Interrogatory responses
Answers to questions 1 thru 1
Files14
UPA-001-SP01_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download UPA-001-SP01_Final.pdfRead the text of UPA-001-SP01_Final.pdf
UPA-001-SP01 Attachment 13 REDACTED.pdf
PDF · 4.6 MB · 14 pagesText searchable
Download UPA-001-SP01 Attachment 13 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 13 REDACTED.pdf
UPA-001-SP01 Attachment 12 REDACTED.pdf
PDF · 3.3 MB · 15 pagesText searchable
Download UPA-001-SP01 Attachment 12 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 12 REDACTED.pdf
UPA-001-SP01 Attachment 11 REDACTED.pdf
PDF · 3.9 MB · 24 pagesText searchable
Download UPA-001-SP01 Attachment 11 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 11 REDACTED.pdf
UPA-001-SP01 Attachment 10 REDACTED.pdf
PDF · 3.7 MB · 19 pagesText searchable
Download UPA-001-SP01 Attachment 10 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 10 REDACTED.pdf
UPA-001-SP01 Attachment 9 REDACTED.pdf
PDF · 3.9 MB · 24 pagesText searchable
Download UPA-001-SP01 Attachment 9 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 9 REDACTED.pdf
UPA-001-SP01 Attachment 8 REDACTED.pdf
PDF · 4.0 MB · 17 pagesText searchable
Download UPA-001-SP01 Attachment 8 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 8 REDACTED.pdf
UPA-001-SP01 Attachment 7 REDACTED.pdf
PDF · 3.7 MB · 14 pagesText searchable
Download UPA-001-SP01 Attachment 7 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 7 REDACTED.pdf
UPA-001-SP01 Attachment 6 REDACTED.pdf
PDF · 3.3 MB · 13 pagesText searchable
Download UPA-001-SP01 Attachment 6 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 6 REDACTED.pdf
UPA-001-SP01 Attachment 5 REDACTED.pdf
PDF · 3.6 MB · 14 pagesText searchable
Download UPA-001-SP01 Attachment 5 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 5 REDACTED.pdf
UPA-001-SP01 Attachment 4 REDACTED.pdf
PDF · 3.6 MB · 16 pagesText searchable
Download UPA-001-SP01 Attachment 4 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 4 REDACTED.pdf
UPA-001-SP01 Attachment 3 REDACTED.pdf
PDF · 3.7 MB · 12 pagesText searchable
Download UPA-001-SP01 Attachment 3 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 3 REDACTED.pdf
UPA-001-SP01 Attachment 2 REDACTED.pdf
PDF · 3.7 MB · 11 pagesText searchable
Download UPA-001-SP01 Attachment 2 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 2 REDACTED.pdf
UPA-001-SP01 Attachment 1 REDACTED.pdf
PDF · 2.8 MB · 13 pagesText searchable
Download UPA-001-SP01 Attachment 1 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 1 REDACTED.pdf
Page 5 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 5 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 5 of 24 Monthly Utility Bill Summary Electric CDD Blended (Balance Billed Energy Total Month Rate Point 65 (kWh) Electric Cost ($/kWh) °F) Jan-23 72,772 $ 10,392 $ 0.14 Feb-23 72,772 $ 10,392 $ 0.14 Mar-23 72,772 $ 10,392 $ 0.14 Apr-23 14 73,241 $ 10,459 $ 0.14 May-23 5 72,939 $ 10,416 $ 0.14 Jun-23 66 74,986 $ 10,708 $ 0.14 Jul-23 264 81,627 $ 11,656 $ 0.14 Aug-23 104 76,260 $ 10,890 $ 0.14 Sep-23 94 75,925 $ 10,842 $ 0.14 Oct-23 9 73,074 $ 10,435 $ 0.14 Nov-23 72,772 $ 10,392 $ 0.14 Dec-23 72,772 $ 10,392 $ 0.14 891,911 $ 127,365 $ 0.14 TOTAL Natural Gas HDD (Balance Month Point 65°F) Jan-23 949 Feb-23 931 Mar-23 875 Apr-23 443 May-23 274 Jun-23 78 Jul-23 Aug-23 14 Sep-23 136 Oct-23 317 Nov-23 816 Dec-23 895 TOTAL Billed Usage (CCF) 2,753 2,698 2,526 1,201 683 82 260 815 2,345 2,587 15,951 Average Estimated Blended Total Cost Rate ($) ($/CCF) $ 3,028 $ 1.10 $ 2,968 $ 1.10 $ 2,779 $ 1.10 $ 1,322 $ 1.10 $ 752 $ 1.10 $ 90 $ 1.10 $ $ $ $ $ 286 $ 1.10 $ 897 $ 1.10 $ 2,580 $ 1.10 $ 2,846 $ 1.10 $ 17,546 $ 1.10 Mechanical System Energy Use Breakdown Based on the initial walk-through, the following electric energy use breakdown was developed. These results are considered high level at this point by using motor nameplates, typical load factors and estimated operational hours. Actual data logging is required to confirm these assumptions.Page 6 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 6 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 6 of 24 End Use Breakdown - Electricity Electric End Use Energy Use (kWh) HVAC - Fans & Cooling 466,309 Lighting 152,000 Process Equipment & Plug Loads 265,000 Compressed Air 7,833 TOTAL 891,142 HVAC Equipment: To calculate the breakout of energy use described above, the following equipment data was used to estimate equipment loads and use (capacities estimated for units with worn nameplates): 250 Freight Street HVAC Equipment List Site ID # Type Manufacturer Model Mult. MAU CT B-1 B-2 B-3 EUH-1 EUH-2 EUH-3 EUH-4 EUH-5 EUH-6 EUH-7 EUH-8 EUH-9 EUH-10 WSHPs MAU Cooling Tower Boiler Boiler Boiler EUH EUH EUH EUH EUH EUH EUH EUH EUH EUH Econaire BAC Bradford White Bradford White Indeeco Chromalox Chromalox Chromalox Chromalox Chromalox Chromalox Chromalox Chromalox Chromalox Chromalox EARTU1-150-6T-ERV BNTH750NJN3 BNTH750NJN3 7U-150U-GHJV1 Serial # N230737902-01-01 G23563932 G23589854 Fan hp Fan CFM 1 3 7.5 0.25 1.25 2.25 3.25 4.25 5.25 6.25 7.25 8.25 9.25 2,000 1,700 Heating Cooling capacity Capacity VFD (1,0) Notes (Tons) (MBH) 2 24 1 Throughout offices 5.8 121 1 Rooftop 1 CHWPs on VFDs 724 1 HWPs on VFDs 724 1 HWPs on VFDs 512 Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric 3.5 Shop, Electric Lighting Equipment: Lighting was noted to be LED, primarily modern controls-integrated fixtures. Fixtures have integrated controls, which are not currently in use for occupied areas. Compressed Air Plant: Site current operates (1) 10hp Quincy reciprocating air compressor with an estimated max capacity of 43 SCFM at 100 psig. Unit was observed to be lightly loaded. Best Practices Site was observed during the assessment walkthrough to be observing the following energy Best Practices: LED lighting in most/all areas Condensing boilers in hot water applications ERV makeup air unitPage 7 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 7 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 7 of 24 Recent Energy Efficiency Projects Overview The site has completed several energy efficiency projects in recent years. Listed below are some of the various energy projects: Upgrade to LED Lighting Installation of WSHPs for space heating and cooling Upgrades to energy-savings equipment on replacement With the Best Practices and projects described above, the identification of additional energy efficiency measures (EEMs) and sustainability projects during the time of the survey was challenging. Some potential recommendations are outlined below that may require some additional analysis and monitoring. Site Energy Efficiency Measures/Recommendations EEM - 01 – Compressed Air Leak Repair The site currently operates a 10hp Quincy reciprocating air compressor with a max capacity of ~45 SCFM at 100 psig, which appears to satisfy the plant air demand most/all of the time. Pictures below show detail: Garage/shop air compressor Air end-use in garage/shop Compressed air end uses at this site include equipment pressurization, CNC/machine tool use, bench tools, and air guns. The most likely sources of non-value-add (NVA) compressed air use for this site are unplanned leaks. (3) unplanned leaks were identified via audible leak noise and ultrasonic tool and quantified by hand during the course of the assessment, as noted in the pictures below:Page 8 of 24
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 9 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 9 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 9 of 24 Data logging is often recommended to confirm compressor loading assumptions and leak rate. However, the size of the CAIR plant (10 – 15hp total) suggests that additional study is not economical. Site is encouraged to repair all identified leaks, either through a local compressed air vendor, or internally. EEM – 02 – Lighting Controls The site was observed to have recently installed modern LED lighting. Existing lighting controls include motion control and dimming but are reported to be currently manually controlled in occupied areas. Site is recommended to pursue the following for more efficient, better controlled lighting: - Programming and/or commissioning of controls to enable scheduling, full occupancy control, tasktuning, and dimming Existing and proposed site lighting use were estimated via lighting density estimates and burn hours. The table below details estimated savings and costs from this measure: Consider Motion/Occupancy and Dimming Controls for Fixtures Description Value Unit Notes Estimated Average Lighting Demand 13 kW Annual Burn Hours 3,000 hours Estimated Annual Lighting Energy Usage 38,000 kWh Proposed Average Lighting Demand, with Controls 8 kW Motion and dimming Annual Burn Hours 3,000 hours Proposed Annual Lighting Energy Usage, with Controls 23,000 kWh Estimated Annual Lighting Energy Savings 15,000 kWh Estimated Annual Cost Savings $ 2,142 $ @ $0..1428/kWh Estimated Annual GHG Savings 4.4 MT CO2e @ 0.0055 MT/CCF & 0.000291 MT/kWh Estimated Installation Cost $ 50,000 $ Programming/Commissioning Simple Payback (with incentive) 23.3 $ Estimated $/Lifetime MT CO2e $ 1,145 $ estimated 10 yr measure lifetime Next steps for this measure are to discuss retrofit and/or programming of new controls strategies with a local lighting vendor. EEM – 03 – Building Management System – Scheduling and AOSS The site currently uses an aged INet Building Management System (BMS) for all HVAC controls. The system is understood to be failing, with limited to no capability and functionality. The site is strongly recommended to move forward with plans to replace the failing system with a new DDC, remote-access capable BMS with ability to: - Handle detailed scheduling by area/unit – with temporary overrides and ability to revert back Adaptive Optimal Start-Stop (AOSS) – help building with heating/cooling schedules Adaptive/Optimal Start/Stop (AOSS) is a control sequence available within modern Building Management Systems. AOSS allows the control system to iteratively “learn” the most optimal times to start up heating orPage 10 of 24
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 11 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 11 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 11 of 24 BMS Upgrade - Scheduling & Adaptive Optimal Start Stop Description Number Unit Notes Building footprint, SF 25,000 SF Occupied areas only Average Ceiling Ht, Ft 10 LF Average Estimated office volume, CF 250,000 CF Typical Air Change per Hour (ACH) 2 ACH Estimated Average Outdoor Air Intake, CFM 8,333 CFM Estimated Existing Operation Estimated Annual Cooling Energy 58,000 kWh Estimated Annual Natural Gas Heating Energy 7,000 CCF Estimated Annual Electric Heating Energy 162,000 kWh WSHPs Proposed Operation Proposed Annual Cooling Energy 48,000 kWh Proposed Annual Natural Gas Heating Energy 3,000 CCF Proposed Annual Electric Heating Energy 81,000 kWh Estimated New Control Strategy Savings Estimated Annual Electrical Savings 91,000 kWh Estimated Annual Natural Gas Savings 4,000 CCF Estimated Annual Cost Savings $ 17,395 $ @$0.1428/kWh and $1.10/CCF Change Cost - Upgrade BMS $ 200,000 $ Simple Payback - no incentives 11.5 yrs Estimated Annual GHG Reduction 49 MT CO2e $/Lifetime GHG Reduction $ 412.19 $/MT CO2e 10 year measure life Recommended next steps for this project involve working with a local vendor to develop a controls scope of work and cost quotation and move forward with the installation. EEM – 04 – Building Management System – Demand Controlled Ventilation The site is not currently able to control the introduction of outside air with existing (failing) HVAC controls. For additional HVAC control and energy optimization, site is recommended to consider Demand Controlled Ventilation (DCV) on the DOAS makeup air unit. DCV works by modulating the outdoor air intake to only what is needed to satisfy the space occupancy. As the graphic below illustrates, a higher occupant load requires more outdoor air and higher HVAC costs, while lower (or no) occupant load requires less (or even no) outdoor air:Page 12 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 12 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 12 of 24 Demand Control Ventilation (DCV) uses CO2 sensors in the space and/or return airstream to monitor the level of CO2 in the space and modulate RTU outdoor air dampers to introduce only as much outdoor air as needed. Sites are commonly found to be introducing significant excess outdoor air, well beyond any occupant requirements – outdoor air dampers often come from the factory set at 20 – 50% without any ability to modulate. Table below shows estimated cost and savings from the installation of DCV controls on (4) RTUs: Consider Switching Makup Air Unit to Demand Control Ventilation Description Value Unit Notes Existing Electric Load - Cooling and Heating 7,400 kWh WSHPs Existing Natural Gas Heating Load 300 CCF w/ ERV Proposed Demand Controlled Electric Load 2,800 kWh w/ ERV Proposed Demand Controlled Heating Load 100 CCF w/ ERV Estimated Demand Control Savings (Electric) 4,600 kWh w/ ERV Estimated Demand Control Savings (Natural Gas) 200 CCF w/ ERV Estimated Annual Cost Savings $ 877 $ @$0.1428/kWh and $1.10/CCF Estimated Annual GHG Reduction 2.4 MT CO2e @ 0.0055 MT/CCF & 0.000291 MT/kWh Estimated Cost to Upgrade $ 10,000 $ Programming, RTU dampers/actuators Simple Payback 11.4 $ Estimated $/Lifetime MT CO2e $ 410 $ estimated 10 yr measure lifetime Recommended next steps for this project involve working with a local vendor to develop a controls scope of work and cost quotation, moving to implement this measure as a facet of the planned BMS upgrade/installation. EEM - 03 – Control Intermittently Occupied Spaces Heating and Cooling via Occupancy An innovative control strategy noted in use at the Berlin Eversource campus is the control of site main Auditorium HVAC equipment based on an occupancy schedule. This space sees highly variable occupancy, particularly post-COVID. Setting other similar spaces to unoccupied setpoints for significant periods of non-use (much as many sites do with lighting) reduces the associated energy expenditure, while allowing a quick recovery for event use.Page 13 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 13 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 13 of 24 It was noted during the assessment that the site Auditorium could likely utilize this type of scheduling, with possibilities in conference rooms and other areas. The example below summarizes a potential before and after schedule – assuming average consistent use in the 10 AM – 2 PM period of weekdays. This model is likely conservative; many of these spaces are experiencing virtually no use and could remain in unoccupied mode for the majority of the operating schedule. Sunday 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM Occ Hrs UnOcc Hrs Intermittent Spaces HVAC Operation - Existing and Proposed with Occupancy Control Existing - Typcial Schedule Proposed - Occupancy Control Monday Tuesday Wednesday Thursday Friday Saturday Sunday Monday Tuesday Wednesday Thursday Friday 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM X X X X X 6:00 AM X X X X X 7:00 AM X X X X X 8:00 AM X X X X X 9:00 AM X X X X X 10:00 AM X X X X X X X X X X 11:00 AM X X X X X X X X X X 12:00 PM X X X X X X X X X X 1:00 PM X X X X X X X X X X 2:00 PM X X X X X X X X X X 3:00 PM X X X X X 4:00 PM X X X X X 5:00 PM X X X X X 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM 0 13 13 13 13 13 0 Occ Hrs 0 5 5 5 5 24 11 11 11 11 11 24 UnOcc Hrs 24 19 19 19 19 Saturday 5 19 Implementation of this strategy should be possible via programming within the proposed BMS and the addition of occupancy sensors. Table below shows estimated cost and savings from the implementation of this type of control: 0 24Page 14 of 24
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 11 REDACTED Page 14 of 24 250 Freight Street – Waterbury, CT QGM Scoping Study October 2024, page 14 of 24 Occupancy Control of Intermittent Use Spaces Description Number Unit Notes Building footprint, SF 5,000 SF Estimated area affected Average Ceiling Ht, Ft 10 LF Average Estimated office volume, CF 50,000 CF Typical Air Change per Hour (ACH) 1.75 ACH Estimated Average Outdoor Air Intake, CFM 1,458 CFM Estimated Existing Operation Estimated Annual Cooling Energy 8,000 kWh Estimated Annual Natural Gas Heating Energy 500 CCF Estimated Annual Electric Heating Energy 13,000 kWh WSHPs Proposed Operation Proposed Annual Cooling Energy 7,000 kWh Proposed Annual Natural Gas Heating Energy 200 CCF Proposed Annual Electric Heating Energy 5,000 kWh Estimated New Control Strategy Savings Estimated Annual Electrical Savings 9,000 kWh Estimated Annual Natural Gas Savings 300 CCF Estimated Annual Cost Savings $ 1,615 $ @$0.1428/kWh and $1.10/CCF Change Cost - Programming $ 5,000 $ Simple Payback - no incentives 3.1 yrs Estimated Annual GHG Reduction 4 MT CO2e $/Lifetime GHG Reduction $117.04 $/MT CO2e 10 year measure life Recommended next steps for this project involve working with controls vendor to develop a scope of work and cost quotation, then working to implement as a facet of BMS installation/upgrade. EEM – 06 – Building Envelope Age of the building was noted during site walkthrough. Relatively low heating energy use indicates the structure is sound and retains heat well, and staff is active in reducing unneeded air infiltration and movement via sealing ducts and openings not in use. Aged doors, garage area bay doors, windows, and building plane transitions (e.g., roof/wall joint) likely have deteriorated seals simply due to building age. Diagram below summarizes the possible heat transfers due to infiltration and thermal envelope deficiencies:
Text of UPA-001-SP01 Attachment 10 REDACTED.pdf
Extracted from the file · 19 pages, 4 without text · 27,484 characters
Text of UPA-001-SP01 Attachment 9 REDACTED.pdf
Extracted from the file · 24 pages, 5 without text · 30,898 characters
Text of UPA-001-SP01 Attachment 8 REDACTED.pdf
Extracted from the file · 17 pages, 5 without text · 22,701 characters
Text of UPA-001-SP01 Attachment 7 REDACTED.pdf
Extracted from the file · 14 pages, 4 without text · 17,187 characters
Text of UPA-001-SP01 Attachment 6 REDACTED.pdf
Extracted from the file · 13 pages, 3 without text · 14,512 characters
Text of UPA-001-SP01 Attachment 5 REDACTED.pdf
Extracted from the file · 14 pages, 4 without text · 17,555 characters
Text of UPA-001-SP01 Attachment 4 REDACTED.pdf
Extracted from the file · 16 pages, 4 without text · 19,788 characters
Text of UPA-001-SP01 Attachment 3 REDACTED.pdf
Extracted from the file · 12 pages, 4 without text · 11,899 characters
Text of UPA-001-SP01 Attachment 2 REDACTED.pdf
Extracted from the file · 11 pages, 4 without text · 10,526 characters
Text of UPA-001-SP01 Attachment 1 REDACTED.pdf
Extracted from the file · 13 pages, 3 without text · 17,141 characters
As listed on the current system
Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026