Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1 thru 1

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy14 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files14

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
  1. Page 3 of 15

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 12 REDACTED Page 3 of 15 Eversource Energy – Cheshire Service Center QGM Scoping Study June 2026, page 3 of 15 Monthly Billing Analysis Site staff provided monthly historical natural gas use (CCF) and cost. Electric energy is metered but not billed at this site, with annual use provided. Monthly use was modeled based on annual use, the site’s footprint, hours of operation, equipment power density and estimated utilization, and example monthly load profiles from similar sites. $0.1428/kWh was used as an electric rate based upon Eversource Facilities’ third-party electric supply costs for similar type facilities The most recent 12 months are summarized below: Costs Energy Usage and Costs Cost - $ Electric (kWh) $98,040 Natural Gas (CCF) $42,420 Total $140,460 Site - Last 12 Months Energy % of total kWh & CCF mmBTU % of total 70% 30% 100% 686,553 18,789 2,343 1,933 4,276 55% 45% 100% MT CO2 Emitted 253.5 102.6 356.1 Unit Costs $0.14 $2.26 Natural gas costs as accounted throughout this analysis have the monthly per-meter “customer charges” removed, for assessment of natural gas marginal cost only. A monthly summary of electric and thermal use is shown below: Monthly Utility Bill Summary Estimated Monthly Electric Monthly Natural Gas Blended Natural Blended Electrical Estimated Total Month Rate Month Gas Use Rate Use (kWh) Cost ($) Cost ($) ($/kWh) (CCF) ($/CCF) Jun-25 55,164 $7,877 $ 0.14 Jun-25 112 $253 $2.26 Jul-25 68,955 $9,847 $ 0.14 Jul-25 20 $45 $2.26 Aug-25 75,851 $10,831 $ 0.14 Aug-25 35 $79 $2.26 Sep-25 55,609 $7,941 $ 0.14 Sep-25 115 $260 $2.26 Oct-25 34,478 $4,923 $ 0.14 Oct-25 533 $1,203 $2.26 Nov-25 48,269 $6,893 $ 0.14 Nov-25 2,012 $4,543 $2.26 62,060 $8,862 $ 0.14 Dec-25 3,826 $8,638 $2.26 Dec-25 Jan-26 75,851 $10,831 $ 0.14 Jan-26 4,311 $9,733 $2.26 Feb-26 82,746 $11,816 $ 0.14 Feb-26 4,086 $9,225 $2.26 Mar-26 62,060 $8,862 $ 0.14 Mar-26 2,235 $5,046 $2.26 Apr-26 31,033 $4,431 $ 0.14 Apr-26 1,113 $2,513 $2.26 May-26 34,478 $4,923 $ 0.14 May-26 391 $883 $2.26 TOTAL 686,553 $98,040 $ 0.14 TOTAL 18,789 $42,420 $2.26 The energy use intensity (EUI) shown below is an indicator of building performance in terms of energy use (kbtu) per building square foot:
  2. Page 4 of 15

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 12 REDACTED Page 4 of 15 Eversource Energy – Cheshire Service Center QGM Scoping Study June 2026, page 4 of 15 Building Energy Use Intensity (EUI) Utility Site EUI Source EUI Unit Natural Gas 28 29 kbtu/sf Electricity 34 96 kbtu/sf TOTAL 63 125 kbtu/sf Source-site ratio per national average, source: https://portfoliomanager.energystar.gov/pdf/reference/Source%20Energy.pdf The EUI metric can be used to baseline existing energy use for future comparison or to compare this building to similar buildings of this type. Energy Star publishes median data by building type for overall comparison. An analysis was carried out for the metered natural gas use and heating degree days (HDD), as seen below: The first graph indicates a visual relationship between natural gas use and HDD, suggesting a majority of the natural gas is used for building heating. Minimal summer month natural gas use can likely be attributed to service hot water. The regression further shows that site natural gas use has a strong, statistically significant relationship to HDD, with an R2 value of 0.99. For electrical consumption, weather data for the site was utilized to help generate a monthly site profile. Below are graphs for the estimated monthly site electrical use and cooling degree days:
  3. Page 5 of 15

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 12 REDACTED Page 5 of 15 Eversource Energy – Cheshire Service Center QGM Scoping Study June 2026, page 5 of 15 The regression above along with provided annual use was developed to help determine building monthly electrical use. Within the first graph, electric use can be seen to follow a similar trend to CDD during cooling season. The regression shows a statistically significant relationship to CDD, with an R 2 value of 0.61. The Department of Energy Superior Energy Performance (SEP) program qualifies that a statistical relationship exists between the two variables with an R2 value of > 0.5, and a strong relationship with an R 2 value of > 0.75. Additionally, monthly electric use was compared to the heating months and the winter/shoulder months to address site electric heating operations in the developed profile. The regressions above show site electric use R 2 value as ~0.84 when compared against the winter and shoulder months, indicating a statistically significant relationship between the two variables, or that heating (as well as cooling) demand has an influence over site electrical use – due to electrical use during winter and shoulder months from electric heating from unit heaters and WSHPs. Mechanical System Energy Use Breakdown Electric Use Based on the initial walk-through, the following electric energy use breakdown was developed. These results should be considered high level and were sourced from motor nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.
  4. Page 6 of 15

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 12 REDACTED Page 6 of 15 Eversource Energy – Cheshire Service Center QGM Scoping Study June 2026, page 6 of 15 Estimated End Use Breakdown - Electricity Electric End Use Energy Use (kWh) HVAC - Fans & Cooling 470,000 Lighting 140,000 Compressed Air 23,000 Plug and Process Load 53,000 TOTAL 686,000 Natural Gas Use Based on the site walk-through and provided billing data, the following site natural gas use breakdown was developed. As above, these results should be considered high level and were sourced from equipment nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.
  5. Page 7 of 15

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 12 REDACTED Page 7 of 15 Eversource Energy – Cheshire Service Center QGM Scoping Study June 2026, page 7 of 15 Estimated End Use Breakdown - Natural Gas Natural Gas End Use Energy Use (CCF) Comfort Heating 18,800 Service Hot Water 0 TOTAL 18,800 Equipment Inventory Equipment inventories were created to catalog existing equipment, as shown below: HVAC Equipment:
  6. Page 8 of 15

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 12 REDACTED Page 8 of 15 Eversource Energy – Cheshire Service Center QGM Scoping Study Tag June 2026, page 8 of 15 Eversource Cheshire Service Center HVAC Equipment Inventory Cooling Model Serial # MBH Fan HP CFM Notes Ton Trane YHC060F4RHA1TH0C1A1 203213959L 5 104 1 3,953 Trane YHC120F4RHA0RH600C1 204513289L 10 202.5 2.75 6,800 Trane YHD240G4RHD15H8 210910529D 20 324 7.5 Trane YHC074F4RHA0RH0C1A1 203411566L 6 121.5 2.75 Greenheck DG-109-H10-DB 15510990 2 1.5 18 0.66 Typical of 20 153739 Type Manufacturer Packaged Roof Top Unit Packaged Roof Top Unit RTU-2 Packaged Roof Top Unit Packaged Roof Top Unit MAU-1 Make Up Air Unit WSHP Infrared Heater Infrared Heater 1 Exhaust Fan Exhaust Fan 3 Exhaust Fan 6 Exhaust Fan 5 Exhaust Fan 4 Exhaust Fan 12 Exhaust Fan 11 Exhaust Fan 8 Exhaust Fan 9 Exhaust Fan Exhaust Fan 14 Exhaust Fan 15 Exhaust Fan Exhaust Fan 16 Exhaust Fan 17 Exhaust Fan 18 Exhaust Fan Canarm HVAC RTA42T30500M Cook 195 ACRU Cook 300 ACRU 5 23,874 140SH598010-00/0000701 0.75 3,990 140SH59801-00/0002001 2 10,500 Boiler Equipment: Eversource Cheshire Service Center Boiler Equipment Quantity 1 Type Make Electric Boiler LAARS Model EB-144-480 Max Max Input Output (kW) (MBH) 144 491 Eversource Cheshire Boiler Pumps Description Quantity HP Circulation Pumps 2 1.5 Compressed Air Equipment: Make Chicago Pneumatic Model Eversource Cheshire - Compressor Inventory Full Load Capacity Compressor HP Power Control Type (SCFM) Type (kW) RCP-C15123D4 7.5 6 46 Reciprocating On/off Cooling Voltage Air Cooled 460
  7. Page 9 of 15

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  8. Page 10 of 15

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 12 REDACTED Page 10 of 15 Eversource Energy – Cheshire Service Center QGM Scoping Study June 2026, page 10 of 15 EEM – 02 – Consider Water Source Heat Pump Loop Summer Temperature Reset WSHP loop temperature reset may be a viable controls strategy. Currently the loop temperature is set at 85˚ F, and the fans modulate to maintain that supply temperature. With reset, the loop temperature would be set by the outdoor air wet bulb temperature and an offset (7-15˚ F depending on age and condition of the cooling tower) and the fans would modulate to meet that temperature. The result would be cooler tower supply water to the heat pumps, thus reducing the “lift” seen by the compressors and the load required to achieve cooling setpoints. It is recommended that facility staff work with their local controls vendor to determine feasibility and execution of loop temperature reset. Savings assume a conservative 10% reduction in annual cooling energy use. Estimated Annual Energy Savings: 4,000 kWh Estimated Annual Cost Savings: $600 Estimated Implementation Costs: $5,000 Next Steps: - The site is encouraged to discuss potential control upgrades with a reputable mechanical/controls vendor. EEM – 03 – Consider Building Management System Upgrade – Demand Control Ventilation Building HVAC operation and controls do not currently include Demand Control Ventilation (DCV). DCV uses CO sensors in the return airstream or space served to monitor the level of CO in the space and modulate outdoor air dampers to introduce only as much outdoor air as needed. Modern DCV controls would offer a significant increase in the ability to modulate the introduction of outside air based on occupancy. The graphic below illustrates how DCV modulates the intake of fresh air based on occupancy: It is recommended that the site consider the addition of DCV controls for all areas served by RTUs. Savings are estimated based on overall site occupancy profiles during all periods, assuming high occupancy during peak daytime hours, average occupancy during mornings and evenings, and low or no occupancy during overnights and weekends.
  9. Page 11 of 15

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 12 REDACTED Page 11 of 15 Eversource Energy – Cheshire Service Center QGM Scoping Study June 2026, page 11 of 15 Estimated Annual Energy Savings: 13,000 kWh and 3,000 CCF Estimated Annual Cost Savings: $9,000 Estimated Implementation Costs: $50,000 Next Steps: - The site is encouraged to discuss potential control upgrades with a reputable mechanical/controls vendor. EEM – 04 – Consider Installing Cycling Air Dryer During time of site audit it appears the site is operating a non-cycling compressed air dryer. Due to the low demand of the system at times the dryer will consume close to max rating of demand regardless of the sites compressed air load. Therefore it is recommended to consider costs to upgrade the dryer before or after failure. It is recommended that facility staff work with their local vendor to determine cost for new dryer with installation. Savings assume a reduction in annual energy use due to dryer being able to operate at part load. Estimated Annual Energy Savings: 7,500 kWh Estimated Annual Cost Savings: $1,000 Estimated Implementation Costs: $7,500 Next Steps: - The site is encouraged to discuss potential upgrades with existing compressed air vendor. Additional Considerations Water-Cooled Ice Machine The site is currently operating an air-cooled ice maker that rejects heat into the surrounding space, adding minor thermal load to the building during cooling season. Discussion with site staff indicates that the installation of a water-cooled ice maker is under consideration. An advantage of a water cooled unit is that the waste heat could be rejected into the water source heat pump loop again reducing the lift and load seen by the compressor. The savings available from reducing the load on the ice make compressor would likely be very close to or less than the load added to the electric heating equipment to make up the heat currently supplied by the air cooled condenser of the ice machine. Thus, this measure is unlikely to be cost effective. Additional Electrification As at other sites of this type through the portfolio, electrification was considered via replacement of existing natural gas fired RTUs for heat pump equipment to eliminate site fossil fuel use for heating. Possible technologies could include additional WSHPs, ASHPs, or a ground source heat pump installation. Given the recent replacement of the gas-fired RTUs, direct replacement does not appear to make sense. Future consideration of additional heat pump technology could be considered when replacement of the existing rooftops is necessary due to equipment life.
  10. Page 12 of 15

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 12 REDACTED Page 12 of 15 Eversource Energy – Cheshire Service Center QGM Scoping Study June 2026, page 12 of 15 Sustainability Considerations Background Site and portfolio sustainability is best guided by the framework and methodology set forth in ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance (available for purchase here: https://www.ashrae.org/technical-resources/bookstore/ansi-ashrae-standard-228-standardmethod-of-evaluating-zero-net-energy-and-zero-net-carbon-building-performance). The site is not known to have a present net-zero strategy; however, the ASHRAE standard presents a strong method to: - Assess current building energy use and carbon emissions Establish a baseline Develop milestones Develop a plan to reach milestones The data and information shown below are intended to help develop an understanding of where current portfolio sustainability goal aligns with current position. Emissions Scopes Emissions reporting is generally addressed across three Emissions Scopes, as seen below: An important aspect of developing a sustainability plan is the determination of which emissions scopes will be targeted for reduction. The majority of sustainability planning at the time of this report is focused on Scopes 1 and 2, although large corporations with significant supply and delivery chains have begun to address Scope 3 as well. The focus of the sustainability plan in this report is on Scope 1 and 2 emissions.
Words on different pages

Text of UPA-001-SP01 Attachment 10 REDACTED.pdf

Extracted from the file · 19 pages, 4 without text · 27,484 characters

Text of UPA-001-SP01 Attachment 9 REDACTED.pdf

Extracted from the file · 24 pages, 5 without text · 30,898 characters

Text of UPA-001-SP01 Attachment 8 REDACTED.pdf

Extracted from the file · 17 pages, 5 without text · 22,701 characters

Text of UPA-001-SP01 Attachment 7 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,187 characters

Text of UPA-001-SP01 Attachment 6 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 14,512 characters

Text of UPA-001-SP01 Attachment 5 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,555 characters

Text of UPA-001-SP01 Attachment 4 REDACTED.pdf

Extracted from the file · 16 pages, 4 without text · 19,788 characters

Text of UPA-001-SP01 Attachment 3 REDACTED.pdf

Extracted from the file · 12 pages, 4 without text · 11,899 characters

Text of UPA-001-SP01 Attachment 2 REDACTED.pdf

Extracted from the file · 11 pages, 4 without text · 10,526 characters

Text of UPA-001-SP01 Attachment 1 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 17,141 characters

As listed on the current system

Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026

This filing on the current system (opens in a new tab)