Interrogatory responses

Answers to questions 30, 31, 32, 34, 36

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy5 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files5

Search terms highlighted
Eversource rate increase is on 2 pages across 2 files of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
1 page match
Words on different pages

Text of UCONN-034_Final.pdf

Extracted from the file · 2 pages · 2,192 characters

Words on different pages
  1. Page 1

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-03 Date Issued October 07, 2026 UCONN-036 Page 1 of 2 Date Filed: October 21, 2026 Witness: Mark P. Baldwin, Christopher Colorio, Lavelle A. Freeman and Elli Ntakou Request from: UCONN Question: (Critical Facility Reliability and Performance Incentive Mechanisms) Refer to the response to UCONN-020 and Exhibit CLP-ELP-1 at pp. 103-117. a. Please state how Eversource designates a hospital or other essential facility as a Critical Facility; b. Please state the number of accounts designated as Critical Facilities; c. On an anonymized aggregate basis, provide the frequency and duration of outages for these designated accounts between 2023-2025 compared with systemwide frequency and duration of outages; and d. Please explain how the proposed Performance Incentive Mechanisms will help prevent service interruptions at Critical Facilities and what restoration data will be reported to PURA during the proposed plan. Response: a. Critical facilities are defined in the Connecticut ESF-12 Annex, as follows: Critical Facility – a building or structure where loss of utility services may interrupt functions considered essential for the delivery of vital services and the life safety of the community. They usually include emergency response facilities (fire, police, rescue, emergency operations centers), hospitals, licensed convalescent homes, facilities designated as emergency shelters, water supply and waste water treatment as provided by the CT Department of Health (DPH) and Department of Energy and Environmental Protection (DEEP), communications facilities (E911 and Public Safety Answering Points), and any other assets pre-identified or identified at the time of the emergency as needed to be of critical importance for the protection of the health and safety of the population. b. There are currently 1,491 accounts designated as “Town Critical Facilities”. c. The table below provides a comparison of SAIDI, SAIFI, and CAIDI system-wide versus performance for the Town Critical Facility (TCF) population. To calculate the TCF metrics, the total customers impacted and total customer minutes were calculated for TCF accounts and divided by the total TCF population. Performance is on par with or better than statewide performance.
  2. Page 2

    The Connecticut Light and Power Company d/b/a Eversource Energy Docket No. 26-05-10 Set UCONN-03 Date Issued October 07, 2026 UCONN-036 Page 2 of 2 Population YEAR 2023 System 2024 2025 2023 TCF 2024 2025 IEEE Non-Storm SAIDI SAIFI CAIDI 76 0.67 114 77 0.65 119 85 0.69 125 59 0.57 103 64 0.55 117 65 0.60 108 IEEE All In SAIDI SAIFI 182 0.82 152 0.83 208 0.92 182 0.85 142 0.78 184 0.95 CAIDI 222 182 227 215 183 194 d. As noted in several prior responses, PIMs are intended to provide performance incentives and accountability; however, PIMs alone do not directly cause reductions in service interruptions, whether in frequency or duration, nor do they impact any particular customer group independently of the Company’s broader operational and investment activities. As the Company continues to invest in the system to improve reliability and resiliency for all customers, service quality for Critical Facilities in impacted areas will also improve. During the PBR term, if accepted, the Company will continue to provide previously required outage and restoration reporting. Reporting of PIMs will depend on acceptance of the PBR proposal and requirements from PURA.

As listed on the current system

Question(s) Answered 30, 31, 32, 34, 36 (Connecticut Light and Power Company dba Eversource Energy) Date Filed: 10/21/2026

This filing on the current system (opens in a new tab)