Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1 thru 1

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy14 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files14

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages
Words on different pages
  1. Page 2 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 2 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 2 of 24 General Facility Description The site has approximately 118,000 square feet of total space in (1) main building and an adjacent shop. The facility includes offices/administration, garage/ repair areas, warehouse, and storage, and original construction date was 1907. Approximately 25,000 SF of the building space is in current use, with 2 nd Floor offices and other spaces shuttered. Space temperature and humidity are controlled even in the shuttered spaces to mitigate humidity issues. The facility operates a regular schedule, with typical staff occupancy Monday – Friday 6:00 AM – 6:00 PM, and occasional weekend hours. Critical support areas were noted to have 24/7 staffing – this is understood to be minimal at this site. Annual hours are estimated at ~3,500 hours/year. HVAC Systems Description HVAC systems consist primarily of water source heat pumps (WSHPs) throughout conditioned spaces and (1) additional roof-mounted (MAU). Heat is rejected from the WSHP loop via a roof mounted cooling tower loop. Heat is provided via the basement boiler plant consisting of natural gas and electric boilers. The Building Management System is no longer functioning. Replacement is planned. Site Lighting Description Site lighting has been replaced within the last few years with controls-integrated LED fixtures. Lighting serving occupied areas is not currently programmed for motion/occupancy, scheduling, or dimming, relying on manual controls. Site Production and CAIR Equipment Description Site garage and repair areas contain typical hoists, air and electric tools, and powered washing equipment. Garage utilizes a 10hp Quincy reciprocating compressor. Compressed air is used for garage air tools, air pumping, and minor tank pressurization. Monthly Billing Analysis Historical electrical and natural gas use for the past three years is reviewed below. The site has (1) electric and (1) natural gas meter. Due to the type of site and use accounting, historical records for this site are annual use only. $0.1428/kWh was used as an electric rate based upon Eversource Facilities’ third-party electric supply costs for similar type facilities. An annual summary of the most recent year can be seen below:
  2. Page 3 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 3 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 3 of 24 Existing Building Baseline Most Recent 12 Month Total Costs Energy Energy Usage and Costs Natural Gas (CCF) Electric Energy (kWh) TOTAL Amount - $ $ 17,546 $ 127,365 $144,911 Amount % of Total % of Total CCF, kWh 12% 88% 100% 15,951 891,911 37% 69% 106% Unit Cost ($/kWh, $/CCF) CO2 Emitted (MT) $1.10 $0.143 88 124 Natural gas is noted to be lower than would otherwise be expected for this building footprint and occupancy/operations at this site due to use of WSHPs for heating. The energy use intensity (EUI) shown below calculated in kbtu/sf is an indicator of building performance in terms of energy use per building square foot: Building Energy Use Intensity (EUI) Utility Site EUI Source EUI Unit Natural Gas 14 15 kbtu/sf Electricity 26 72 kbtu/sf TOTAL 40 87 kbtu/sf Source-site ratio per national average, source: https://portfoliomanager.energystar.gov/pdf/reference/Source%20Energy.pdf The EUI metric can be used to baseline existing energy use for future comparison or to compare to similar buildings, though it should be noted the EUI does not consider production levels. Lacking monthly use data, profiles for electricity and natural gas were modelled for this site using provided annual metered totals and linear regression models developed from similar sites. Regression models based on weather impact from similar buildings/operations were used to provide basic linear regression equations for heating and cooling, which were then scaled for total use and building footprint and used to estimate monthly use. A building was selected with some garage/process electrical use to reflect the garage/repair operation at the site, as well as a significant summer cooling load. Some variability would be expected in the non-cooling season baseline use due to production volume fluctuation as well as WSHP electrical heating – the flat result is due to the use of a cooling weather-impact regression equation to model use. Below are graphs showing the example regression used and the resulting modeled monthly electrical use:
  3. Page 4 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 4 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 4 of 24 Similar analysis was performed for natural gas use, as seen below: As above, modeled use would expect to show some variability. The use of a weather-impact regression equation creates a model with a close correlation. Based on these models, estimated monthly use breakout is shown in the table below:
  4. Page 5 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 5 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 5 of 24 Monthly Utility Bill Summary Electric CDD Blended (Balance Billed Energy Total Month Rate Point 65 (kWh) Electric Cost ($/kWh) °F) Jan-23 72,772 $ 10,392 $ 0.14 Feb-23 72,772 $ 10,392 $ 0.14 Mar-23 72,772 $ 10,392 $ 0.14 Apr-23 14 73,241 $ 10,459 $ 0.14 May-23 5 72,939 $ 10,416 $ 0.14 Jun-23 66 74,986 $ 10,708 $ 0.14 Jul-23 264 81,627 $ 11,656 $ 0.14 Aug-23 104 76,260 $ 10,890 $ 0.14 Sep-23 94 75,925 $ 10,842 $ 0.14 Oct-23 9 73,074 $ 10,435 $ 0.14 Nov-23 72,772 $ 10,392 $ 0.14 Dec-23 72,772 $ 10,392 $ 0.14 891,911 $ 127,365 $ 0.14 TOTAL Natural Gas HDD (Balance Month Point 65°F) Jan-23 949 Feb-23 931 Mar-23 875 Apr-23 443 May-23 274 Jun-23 78 Jul-23 Aug-23 14 Sep-23 136 Oct-23 317 Nov-23 816 Dec-23 895 TOTAL Billed Usage (CCF) 2,753 2,698 2,526 1,201 683 82 260 815 2,345 2,587 15,951 Average Estimated Blended Total Cost Rate ($) ($/CCF) $ 3,028 $ 1.10 $ 2,968 $ 1.10 $ 2,779 $ 1.10 $ 1,322 $ 1.10 $ 752 $ 1.10 $ 90 $ 1.10 $ $ $ $ $ 286 $ 1.10 $ 897 $ 1.10 $ 2,580 $ 1.10 $ 2,846 $ 1.10 $ 17,546 $ 1.10 Mechanical System Energy Use Breakdown Based on the initial walk-through, the following electric energy use breakdown was developed. These results are considered high level at this point by using motor nameplates, typical load factors and estimated operational hours. Actual data logging is required to confirm these assumptions.
  5. Page 6 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 6 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 6 of 24 End Use Breakdown - Electricity Electric End Use Energy Use (kWh) HVAC - Fans & Cooling 466,309 Lighting 152,000 Process Equipment & Plug Loads 265,000 Compressed Air 7,833 TOTAL 891,142 HVAC Equipment: To calculate the breakout of energy use described above, the following equipment data was used to estimate equipment loads and use (capacities estimated for units with worn nameplates): 250 Freight Street HVAC Equipment List Site ID # Type Manufacturer Model Mult. MAU CT B-1 B-2 B-3 EUH-1 EUH-2 EUH-3 EUH-4 EUH-5 EUH-6 EUH-7 EUH-8 EUH-9 EUH-10 WSHPs MAU Cooling Tower Boiler Boiler Boiler EUH EUH EUH EUH EUH EUH EUH EUH EUH EUH Econaire BAC Bradford White Bradford White Indeeco Chromalox Chromalox Chromalox Chromalox Chromalox Chromalox Chromalox Chromalox Chromalox Chromalox EARTU1-150-6T-ERV BNTH750NJN3 BNTH750NJN3 7U-150U-GHJV1 Serial # N230737902-01-01 G23563932 G23589854 Fan hp Fan CFM 1 3 7.5 0.25 1.25 2.25 3.25 4.25 5.25 6.25 7.25 8.25 9.25 2,000 1,700 Heating Cooling capacity Capacity VFD (1,0) Notes (Tons) (MBH) 2 24 1 Throughout offices 5.8 121 1 Rooftop 1 CHWPs on VFDs 724 1 HWPs on VFDs 724 1 HWPs on VFDs 512 Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric Lighting Equipment: Lighting was noted to be LED, primarily modern controls-integrated fixtures. Fixtures have integrated controls, which are not currently in use for occupied areas. Compressed Air Plant: Site current operates (1) 10hp Quincy reciprocating air compressor with an estimated max capacity of 43 SCFM at 100 psig. Unit was observed to be lightly loaded. Best Practices Site was observed during the assessment walkthrough to be observing the following energy Best Practices: LED lighting in most/all areas Condensing boilers in hot water applications ERV makeup air unit
  6. Page 7 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 7 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 7 of 24 Recent Energy Efficiency Projects Overview The site has completed several energy efficiency projects in recent years. Listed below are some of the various energy projects: Upgrade to LED Lighting Installation of WSHPs for space heating and cooling Upgrades to energy-savings equipment on replacement With the Best Practices and projects described above, the identification of additional energy efficiency measures (EEMs) and sustainability projects during the time of the survey was challenging. Some potential recommendations are outlined below that may require some additional analysis and monitoring. Site Energy Efficiency Measures/Recommendations EEM - 01 – Compressed Air Leak Repair The site currently operates a 10hp Quincy reciprocating air compressor with a max capacity of ~45 SCFM at 100 psig, which appears to satisfy the plant air demand most/all of the time. Pictures below show detail: Garage/shop air compressor Air end-use in garage/shop Compressed air end uses at this site include equipment pressurization, CNC/machine tool use, bench tools, and air guns. The most likely sources of non-value-add (NVA) compressed air use for this site are unplanned leaks. (3) unplanned leaks were identified via audible leak noise and ultrasonic tool and quantified by hand during the course of the assessment, as noted in the pictures below:
  7. Page 8 of 24

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  8. Page 9 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 9 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 9 of 24 Data logging is often recommended to confirm compressor loading assumptions and leak rate. However, the size of the CAIR plant (10 – 15hp total) suggests that additional study is not economical. Site is encouraged to repair all identified leaks, either through a local compressed air vendor, or internally. EEM – 02 – Lighting Controls The site was observed to have recently installed modern LED lighting. Existing lighting controls include motion control and dimming but are reported to be currently manually controlled in occupied areas. Site is recommended to pursue the following for more efficient, better controlled lighting: - Programming and/or commissioning of controls to enable scheduling, full occupancy control, tasktuning, and dimming Existing and proposed site lighting use were estimated via lighting density estimates and burn hours. The table below details estimated savings and costs from this measure: Consider Motion/Occupancy and Dimming Controls for Fixtures Description Value Unit Notes Estimated Average Lighting Demand 13 kW Annual Burn Hours 3,000 hours Estimated Annual Lighting Energy Usage 38,000 kWh Proposed Average Lighting Demand, with Controls 8 kW Motion and dimming Annual Burn Hours 3,000 hours Proposed Annual Lighting Energy Usage, with Controls 23,000 kWh Estimated Annual Lighting Energy Savings 15,000 kWh Estimated Annual Cost Savings $ 2,142 $ @ $0..1428/kWh Estimated Annual GHG Savings 4.4 MT CO2e @ 0.0055 MT/CCF & 0.000291 MT/kWh Estimated Installation Cost $ 50,000 $ Programming/Commissioning Simple Payback (with incentive) 23.3 $ Estimated $/Lifetime MT CO2e $ 1,145 $ estimated 10 yr measure lifetime Next steps for this measure are to discuss retrofit and/or programming of new controls strategies with a local lighting vendor. EEM – 03 – Building Management System – Scheduling and AOSS The site currently uses an aged INet Building Management System (BMS) for all HVAC controls. The system is understood to be failing, with limited to no capability and functionality. The site is strongly recommended to move forward with plans to replace the failing system with a new DDC, remote-access capable BMS with ability to: - Handle detailed scheduling by area/unit – with temporary overrides and ability to revert back Adaptive Optimal Start-Stop (AOSS) – help building with heating/cooling schedules Adaptive/Optimal Start/Stop (AOSS) is a control sequence available within modern Building Management Systems. AOSS allows the control system to iteratively “learn” the most optimal times to start up heating or
  9. Page 10 of 24

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  10. Page 11 of 24

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 11 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 11 of 24 BMS Upgrade - Scheduling & Adaptive Optimal Start Stop Description Number Unit Notes Building footprint, SF 25,000 SF Occupied areas only Average Ceiling Ht, Ft 10 LF Average Estimated office volume, CF 250,000 CF Typical Air Change per Hour (ACH) 2 ACH Estimated Average Outdoor Air Intake, CFM 8,333 CFM Estimated Existing Operation Estimated Annual Cooling Energy 58,000 kWh Estimated Annual Natural Gas Heating Energy 7,000 CCF Estimated Annual Electric Heating Energy 162,000 kWh WSHPs Proposed Operation Proposed Annual Cooling Energy 48,000 kWh Proposed Annual Natural Gas Heating Energy 3,000 CCF Proposed Annual Electric Heating Energy 81,000 kWh Estimated New Control Strategy Savings Estimated Annual Electrical Savings 91,000 kWh Estimated Annual Natural Gas Savings 4,000 CCF Estimated Annual Cost Savings $ 17,395 $ @$0.1428/kWh and $1.10/CCF Change Cost - Upgrade BMS $ 200,000 $ Simple Payback - no incentives 11.5 yrs Estimated Annual GHG Reduction 49 MT CO2e $/Lifetime GHG Reduction $ 412.19 $/MT CO2e 10 year measure life Recommended next steps for this project involve working with a local vendor to develop a controls scope of work and cost quotation and move forward with the installation. EEM – 04 – Building Management System – Demand Controlled Ventilation The site is not currently able to control the introduction of outside air with existing (failing) HVAC controls. For additional HVAC control and energy optimization, site is recommended to consider Demand Controlled Ventilation (DCV) on the DOAS makeup air unit. DCV works by modulating the outdoor air intake to only what is needed to satisfy the space occupancy. As the graphic below illustrates, a higher occupant load requires more outdoor air and higher HVAC costs, while lower (or no) occupant load requires less (or even no) outdoor air:

Text of UPA-001-SP01 Attachment 10 REDACTED.pdf

Extracted from the file · 19 pages, 4 without text · 27,484 characters

Text of UPA-001-SP01 Attachment 9 REDACTED.pdf

Extracted from the file · 24 pages, 5 without text · 30,898 characters

Text of UPA-001-SP01 Attachment 8 REDACTED.pdf

Extracted from the file · 17 pages, 5 without text · 22,701 characters

Text of UPA-001-SP01 Attachment 7 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,187 characters

Text of UPA-001-SP01 Attachment 6 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 14,512 characters

Text of UPA-001-SP01 Attachment 5 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,555 characters

Text of UPA-001-SP01 Attachment 4 REDACTED.pdf

Extracted from the file · 16 pages, 4 without text · 19,788 characters

Text of UPA-001-SP01 Attachment 3 REDACTED.pdf

Extracted from the file · 12 pages, 4 without text · 11,899 characters

Text of UPA-001-SP01 Attachment 2 REDACTED.pdf

Extracted from the file · 11 pages, 4 without text · 10,526 characters

Text of UPA-001-SP01 Attachment 1 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 17,141 characters