Skip to main content

A prototype public docket site for the Connecticut Public Utilities Regulatory Authority

Utility Dockets and Filings

Interrogatory responses

Answers to questions 1 thru 1

ResponseFiled by Connecticut Light and Power Company dba Eversource Energy14 files
Part of docket 26-05-10Open
  • Electric
Application of The Connecticut Light and Power Company d/b/a Eversource Energy to Amend its Rate Schedules

Files14

Search terms highlighted
Eversource rate increase is on 1 page of the text below, highlighted. Go to the first matchClear highlighting
Words on different pages
Words on different pages
Words on different pages

Text of UPA-001-SP01 Attachment 11 REDACTED.pdf

Extracted from the file · 24 pages, 4 without text · 36,138 characters

Text of UPA-001-SP01 Attachment 10 REDACTED.pdf

Extracted from the file · 19 pages, 4 without text · 27,484 characters

Text of UPA-001-SP01 Attachment 9 REDACTED.pdf

Extracted from the file · 24 pages, 5 without text · 30,898 characters

Text of UPA-001-SP01 Attachment 8 REDACTED.pdf

Extracted from the file · 17 pages, 5 without text · 22,701 characters

Words on different pages
  1. Page 2 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 7 REDACTED Page 2 of 14 Eversource Energy – New Britain, CT QGM Scoping Study - March 2026, page 2 of 14 ~57,000 SF mixed use main building consisting of offices, conference rooms, workrooms, and shop areas ~9,000 SF garage building used for fleet vehicle maintenance The main building is heated and cooled primarily with packaged rooftop units (RTUs) and a ground mounted aircooled chiller. RTUs and AHUs are controlled with an aged Building Management System (BMS) that includes some pneumatic controls with occupied/unoccupied scheduling and adaptive/optimal startup. Facility personnel indicate there is a near-future plan to install a new DDC BMS that will include demand control ventilation (DCV). Additional spot heating and cooling for the garage building is achieved with split system heat pumps and unit heaters (UHs). Lighting systems are LED with motion/occupancy controls. Lighting controls are reported to be commissioned and working well. Typical building occupancy is 6:00 AM – 5:00 PM, Monday through Friday with limited 24-hour occupancy during emergency and storm events. Occupied building operations are estimated to be 3,700 annual hours. Monthly Billing Analysis Natural gas historical energy data was provided by facility staff. Bill examples included the past 13 months of natural gas metered use and billed cost, and all accounts were summed for overall site gas use. There is an additional meter at the site with no historical data at the time of this report. Actual natural gas use is estimated to be ~15,000 – 20,000 total CCF annually for this campus. Electric use is metered but not billed at this site, with annual use provided; monthly use was modeled based on annual use, the site’s footprint, hours of operation, equipment and estimated utilization, and an example monthly load profile from a similar site. The most recent 12 months are summarized below: Most Recent 12 Month Summary Energy Usage and Costs Electric (kWh) Natural Gas Costs $ kWh/CCF $ 51,000 358,600 $ Total $ 5,520 56,520 5,735 Energy MT CO2 mmBTU % of total Emitted 1,223.5 67% 87.9 595.3 1,818.8 33% 100% 31.6 119.5 Unit Costs $ 0.14 $ 0.96 *Additional billing history for gas meter associated with main building believed to be missing Natural gas costs as accounted throughout this analysis have the monthly per-meter “customer charge” (~$165) removed, for assessment of natural gas marginal cost only. $0.1428/kWh was used as an electric rate based upon Eversource Facilities’ third-party electric supply costs for similar type facilities. A summary of modeled monthly electric use and monthly metered natural gas use is shown below:
  2. Page 3 of 14

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  3. Page 4 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 7 REDACTED Page 4 of 14 Eversource Energy – New Britain, CT QGM Scoping Study March 2026, page 4 of 14 The first graph indicates a visual relationship between natural gas use and HDD, suggesting a majority of the natural gas is used for building heating. Summer month natural gas use can likely be attributed to service hot water. The regression further shows that site natural gas use has a strong, statistically significant relationship to HDD, with an R 2 value of 0.97. For electrical consumption, weather data for the site was utilized similarly to help generate a monthly site profile. Below are graphs for the estimated monthly site electrical use and cooling degree days: The regression above was developed to help model site monthly electrical use. The R 2 regression shows a statistically significant relationship to CDD, with an R2 value of 0.83 as the site’s usage is driven by the outside weather. The Department of Energy Superior Energy Performance (SEP) program qualifies that a statistical relationship exists with an R2 value of 0.75. Mechanical System Energy Use Breakdown Electric Use Based on the initial walk-through, the following electric energy use breakdown was developed. These results should be considered high level and were sourced from motor nameplates, typical load factors, and estimated operational hours. Actual data logging is required to confirm these assumptions.
  4. Page 5 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 7 REDACTED Page 5 of 14 Eversource Energy – New Britain, CT QGM Scoping Study March 2026, page 5 of 14 Estimated End Use Breakdown - Electricity Electric End Use Energy Use (kWh) Plug & Process 86,000 Compressed Air 4,000 HVAC - Fans & Cooling 160,000 Lighting 110,000 TOTAL 360,000 Natural Gas Use Walkthrough data indicates that site service hot water is provided through electric hot water heaters. All site natural gas use is for comfort heating. Equipment Inventory: Equipment inventories for current equipment were gathered during the walkthrough. Below are tables for HVAC and boiler equipment on site. Eversource New Britain Boiler Equipment Quantity 1 1 Type Make Model Hydronic Boiler Smith Cast Iron Boiler 19A-S/W Hydronic Boiler Smith Cast Iron Boiler 19A-S/W Max Input (MBH) 1,137 1,137 Max Output (MBH) 750 750
  5. Page 6 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 7 REDACTED Page 6 of 14 Eversource Energy – New Britain, CT QGM Scoping Study March 2026, page 6 of 14 Eversource New Britain Boiler Pumps Description Quantity HP Circulation Pump 2 3 Type Packaged Roof Top Unit Exhaust Fan Exhaust Fan Packaged Roof Top Unit Split System - condenser Split System - wall unit Split System - condenser Split System - ceiling unit Humidifier Air Handling Unit Air Handling Unit Air Handling Unit Air Handling Unit Air Cooled Chiller Split System - condenser Split System - wall unit Single Stage Gas Furnace Eversource New Britain HVAC Equipment Inventory Cooling Model Serial # Ton AAON 9 Soler & Palau USA, INC DB08 Soler & Palau USA, INC DB08 AAON RQ-005-8-V-GA02-232 202-401-AYGE38031 5 Mitsubishi PUZ-A24NHA7 25U26364C Mitsubishi PKA-A24KA7 2YM02778 2 Mitsubishi PUZ-HA36NKA 36U10945 Mitsubishi PLA-A36EA7 3 Nortec NHMC 30 600369421001 Magic Aire 90-HBAW-4 W050440S15 Magic Aire 90/120 - BMW/BMX Blower Section W050849387 Magic Aire 60-BNW-6-4 961285805 Manufacturer MBH Fan HP CFM Notes Name plate was unreadable 0.25 0.25 81 2 0.11 26 0.07 0.1 3880 36 0.3 1020 1.5 1.5 1 No name plate available Trane Mitsubishi Mitsubishi Trane CGAM 052A 2V02 AXD2 A1A1 PUZ-HA24NHA1 PVA-A24AA7 XR80 U20C80333 28U03455 52 2 24 2.5 0.1 0.2 Eversource New Britain Compressor Inventory Make Model HP Estimated Compress Capacity or Control Type (CFM) Quincy QT-5 5 17.7 *Annual run hours estimated Recip Cooling Voltage Estimated Annual Run Hours Air Cooled 460 1,000 Eversource New Britain Dryer Inventory Rated Make Model Type CFM Quincy ZDHT35 35 Non-Cycling Eversource New Britain Air Receivers Location Capacity (Gallon) Integrated with Compressor 150 744
  6. Page 7 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 7 REDACTED Page 7 of 14 Eversource Energy – New Britain, CT QGM Scoping Study March 2026, page 7 of 14 Site Energy Efficiency Measures/Recommendations EEM – 01 – Consider Building Management System Upgrade – Demand Control Ventilation Building HVAC operation and controls did not include Demand Control Ventilation (DCV). DCV uses CO sensors in the return airstream or space served to monitor the level of CO in the space and modulate outdoor air dampers to introduce only as much outdoor air as needed. Modern DCV controls would offer a significant increase in the ability to modulate the introduction of outside air based on occupancy. The graphic below illustrates how DCV modulates the intake of fresh air based on occupancy: It is recommended that the site consider modern DCV controls for all areas as a facet of the proposed BMS upgrade. Savings are estimated based on overall site occupancy profiles during all periods, assuming high occupancy during peak daytime hours, average occupancy during mornings and evenings, and low or no occupancy during overnights and weekends. Estimated Annual Energy Savings: 15,000 kWh and 4,000 CCF Estimated Annual Cost Savings: $6,000 Estimated Implementation Costs: $50,000 Next Steps: - Spot readings are recommended to confirm equipment loading assumptions and schedules. - The site is encouraged to discuss potential control upgrades with a reputable mechanical/controls vendor. EEM – 02 – Consider Integrating Air Compressor with New BMS An upgrade to a new, fully DDC HVAC controls system will eliminate any existing pneumatic controls, reducing run hours on the building air compressor. Remaining compressed air demand will solely be from minor hand tool use in the lab/testing areas. Savings assume a reduction in the compressor’s annual run hours by 75%: Estimated Annual Energy Savings: 2,200 kWh Estimated Annual Cost Savings: $300
  7. Page 8 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 7 REDACTED Page 8 of 14 Eversource Energy – New Britain, CT QGM Scoping Study March 2026, page 8 of 14 Estimated Implementation Costs: n/a Next Steps: - It may be of value to investigate remaining compressed air use to determine if it can be eliminated entirely with use of electric hand tools or other solutions. - The site is encouraged to continue with planned control upgrades. EEM – 03 – Consider New RTU-1 to Replace Hot Deck/Cold Deck 2nd floor perimeter and parts of the 1 st floor in the main building are served by an aged hot deck/cold deck design AHU mounted in the basement. The photo below shows controls for this AHU, the status of which are not known: Hot deck/cold deck systems work by supplying two separate air streams to space at all times, and lead to frequent periods of simultaneous heating and cooling. Discussion with facility staff indicates there is a near term plan to replace this aged piece of equipment with a modern AHU. It is recommended that the site install variable air volume (VAV) boxes with electric or HW reheats to meet HVAC needs for these spaces and allow variation of heating/cooling airflow for these spaces based on actual demand. Savings are estimated from modeled existing case hot deck/cold deck use and modeled proposed single airstream VAV system with reheats, eliminating the majority of the simultaneous heating and cooling as well as ~25% of the nominal fan energy. Estimated Annual Energy Savings: 61,000 kWh and 400 CCF Estimated Annual Cost Savings: $9,100 Estimated Implementation Costs: $500,000 (high level estimate) Next Steps: - Datalogging is recommended to confirm air handling unit run hours and loading.
  8. Page 9 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 7 REDACTED Page 9 of 14 Eversource Energy – New Britain, CT QGM Scoping Study - March 2026, page 9 of 14 The site should discuss potential equipment replacement and redesign with a local vendor to develop scope of work and cost quotations. EEM – 04 – Add VFDs to Hot Water Pumps & Replace the Bypass The site utilizes hydronic boilers in order to supply heat to various locations on site. This hot water is circulated with (2) constant volume pumps that do not utilize variable frequency drives. HW needs are modulated with an existing bypass, which reduces the flow according to demand, but does not reduce pump motor energy. HW circulation pumps are seen in the photo below: Replacing the existing bypass and retrofitting a VFD would allow for the pump motor speed to match the demand for hot water and the ability to reduce speed when demand is lower. Savings are estimated based on an average 45% reduction of the pump’s electrical energy: Estimated Annual Energy Savings: 2,000 kWh Estimated Annual Cost Savings: $300 Estimated Implementation Costs: $10,000 Next Steps: - Spot readings are recommended to confirm pump run hours and loading. - The site should discuss potential equipment replacement with a local vendor to develop scope of work and cost quotations. EEM – 05 – Consider Installing VAVs and a Fan VFD for RTU-1 RTU-1 was noted to supply constant flow volume to its areas served on the 2 nd floor of the main building, some of which include VAV boxes that are not currently modulating. It is recommended that the facility consider replacing any existing constant volume terminal airflow equipment with VAV boxes and retrofit a VFD to the supply fan on RTU-1.
  9. Page 10 of 14

    No text on this page. It may be a picture of a page, such as a scan or a chart.
  10. Page 11 of 14

    The Connecticut Light and Power Company d/b/a Eversource Energy REDACTED Docket No. 26-05-10 Date Issued August 07, 2026 UPA-001-SP01 Attachment 7 REDACTED Page 11 of 14 Eversource Energy – New Britain, CT QGM Scoping Study March 2026, page 11 of 14 Next Steps: - The site is encouraged to discuss building shell survey and remediation with a specialized vendor. - The site should also discuss this effort with a utility representative for possible incentives to offset some of the survey and implementation costs through the custom program. Sustainability Considerations Background Site and portfolio sustainability is best guided by the framework and methodology set forth in ASHRAE Standard 228-2023 Standard Method of Evaluating Zero Net Energy and Zero Net Carbon Building Performance (available for purchase here: https://www.ashrae.org/technical-resources/bookstore/ansi-ashrae-standard-228-standardmethod-of-evaluating-zero-net-energy-and-zero-net-carbon-building-performance). The site is not known to have a present net-zero strategy; however, the ASHRAE standard presents a strong method to: - Assess current building energy use and carbon emissions Establish a baseline Develop milestones Develop a plan to reach milestones The data and information shown below are intended to help develop an understanding of where current portfolio sustainability goal aligns with current position. Emissions Scopes Emissions reporting is generally addressed across three Emissions Scopes, as seen below:

Text of UPA-001-SP01 Attachment 6 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 14,512 characters

Text of UPA-001-SP01 Attachment 5 REDACTED.pdf

Extracted from the file · 14 pages, 4 without text · 17,555 characters

Text of UPA-001-SP01 Attachment 4 REDACTED.pdf

Extracted from the file · 16 pages, 4 without text · 19,788 characters

Text of UPA-001-SP01 Attachment 3 REDACTED.pdf

Extracted from the file · 12 pages, 4 without text · 11,899 characters

Text of UPA-001-SP01 Attachment 2 REDACTED.pdf

Extracted from the file · 11 pages, 4 without text · 10,526 characters

Text of UPA-001-SP01 Attachment 1 REDACTED.pdf

Extracted from the file · 13 pages, 3 without text · 17,141 characters

As listed on the current system

Question(s) Answered 1 thru 1 (Connecticut Light and Power Company dba Eversource Energy)(Supplemental/Revision) Date Filed: 10/07/2026

This filing on the current system (opens in a new tab)