Interrogatory responses
Answers to questions 1 thru 1
Files14
UPA-001-SP01_Final.pdf
PDF · 109 KB · 1 pageText searchable
Download UPA-001-SP01_Final.pdfRead the text of UPA-001-SP01_Final.pdf
UPA-001-SP01 Attachment 13 REDACTED.pdf
PDF · 4.6 MB · 14 pagesText searchable
Download UPA-001-SP01 Attachment 13 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 13 REDACTED.pdf
UPA-001-SP01 Attachment 12 REDACTED.pdf
PDF · 3.3 MB · 15 pagesText searchable
Download UPA-001-SP01 Attachment 12 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 12 REDACTED.pdf
UPA-001-SP01 Attachment 11 REDACTED.pdf
PDF · 3.9 MB · 24 pagesText searchable
Download UPA-001-SP01 Attachment 11 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 11 REDACTED.pdf
UPA-001-SP01 Attachment 10 REDACTED.pdf
PDF · 3.7 MB · 19 pagesText searchable
Download UPA-001-SP01 Attachment 10 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 10 REDACTED.pdf
UPA-001-SP01 Attachment 9 REDACTED.pdf
PDF · 3.9 MB · 24 pagesText searchable
Download UPA-001-SP01 Attachment 9 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 9 REDACTED.pdf
UPA-001-SP01 Attachment 8 REDACTED.pdf
PDF · 4.0 MB · 17 pagesText searchable
Download UPA-001-SP01 Attachment 8 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 8 REDACTED.pdf
UPA-001-SP01 Attachment 7 REDACTED.pdf
PDF · 3.7 MB · 14 pagesText searchable
Download UPA-001-SP01 Attachment 7 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 7 REDACTED.pdf
UPA-001-SP01 Attachment 6 REDACTED.pdf
PDF · 3.3 MB · 13 pagesText searchable
Download UPA-001-SP01 Attachment 6 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 6 REDACTED.pdf
UPA-001-SP01 Attachment 5 REDACTED.pdf
PDF · 3.6 MB · 14 pagesText searchable
Download UPA-001-SP01 Attachment 5 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 5 REDACTED.pdf
UPA-001-SP01 Attachment 4 REDACTED.pdf
PDF · 3.6 MB · 16 pagesText searchable
Download UPA-001-SP01 Attachment 4 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 4 REDACTED.pdf
UPA-001-SP01 Attachment 3 REDACTED.pdf
PDF · 3.7 MB · 12 pagesText searchable
Download UPA-001-SP01 Attachment 3 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 3 REDACTED.pdf
UPA-001-SP01 Attachment 2 REDACTED.pdf
PDF · 3.7 MB · 11 pagesText searchable
Download UPA-001-SP01 Attachment 2 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 2 REDACTED.pdf
UPA-001-SP01 Attachment 1 REDACTED.pdf
PDF · 2.8 MB · 13 pagesText searchable
Download UPA-001-SP01 Attachment 1 REDACTED.pdfRead the text of UPA-001-SP01 Attachment 1 REDACTED.pdf
Text of UPA-001-SP01 Attachment 11 REDACTED.pdf
Extracted from the file · 24 pages, 4 without text · 36,138 characters
Text of UPA-001-SP01 Attachment 10 REDACTED.pdf
Extracted from the file · 19 pages, 4 without text · 27,484 characters
Text of UPA-001-SP01 Attachment 9 REDACTED.pdf
Extracted from the file · 24 pages, 5 without text · 30,898 characters
Page 7 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 8 REDACTED Page 7 of 17 Eversource Energy – Newtown, CT Service Center QGM Consulting Scoping Study Febuary 2026, page 7 of 17 HVAC Equipment: Tag AHU-1 AHU-2 MAS-1 (4) VF-1 VF-4 VF-5 VF-6 VF-8 VF-10 VF-12 VF-13 VF-14 VF-15 VF-16 VF-17 VF-18 VF-19 VF-20 VF-21 VF-22 VF-23 VF-24 VF-25 VF-26 VF-27 VF-28 VF-29 VF-30 VF-31 VF-32 VF-33 VF-34 VF-35 VF-36 VF-37 VF-38 VF-39 VF-41 EF-2 - Eversource Newtown Service Center HVAC Equipment Inventory Cooling Total Max Type Manufacturer Model MBH Notes Ton Fan HP CFM Air Handling Unit Trane CSAA021 101.38 16.08 Serves main building Air Handling Unit Trane CSAA021 101.38 16.08 Serves main building Make up Air Unit Reznor Not in service Packaged RTU Trane YHC060F4RHA1R 5 104 1.4 Serves garage RTU Reznor Preeva Serves main building Packaged RTU Trane YSC092H3RHA29K 7.5 4.7 Condenser Trane 4TTA7048A4 0.2 Ceiling-Suspended Indoor Unit Mitsubishi PCA-A30KA7 2.5 670 Condenser Mitsubishi PUY-A30NHA7 1940 Ceiling-Suspended Indoor Unit Mitsubishi PKA-A12HA7 1 Condenser Trane PUY-A12NKA7 Variable Air Volume Box Trane VPWF12-SQ04 32.4 0.125 1,120 Variable Air Volume Box Trane VPWF10-SQ03 17.3 0.33 800 Variable Air Volume Box Trane VPWF12-SQ04 1 1,400 Variable Air Volume Box Trane VPWF10-SQ03 20.3 0.33 940 Variable Air Volume Box Trane VPWF06-SQ02 8.6 0.125 400 Variable Air Volume Box Trane VPWF10-SQ03 20 0.33 930 Variable Air Volume Box Trane VPWF12-SQ04 26.8 0.33 1,240 Variable Air Volume Box Trane VPWF06-SQ02 11.7 0.125 435 Variable Air Volume Box Trane VPWF06-SQ02 7.7 0.125 285 Variable Air Volume Box Trane VPWF10-SQ03 23.1 0.33 855 Variable Air Volume Box Trane VPWF06-SQ02 9.7 0.125 360 Variable Air Volume Box Trane VPWF08-SQ03 19.4 0.33 720 Variable Air Volume Box Trane VPWF08-SQ03 11.7 0.33 540 Variable Air Volume Box Trane VPWF08-SQ03 15.6 0.33 720 Variable Air Volume Box Trane VPWF08-SQ03 15.6 0.33 720 Variable Air Volume Box Trane VPWF08-SQ03 17.8 0.33 660 Variable Air Volume Box Trane VPWF08-SQ03 15.3 0.33 570 Variable Air Volume Box Trane VPWF06-SQ02 8.1 0.125 300 Variable Air Volume Box Trane VPWF06-SQ02 9.8 0.125 455 Variable Air Volume Box Trane VPWF06-SQ02 8.7 0.125 405 Variable Air Volume Box Trane VPWF08-SQ03 12.5 0.33 580 Variable Air Volume Box Trane VPWF08-SQ03 17.1 0.33 635 Variable Air Volume Box Trane VPWF08-SQ03 16.6 0.33 615 Variable Air Volume Box Trane VPWF06-SQ02 9.7 0.125 360 Variable Air Volume Box Trane VPWF08-SQ03 17.4 0.33 645 Variable Air Volume Box Trane VPWF10-SQ03 18.7 0.33 865 Variable Air Volume Box Trane VPWF08-SQ03 11.7 0.125 540 Variable Air Volume Box Trane VPWF08-SQ03 13.5 0.125 500 Variable Air Volume Box Trane VPWF08-SQ03 12.4 0.33 575 Variable Air Volume Box Trane VPWF06-SQ02 7.8 0.125 290 Variable Air Volume Box Trane VPWF08-SQ03 14.8 0.33 685 Variable Air Volume Box Trane VPWF08-SQ03 14.8 0.33 685 Variable Air Volume Box Trane VCCF10 1,000 Cooling only Variable Air Volume Box Trane VPEF-6"-02SQ 6.8 0.125 240 Has electric reheat (2 kW) Variable Air Volume Box Trane VPEF-6"-02SQ 8.5 0.125 250 Has electric reheat (2.5 kW) Exhaust Fan Greenheck G-95-D 1,059 Exhaust Fan Greenheck GB-80-4 0.25 Exhaust Fan Greenheck GB-130-4X-QDPage 8 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 8 REDACTED Page 8 of 17 Eversource Energy – Newtown, CT Service Center QGM Consulting Scoping Study Febuary 2026, page 8 of 17 Eversource Newtown Unit Heaters Location Type Quantity Main Building Fan coil 4 Main Building Cabinet 3 Garage Fan coil 3 Garage Radiative 4 Compressed Air Equipment: Eversource Newtown Compressor Inventory Make Model Estimated Compressor Capacity Control Type (CFM) HP Powerex 2 X 5hp 10 *Annual run hours estimated 45 Recip Cooling Voltage Estimated Annual Run Hours Air Cooled 460 1,000 Eversource Newtown Dryer Inventory Rated Type Make Model CFM Altec Air RAD-007SA-1 75 Non-Cycling Eversource Newtown Air Receivers Location Capacity (Gallon) Integrated with Compressor 150 Chiller Summary: Chiller Summary Manufacturer Model Cooling Ton Trane RTAC 1554 155 Volts 460 Boiler Equipment: Eversource Newtown Boiler Summary Quantity Type 2 1 Hydronic Boiler Hydronic Boiler Make Model Weil McLain P-LGB-6-W Weil McLain GV-5 Max Input (MBH) 650 140 Max Output (MBH) 450 122 Service Point Main Building GaragePage 9 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 8 REDACTED Page 9 of 17 Eversource Energy – Newtown, CT Service Center QGM Consulting Scoping Study Febuary 2026, page 9 of 17 Eversource Newtown Boiler Pumps Description Quantity HP Main Building Boiler Supply 2 1.5 Main Building Boiler Return 2 0.25 Service Hot Water Heaters: Eversource Newtown Hot Water Heater Summary Max Max Input Quantity Make Model Output Service Point (MBH) (MBH) 1 AO Smith BTX-300 300 78 Main Building 1 Bradford-White D25T1253N 125 Garage Best Practices The Newtown facility was observed to be following several energy Best Practices: Use of LED lighting in most/all areas with aggressive controls VFD control of HW and CHW Scheduled nighttime/weekend temperature setback in most/all areas Demand Control Ventilation and Adaptive/Optimal Start/Stop HVAC control strategies in place Recent Energy Efficiency Projects Overview The campus has completed several energy efficiency projects in recent years. Listed below are some of the various completed energy projects: Upgrade to LED Lighting and advanced lighting controls Campus-wide DDC control of HVAC systems Upgrades to energy-savings equipment on replacement With the projects described above, QGM Consulting was challenged to find additional energy efficiency measures (EEMs) and sustainability projects. Potential recommendations are outlined below, some of which may require some additional analysis and monitoring. Site Energy Efficiency Measures/Recommendations EEM – 01 – Consider Building Shell Gap Remediation During the walkthrough of the site, gaps and cracks were noted at door and window seals and are suspected at roof/wall transitions. Insulation and air sealing are understood to be original construction and have likely degraded over time. Envelope gaps are thus allowing the infiltration/exfiltration of untempered air and increasing the load on HVAC equipment. It is recommended that the site perform a comprehensive building andPage 10 of 17
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 11 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 8 REDACTED Page 11 of 17 Eversource Energy – Newtown, CT Service Center QGM Consulting Scoping Study Febuary 2026, page 11 of 17 HVAC Schedule - Existing and Proposed with Occupancy Control Sunday 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM Occ Hrs UnOcc Hrs Existing Schedule Tuesday Wednesday Thursday Monday X X X X X X X X X X X X X X 0 24 X X X X X X X X X X X X X X 14 10 X X X X X X X X X X X X X X 14 10 Friday X X X X X X X X X X X X X X 14 10 Saturday X X X X X X X X X X X X X X 14 10 14 10 Proposed Schedule - Estimated Reduced Hours Monday Tuesday Wednesday Thursday Sunday 0 24 12:00 AM 1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM 12:00 PM 1:00 PM 2:00 PM 3:00 PM 4:00 PM 5:00 PM 6:00 PM 7:00 PM 8:00 PM 9:00 PM 10:00 PM 11:00 PM Occ Hrs UnOcc Hrs X X X X X 0 24 X X X X X 5 19 X X X X X 5 19 Friday X X X X X 5 19 Saturday X X X X X 5 19 5 19 Implementation of this strategy may be possible via programming within the existing controls or require the installation of new thermostats or local controls and occupancy sensors. The table below shows estimated costs and savings from the implementation of this type of control. Estimated Annual Energy Savings: 600 kWh and 100 CCF Estimated Annual Cost Savings: $300 Estimated Implementation Costs: $1,000 Next Steps: - Datalogging is recommended to confirm equipment loading assumptions and schedules. - The site is encouraged to discuss potential control upgrades with an ALC representative or internal resources. EEM – 03 – Consider HVAC Balancing Discussion with facility personnel indicates that portions of the main building are receiving insufficient air flow resulting in cold spots throughout the site, primarily in the VP office suite area in the southwest corner of the building. Hot/cold complaints and drafts are indicators of the need for HVAC equipment air balancing. The balancing process consists of surveying airflows against design capacities, checking/exercising dampers, and tuning fans and airflows to optimize delivery of tempered air. Energy savings were estimated based at an overall 2% reduction in estimated annual HVAC energy use. Savings are modest for this measure but compliment an existing operational need for air balancing. Estimated Annual Energy Savings: 5,000 kWh and 300 CCF Estimated Annual Cost Savings: $2,000 0 24Page 12 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 8 REDACTED Page 12 of 17 Eversource Energy – Newtown, CT Service Center QGM Consulting Scoping Study Febuary 2026, page 12 of 17 Estimated Implementation Costs: $20,000 Next Steps: - Datalogging is recommended to confirm equipment loading assumptions and schedules. - The site is encouraged to discuss potential testing and balancing with a reputable local vendor. EEM – 04 – Consider Replacing Bay Heaters with Gas-fired IR Heaters Currently the site employes hydronic bay heaters over each garage bay. Below are photos of the heaters: These direct-fire units provide heat for the garage bays and while still operational, are aged and replacement parts are becoming difficult to procure. Facility staff might consider replacement of these heaters with natural gas-fired infrared radiant heaters. Lab testing and use at other sites indicates that use of radiant heaters, which heat surfaces rather than total air mass, can use significantly less natural gas to achieve occupant comfort in difficult spaces such as garage bays with frequently open doors. Savings are often suggested to run in the 20 – 50% range compared to forced hot air heating for these types of spaces. Savings for the report assume a conservative 20% reduction in existing natural gas use: Estimated Annual Energy Savings: 3,000 CCF Estimated Annual Cost Savings: $4,000 Estimated Implementation Costs: $25,000 Next Steps: - Datalogging is recommended to confirm equipment loading assumptions and schedules. - The site is encouraged to discuss potential control upgrades with a reputable mechanical vendor.Page 13 of 17
No text on this page. It may be a picture of a page, such as a scan or a chart.Page 14 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 8 REDACTED Page 14 of 17 Eversource Energy – Newtown, CT Service Center QGM Consulting Scoping Study Febuary 2026, page 14 of 17 Estimated Implementation Costs: $5,000 Next Steps: - Facility staff should review equipment selection with a mechanical vendor or local supplier if planning to install. Additional Recommendations – Future Equipment Replacements Consider New Hydronic Boilers for Main Building It is understood that the current hydronic boilers on site are aged and will reach end of life in the near future. It is recommended that when these boilers are replaced, site staff consider equipment efficiencies, procuring the highest efficiency equipment for replacements. Condensing boilers, with peak combustion efficiency 95%+, are a logical choice for future equipment installation. It should be noted that condensing boiler efficiency will vary based on loading and required HW temperature and will often be lower than their stated peak efficiency. Condensing boilers additionally have a higher maintenance burden than traditional units, which should be considered as well as the overall energy use. Consider Replacing Natural Gas Water Heater with an Electric Water Heater It is understood that the current service HW heaters on site are also aged and will reach end of life in the near future. It is recommended that when these hot water heaters are replaced, they also be switched to condensing boilers. Service HW heaters typically deliver water at a much lower temperature than for HVAC use and can run at peak condensing/efficiency most or all annual run hours. Facility staff indicate a preference for tanked units, rather than tankless on-demand, due to capacity and maintenance concerns. Sustainability Considerations Background Site and portfolio sustainability is best guided by the framework and methodology set forth in ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance (available for purchase here: https://www.ashrae.org/technical-resources/bookstore/ansi-ashrae-standard-228-standardmethod-of-evaluating-zero-net-energy-and-zero-net-carbon-building-performance). The site is not known to have a present net-zero strategy; however, the ASHRAE standard presents a strong method to: - Assess current building energy use and carbon emissions Establish a baseline Develop milestones Develop a plan to reach milestones The data and information shown below are intended to help develop an understanding of where current portfolio sustainability goal aligns with current position.Page 15 of 17
The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 8 REDACTED Page 15 of 17 Eversource Energy – Newtown, CT Service Center QGM Consulting Scoping Study Febuary 2026, page 15 of 17 Emissions Scopes Emissions reporting is generally addressed across three Emissions Scopes, as seen below: An important aspect of developing a sustainability plan is the determination of which emissions scopes will be targeted for reduction. The majority of sustainability planning at the time of this report is focused on Scopes 1 and 2, although large corporations with significant supply and delivery chains have begun to address Scope 3 as well. The focus of the sustainability plan in this report is on Scope 1 and 2 emissions. ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance ASHRAE 228-2023 includes the following diagram illustrating energy flows into, from, and out of a site:Page 16 of 17
No text on this page. It may be a picture of a page, such as a scan or a chart.
Text of UPA-001-SP01 Attachment 7 REDACTED.pdf
Extracted from the file · 14 pages, 4 without text · 17,187 characters
Text of UPA-001-SP01 Attachment 6 REDACTED.pdf
Extracted from the file · 13 pages, 3 without text · 14,512 characters
Text of UPA-001-SP01 Attachment 5 REDACTED.pdf
Extracted from the file · 14 pages, 4 without text · 17,555 characters
Text of UPA-001-SP01 Attachment 4 REDACTED.pdf
Extracted from the file · 16 pages, 4 without text · 19,788 characters
Text of UPA-001-SP01 Attachment 3 REDACTED.pdf
Extracted from the file · 12 pages, 4 without text · 11,899 characters
Text of UPA-001-SP01 Attachment 2 REDACTED.pdf
Extracted from the file · 11 pages, 4 without text · 10,526 characters
Text of UPA-001-SP01 Attachment 1 REDACTED.pdf
Extracted from the file · 13 pages, 3 without text · 17,141 characters
As listed on the current system
Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026