Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1 thru 1

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy14 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files14

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
  1. Page 2 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 13 REDACTED Page 2 of 14 Eversource Energy – Tolland AWC QGM Scoping Study May 2026, page 2 of 14 Aerial views of the campus with stie floorplans overlaid are shown below: First Floor and Garage: Offices and Conference Rooms Warehouse Maintenance Garage
  2. Page 3 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 13 REDACTED Page 3 of 14 Eversource Energy – Tolland AWC QGM Scoping Study May 2026, page 3 of 14 Second Floor and Mezzanine: Total facility footprint is ~64,600 SF across all buildings. Campus population is 80 people, with variable but high attendance at the site. Typical occupancy is 7:30 AM – 5:00 PM Monday through Friday, with equipment scheduled for occupancy 5:00 AM – 5:00 PM. Additionally, the garage building has a second shift, operating until 11:30 PM, and minor weekend occupancy from storm duty or other projects is frequent. Total site operating hours are estimated to be ~4,600 annually. Building structures are dated with some HVAC equipment from original construction. HVAC is provided by: - - A water source heat pump (WSHP) heating and cooling loop serving both perimeter units and fresh-air intake core units in the office, conference room, and common areas o WSHP loop heat provided by an aged electric resistance boiler o WSHP heat rejection provided by a Frick cooling tower (1) electric resistance heat/DX cooling packaged rooftop unit (RTU) serving the second floor spaces Electric unit heaters (EUHs) throughout the shop areas, garage, and warehouse Electric cabinet unit heaters (ECUHs) in foyers and entryways Spot cooling and heating by splits systems and air source heat pumps (ASHPs) HVAC controls consist of digital programmable thermostats (noted to be programmed well-maintained) and dial thermostats. Despite the lack of a DDC building management system, the building is well controlled and adhering to occupancy schedules and manual control of outside air intake. Lighting systems are modern LED with integrated controls and were observed to be functioning well.
  3. Page 4 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 13 REDACTED Page 4 of 14 Eversource Energy – Tolland AWC QGM Scoping Study May 2026, page 4 of 14 Garage and shop equipment include electric hoists, hand tools, and (2) small compressed air plants with air provided by individual 5hp reciprocating air compressors. Monthly Billing Analysis Electric use is metered but not billed at this site with annual use provided; monthly use was modeled based on annual use, the site’s footprint, hours of operation, equipment power density and estimated utilization, and example monthly load profiles from similar sites. Annual Site Summary Energy Costs Energy Usage and Costs $ kWh mmBTU Electric (kWh) $ 39,367 275,680 941 MT CO2 Emitted 80.2 Unit Costs $0.14 There is natural gas service at the site, but end uses are noted to be minimal: site emergency generator and a low-utilization pressure washer. $0.1428/kWh was used as an electric rate based upon Eversource Facilities’ third-party electric supply costs for similar type facilities. A summary of estimated monthly electric use is shown below: Monthly Utility Use Summary Estimated Monthly Electric Month Electrical Estimated Use (kWh) Cost ($) Jan-25 33,348 Feb-25 26,679 Mar-25 20,009 Apr-25 13,339 May-25 11,116 Jun-25 24,455 Jul-25 31,125 Aug-25 26,679 Sep-25 22,232 Oct-25 11,116 Nov-25 24,455 Dec-25 31,125 TOTAL 275,680 $4,762 $3,810 $2,857 $1,905 $1,587 $3,492 $4,445 $3,810 $3,175 $1,587 $3,492 $4,445 $39,367 Estimated Blended Rate ($/kWh) $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 $0.14 The energy use intensity (EUI) shown below is an indicator of building performance in terms of energy use (kbtu) per building square foot:
  4. Page 5 of 14

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  5. Page 6 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 13 REDACTED Page 6 of 14 Eversource Energy – Tolland AWC QGM Scoping Study May 2026, page 6 of 14 As above for CDD, visual electrical peaks to coincide with increases in HDD; however, the regression indicates no statistical relationship. The combination of two correlations makes initial regression difficult. As an additional aid to modeling electric use, CDD and HDD were next compared to only the relevant months: summer and shoulder months for CDD and winter and shoulder months for HDD, with the resulting graphs shown below: R2 values of 0.96 for separated cooling electric use and 0.95 for separated heating electric use indicate good model fits for the estimated electric use at this facility. Mechanical System Energy Use Breakdown Electric Use Based on the initial walk-through, the following electric energy use breakdown was developed. These results should be considered high level and were sourced from motor nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.
  6. Page 7 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 13 REDACTED Page 7 of 14 Eversource Energy – Tolland AWC QGM Scoping Study May 2026, page 7 of 14 Estimated End Use Breakdown - Electricity Electric End Use Energy Use (kWh) Plug & Process 15,000 HVAC - Heating & Cooling 225,000 Lighting 40,000 CAIR 3,000 TOTAL 280,000 Equipment Inventory: A site equipment inventory was created to catalog the current equipment, as shown below: Eversource Tolland AWC Equipment Inventory Tag QTY Type RTU Mezz HVAC 1 1 1 1 1 2 ~70 1 1 1 6 20 1 1 1 4 13 1 1 2 1 1 1 Packaged Electric/DX RTU WSHP core unit WSHP core unit WSHP core unit WSHP core unit WSHP core unit Perimeter WSHP Electric Boiler Cooling Tower Pump Motor Electric Cabinet Unit Heater Electric Unit Heater WSHP WSHP WSHP Electric Hot Water Heater Exhaust Fan Electric Hot Water Heater Exhaust Fan ASHP Recip Air Compressor Recip Air Compressor CAIR Dryer Offices 1st Fl HVAC WSHP Boiler CT WSHP Loop Pumps CUH EUH Data Room Data Room Data Room DHW EF Garage DHW Garage EF Garage Cooling Shop A/C Garage A/C Garage A/C Manufacturer Model Serial # Trane THD240G4RRB0SPC 192311044D Trane GEVE03641G01B0TLF0 W19E13324 ClimateMaster TCV060AFC30CRTS N13340918 Bosch EC240-4VTC 2940-176 Trane GEVE1204F0DB0 W20A02811 ClimateMaster TCV120 Friedrich / Adirondack Aire multiple Chromalox CEW-156 SS-10156 P79 Frick 43463-1 Lincoln Chromalox/ Federal Pacific Bosch ClimateMaster Typhoon Rheem Multiple Hubbell Bryant Ingersoll Rand Quincy Arrow multiple LV030-1VTC GCH030BGC30CLSS 2940-040 314531019 Cooling MBH Ton 20 246 3 36 5 60 20 315 9.9 134 10 120 1 3.4 505 HP CFM 7.5 1 1 4 3 2 0.1 8,000 1,140 1,950 8,000 3,500 4,000 148 kW 20 15 2.4 2.5 3 3 32.6 30 ELD52-B multiple S4010SLR RR 0810D07214 20.5 40100 34 2545E10V QR-325 212110143 Notes 72 kW electric coil Fresh air intake and ERV Fresh air intake Dampered fresh air intake Fresh air intake Fresh air intake 0.25 0.25 Throttled to 300 gpm, 254T Dial stat control Dial stat control 950 1,000 2nd Stage/additional cooling Backup, aged unit 6 kW Timers and manual controls 5/5 kW W/ bay exhaust, low utilization 1.5 5 5 35 35 35 Low utilization High utilization Non-cycling Site Energy Efficiency Measures/Recommendations EEM – 01 – Consider Building Shell Gap Remediation During the walkthrough of the site, future renovations were discussed such as roof replacement (scheduled for 2027) and exterior façade work. Facility staff may want to consider building shell remediation as part of or in tandem with these efforts. Insulation and air sealing are understood to be original construction and have likely degraded over time, visible as gap and cracks in door systems and drafts through window systems, and invisible as roof/wall building plane intersections (possibly addressable as a facet of roof replacement). Envelope gaps allow the infiltration/exfiltration of untempered air and increase the load on HVAC equipment. It is recommended that the site perform a comprehensive building and thermal shell survey and remediate any identified gaps. Pictures below detail some of the observed building shell gaps:
  7. Page 8 of 14

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  8. Page 9 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 13 REDACTED Page 9 of 14 Eversource Energy – Tolland AWC QGM Scoping Study May 2026, page 9 of 14 15hp constant speed pumps use an estimated 50,000 kWh annually, and retrofitting VFD controls would allow for the pump motor speed to match the demand for hot water and the ability to reduce speed when demand is lower. It should be noted that replacement of existing end-use three-way valves with new two-way valves would be required in order for actual loop flow to be modulated, at significant implementation cost. This measure would likely only make sense as part of an overall equipment or system overhaul, rather than as a standalone energy measure. Savings are estimated based on an average 40% reduction of the pump’s electrical energy: Estimated Annual Energy Savings: 20,000 kWh Estimated Annual Cost Savings: $3,000 Estimated Implementation Costs: $127,000 Next Steps: - Facility staff could discuss future equipment and system design with a mechanical vendor EEM – 03 – Consider Installing VFD Fan Control on the Cooling Tower Fan The WSHP loop cooling tower (CT) was noted to be constant speed, regardless of actual loop heat rejection demand. Confined space limitations precluded visual inspection of the fan, but the motor capacity is reasonably estimated to be 20hp, with high utilization during summer and shoulder season hours. It is recommended that the facility consider retrofitting the existing CT fan with VFD controls, allowing the fan to modulate according to differential temperature between the WSHP loop temperature and wet-bulb outdoor air temperature. Savings assume an average 40% reduction in CT fan energy across its annual operation: Estimated Annual Energy Savings: 19,000 kWh Estimated Annual Cost Savings: $53,000 Estimated Implementation Costs: $5,000
  9. Page 10 of 14

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  10. Page 11 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 13 REDACTED Page 11 of 14 Eversource Energy – Tolland AWC QGM Scoping Study May 2026, page 11 of 14 Estimated Annual Energy Savings: 28,000 kWh Estimated Annual Cost Savings: $4,000 Estimated Implementation Costs: $37,500 Next Steps: - Facility staff should review equipment selection and sizing with a mechanical vendor or local supplier if planning to self-install. Additional Considerations Building Management System Facility HVAC controls were discussed with site operators during the walkthrough. Although this is one of the few such sites without a centralized building management system (BMS), existing tight manual controls reduces the impact of potential controls savings, particularly against a high implementation cost due to the amount of equipment that would need to be integrated. Controls strategies such as adaptive optimal startup and demand control ventilation would offer some additional energy savings beyond existing control, and there are operational benefits such as remote access and equipment status monitoring that could be beneficial for future consideration. Sustainability Considerations Background Site and portfolio sustainability is best guided by the framework and methodology set forth in ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance (available for purchase here: https://www.ashrae.org/technical-resources/bookstore/ansi-ashrae-standard-228-standardmethod-of-evaluating-zero-net-energy-and-zero-net-carbon-building-performance). The site is not known to have a present net-zero strategy; however, the ASHRAE standard presents a strong method to: - Assess current building energy use and carbon emissions Establish a baseline Develop milestones Develop a plan to reach milestones The data and information shown below are intended to help develop an understanding of where current portfolio sustainability goal aligns with current position. Emissions Scopes Emissions reporting is generally addressed across three Emissions Scopes, as seen below:
Words on different pages
Words on different pages

Text of UPA-001-SP01 Attachment 10 REDACTED.pdf

Extracted from the file · 19 pages, 4 without text · 27,484 characters

Text of UPA-001-SP01 Attachment 9 REDACTED.pdf

Extracted from the file · 24 pages, 5 without text · 30,898 characters

Text of UPA-001-SP01 Attachment 8 REDACTED.pdf

Extracted from the file · 17 pages, 5 without text · 22,701 characters

Text of UPA-001-SP01 Attachment 7 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,187 characters

Text of UPA-001-SP01 Attachment 6 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 14,512 characters

Text of UPA-001-SP01 Attachment 5 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,555 characters

Text of UPA-001-SP01 Attachment 4 REDACTED.pdf

Extracted from the file · 16 pages, 4 without text · 19,788 characters

Text of UPA-001-SP01 Attachment 3 REDACTED.pdf

Extracted from the file · 12 pages, 4 without text · 11,899 characters

Text of UPA-001-SP01 Attachment 2 REDACTED.pdf

Extracted from the file · 11 pages, 4 without text · 10,526 characters

Text of UPA-001-SP01 Attachment 1 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 17,141 characters

As listed on the current system

Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026

This filing on the current system (opens in a new tab)