Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1 thru 1

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy14 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files14

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of UPA-001-SP01 Attachment 11 REDACTED.pdf

Extracted from the file · 24 pages, 4 without text · 36,138 characters

Words on different pages
  1. Page 2 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 10 REDACTED Page 2 of 19 410 Sheldon Street – Hartford, CT QGM Scoping Study October 2024, page 2 of 19 General Facility Description The site has approximately 135,000 square feet of total space in a single building originally constructed in 1928, with significant renovations in 2010. The facility includes offices/administration, garage/ repair areas, warehouse, and storage. The facility operates a regular schedule, with typical staff occupancy Monday – Friday 6:00 AM – 6:00 PM, and occasional weekend hours. Some critical support areas were noted to have 24/7 staffing. Annual hours are estimated to be ~3,500 hours/year. HVAC Systems Description HVAC systems consist of roof mounted air handling units (AHUs) and 1 additional Rooftop Unit (RTU). Air is cooled via roof-mounted air-cooled chiller and heated via condensing boilers in the basement. Air delivery is via VAV boxes and a chilled beam system. Building Management System is noted to no longer function. Replacement is planned with a new controls system. Site Lighting Description Site lighting has been replaced within the last few years with controls-integrated LED fixtures. Controls are programmed for motion/occupancy, dimming, and scheduling. Site Production and CAIR Equipment Description Site garage and repair areas contain typical hoists, air and electric tools, and powered washing equipment. Garage utilizes a 2x7.5hp Saylor-Beall dual-piston reciprocating compressor. Compressed air is used for garage air tools and minor tank pressurization. Monthly Billing Analysis Historical electrical and natural gas use for the past three years is reviewed below. The site has (1) electric and (1) natural gas meter. Due to the type of site and use accounting, historical records for this site are annual use only. $0.1428/kWh was used as an electric rate based upon Eversource Facilities’ third-party electric supply costs for similar type facilities. An annual summary of the most recent year can be seen below: Existing Building Baseline Most Recent 12 Month Total Costs Energy Energy Usage and Costs Natural Gas (CCF) Electric Energy (kWh) TOTAL Amount - $ $ 39,512 $ 148,883 $188,395 Amount % of Total % of Total CCF, kWh 21% 79% 100% 35,920 1,042,598 84% 81% 164% Unit Cost ($/kWh, $/CCF) CO2 Emitted (MT) $1.10 $0.143 198 145
  2. Page 3 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 10 REDACTED Page 3 of 19 410 Sheldon Street – Hartford, CT QGM Scoping Study October 2024, page 3 of 19 The energy use intensity (EUI) shown below calculated in kbtu/sf is an indicator of building performance in terms of energy use per building square foot: Building Energy Use Intensity (EUI) Utility Site EUI Source EUI Unit Natural Gas 36 38 kbtu/sf Electricity 14 39 kbtu/sf TOTAL 50 77 kbtu/sf Source-site ratio per national average, source: https://portfoliomanager.energystar.gov/pdf/reference/Source%20Energy.pdf The EUI metric can be used to baseline existing energy use for future comparison or to compare to similar buildings, though it should be noted the EUI does not consider production levels. Lacking monthly use data, profiles for electricity and natural gas were modelled for this site using provided annual totals and linear regression models developed from similar sites. Regression models based on weather impact from similar buildings/operations were used to provide basic linear regression equations for heating and cooling, which were then scaled for total use and building footprint and used to estimate monthly usage. A building was selected with some garage/process electrical use to reflect the garage/repair operation at the site, as well as a significant summer cooling load. Some variability would be expected in the non-cooling season baseline use – the flat result is due to the use of a weather-impact regression equation to model use. Below are graphs showing the example regression used and the resulting modeled electrical use: Similar analysis was performed for natural gas use, as seen below:
  3. Page 4 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 10 REDACTED Page 4 of 19 410 Sheldon Street – Hartford, CT QGM Scoping Study October 2024, page 4 of 19 As above, modeled use would expect to show some variability. The use of a weather-impact regression equation creates a model with a close correlation. Based on these models, monthly use and estimated costs are shown in the table below: Monthly Utility Bill Summary Electric CDD (Balance Month Point 65 °F) Jan-23 Feb-23 Mar-23 Apr-23 14 May-23 5 Jun-23 66 Jul-23 264 Aug-23 104 Sep-23 94 Oct-23 9 Nov-23 Dec-23 TOTAL Billed Energy (kWh) Natural Gas Total Electric Cost 85,067 $ 12,147 85,067 $ 12,147 85,067 $ 12,147 85,615 $ 12,226 85,263 $ 12,175 87,654 $ 12,517 95,418 $ 13,626 89,144 $ 12,730 88,752 $ 12,674 85,419 $ 12,198 85,067 $ 12,147 85,067 $ 12,147 1,042,598 $ 148,883 Blended Rate ($/kWh) $ $ $ $ $ $ $ $ $ $ $ $ $ 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14 HDD (Balance Month Point 65°F) Jan-23 949 Feb-23 931 Mar-23 875 Apr-23 443 May-23 274 Jun-23 78 Jul-23 Aug-23 14 Sep-23 136 Oct-23 317 Nov-23 816 Dec-23 895 TOTAL Billed Usage (CCF) 6,199 6,075 5,688 2,705 1,539 185 586 1,835 5,281 5,826 35,920 Average Estimated Blended Total Cost Rate ($) ($/CCF) $ 6,819 $ 1.10 $ 6,682 $ 1.10 $ 6,257 $ 1.10 $ 2,976 $ 1.10 $ 1,692 $ 1.10 $ 204 $ 1.10 $ $ $ $ $ 644 $ 1.10 $ 2,019 $ 1.10 $ 5,809 $ 1.10 $ 6,409 $ 1.10 $ 39,512 $ 1.10 Mechanical System Energy Use Breakdown Based on the initial walk-through, the following electric energy use breakdown was developed. These results are considered high level at this point by using motor nameplates, typical load factors and estimated operational hours. Actual data logging is required to confirm these assumptions.
  4. Page 5 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 10 REDACTED Page 5 of 19 410 Sheldon Street – Hartford, CT QGM Scoping Study October 2024, page 5 of 19 End Use Breakdown - Electricity Electric End Use Energy Use (kWh) HVAC - Fans & Cooling 371,509 Lighting 337,500 Process Equipment & Plug Loads 315,000 Compressed Air 20,888 TOTAL 1,044,897 HVAC Equipment: To calculate the breakout of energy use described above, the following equipment data was used to estimate equipment loads and use (capacities estimated for units with worn nameplates): 410 Sheldon Street HVAC Equipment List Site ID # Type Manufacturer Model Serial # RTU-1 AHU-1 AHU-2 AHU-3 CH B-1 B-2 HW-1 HW-2 HW-3 EF-2 EF-3 EF-8 UH Split Split Split Split Split RTU AHU AHU AHU Chiller Boiler Boiler HWH HWH HWH EF EF EF UH Split System Split System Split System Split System Split System Lennox McQuay McQuay McQuay McQuay Hydrotherm Hydrotherm Hubbell Hubbell Hubbell Greenheck Greenheck Greenheck LGH060S4TM1G 5611E01394 AGZ160DHHNN-ER10 KN-20 KN-20 SE-120-0-27SLR SE-120-0-27SLR SE-120-0-27SLR GB-121-5-X CWB-141-7-x GB-091-4-X FBOU110501200 STNU110500124 KN-H-NET-M11NB-6357 KN-H-NET-M11NB-6356 S8576S S9778S S9776S 12461477 1105 12562546 1108 12461430 1105 Mitsubishi Electric Mitsubishi Electric Mitsubishi Electric Mitsubishi Electric Mitsubishi Electric PUY-A18NHA4 PUY-A18NHA4 PUY-A12NHA4 PUY-A12NHA4 PUY-A24NHA4 - Fan hp Fan CFM 2.5 5 5 5 1,147 10,000 10,000 10,000 Cooling capacity (Tons) 5 Heating Capacity (MBH) 84 160 1,854 1,854 92 92 92 0.50 1 0.13 2,000 2,500 1,000 1.5 1.5 1 1 2 Avg. 1 - VFD (1,0) Notes 0 EER 12.5 1 1 1 VFDs on CHWPs VFDs on HWPs VFDs on HWPs Electric Electric Electric 0 0 0 0 - multiple
  5. Page 6 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 10 REDACTED Page 6 of 19 410 Sheldon Street – Hartford, CT QGM Scoping Study October 2024, page 6 of 19 Lighting Equipment: Lighting was noted to be LED, primarily modern controls-integrated fixtures, with some LED strip/TLED replacements in lower-traffic areas. Controls were noted to be commissioned and functioning. With modern lighting and programmed controls in place, no lighting measures are recommended for this site. Compressed Air Plant: Site current operates a 2x7.5 Saylor-Beall dual-piston reciprocating air compressor with an estimated max capacity of 65 SCFM at 100 psig. Pictures below show detail: Garage/shop air compressor Air end-use in garage/shop Unit was observed to be lightly loaded. Compressed air plant was scanned via ultrasonic tool for air leaks with none found. With a lightly loaded reciprocating compressor and no detected air leaks, the site is running an efficient compressed air plant and no CAIR measures are recommended. Best Practices Site was observed to be following the following energy Best Practices:LED lighting and integrated controls in most/all areas Condensing boilers in hot water applications High efficiency and well-maintained compressed air plant Recent Energy Efficiency Projects Overview The site has completed several energy efficient projects in recent years. Listed below are some of the various energy projects:
  6. Page 7 of 19

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  7. Page 8 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 10 REDACTED Page 8 of 19 410 Sheldon Street – Hartford, CT QGM Scoping Study October 2024, page 8 of 19 Table below shows estimated cost and savings from the installation of a new BMS: BMS Upgrade - Scheduling & Adaptive Optimal Start Stop Description Number Unit Notes Building footprint, SF 81,900 SF 3 story offices only Average Ceiling Ht, Ft 10 LF Average Estimated office volume, CF 819,000 CF Typical Air Change per Hour (ACH) 0.75 ACH Estimated Average Outdoor Air Intake, CFM 10,238 CFM Estimated Existing Operation Estimated Annual Cooling Energy 72,000 kWh Estimated Annual Natural Gas Heating Energy 16,000 CCF Estimated Annual Electric Heating Energy kWh Proposed Operation Proposed Annual Cooling Energy 63,000 kWh Proposed Annual Natural Gas Heating Energy 10,000 CCF Proposed Annual Electric Heating Energy kWh Estimated New Control Strategy Savings Estimated Annual Electrical Savings 9,000 kWh Estimated Annual Natural Gas Savings 6,000 CCF Estimated Annual Cost Savings $ 7,885 $ @$0.1428/kWh and $1.10/CCF Change Cost - Upgrade BMS $ 150,000 $ Simple Payback - no incentives 19.0 yrs Estimated Annual GHG Reduction 36 MT CO2e $/Lifetime GHG Reduction $ 420.42 $/MT CO2e 10 year measure life Recommended next steps for this project involve working with a local vendor to develop a controls scope of work and cost quotation and move forward with the installation. EEM – 02 – Building Management System – Demand Controlled Ventilation The site is not currently able to control the introduction of outside air with existing (failing) HVAC controls. When upgrading the BMS system, the site is recommended to consider Demand Controlled Ventilation (DCV). DCV works by modulating the outdoor air intake to only what is needed to satisfy the space occupancy. As the graphic below illustrates, a higher occupant load requires more outdoor air and higher HVAC costs, while lower (or no) occupant load requires less (or even no) outdoor air:
  8. Page 9 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 10 REDACTED Page 9 of 19 410 Sheldon Street – Hartford, CT QGM Scoping Study October 2024, page 9 of 19 Demand Control Ventilation (DCV) uses CO2 sensors in the space and/or return airstream to monitor the level of CO2 in the space and modulate RTU outdoor air dampers to introduce only as much outdoor air as needed. Sites are commonly found to be introducing significant excess outdoor air, well beyond any occupant requirements – outdoor air dampers often come from the factory set at 20 – 50% without any ability to modulate. Table below shows estimated cost and savings from the installation of DCV controls on (4) RTUs: Consider Switching HVAC Equipment to Demand Control Ventilation Description Value Unit Notes Existing Cooling Load 63,000 kWh 3 story offices only Existing Heating Load 10,000 CCF Proposed Demand Controlled Cooling Load 53,000 kWh Proposed Demand Controlled Heating Load 7,000 CCF Estimated Demand Control Savings (cooling) 10,000 kWh Estimated Demand Control Savings (heating) 3,000 CCF Annual Cost Savings $ 4,728 $ @ $0.1428/kWh & $1.10/CCF Estimated Annual GHG Reduction 19.4 MT CO2e @ 0.0055 MT/CCF & 0.000291 MT/kWh Estimated Cost to Upgrade $ 50,000 $ Programming, RTU dampers/actuators Simple Payback 10.6 $ Estimated $/Lifetime MT CO2e $ 258 $ estimated 10 yr measure lifetime Recommended next steps for this project involve working with a local vendor to develop a controls scope of work and cost quotation, moving to implement this measure as a facet of the planned BMS upgrade/installation. EEM – 03 – Building Envelope The age of the building was noted during site walkthrough, as well as a recent and thorough 2012 renovation. Relatively low heating energy use indicates the structure is sound and retains heat well, and staff is active in reducing unneeded air infiltration and movement via sealing ducts and openings not in use. However, some areas were noted where the thermal envelope could be improved – air seal deficiencies were noted in doors and garage area bay doors, and based on discussion with site staff, it is likely that building plane
  9. Page 10 of 19

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  10. Page 11 of 19

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 10 REDACTED Page 11 of 19 410 Sheldon Street – Hartford, CT QGM Scoping Study Building Shell Savings Calculation Description Value Unit Existing Cooling Load 238,000 kWh Existing Heating Load 34,000 CCF Proposed Cooling Load 230,000 kWh Proposed Heating Load 29,000 CCF Estimated Building Shell Remediation Savings (cooling) 8,000 kWh Estimated Building Shell Remediation Savings (heating) 5,000 CCF Annual Cost Savings $ 6,642 $ Estimated Annual GHG Reduction 29.8 MT CO2e Estimated Install Cost $ 50,000 $ Simple Payback 7.5 $ Estimated $/Lifetime MT CO2e $ 112 $ October 2024, page 11 of 19 Notes Whole building Whole building @ $0.1428/kWh & $1.10/CCF @ 0.0055 MT/CCF & 0.000291 MT/kWh Including survey cost estimated 15 yr measure lifetime Next steps involve working with a local vendor to obtain a building shell assessment and recommendations, determining path forward with regard to performing remediations, then working with a local vendor to remediate gaps and cracks. EEM – 04 – Building Heating Electrification Existing heating and cooling are via roof-mounted AHUs and VAV/chilled beams in the spaces. Air or water source heat pumps would likely not be a good immediate fit for this building given the recent installation of high efficiency equipment and size of the rooftop HVAC units. Ground source heat pumps are a highly efficient method of building heating and cooling but are likely not a good fit at this location due to proximity to the Connecticut River and permitting and approval difficulties associated with drilling for ground source wells. Existing heating is primarily through natural gas fired hot water boilers – heating electrification could potentially be achieved with the installation of electric boilers. Note that existing boilers are condensing (high efficiency) and recent installation, and at 724 MBH peak output, (2) new electric boilers would require an additional ~300 – 600A, which would likely require an additional service to the building at significant cost. As a future means of electrification, site could consider eventual replacement of existing heating and cooling equipment with air source heat pumps. Energy and GHG emissions savings would be realized via: - Associated site Greenhouse Gas emissions reduction the switch from natural gas to lower GHG emissions grid electricity Additionally, this would require a switch to electricity as a heating fuel, with similar energy costs to achieve site heating than existing natural gas (increased heating efficiency/COP but also higher $/btu cost fuel). Table below estimates costs and associated GHG reduction from electrification of all existing natural gas heating applications:

Text of UPA-001-SP01 Attachment 9 REDACTED.pdf

Extracted from the file · 24 pages, 5 without text · 30,898 characters

Text of UPA-001-SP01 Attachment 8 REDACTED.pdf

Extracted from the file · 17 pages, 5 without text · 22,701 characters

Text of UPA-001-SP01 Attachment 7 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,187 characters

Text of UPA-001-SP01 Attachment 6 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 14,512 characters

Text of UPA-001-SP01 Attachment 5 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,555 characters

Text of UPA-001-SP01 Attachment 4 REDACTED.pdf

Extracted from the file · 16 pages, 4 without text · 19,788 characters

Text of UPA-001-SP01 Attachment 3 REDACTED.pdf

Extracted from the file · 12 pages, 4 without text · 11,899 characters

Text of UPA-001-SP01 Attachment 2 REDACTED.pdf

Extracted from the file · 11 pages, 4 without text · 10,526 characters

Text of UPA-001-SP01 Attachment 1 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 17,141 characters

As listed on the current system

Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026

This filing on the current system (opens in a new tab)