 31,481 0 2,496 0 0 0 0 0 36 (63,800) 104,235 32 40,504 CTENGCOM:Field Engineer Field Communication 103,185 107,182 15,234 97,075 322,675 CD01920:Rte 72/69 Bristol Intersection Impr (15,289) (18,014) 18,014 (3,331) (18,620) CD01244:SR N Stonington Interconnection 6,053 (20,794) 20,964 (17,143) (10,921) CD01117:Stmfrd – Greenwich Ave – Rel. Facil 3,040 (21,983) 40,780 (28,617) (6,780) 117,623 10,837 17,900 38,825 185,185 CTTRNDOBLE:CT Doble Test Kits 0 634,382 0 0 634,382 CS00556:S Meadow 1A Replace Fence 0 0 0 0 0 (2,828) GXTD24:2024 CT D SS Capital Tool Annual CD01633:CDOT L034- White St Road Widening 4,376 (29,279) 22,965 (890) FP11FIBR:FRCST PROJ TELECOM FIBER BUILDOUT 0 0 0 0 0 XTRANCT01:XTRAN Pilot Project 0 0 0 608,156 608,156 CD01223:Bradley Airport Alternate Supply 317 (224) 208,108 317,449 525,649 CD02498:Enterprise Dr DB Cable Repl Bristol 0 0 596,159 1,113 597,272 500,752 (14,252) 14,510 (4,591) 496,420 0 (9,567) 10,314 0 748 DSEQ24:2024 CT D SS Emergent Annual 264,988 76,536 21,829 1,302 364,654 CS00553:Bunker Hill 12B Replace Fence 0 0 0 0 0 CD01958:Lakeview 31A Contingency Overload 0 (116) 116 0 (0) CD02579:PRI DB Turnover Ledgewood Dr Brookf 0 (55,225) 57,824 0 2,599 CD02293:Somers Rd Enfield DB Cable Replace 0 0 0 550,606 550,606 CD01546:Convert 20H 0 (32,785) 110,926 (12,622) 65,519 CD02150:CDOT 95-97 Route 44 Norfolk CD02392:Blue Hills Ave 301D Switchgear Repl CS00267:Hopewell 22R - Install Greenjacket 0 0 0 0 0 CD02004:Canton 5R6 – Contingency Overload 101 (18,505) 18,505 (51,510) (51,409) CD01594:Haddam Qtr Solar 0 (16,367) 16,418 (27,181) (27,129) CD02548:639 Staits Tpke Watertown 0 0 0 (666) (666) 24788:Replace generator 0 0 0 520,609 520,609 CD01828:Canton 5R2 – Contingency Overload 0 (5,102) 5,140 (47,585) (47,547) CD00743:St Hwy Proj #63-703 - Impr to I-91N 0 0 0 0 0 CD00964:1G28 Contingency Overload 0 (16,436) 12,777 119 (3,541)
  6. Page 21 of 32

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 15, 2026 RSR-011 Attachment 5 Page 21 of 32 Docket No. 25-01-03 xxi CD01203:55 Elm St., Hart. - Vault Repairs 0 0 451,508 62,363 513,871 CD02046:New Load 311C Tech Park Bristol 0 0 0 505,703 505,703 80493998P:JMS-HTFD, 960 Main St - RELP 300E 0 0 0 0 0 CTTRN24:CT Electric Tools & Equipment 2024 48,889 40,008 120,745 42,160 251,803 CD02259:305N LOB Switchgear Replacement (1,357) 0 39 0 (1,319) 22703:CL&P-D Fac 2022 LOB - Bldgs & GP 0 0 0 (2,992) (2,992) 49580216:Third Party Make Ready Special Proj 0 0 0 0 0 CD02358:Enterprise Dr Rocky Hill DB Replace 0 0 0 449,727 449,727 CD00925:Convert South Leonard Ave 5 kV Feed 24,122 273,917 (7,643) (5,932) 284,464 CS00600:Mystic 13K Sound Mitigation 0 0 0 1,030 1,030 CD02261:NS 321 Ellis St, New Britain 4,525 (20,219) 28,055 1,149 13,511 CD02344:LILLINNONAH LAKE RD N. RECONDUCTORI 0 (1,615) 1,615 (15,606) (15,606) CD02287:Lower Summer St Roadway/Sidewalk Im 0 2,398 (157,465) (168,899) 9,036 CD01270:1291 Albany Ave., Hart. - Replace M 0 (7,667) 7,995 166 495 CD00773:Pinnacle Dev - Butler/Quincy St, Nr 0 0 415,021 4,354 419,376 CD00654:Eliminate 4.8 kV 12F-6X Islanded SS 20,736 (33,340) 28,335 (30,388) (14,659) CD02343:Christian St. 31C Normal Overload (21,732) 22,390 (2,142) (1,642) (3,126) 468601:4.8KV GROUNDING FOR CODE COMPLIANCE 0 0 307,178 98,618 405,797 CD00672:NewSvc - Isaac St, Nrwlk - POKO Dev 114 0 0 0 114 CD00454:Hartford Hospital - Construct New S 0 0 0 401,351 401,351 CS00316:Beacon Falls Install B/U Dist. Rel 0 0 0 400,427 400,427 CD02499:Replace Westlake. Switchgear with P 14,285 2,923 999 (901) 17,306 CD01451:Ridgefield 22N Contingency Overload 0 84,658 3,932 (8,551) 80,038 24781:Loading Dock Replacement 0 386,801 0 0 386,801 77,996 2,161 0 215,194 295,352 24785:Hartford BMS system replacement 0 0 0 369,224 369,224 CD01718:Sandy Hook 37F2 TDRP 0 0 0 0 0 CD00944:Cos Cob 11R DGI Sensors 0 0 0 0 0 CD01761:New Service Murdock Ave 0 (23,135) 23,277 (40,179) (40,038) GXTD23:2023 CT D SS Capital Tool Annual 29 0 1,552 0 1,581 CD02101:11N86 Overload Project 0 94,051 9,726 0 103,777 CTTOOL24:CT Elec D Fleet Capital Tools
  7. Page 22 of 32

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 15, 2026 RSR-011 Attachment 5 Page 22 of 32 Docket No. 25-01-03 CD02402:21P3 CDOT 79-245 Rt 91 Widening CD01762:New Serv - Broad and Greyrock DR2L20:OH RELIAB IMPROVE Torrington xxii 351,166 (68) 68 1,399 352,565 0 0 0 0 0 0 (35,641) 35,766 (11,296) (11,171) 1,481 (0) 0 115 1,596 237102:Replace air handling unit 0 0 0 0 0 CS00372:Tunnel 12S LTC Upgrade 0 0 (3,134) 0 (3,134) 23703:CL&P-D Buildings 2023 LOB 642 277 921 668 2,508 0 0 (899) 0 (899) CD02100:Convert ABB Relay Testing Site Svc (5,640) (5,120) 5,120 0 (5,640) CS00284:Carmel Hill - add 2nd Xfmr + SWGR 3,635 11,498 2,283 7,121 24,537 CD02162:RECOMMENDATION FOR I-95 0 0 0 (4,662) (4,662) CS00626:Xfmr Vacuum Processor Refurbish 0 0 0 0 0 14,184 24,187 724 (13,166) 25,929 CD01986:T-Mobile Bloomfield New Service 0 313,649 (607) 709 313,752 CD02459:Bokum 15L12, 15L68, 15L69 23kv geta 0 0 0 309,870 309,870 CD01693:Relocate 36F5 Auto-Transformers D 0 (13,802) 13,802 (23,442) (23,442) MCRO22NM:Microwave Upgrade New Milford 1,755 279 154 668 2,857 1DWANA24:Telecom CT 2024 WAN Annual DSEQ:CLP DIST.SS FAILED EQUIPMENT ANNUAL 237104:CL&P-D 2034 LOB Add'l Projects CS00516:Ridgefield 22N Replace Xfmr 27,262 104,899 12,118 2,394 146,672 CS00554:E Hartford 32G Replace Fence 0 0 0 0 0 CD01982:21P4 OVLD 0 (10,531) 10,523 (11,567) (11,575) CD02172:Farmington1C19 Contingency Overload 0 0 33,114 242,350 275,464 CS00021:SS LIGHTING UPGRADES 0 0 0 0 0 CS00426:Van Dyke 12 Rplc Xfrmr CTs 0 0 0 0 0 CS00009:REMOTE RACKING UNITS FOR SWG 15,011 0 0 0 15,011 CD01663:CDOT 135-331 High Ridge Rd Bridge 0 0 0 0 0 0 (1,389) 2,792 0 1,403 (518) (2,636) 14,068 (8,592) 2,322 CD01459:Thompson Land Trust - NS CD01897:CDOT Exit 14 Southbury Line Reloc 24763:Cheshire - Replace paving 0 0 0 0 0 MCRO22SM:Microwave Upgrade South Mtn 1,407 856 1,574 6,855 10,691 CD00942:CDOT 14-185 Int 95 Brdg over rt 1 0 0 0 0 0 CD01374:Williams St 9L09 Crystal Ave UG Loo 0 0 134,957 71,753 206,710
  8. Page 23 of 32

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 15, 2026 RSR-011 Attachment 5 Page 23 of 32 Docket No. 25-01-03 xxiii CD02104:VCP, Johnson St, Middletown 0 0 177,914 25,037 202,950 CD01780:24F1 Replace Ringed Spacer Cable 0 (9,394) 9,394 0 0 10139521:Direct Buried Cable Replacement 0 (1) 1 0 0 DN5T21:New/Existing Customers Tolland 0 195,310 1,458 (754) 196,015 0 (6,306) 6,306 (3,877) (3,877) 343 (9,007) 4,215 (4,792) (9,241) CD00412:CL&P Repl Net. Xfmrs Blanket CD02194:26E8 WPC Reliability Improvement CS00549:Berlin 6A Rplc Bat & Chrgr DSQ03004 0 0 0 0 0 MCRO22TM:Talcott Mtn Microwave Upgrade 42 1,099 154 817 2,112 701 (5,597) 5,701 20,379 21,185 0 975 0 0 1,284 CD01473:DG Impact Study Verogy Enfield DSCN22:2022 CT D SS Planned Annual MCRO22NT:Microwave Upgrade Newtown CD02045:48C7 Overload Project CS00493:Tracy 14M OCB Replacement PH2 309 1,068 383 232 545 2,228 0 (2,049) 2,049 (3,411) (3,411) 11,460 12,685 8,516 18,112 50,773 CD01752:4R09 TDRP 0 (4,877) 4,877 (1,999) (1,999) CS00577:Rockville 14W Transformer Refurbish 0 0 0 0 0 CS00707:Berlin 6A Install HVAC&H2 Detection 888 0 0 0 888 CD01480:Main St Bridge Replacement in Stamf 0 0 0 0 0 CD02182:NS 3333 Berlin Tpke, Newington 0 0 0 158,497 158,497 CD01555:11R56 PILC Cable Replacement 227,992 (123,954) 49,457 41 153,537 CD01822:School House Rd 16S Inst B/Up Steps 6,625 (18,472) 18,472 (33,232) (26,607) 10161021:Repair & Repl of CL&P UG Structures 0 0 0 0 0 CS00455:Weston 21M Rplc Rclsr Xfer DSN92046 0 0 0 0 0 CD01357:10 or more Wagon Wheel Road 0 (13,843) 13,843 (5,001) (5,001) CTSWITCH24:CT Electric Training Equipment 18,391 4,515 80 46,049 69,035 CD01861:Nevar Co., 343 Lopus Rd Beacon Fall 0 (217) 295 (3,047) (2,969) CTTRNSUB24:Berlin Training Substation 2024 3,630 28,646 25,914 25,825 84,015 CTCSCG24:CT Apprentice Climbing Gear 2024 0 0 0 128,125 128,125 CD02118:Verogy, Oakdale Rd, Montville 0 0 116,153 6,938 123,091 CT24CAPEQUIP:2024 Capital Equipment Dist Comm 0 0 0 120,973 120,973 1,422 0 0 93,853 95,275 0 0 0 119,257 119,257 22760:Windsor ERP Staging Site CD02506:37F Substation Cable to New Switchg
  9. Page 24 of 32

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 15, 2026 RSR-011 Attachment 5 Page 24 of 32 Docket No. 25-01-03 xxiv CD02138:5R80 EXTENSION - Colebrook 0 (5,740) 5,740 (9,225) (9,225) 201435:SUBSTATION METERING 0 0 0 0 0 CD02119:VCP Realty,Winthrop Rd Deep River 0 0 112,294 1,655 113,949 CD01383:Charter Communications Phase 2 0 0 0 0 0 CTCSTRN24:CT Apprentice Tools & Equipment 6,014 12,125 13,688 68,116 99,943 CD01297:Parcel 38 – Tresser Blvd Phase 2 25,088 (2,039) 2,039 0 25,088 23775:Wtby Freight - Mech. Equip. Replc. 7,664 458 0 0 8,121 103353:CL&P REPLACE LEAKING SPLICES 9,788 (1,277) 1,696 0 10,207 CD00322:OLD SYBRK - MAXS PLACE - DB LOOP 0 0 0 0 0 20CGMR11:2020 CG Equipment- Shared Services 0 0 0 0 0 CD01386:2020 CT DB Insp/Fault Ind Repl 0 0 0 0 0 CD01941:Main St MH#33 Rerack Splices 0 0 88,465 2,629 91,094 ML2301:2023 CLP-D ML Line of Business 0 0 44,854 (45,385) (531) CD01489:Convert-Reloc Step-Crown St 12F55 0 0 0 0 0 CTWEDV23:CT Elec D Wrkfrce Exp Flt Cap Veh 0 78,538 0 0 78,538 CD01878:17F Brook St Recovery Plan 0 (5,273) 7,231 0 1,958 102118:PCB TRANSFORMER REPL PROGRAM 17,657 6,417 25,895 3,981 53,950 CD02330:Driftway Ln Reconductoring & Tree 0 0 0 76,860 76,860 CD01393:CD01393 Wind Colebrook South 0 5,354 27 911 6,293 CTMTR23:CT Annual Meter Project for 2023 0 0 0 0 0 CD01024:Norwalk 9S 5kV Elimination 0 0 0 0 0 CD01611:Dooley 30K16 Contingency Overload d 0 (688) 748 0 60 CD01914:Bungee Lake Reconductoring 0 (7,995) 7,995 (10,893) (10,893) CD01558:Ridgefield 22N4 & 22N1 Normal Overl 0 (291) (455) (1,696) (2,442) CD01607:Hartford Reverse Risers Rebuilds 0 (12,034) 8,799 (2,607) (5,842) CD01964:Great Wolf Resort at Foxwoods 0 0 0 0 0 CS00573:Rocky Hill 3R Battery Monitor 0 0 52,147 0 52,147 CD01950:30R10 Durham Rd Lateral Reconductor 0 (16,382) 16,381 (19,854) (19,856) CS00611:Shepaug 13A Battery Monitor 0 0 549 1,643 2,192 CTTRNSUB:Berlin Training Substation 0 0 0 0 0 21CGVE11:2021 CG Vehicles CT MTR 0 0 0 0 0
  10. Page 25 of 32

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Date Issued September 15, 2026 RSR-011 Attachment 5 Page 25 of 32 Docket No. 25-01-03 xxv CS00536:Windsor Locks 14K Battery Monitor 278 784 0 0 1,063 CS00534:E New Britain 7L Battery Monitor 0 0 0 0 0 611 840 0 0 1,451 0 0 0 0 0 CTDMX23:CT DMX Replacements 23747:Wat Fr - Front office renovation CD01657:Amazon Distribution Warehouse 0 (9) 23,252 0 23,243 CS00418:NW Hartford 2N Replace OCB's 1,724 1,217 0 3,869 6,809 21703:CL&P-D Fac 2021 LOB (344) 212 539 (7,610) (7,204) CD00728:Cedar Heights - Establish new fdr;4 0 (3,654) 3,654 (1,466) (1,466) CD02137:Salmon Brook Granby NS DB 0 0 0 0 0 CD01912:Middlebury 18J1 Reliability Improve 2 (4,608) 4,597 0 (8) CD00992:New Road in Bristol, Relocate and S 0 (129) 129 0 0 CTCSTT23:CT Apprentice Truck Tool Kits 0 0 0 0 0 CD01779:13S9 Overload Project 0 (852) 160 (1,375) (2,067) CD01756:Sandy Lane Village DB Cable Replace 0 0 0 0 0 CT24SCADA:SEL ICON for SCADA Access Solution 0 0 0 25,613 25,613 20703:CL&P-D Fac LOB for 2020 0 891 (13) 0 878 CD01009:15C8, 13B10, 13B21 New Loops 0 (1,385) 1,027 (1,131) (1,488) CD01810:Vault#9 Prospect St, Ridgefield UCT 0 0 0 0 0 IT1DWANA:TELECOM -WAN ANNUALS - CLP 0 0 0 0 0 DSEQ21:2021 CT D SS Emergent Annual 103 0 0 151 254 CTTENT23:2 Tents for Berlin Training Yard 0 0 0 0 0 CD01398:Town of Norfolk, 599 Greenwoods Rd 0 0 0 17,289 17,289 CS00459:Stony Hill 48C BES Battery Monitor 0 0 16,644 0 16,644 21CGMR11:2021 CG Equipment CLP Equipment 0 0 0 0 0 CD01465:Cedar Heights Rd Bridge CDOT 135 0 0 0 0 0 BHSEL24:ISO NE Blue Hills SEL ICON 0 0 0 0 0 2,026 0 0 0 2,026 CD01872:Line Relocation Rubber Ave Naugatuc 0 12,819 50 0 12,868 CD00947:Westside 7A DGI Sensors 0 0 0 0 0 217114:CL&P 2021 LOB Add'l Projects 0 2,834 (28) (117) 2,689 CD01827:Cromwell Chelsea Estates Create DB 0 2,720 6,059 2,335 11,114 CD01667:13H91 Replace Ringed Spacer Cable

Text of RSR-011 Attachment 6.pdf

Extracted from the file · 22 pages · 79,474 characters

As listed on the current system

Question(s) Answered 11 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/10/2026

This filing on the current system (opens in a new tab)